HomeMy WebLinkAbout2024-06-17 I01H_01 Stratford Crossing Park_Change Order 6AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 17, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 6 to Elder Corporation for the Stratford Crossing Park Project in the amount of $16,550.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 6 to Elder Corporation increases the contract amount by $16,550.00. Change Order No. 6 is due to a design error of a portion of trail that was discovered during the project closeout. The two trail portions were removed and replaced so that water would drain and not sit on the trail during rain events. The engineer on the project has agreed to reimburse the City of Waukee $16,550.00. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 6 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H1 gēnus [ landscape architects ] 520 42ND STREET SUITE 400 DES MOINES, IA 50312 T 515 284 1010 WWW.GENUS-LA.COM June 13, 2024 Matt Jermier Parks and Recreation Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Stratford Crossing Park Change Order #6 Genus Project No. 22024 Dear Mr. Jermier: Please find Change Order #6 attached in the amount of $16,550.00 for the above-referenced project. This cost add is for removal and replacement of two trail segments that are not draining properly. The cost of this work will be offset by a reimbursement from the Consultant team at a later date. Genus recommends that the City of Waukee approve Change Order #6 for Elder Corporation. Don’t hesitate to reach out if you have questions or need additional information. Sincerely, Brett Douglas, ASLA, PLA Principal CC: Nick Yeast, Elder Corporation Daniel Laughridge, City of Waukee 4:03 pm Tuesday, May 28, 2024 Stratford Crossing Park Trail Repairs Waukee, IA City of Waukee Project: Location: Owner: Plans Dated: Phone 515-266-3111 Fax 515-265-4565 5088 E. University Ave. Des Moines, Iowa 50327 24-0520NY Change Order Addenda: Project Notes Nick Yeast 515-402-5427 Estimator: Phone: DESCRIPTION AMOUNTUNIT PRICEUNITQUANTITYITEM $1,450.00EA 8.005000 $11,600.00Remove & Replace Trail Panels $3,200.00LS 1.005001 $3,200.00Finish Grading $1,400.00LS 1.005002 $1,400.00Seeding $350.00LS 1.005003 $350.00Traffic Control Pricing includes removal, grading, prep, and pouring back 10 panels.NOTES: Pricing includes backfilling new panels & cleaning up ruts from trackout.NOTES: Pricing includes overseeding disturbed areas. Pricing does not include hydromulch.NOTES: GRAND TOTAL $16,550.00 NOTES: 1. EXCLUSIONS: A.We exclude in our scope of work: bonds, permits and AGC dues, liquidated damages, Pollution Liability Insurance Coverage, cost of inspection, layout staking/surveying, compaction tests, soil testing, utility cut-offs, saw cuts, damage to utilities or conduits embedded in concrete, dewatering, abandoning or removal of intakes or manholes, temporary access roads, sheeting or shoring, handling of contaminated soils, unacceptable soil removal or replacement, frost excavation, frost removal, work when temps are 10 degrees or below, over excavation or recompaction, soil stabilization, foundation or footing excavation, backfill of foundation walls, removal of foundation spoil, excavation or backfill of retaining walls, handling of other contractor's soil, import or export of soil, import or export of granular materials, import of topsoil or black dirt, well abandonment, under cutting fill areas, fine grading, hand excavation, grading for sidewalks, repair to any work damaged by others, traffic control, hand tamping, silt fences, erosion control, mowing, seeding or sodding, connection fees, pavement removal or replacement for utilities unless stated above, boxout paving around intakes or steel plates to cover intakes and adjustment of fixtures, System Development Fee, As-Built Drawing . 2. SPECIAL CONSIDERATIONS: A.All service lines stop 5' away from building. Utility items tied to Earthwork items. All utilities backfilled with trench spoils - Compaction to be with existing soil to 95% Standard Proctor. This Proposal may be withdrawn by us if not accepted within 14 days. Payment to be made in monthly draws. Nothing shall obligate Elder Corporation outside the scope listed herein. B. We are not responsible for locating or notifying private utilities . C. Contractor shall accept pad or parking grades prior to work done by other trades. Grading tolerances to be within plus or minus two tenths of a foot. 3.The Agreement may be withdrawn by Elder Corporation without notice at any time prior to receipt by Elder Corporation at its home office of a fully executed copy of same . 4.The laws of the State of Iowa shall apply to all claims and disputes arising out of or related to this Agreement and/or the Project. ACCEPTANCE OF PROPOSAL We have carefully read and reviewed and hereby accept the foregoing Proposal for Construction Agreement from Elder Corporation. By: _________________________________________________ Date: _____________________ Title: ____________________________ This Agreement is not binding on Elder Corporation unless and until signed by an officer of Elder Corporation in the space indicated below and delivered to the Owner. By:__________________________________________________ Date:______________________ Title:_____________________________ 05/28/24 Project Manager/Estimator Nick Yeast