Loading...
HomeMy WebLinkAbout2024-07-01 I01H_03 Traffic Signal Enhancement, School and Trail Crossings_Pmt Est 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 1, 2024 AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to Iowa Signal, Inc. for the Traffic Signal Enhancements project in the amount of $2,696.60. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Iowa Signal, Inc. requested Payment Estimate No. 1 for the work completed on the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements project in the amount of $2,696.60. Snyder & Associates has reviewed the payment estimate and recommends payment. The partial payment is for the pay period April 17, 2024 to June 30, 2023. This pay estimate is for mobilization FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $2,696.60 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 1 ATTACHMENTS: I. Payment Estimate No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H3 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2022\122.0627.01\construction\ltr_2024-06-19_payapp01_signalenhancement(tap).docx June 19, 2024 Rudy Koester, P.E. Public Works Director City of Waukee 805 University Ave Waukee, IA 50263 RE: PARTIAL PAYMENT APPLICATION NO. 1 TRAFFIC SIGNAL ENHANCEMENT S&A PROJECT NO.: 122.0627.01 IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25 Dear Mr. Koester: Partial payment application #1 is for 10% of the mobilization for the project. Per Iowa DOT’s standard specification 2533.05, partial payment for 10% of mobilization or 1% of the overall project cost (whichever is less) should be paid to the contractor after the signed contract is received. For this project, 10% of mobilization ($2,780) is less than 1% of the overall project ($917,492). Attached is partial payment application #1 for the project. The project will utilize 3% retainage, per the Iowa DOT’s maximum. We recommend the payment of $2696.60 to the contractor, Iowa Signal, Inc. This represents about 0.3% of the total project cost, less withheld retainage. Please contact me should you have any questions regarding this partial payment application. Sincerely, SNYDER & ASSOCIATES, INC. Andrew Houchin, P.E. Project Engineer Enclosure PROJECT: Traffic Signal Enhancement SNYDER & ASSOCIATES PROJECT NO.: 122.0627.01 IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25 OWNER: Waukee CONTRACTOR: Iowa Signal, Inc. ADDRESS: 3711 SE Capitol Circle, Grimes, IA 50111 DATE: 7/1/2024 PAYMENT PERIOD: 4/17/2024 to 6/30/2024 1. CONTRACT SUMMARY: Original Contract Amount:917,492.00$ CONTRACT PERIOD: COMPLETION DATE Contract Completion Date: December 31, 2024 Net Change by Change Order:-$ Contract Amount to Date:917,492.00$ 2. WORK SUMMARY:Extension by Change Order: 0 Total Work Performed to Date:2,780.00$ Retainage: 3%$83.40 Total Earned Less Retainage:2,696.60$ Less Previous Applications for Payment:-$ AMOUNT DUE THIS APPLICATION:2,696.60$ 3. CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with the Work covered by prior Applications for Payment; and (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by the application for Payment are free and clear of all liens, claims, security interests, and encumbrances Iowa Signal, Inc. CONTRACTOR By DATE: 4. ENGINEER'S APPROVAL: Payment of the above AMOUNT DUE THIS APPLICATION is recommended: Snyder & Associates, Inc. ENGINEER By DATE: 5. OWNER'S APPROVAL OWNER By DATE: APPLICATION FOR PARTIAL PAYMENT NO. 1 V:\Projects\2022\122.0627.01\Construction\PayApp01_2024-07-01_SignalEnhancement(TAP).xlsx 6/19/24 6. DETAILED ESTIMATE OF WORK COMPLETED: APPLICATION FOR PARTIAL PAYMENT NO. 1 ITEM DIV 1 DIV 2 TOTAL DIV 1 DIV 2 TOTAL DIV 1 DIV 2 TOTAL PREV DIV 1 DIV 2 TOTAL CURRENT PERCENT NO.QTY. QTY. QTY.COST COST COST QTY. QTY. QTY. COST QTY. QTY. QTY. COST COMPL. 1.1 1 LS 2,700.00$ 2,700.00$ -$ 2,700.00$ 0 -$ 0 -$ 0.00% 2.1 1 LS 27,800.00$ 27,800.00$ -$ 27,800.00$ 0 -$ 0.1 0.1 2,780.00$ 10.00% 3.1 1 LS 2,145.00$ -$ 2,145.00$ 2,145.00$ 0 -$ 0 -$ 0.00% 4.24 24 EA 1,634.00$ 39,216.00$ -$ 39,216.00$ 0 -$ 0 -$ 0.00% 5.8 8 EA 6,783.00$ 54,264.00$ -$ 54,264.00$ 0 -$ 0 -$ 0.00% 6.7 7 EA 4,412.00$ 30,884.00$ -$ 30,884.00$ 0 -$ 0 -$ 0.00% 7.4 7 11 EA 50,405.00$ 201,620.00$ 352,835.00$ 554,455.00$ 0 -$ 0 -$ 0.00% 8.10 4 14 EA 370.00$ 3,700.00$ 1,480.00$ 5,180.00$ 0 -$ 0 -$ 0.00% 9.35 35 EA 370.00$ -$ 12,950.00$ 12,950.00$ 0 -$ 0 -$ 0.00% 10.10 10 EA 402.00$ 4,020.00$ -$ 4,020.00$ 0 -$ 0 -$ 0.00% 11.2 2 EA 850.00$ 1,700.00$ -$ 1,700.00$ 0 -$ 0 -$ 0.00% 12.2 2 EA 550.00$ 1,100.00$ -$ 1,100.00$ 0 -$ 0 -$ 0.00% 13.18 18 EA 437.00$ 7,866.00$ -$ 7,866.00$ 0 -$ 0 -$ 0.00% 14.7 35 42 EA 776.00$ 5,432.00$ 27,160.00$ 32,592.00$ 0 -$ 0 -$ 0.00% 15.15 15 EA 523.00$ 7,845.00$ -$ 7,845.00$ 0 -$ 0 -$ 0.00% 16.25 25 EA 751.00$ 18,775.00$ -$ 18,775.00$ 0 -$ 0 -$ 0.00% 17.10 10 EA 10,800.00$ -$ 108,000.00$ 108,000.00$ 0 -$ 0 -$ 0.00% 18.3,000 3000 LF 2.00$ 6,000.00$ -$ 6,000.00$ 0 -$ 0 -$ 0.00% DIV 1 DIV 2 TOTAL ORIGINAL CONTRACT = 412,922.00$ 504,570.00$ 917,492.00$ OVERALL PERCENT COMPLETE = 0.30% PREVIOUS PAY APPS = -$ -$ -$ CURRENT PAY APP = 2,780.00$ -$ 2,780.00$ CHANGE ORDER SUMMARY: ITEM CO DIV 1 DIV 2 TOTAL DIV 1 DIV 2 TOTAL DIV 1 DIV 2 TOTAL PREV DIV 1 DIV 2 TOTAL CURRENT PERCENT NO. DESCRIPTION # QTY. QTY. QTY.COST COST COST QTY. QTY. QTY. COST QTY. QTY. QTY. COST COMPL. DIV 1 DIV 2 TOTAL TOTAL CHANGE ORDERS = -$ -$ -$ PREVIOUS CHANGE ORDERS = -$ -$ -$ CURRENT CHANGE ORDER = -$ -$ -$ DIV 1 DIV 2 TOTAL TOTAL CONTRACT & CHANGE ORDERS 412,922.00$ 504,570.00$ 917,492.00$ UNIT UNIT COST PREVIOUS PAY APPS PREVIOUS CHANGE ORDERS UNIT UNIT COST CONTRACT ITEMS CURRENT PAY APP DESCRIPTION Traffic Control Mobilization Railroad Protective Liability Insurance for Union Pacific Railroad Co. Accessible Pedestrian Signal Push Button and Sign Rectangular Rapid Flashing Beacon Assembly, per Post Signal Cabinet Modification Signal Cabinet Replacement Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement, 16" Pedestrian Head, Hand/Person, Countdown CURRENT CHANGE ORDER Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED), Side of Pole Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted Uninterruptible Power Supply Signal Cable, 5c V:\Projects\2022\122.0627.01\Construction\PayApp01_2024-07-01_SignalEnhancement(TAP).xlsx