HomeMy WebLinkAbout2024-07-01 I09 Waukee Towne Center Plat 2, Lot 2_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 1, 2024 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Lot 2, Waukee Towne Center Plat 2 (980 SE Laurel Street) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Waukee Towne Center, LLC requests approval of a new site plan to authorize the construction of a 48,000 square foot multi-tenant retail building. The building is 29-feet in height. The main entrances to the building are along the east side. The original site plan received approval by City Council on April 3, 2023. The site plan has since expired; therefore, the applicant is asking for approval of a new site plan. There are a couple of minor changes from the originally approved site plan including: striping of parking spaces along the west side of the lot for employee parking and phasing the plan into two separate phases. Phase 1 includes the construction of the utilities and parking lot on the east side of the building; Phase 2 includes the construction of the building and the paved areas located on the west side of the building. The site plan shows a total of three tenant spaces. Each tenant space includes a loading dock along the west side of the building. Trash will be collected interior to the building, with each tenant space including a compactor along the west side of the building. A monument sign/fountain feature is shown at the far east side of the site. This will be the entrance feature for the entire commercial development. Several shared accesses will be provided into this site. Pedestrian connections will be provided from SE Laurel Street and from the adjacent sites. A total of 193 parking spaces are required and they are providing 285 parking spaces. Private utilities will serve the site. Stormwater management is provided with a detention basin located along the west side of the site and a large pond to the south of the site. A 30-foot-wide landscape buffer will be provided along the west side of the site to provide a buffer for the adjacent residential properties. All landscaping requirements have been met. The elevations of the building are proposed to be constructed mainly of brick, composite cladding panels, concrete masonry unit, and glazing. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the June 25, 2024, Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Lot 2, Waukee Towne Center Plat 2 (980 SE Laurel Street) Melissa DeBoer, Planning Coordinator, introduced the request for approval of a site plan for a commercial development, as requested by Waukee Towne Center, LLC, represented by Ed Arp, Civil Engineering Consultants. I9 The property is generally located west of SE Alice’s Road and south of SE Laurel Street, containing approximately 5.51-acres. A site plan for the subject property was approved by City Council on April 3, 2023. The site plan has since expired; therefore, the applicant is asking for approval of a new site plan. There are a couple of minor changes to the originally approved site plan. One of the changes includes striping of parking spaces on the west side of the lot to provide employee parking located behind the building. The other proposed change is to phase the project into two different phases. Phase 1 includes the construction of the utilities and parking lot on the east side of the building; Phase 2 includes the construction of the building and paved areas on the west side of the building. The project involves the construction of a 48,000 square foot multi-tenant building, 29-ft in height. The main entrances to the building are along the east side. The site plan shows a total of three tenant spaces. Each tenant space includes a loading dock along the west side of the building. Trash will be collected interior to the building, with each tenant space including a compactor along the west side of the building. A monument sign/fountain feature is shown at the far east side of the site. This will act as the entrance feature for the entire commercial development. Access to this site will be provided with shared access for the entire development. Several accesses are provided to the north from SE Laurel Street, and a private drive will also be constructed to the south of SE Laurel Street, which will provide access into the proposed site. Pedestrian connections will be provided from SE Laurel Street and from the adjacent sites in order to provide connections throughout the commercial development. A total of 193 parking spaces are required for the proposed site plan, with 299 spaces being provided. Private utilities will serve the proposed site. Utilities within the development will be privately owned and maintained. Storm water management will be provided with a detention basin located along the west side of the site and a large pond to the south of the proposed site. Per the planned development for Waukee Towne Center, a minimum of 20% of the overall commercial development is required to be open space. The total amount of open space proposed is 38%. A 30-foot-wide landscape buffer will be provided along the west side of the site, providing a buffer for the residential properties to the west. The landscape plan meets the requirement of the Landscape and Open Space Ordinance. The elevations of the building are proposed to be constructed mainly of brick, composite cladding panels, concrete masonry unit, and glazing. The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan, subject to remaining staff comments. Discussion as follows: • General discussion of the reason for the change; parking is a priority to prepare for the Target store opening Motion by Commissioner Bankole for approval of a Site Plan for Lot 2, Waukee Towne Center Plat 2 (980 SE Laurel Street), seconded by Commissioner Koelker. Ayes: Koelker, Beenken, Tessau, Lohse and Bankole. Recusal: Broderick. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE SITE PLAN FOR LOT 2, WAUKEE TOWNE CENTER PLAT 2 (980 SE LAUREL STREET) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Lot 2, Waukee Towne Center Plat 2, subject to remaining staff comments on June 25, 2024; AND, WHEREAS, the Site Plan for Lot 2, Waukee Towne Center Plat 2 is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Lot 2, Waukee Towne Center Plat 2 is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 1st day of July, 2024 that the Site Plan for Lot 2, Waukee Towne Center Plat 2 is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Lot 2, Waukee Towne Center Plat 2 Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: June 21, 2024 MEETING DATE: June 25, 2024 GENERAL INFORMATION Owner/Applicant: Waukee Towne Center, LLC Owner’s Representative: Ed Arp, Civil Engineering Consultants Request: The applicant is requesting approval of a site plan for a commercial development. Location and Size: Property is generally located west of SE Alice’s Road and south of SE Laurel Street, containing approximately 5.51-acres. Site Address: 980 SE Laurel Street AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. June 21, 2024 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Neighborhood Commercial C-1 (Community & Highway Service Commercial District) / PD-1 (Planned Development Overlay) North Target Site – Currently Under Construction Community Commercial C-1 (Community & Highway Service Commercial District) / PD-1 (Planned Development Overlay) South Vacant – Undeveloped (Waukee Towne Center Plat 3) Neighborhood Commercial C-1 (Community & Highway Service Commercial District) / PD-1 (Planned Development Overlay) East Hickman West Industrial Park Mixed Use Corridor & Neighborhood Commercial M-1 (Light Industrial District) West Westgate Neighborhood Single Family Residential R-2 (One & Two Family Residential District) BACKGROUND A site plan for the subject property was approved by City Council on April 3, 2023. The site plan has since expired; therefore, the applicant is asking for approval of a new site plan. There are a couple of minor changes from the originally approved site plan. One of the changes includes striping of parking spaces on the west side of the lot to provide employee parking located behind the building. The other proposed change is to phase the project into two different phases. Phase 1 includes the construction of the utilities and parking lot on the east side of the building; Phase 2 includes the construction of the building and the paved areas located on the west side of the building. PROJECT DESCRIPTION The project involves the construction of a 48,000 square foot multi-tenant retail building. The building is 29-ft in height. The main entrances to the building are along the east side. The site plan shows a total of three tenant spaces. Each tenant space includes a loading dock along the west side of the building. Trash will be collected interior to the building, with each tenant space including a compactor along the west side of the building. A monument sign / fountain feature is shown at the far east side of the site. This will act as the entrance feature for the entire commercial development. ACCESS AND PARKING Access into this site will be provided with shared accesses for the entire development. Several accesses are provided into the site to the north off of SE Laurel Street and a private drive will also be constructed to the south of SE Laurel Street which will provide access into the proposed site. Pedestrian connections will be provided from SE Laurel Street and from the adjacent sites in order to provide pedestrian connections throughout the commercial development. June 21, 2024 3 of 3 A total of 193 parking spaces are required for the proposed site plan and they are providing 299 parking spaces. UTILITIES Private utilities will serve the proposed site. Utilities within the development will be privately owned and maintained. Storm water management will be provided with a detention basin located along the west side of the site and a large pond to the south of the proposed site. LANDSCAPING & OPEN SPACE Per the planned development for Waukee Towne Center, a minimum of 20% of the overall commercial development is required to be open space. The total amount of open space proposed is 38%. A 30-foot-wide landscape buffer will be provided along the west side of the site to provide a buffer for the residential properties to the west. The landscape plan meets the requirements of the Landscape and Open Space Ordinance. ELEVATIONS The elevations of the building are proposed to be constructed mainly of brick, composite cladding panels, concrete masonry unit, and glazing. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan subject to remaining staff comments. PRELIMINARY CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N CATEGORY REQUIRED AREA REQUIRED % PROPOSED AREA PROPOSED % BUILDINGS 319,778.38 18.68% PAVEMENTS 737,367.94 43.07% OPEN SPACE 342,437.32 20.00%655,040.30 38.26% TOTAL 1,712,186.62 100.00% PRELIMINARY Civil Drawings List Table Drawing Number Drawing Title 1 COVER 2 DETAILS 3 DEMOLITION PLAN 4 DIMENSION PLAN 5 SE LAUREL STREET RESTRIPING PLAN 6 GRADING PLAN - EAST 7 GRADING PLAN - WEST 8 ADA DETAIL 9 UTILITY PLAN 10 UTILITY PLAN (SANITARY PROFILE) 11 PAVING PLAN 12 PHASING PLAN 13 LANDSCAPING PLAN 14 EROSION CONTROL NOTES 15 EROSION CONTROL PLAN 16 EROSION CONTROL DETAILS Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 c o v e r . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 2 : 2 0 A M , l t w i f o r d , 1 : 1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 D E T A I L S . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 2 : 3 1 A M , l t w i f o r d , 1 : 1 ONLY LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 D E M O L I T I O N P L A N . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 3 : 3 6 A M , l t w i f o r d , 1 : 1 ONLY NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 D I M E N S I O N S . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 4 : 1 9 A M , l t w i f o r d , 1 : 1 ON L Y ON L Y ON L Y ON L Y CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 R E S T R I P I N G P L A N . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 5 : 0 5 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 G R A D I N G . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 6 : 4 5 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 G R A D I N G . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 6 : 5 1 A M , l t w i f o r d , 1 : 1 NO PA R K I N G NO PA R K I N G NO PA R K I N G NO PA R K I N G NO PA R K I N G NO PA R K I N G NO PA R K I N G LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 A D A D E T A I L S . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 8 : 0 4 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 U T I L I T Y P L A N . d w g , 6 / 4 / 2 0 2 4 1 0 : 5 9 : 2 3 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 U T I L I T Y - S A N P R O F . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 0 : 3 9 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 P A V I N G . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 1 : 1 9 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 P H A S I N G P L A N . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 2 : 0 8 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N MARK Botanical name QUAN.SIZE ROOT REMARKS MATURE COMMON NAME TYPE HEIGHT AC Amelanchier arborea 14 1.5" CAL.CONT.MATCHED, SPECIMEN, 3 STEM MIN.20' SERVICEBERRY 12' OC, PARKING ISLANDS-MULCH BED AT Asclepias tuberosa 16 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 2' BUTTERFLY WEED LOC. AS DIMENSIONED; 2' o.c. BP Betula populifolia 'Whitespire Senior'5 12' HT.CONT.MATCHED, SPECIMEN 30' WHITESPIRE BIRCH MULCH BED CK Cladrastis kentuckea 2 2" CAL.B&B MATCHED, SPECIMEN 50' YELLOWWOOD 13.5' OC EP Echinacea purpurea 'Rubinstern'11 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 3' RUBY STAR CONEFLOWER LOC. AS DIMENSIONED; 2' o.c. GT Gleditsia triacanthos f. inermis 'Skycole'1 2" CAL.B&B MATCHED, SPECIMEN 40' SKYLINE HONEYLOCUST JS Juniperus squamata 'Blue Star'40 15" HT.CONT.MATCHED, SPECIMEN, MULCH BED 2' BLUE STAR JUNIPER LOC. AS DIMENSIONED LS Liquidambar styraciflua 'Rotundiloba'3 1.5" CAL.B&B MATCHED, SPECIMEN 60' ROUND-LOBED SWEET GUM LT Liriodendron tulipfera 'JFS-Oz'5 2" CAL.B&B MATCHED, SPECIMEN 55' EMERALD CITY TULIP TREE MH Malus 'Hozam'6 1.5" CAL.CONT.MATCHED, SPECIMEN 15' HOLIDAY GOLD CRABAPPLE MS Malus 'Shotizam'8 1.5" CAL.CONT.MATCHED, SPECIMEN 15' SHOW TIME CRABAPPLE MT Malus 'Sutyzam'10 1.5" CAL.CONT.MATCHED, SPECIMEN 15' SUGAR TYME CRABAPPLE PF Pinus strobus 'Fastigiata'6 7' HT.CONT.MATCHED, SPECIMEN 35' COLUMNAR WHITE PINE MULCH BED PI Picea pungens 6 7' HT.B&B MATCHED, SPECIMEN 60' COLORADO SPRUCE 12' o.c. IN BUFFER PL Pinus flexilis 'Vanderwolf's Pyramid'9 7' HT.B&B MATCHED, SPECIMEN 30' VANDERWOLF'S PYRAMID LIMBER PINE 10' o.c. PM Pseudotsuga menziesii glauca 4 7' HT.B&B MATCHED, SPECIMEN 50' DOUGLAS FIR 12' o.c. IN BUFFER PV Panicum virgatum 'Cheyenne Sky'60 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 3' CHEYENNE SKY SWITCH GRASS LOC. AS DIMENSIONED; 2' o.c. QB Quercus bicolor 3 2" CAL.B&B MATCHED, SPECIMEN 50' SWAMP WHITE OAK QC Quercus x bimundorum 'Crimschmidt'1 2" CAL.B&B SPECIMEN 45' CRIMSON SPIRE OAK MULCH BED QM Quercus macrocarpa 'JFS-KW3'4 2" CAL.B&B MATCHED, SPECIMEN 55' URBAN PINNACLE OAK RA Rhus aromatica 4 24" HT.CONT.MATCHED, SPECIMEN, MULCH BED 6' FRAGRANT SUMAC 6' o.c. RB Rhus aromatica 'Gro-Low'38 3 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 6' GRO-LOW FRAGRANT SUMAC 5' o.c. SA Salvia nemorosa 'Tidal Pool'16 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 3' TIDAL POOL SALVIA LOC. AS DIMENSIONED; 2' o.c. SE Sedum 'Autumn Fire'10 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 2' AUTUMN FIRE SEDUM LOC. AS DIMENSIONED; 2' o.c. SF Sedum 'Lime Zinger'27 6" POT CONT.MATCHED, SPECIMEN, MULCH BED 1' LIME ZINGER SEDUM LOC. AS DIMENSIONED; 1' o.c. SS Schizachyrium scoparium 'Prairie Blues'56 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 3' PRAIRIE BLUES LITTLE BLUE STEM LOC. AS DIMENSIONED; 2' o.c. SV Syringa vulgaris 10 5 GAL.CONT.MATCHED, SPECIMEN 15' COMMON LILAC MULCH BED, 6'o.c. VP Viburnum prunifolium 14 1" CAL.CONT.MATCHED, SPECIMEN, TREE FORM 25' BLACKHAW VIBURNUM VT Viburnum trilobum 'Alfredo'13 5 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 5' ALFREDO VIBURNUM 4' o.c. WF Weigela florida 'Elvera'56 3 GAL.CONT.MATCHED, SPECIMEN, MULCH BED 2' MIDNIGHT WINE WEIGELA LOC. AS DIMENSIONED; 1.75' o.c. Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 L A N D S C A P I N G . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 3 : 2 7 A M , l t w i f o r d , 1 : 1 NOPARK I N GNO PARK I N G NO PARK I N GNO PARK I N G NOPARKI N GNOPARKIN GNOPARKI N G SUITE 1 100 SUITE 2200 SPRI N K L E R 300 NOPARKI N G ONLY ONLY ONL Y CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N · · · · · · · · · · · · · · · · · · · · Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 E R O S I O N C O N T R O L P L A N . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 3 : 4 0 A M , l t w i f o r d , 1 : 1 NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING ONLY CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 E R O S I O N C O N T R O L P L A N . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 3 : 4 6 A M , l t w i f o r d , 1 : 1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 E R O S I O N C O N T R O L P L A N . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 3 : 5 1 A M , l t w i f o r d , 1 : 1 LOT 2 NO PARKING CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q: \ A - F I L E S \ A - 2 2 0 0 \ A 2 2 0 2 \ C o n s t r u c t i o n D o c u m e n t s \ S i t e P l a n \ A 2 2 0 2 F U T U R E T R A I L D E T A I L S . d w g , 6 / 4 / 2 0 2 4 1 1 : 0 5 : 2 1 A M , l t w i f o r d , 1 : 1 WAUKEE TOWNE CENTER POWER CENTER WAUKEE, IOWA 2/27/23 SCREENING EXHIBIT APPROXIMATE VIEW 500' FROM BUILDING FACE