Loading...
HomeMy WebLinkAbout2024-07-15 I01G_02 Public Safety Building_Change Order 4AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 15, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 4 (Combined) for the Waukee Public Safety Building Project, increasing the contract in the amount of $2,894.55 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 4 relates to costs associated with the relocation of the FATS police simulator room to another location within the building ($674.55) as well as the addition of some detection in the stairways ($2,220). FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $2,894.55 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 4 PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1G2 Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com July 10, 2024 Brad Deets, City Administrator City of Waukee 230 W. Hickman Road Waukee, IA 50263 Re: Waukee Public Safety Building: Change Order No. 4: Multiple Pricing Request Approvals Dear Brad: Change Order No. 4 for the Waukee Public Safety Building includes the following revisions: · WPS CR012: PR-06: Relocated FATS room. Power requirements, lighting control, and mechanical layout. ADD of $674.55 · WPS CR027: PR-08: Addition of cane detection at Stairs A and C. ADD of $2,220.00 Ryan Companies recommends approval of the Prime Contractors for Change Order No. 4 at a combined value of $2,894.55. Please see attached Change Order No. 4 individual change orders and associated back up for each individual change request (CR) for additional information. If you have any questions or comments regarding this information, please contact me at your convenience. Thank you. Sincerely, RYAN COMPANIES US, INC. Jill Boetger Project Manager Enclosed: WPS Prime CO No. 4_DRAFT Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com CC: Matt Van Loon, Ryan Companies Ryan Pigneri, Ryan Companies Angie Pfannkuch, Sidekick Development Danielle Hermann, OPN Architects Aaron Twedt, OPN Architects Alex Streyffeler, OPN Architects AIA® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #4 Structural & Misc. Steel Material Change Order Number: WPS CO 04 (TSF No. 4) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 07.09.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) TSF Structures, Inc. 6410 7th St Ct SW Cedar Rapids, IA 52404 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed u pon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR027: PR-08: Cane Detection at Stairs A and C. Value of $720.00 The original Contract Sum was $ 1,932,100.00 Net change by previously authorized Change Orders $ 2,170.00 The Contract Sum prior to this Change Order was $ 1,934,270.00 The Contract Sum will be increased by this Change Order in the amount of $ 720.00 The new Contract Sum including this Change Order will be $ 1,934,990.00 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: TSF Structures, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #5 Precast & Steel Erection Change Order Number: WPS CO 04 (Northwest Steel No. 3) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 07.09.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Northwest Steel Erection, Inc. 6285 NE Industry Dr. Des Moines, IA 50313-7602 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed u pon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR027: PR-08: Cane detection install at Stairs A & C. Value of $1,500.00 The original Contract Sum was $ 1,064,188.00 Net change by previously authorized Change Orders $ 660.00 The Contract Sum prior to this Change Order was $ 1,064,848.00 The Contract Sum will be increased by this Change Order in the amount of $ 1,500.00 The new Contract Sum including this Change Order will be $ 1,066,348.00 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Northwest Steel Erection, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #13 Electrical & Communications Change Order Number: WPS CO 04 (Van Maanen No. 3 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 07.09.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Van Maanen Electric, Inc. 500 Iowa Speedway Dr. Newton, IA 50208 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed u pon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR012: MidAm electrical service pathway changes to avoid conflicts with geothermal system and landscaping . Value of $674.55 The original Contract Sum was $ 4,711,425.00 Net change by previously authorized Change Orders $ 56,220.04 The Contract Sum prior to this Change Order was $ 4,767,645.04 The Contract Sum will be increased by this Change Order in the amount of $ 674.55 The new Contract Sum including this Change Order will be $ 4,768,319.59 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Van Maanen Electric, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: w PROPOSAL REQUEST – PR NO. 06 (REV. 1) Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contra ct Documents described herein. This is not a Change Order, a Construction Change Directive or a direction to proceed with the w ork described in the proposed modifications. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: Revise Location of FATS Room 368 per owner direction. 1. Sheet A101 – OVERALL FLOOR PLAN • Revise location of FATS Room 368 2. Sheet A111C – FLOOR PLAN – AREA C • Revise location of FATS Room 368 3. Sheet A611C – FINISH FLOOR PLAN – AREA C • Revise location of FATS Room 368 4. Sheet 6112C – FFE FLOOR PLAN – AREA C • Revise location of FATS Room 368 5. Sheet A711C – REFLECTED CEILING PLAN – AREA C • Revise location of FATS Room 368 MEP: 6. REVISED DEVICE LAYOUTS BASED ROOM LOCATION UPDATE. • Drawings Impacted: E111C, E211C, E311C, T111C, and TY111C. 7. ADD CONTROLLED RECEPTACLE IN FATS ROOMS • Drawings Impacted: E111C and E211C. 8. REVISED FIRE PROTECTION AND VRF LAYOUTS BASED ROOM LOCATION UPDATE. • Drawings Impacted: FP111C, M111C, and M211C. Attachments: A101, A111C, A611C, A612C, A711C, E111C, E211C, E311C, T111C, TY111C, FP111C, M111C, M211C OPN Architects, Inc. Date: 05/06/2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies Waukee Public Safety - Change Request Summary 6/25/2024 Ryan Companies US, Inc. Change Request 012 Change Request Subcontractor Comments Cost Change 12.0 DDVI No cost impact as flooring was removed from scope.$0.00 12.1 Jordison Construction No response $0.00 12.2 Enterprise Precast No response $0.00 12.3 TSF Structures No response $0.00 12.4 Northwest Steel No response $0.00 12.5 Forman Ford No response $0.00 12.6 Academy Roofing No response $0.00 12.7 Ford Metro No response $0.00 12.8 Skold Door No response $0.00 12.9 Hilsabeck Schacht No response $0.00 12.10 Elite Fire Sprinkler No response $0.00 12.11 Kruck Plumbing and Heating No response $0.00 12.12 Van Maanen (4) power poles credited, 1" conduit and lighting controls added $674.55 12.13 TriCity Electric No response $0.00 12.14 Wenthold No response $0.00 12.15 Absolute No response $0.00 12.16 Jordison Construction No response $0.00 12.17 Alpha Landscapes No response $0.00 $674.55 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$21.92 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 Change Request 12 Cost Change Total $696.47 Summary: FATS: Move room, added power and lighting control, increased conduit pathways, revised mechanical and fire protection layouts. Change Request 12 Subtotal w PROPOSAL REQUEST – PR NO. 08 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. This is not a Change Order, a Construction Change Directive or a direction to proceed with the w ork described in the proposed modifications. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: Add cane detection rails under stairs A and C per shop drawing review and confirmation with AHJ. 1. Sheet A450 – ENLARGED STAIR PLANS & SECTIONS • A1, A16: Add galvanized angles for cane detection under stair A • P10, P17: Add galvanized angles for cane detection under stair C OPN Architects, Inc. Date: 05/21/2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies Waukee Public Safety - Change Request Summary 6/13/2024 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 27.0 DDVI No cost impact $0.00 27.1 Jordison Construction No response $0.00 27.2 Enterprise Precast No response $0.00 27.3 TSF Structures Cane detection material at Stairs A & C $720.00 27.4 Northwest Steel Cane detection install at Stairs A & C $1,500.00 27.5 Forman Ford No response $0.00 27.6 Academy Roofing No response $0.00 27.7 Ford Metro No response $0.00 27.8 Skold Door No response $0.00 27.9 Hilsabeck Schacht No response $0.00 27.10 Elite Fire Sprinkler No response $0.00 27.11 Kruck Plumbing and Heating No response $0.00 27.12 Van Maanen No response $0.00 27.13 TriCity Electric No response $0.00 27.14 Wenthold No response $0.00 27.15 Absolute No response $0.00 27.16 Jordison Construction No response $0.00 27.17 Alpha Landscapes No response $0.00 $2,220.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$72.15 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $2,292.15 Change Request 027 Summary: PR-08 Added code required cane detection at Stairs A and C. Change Request 027 Subtotal Change Request 027 Cost Change Total May 22, 2024 CR#027 Waukee Public Safety Building Job #6173-000 DDVI – General Construction Hilsabeck Schacht - Framing, Drywall & Ceilings Jordison Construction – Building Concrete Elite Fire Sprinkler – Fire Protection Enterprise Precast – Precast Material Kruck Plumbing and Heating - Mechanical & Plumbing TSF Structures - Steel Material & Misc. Metals Van Maanen Electric – Electrical & Communications Northwest Steel - Precast & Steel Erection TriCity Electric – Audio-Visual Forman Ford – Metal Panels Wenthold Excavating – Earthwork & Utilities Academy Roofing – Roofing Absolute Group - SWPPP Ford Metro – Glass & Glazing Jordison Construction – Site Concrete Skold Door – Overhead Doors Alpha Landscapes – Landscape & Irrigation Dear Prime Contractors: We are forwarding this Change Request, briefly described as follows, for your review and response: PR-08 includes the following revisions: Add cane detection rails under stairs A and C This Change Request is further defined by the following attached documents: Drawings: A450 Spec Sections: NA Please mark the appropriate “Status” below, sign and re turn one copy of this Change Request to Ryan Companies US, Inc. no later than 05/29/2024. Attach a detailed proposal itemizing any cost or schedule impacts resulting from this change. Include reference to this Change Request, quantities (add or deduct), unit prices for labor and materials, and the latest date the proposal may be accepted. A lack of response by the date required above will indicate no change to your Prime Contract Agreement. Your timely response to the Change Request will be appreciated. Please call if you have any questions, or if you need additional information. DO NOT PROCEED; SUBMIT QUOTATION ONLY PROCEED WITH WORK PROCEED WITH WORK NOT TO EXCEED $ AND SUBMIT QUOTATION PROCEED WITH WORK; NO ADDITIONAL COST ANTICIPATED PROCEED WITH WORK; SUBMIT QUOTATION OTHER Sincerely, Acknowledged: RYAN COMPANIES US, INC. By: Company: Date: Status: Proposal attached Jill Boetger No impact on cost or schedule Project Manager II More information or discussion required TSF Structures, Inc Page 1 of 2 Date: 5/28/2024 CO #: 3 Job #: 1798 Waukee Public Safety Building 6410 7th Street Court SW Suite C Cedar Rapids, IA 52404 Phone: (319)365-7133 Fax: (319)365-2410 Change Order Request Ryan Companies Des Moines 111 East Grand Suite 200 Des Moines, IA 50309 Phone: (515) 309-8500 To:Jill Boetger Subject:PR #08 - Cane Rails Change Requested By:Austin Ressler Sent Via:Email Description of Change: Provide cane rails per PR 08 drawings. Labor - $124.00 Material - $320.00 Detailing - $196.00 Markup (OH & Profit) - $80.00 The change will cause an increase of $720.00 to the contract amount. TSF Structures, Inc Page 2 of 2 Date: 5/28/2024 CO #: 3 Job #: 1798 Waukee Public Safety Building 6410 7th Street Court SW Suite C Cedar Rapids, IA 52404 Phone: (319)365-7133 Fax: (319)365-2410 Change Order Request TSF Structures, Inc A signature below indicates acceptance of all changes shown herein . Any work associated with this change will begin upon receipt of a signed copy of this C.O. in our office. Please respond by 5/28/2024. If the requested response time is not met, the project may be delayed. Accepted By Austin Ressler Jill Boetger Ryan Companies Des Moines Northwest Steel Erection Inc. 6285 NE Industry Drive Phone: (515) 986-0380 Des Moines, IA 50313 REQUEST FOR CHANGE ORDER #:Date:06/13/24 Job #:231106 Directive:(RFI, ITC, PR, PCO, ADDENDA, FIELD ORDER #, etc.) Brief Description of Work and/or Directive: 12.0 mh x $95.00 / hr. Ironworker $1,140.00 mh x $92.00 / hr. Operator $0.00 mh x $35.00 / hr. OT Premium $0.00 ea. $600.00 / ea. $0.00 Ea. $200.00 / ea. $0.00 12.0 hr. $15.00 / hr. $180.00 12.0 hr. $15.00 / hr. $180.00 $0.00 Pricing of Add/Deduct Codes (NSE Office Use) Other: $0.00 Labor: $1,140.00 Equipment $360.00 Total C.O. Request:$1,500.00 Please prepare the appropriate Change Order and forward copies for execution. Upon request, all necessary back-up can be supplied as needed. Thank you, Zach Abild Erection Services Division Manager 2 Contact: Phone: Fax: Waukee Public Safety Facility Ryan Companies 111 E Grand Ave., Suite 200 Des Moines, IA 50309 Project Name: Contract #: Customer: Address: Add cane rail stair A&C PR 08 Welding Machine Jill Boetger (515) 314-1338 Material Delivery & Pick-Up of Equipment Forklift Service Truck/Small Tools & Supplies LABOR EQUIPMENT 1 Ryan Pigneri From:Rich <rich@ddvi.net> Sent:Thursday, May 23, 2024 11:32 AM To:Ryan Pigneri; 'gina piper' Cc:Jill Boetger; Jason Arsenault Subject:RE: PR 08_Cane Detection at Stairs A and C EXTERNAL EMAIL: If unknown sender, DO NOT click links/attachments. NEVER give out your user ID or password. Thank you for the clarification. We will have NO costs. From: Ryan Pigneri <Ryan.Pigneri@RyanCompanies.com> Sent: Thursday, May 23, 2024 8:40 AM To: Rich <rich@ddvi.net>; gina piper <gina@ddvi.net> Cc: Jill Boetger <Jill.Boetger@RyanCompanies.com>; Jason Arsenault <Jason.Arsenault@RyanCompanies.com> Subject: Fwd: PR 08_Cane Detection at Stairs A and C See response below. Begin forwarded message: From: Alex Streyffeler <astreyffeler@opnarchitects.com> Date: May 23, 2024 at 7:55:58 AM CDT To: Ryan Pigneri <Ryan.Pigneri@ryancompanies.com> Cc: Jill Boetger <Jill.Boetger@ryancompanies.com> Subject: RE: PR 08_Cane Detection at Stairs A and C EXTERNAL EMAIL: If unknown sender, DO NOT click links/attachments. NEVER give out your user ID or password. My understanding is that all the stair components are going to be galvanized and left unpainted so these angles can also remain unpainted. Alex Streyffeler AIA | WELL AP Architect OPN Architects o: (515) 309-0722 | d: 515-309-7302 | astreyffeler@opnarchitects.com 100 Court Ave. Suite 100, Des Moines, Iowa, 50309 www.opnarchitects.com From: Ryan Pigneri <Ryan.Pigneri@RyanCompanies.com> Sent: Wednesday, May 22, 2024 4:53 PM 2 To: Alex Streyffeler <astreyffeler@opnarchitects.com> Cc: Jill Boetger <Jill.Boetger@RyanCompanies.com> Subject: Fwd: PR 08_Cane Detection at Stairs A and C Alex, see below. Let us know which way you would like to go. Begin forwarded message: From: Rich <rich@ddvi.net> Date: May 22, 2024 at 4:32:46 PM CDT To: Ryan Pigneri <Ryan.Pigneri@ryancompanies.com>, Jill Boetger <Jill.Boetger@ryancompanies.com> Subject: RE: PR 08_Cane Detection at Stairs A and C EXTERNAL EMAIL: If unknown sender, DO NOT click links/attachments. NEVER give your user ID or password. Ryan and Jill, I understand these are to be galvanized. But does the design team want them painted as well, to match the surroundings? Thanks Rich Piper From: Liz Cameron (Ryan Companies US Inc) <notifications_ryan_companies@procoretech.com> Sent: Wednesday, May 22, 2024 4:22 PM To: rich@ddvi.net Subject: PR 08_Cane Detection at Stairs A and C Waukee Public Safety Facility To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet. More details: View online From: Liz Cameron (Ryan Companies US Inc) Date: Wednesday, May 22, 2024 at 04:22 pm CDT Sent To: Zach Abild (Northwest Steel Erection Inc) Henry Alliger (Wenthold Excavating LLC) Jill Boetger (Ryan Companies US Inc) 3 Chris Borst (DDVI Inc) Chris Campbell (Absolute Concrete Construction Inc) Rod Christofferson (Tri-City Electric Company of Iowa) Luke Danielson (OPN Inc) Becca Decker (Van Maanen Electric Inc) Andrew Doyle (Alpha Landscapes LLC) Chad Evans (Hilsabeck Schacht Inc) Kelly Gray (Academy Roofing & Sheet Metal Company) Scott Handeland (Van Maanen Electric Inc) Nick Hanrahan (Ford Metro Inc) Jonathan Hapke (Skold Door & Floor Company Inc) Joey Isaacson (Enterprise Precast Concrete Inc) Gary Lewis (Kruck Plumbing & Heating Co Inc) Katie Maki (Cable Glass LLC) Mike Mullen (Tri-City Electric Company of Iowa) Nick Parenza (Academy Roofing & Sheet Metal Company) Joshua Pearson (Elite Fire Sprinkler Systems Inc) Angie Pfannkuch (Sidekick Development) Ryan Pigneri (Ryan Companies US Inc) Gina Piper (DDVI Inc) Rich Piper (DDVI Inc) Austin Ressler (TSF Structures Inc) Tom Richards (Baker Mechanical Inc) Jerry Savage (Jordison Construction Inc) Alex Streyffeler (OPN Inc) Aaron Twedt (OPN Inc) Rob Walton (Baker Mechanical Inc) CC: Liz Cameron (Ryan Companies US Inc) Attachments: None Good Afternoon- Attached please find PR 08 and Change Request Form 027. This PR includes the following changes: Cane Detection at Stairs A and C Please review this set and sign and return the attached form to me no later than 05/29/2024. Responses should be saved to the Documents Tab folder found here. https://app.procore.com/2046538/project/documents?folder_id=795235159 Thank you! 4 Liz Cameron Project Coordinator II Document Details Document Name: PR 08_Cane Detection at Stairs A and C Download Link: Click to Download (this download link will expire in 30 days) More details: View online Powered By Procore | support@procore.com | https://support.procore.com