Loading...
HomeMy WebLinkAbout2024-08-05 I01G_06 Structural and Environmental Assessment_410 6th StAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 5, 2024 AGENDA ITEM:Consideration of approval of a resolution approving Structural and Environmental Assessment Services Agreement with ISG [410 6th Street/Veterans’ Hall] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The City of Waukee sought proposals for structural and environmental investigations at the old city hall/VFW building located at 410 6th Street in Waukee Iowa. This study is necessary due to the unknown condition of the building. ISG Inc has provided a professional services proposal for this investigation. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The cost for these services is not to exceed $13,450. The deliverables from this proposal will be a detailed report describing the structural analysis and environmental study, including cost estimates to remediate any deficiencies discovered. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Staff recommends approval ATTACHMENTS: I. Proposed Resolution II. Proposal PREPARED BY: Christine Maduro REVIEWED BY: Christine Maduro PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1G6 THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING STRUCTURAL AND ENVIRONMENTAL ASSESSMENT SERVICES AGREEMENT WITH ISG [410 6TH STREET/VETERANS’ HALL] IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Iowa is a duly organized municipality within Dallas County; AND, WHEREAS, Waukee City staff solicited proposals for structural and environmental investigations at the Veterans’ Hall building located at 410 6th Street in order to assess the condition of the building; AND, WHEREAS, City staff recommend approval of a proposal from ISG to provide a detailed report describing the structural analysis and environmental study, including cost estimates to remediate any deficiencies discovered; NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council on this 5th day of August, 2024, that the Structural and Environmental Assessment Services Agreement with ISG [410 6th Street/Veterans’ Hall] is hereby approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair 217 East 2nd Street + Suite 110 + Des Moines, IA 50309 + 515.243.9143 | ISGInc.com Page 1 RE: Professional Services Proposal for 410 6th Street Waukee, Iowa Christine, As the City of Waukee seeks testing for the building at 410 6th Street in Waukee, Iowa, ISG stands eager and ready to assist. Backed by our in-house, multi-disciplinary professionals, vast industry experience, and a sound project understanding, ISG proposes to provide the following scope of services to meet your project needs. SCOPE OF SERVICES Structural Assessment On-Site Investigation ISG will provide the following on-site investigation services: • Take measurements of roof and floor joists to perform analysis and provide load ratings • Observations of all joist bearing conditions • Assessment of brick to ascertain square footages of repair needed • Assessment of mortar to ascertain square footages of repair needed • Foundation evaluation Structural Report ISG will provide a structural report that includes: • A detailed summary of findings and repairs needed • Clear differentiation between structural requirements and building improvements • High-level construction cost estimates Environmental Assessment ISG will be partnering with Terracon to provide environmental work for this project. Terracon will provide the following environmental testing services: • Phase 1 Environmental Site Assessment (ESA) • Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP) inspection • Lead-based paint inspection • Mold and moisture assessment • Radon, including short-term, activated charcoal testing July 31, 2024 Christine Maduro Facilities Maintenance Manager City of Waukee 230 West Hickman Road Waukee, IA 50263 515.978.7929 cmaduro@waukee.org Architecture + Engineering + Environmental + Planning | ISGInc.com Page 2 July 31, 2024 SCHEDULE + COMPENSATION ISG anticipates completing all work in five to six (5–6) weeks. We propose to provide the scope of work described within this proposal for compensation in accordance with the following schedule. Anticipated reimbursable expenses such as travel, mileage, and printing are included. Sales tax is excluded from the compensation. Phase Cost Structural Assessment $3,500* Environmental Assessment Phase I ESA $3,100* Asbestos NESHAP inspection $3,500* Lead-based paint inspection $1,500* Mold and moisture assessment $1,250* Radon (short term, activated charcoal testing)$600* Total Not To Exceed $13,450 *Not To Exceed (NTE) Amount ADDITIONAL SERVICES ISG’s goal for this proposal, like its services, is to be flexible with accommodating the requirements of this project. Upon request, ISG is able to provide a subsequent proposal to assist with additional professional design and construction phase services that will be necessary to facilitate this project as it moves forward. ISG appreciates the opportunity to provide a solution tailored to the needs of the City of Waukee. Upon acceptance of this proposal, please sign the acknowledgment box and return a copy of the proposal to our office. We look forward to providing you with responsive service, a collaborative approach, and timely delivery. Sincerely, Derek Johnson, PE Public Works Business Unit Leader Applicable Contract The General Terms and Conditions applicable to this Proposal are available at the link below and are hereby accepted and incorporated herein by reference. Upon acceptance of this Proposal, the parties can proceed with the project based on this signed Proposal, per its General Terms and Conditions, or for more complex projects, ISG, at its discretion, will prepare and require the use of an AIA or EJCDC Contract that will govern the project. General Terms + Conditions bit.ly/termsconditions_isg Acknowledgment of Acceptance This proposal is valid for 30 days. Accepted this _______ day of _____________, 2024. Company: ____________ Name: ______________ Title: _______________ Signature: ____________ Print Print Print