AGENDA ITEM:Consideration of approval of Change Order No. 7 to Concrete
Technologies, Inc. for the Ute Avenue and Ashworth Road Intersection
Project decreasing the contract amount by $114,831.39.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 7 includes quantity adjustments to
account for field adjustments and measurements and damages per contract and recent
correspondence.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order decreases the contract price in the amount of $114,831.39.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Change Order No. 7
ATTACHMENTS: I. Change Order No. 7
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I14A
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
autofill
v:\projects\2020\120.0783.01\construction\co_2024-07-29_letterco07.docm
July 29, 2024
Mr. Rudy Koester, P.E.
City of Waukee
805 University Avenue
Waukee, IA 50263
RE: CHANGE ORDER NO. 07
UTE AVENUE AND ASHWORTH ROAD INTERSECTION PROJECT
Dear Rudy:
Enclosed is change order 07 for the Ute Avenue and Ashworth Road Intersection project. This
change order includes quantity adjustments to account for field adjustments and measurements
and damages per contract and recent correspondence. These adjustments result in a net decrease
in the contract amount.
We recommend approval of change order 07 in the amount of -$114,831.39 to the prime
contractor, Concrete Technologies, Inc. of Grimes, Iowa. Substantial completion date remains
unchanged with this change order. Please place this change order on the next available city
council meeting agenda for approval.
Sincerely,
SNYDER & ASSOCIATES, INC.
Nathan Carhoff, P.E.
Project Manager
Enclosure
OWNER: City of Waukee PROJECT: Ute Avenue & Ashworth Road Intersection
S&A PROJECT #: 120.0783.01
To:
You are directed to make the following changes in this contract:
1. Description of change to be made:
Adjust quantities to account for field adjustments and measurements. Refer to Section 3.
Damages as per contract documents.
2. Reason for Change:
3. Settlement for the cost of making the change shall be as follows:
Item No. Item Description Quantity Unit Unit Price Total Price
2.4 Excavation, Class 10 133 CY $ 10.60 $ 1 ,409.80
2.5 Below Grade Excavation (Core Out) -300 CY $ 1 0.60 $ (3,180.00)
2.7 Subgrade Treatment (Cement or Fly Ash) -500 SY $ 1 2.75 $ (6,375.00)
2.8 Subgrade Treatment (Geogrid, Type I) -500 SY $ 7 .50 $ (3,750.00)
3.1 Trench Foundation -100 TON $ 63.50 $ (6,350.00)
4.5 Sanitary Sewer Cleanout -2 EACH $ 555.00 $ (1,110.00)
4.12 Pipe Culvert, Trenched, CMP, 18 Inch -54 LF $ 1 06.00 $ (5,724.00)
4.13 Pipe Culvert, Trenched, Remove and Reinstall,
CMP, 15 Inch
-21 LF $ 1 32.50 $ (2,782.50)
4.14 Pipe Apron, CMP, 18 Inch -2 EACH $ 795.00 $ (1,590.00)
4.24 Subdrain, Type 1, 6 Inch -30 LF $ 10.90 $ (327.00)
5.1 Water Main, Trenched, PVC, 8 Inch 4 LF $ 84.75 $ 339.00
5.6 Fitting, 90 Degree Bend, 8 Inch 2 EACH $ 530.00 $ 1 ,060.00
7.2 Pavement, PCC, 9 Inch 41 SY $ 79.50 $ 3 ,259.50
7.6 Removal of Driveway, Paved 127 SY $ 10.60 $ 1 ,346.20
7.8 Shared Use Path, PCC, 6 Inch 67 SY $ 40.50 $ 2 ,713.50
7.10 Sidewalk, PCC, 5 In. 10 SY $ 53.50 $ 535.00
7.14 Driveway, Granular 70 SY $ 10.60 $ 742.00
7.17 Pavement Removal 30 SY $ 9 .55 $ 286.50
8.10 Portable Dynamic Message Signs 16 CDAY $ 215.00 $ 3 ,440.00
9.2 Hydraulic Seeding, Seeding, and Fertilizing,
Type 1
0.43 ACRE $ 1 ,165.00 $ 500.95
9.3 Hydraulic Seeding, Seeding, Fertilizing, and
Mulching, Type 1
1 ACRE $ 3 ,600.00 $ 3 ,600.00
9.4 Hydraulic Seeding, Seeding, Fertilizing, and
Mulching, Type 4
6.9 ACRE $ 2 ,915.00 $ 20,113.50
9.7 Filter Sock, 12 Inch -733 LF $ 2.15 $ (1,575.95)
9.8 Filter Sock, Removal -733 LF $ 0.35 $ (256.55)
9.9 Temporary RECP, Type 2D (Short Term) 2,472 SY $ 1 .35 $ 3 ,337.20
9.10 Rip Rap, Class E -13 TON $ 1 06.00 $ (1,378.00)
9.11 Silt Fence or Silt Fence Ditch Check -4,082.7 LF $ 1.60 $ (6,532.32)
9.12 Silt Fence or Silt Fence Ditch Check Removal
of Sediment
-4,082.7 LF $ 0 .05 $ (204.14)
CHANGE ORDER NO. 7
City, State, Zip
Concrete Technologies, Inc.
Contractor
1001 SE 37th Street
Grimes, IA 50111
Address
Adjusting plan quantities per as-built field measurements and adjustments.
Damages due to project duration beyond specified contract completion date.
V:\Projects\2020\120.0783.01\Construction\CO_2024-07-29_ChangeOrder07.xlsx
9.13 Silt Fence or Silt Fence Ditch Check Removal
of Device
-4,082.7 LF 0.05$ (204.14)$
9.14 Stabilized Construction Entrance -897 SY 12.75$ (11,436.75)$
9.16 Inlet Protection Device, Maintenance and
Removal
4 EACH 26.50$ 106.00$
9.17 Flow Transition Mat -274 SF 15.90$ (4,356.60)$
11.2 Monument Preservation and Replacement -1 LS 5,295.00$ (5,295.00)$
11.5 Remove and Reinstall Mailbox 1 EACH 400.00$ 400.00$
12.5 Pavement Markings, Temporary 8.8 STA 71.50$ 629.20$
12.12 Damages 1 LS (96,221.79)$ (96,221.79)$
-$
TOTAL (114,831.39)$
4.4.This change order will result in a net change in the contract completion time of 0 days and a net change
in the cost of the project of -$114831.39 divided as follows:
Contract Contract
Amount Completion Date
Approved funds and contract completion date as per (Engineer's
Estimate, Contract or last approved C.O.)$4,961,992.14 August 6, 2022$4,961,992.14 August 6, 2022
Change due to this C.O. (+ or -)(114,831.39)$ 0
Totals including this C.O.:$4,847,160.75 August 6, 2022$4,847,160.75 August 6, 2022
The change described herein is understood, and the terms of settlement are hereby agreed to:
Concrete Technologies, Inc.
CONTRACTOR
ByBy DATE:
Snyder & Associates, Inc.
ENGINEER
ByBy DATE: July 29, 2024
City of Waukee
OWNER
ByBy DATE:
V:\Projects\2020\120.0783.01\Construction\CO_2024-07-29_ChangeOrder07.xlsx
07/31/2024
Beau S. SprouseBeau S. Sprouse Digitally signed by Beau S. SprouseDigitally signed by Beau S. Sprouse
DN: C=US, E=bsprouse@cti-ia.com, O="Concrete DN: C=US, E=bsprouse@cti-ia.com, O="Concrete DN: C=US, E=bsprouse@cti-ia.com, O="Concrete
Technologies, Inc.", OU=Director of Construction Operations, Technologies, Inc.", OU=Director of Construction Operations, Technologies, Inc.", OU=Director of Construction Operations,
CN=Beau S. SprouseCN=Beau S. Sprouse