HomeMy WebLinkAbout2024-10-21 H02B 11th and 17th St Culverts_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: October 21, 2024 AGENDA ITEM:Consideration of approval of resolution awarding contract [11th Street and 17th Street Culverts Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The bids received included alternates for a cast-in- place or precast culvert structure type. Bidders were required to submit a bid for a minimum of one structure type with the decision on which structure type to award to be at the City’s discretion. Bids were received on October 8, 2024, with nine general contractors submitting bids. The engineer’s estimate for the project was $885,474.50 for the precast culvert structure type and $772,358.50 for the cast-in-place structure type. The apparent low bid was submitted by Nagel Construction, LLC, of Allerton, Iowa for $564,004.00 for the cast-in-place structure type. This bid is approximately 27% below the engineer’s estimate. Staff recommend awarding the project to Nagel Construction, LLC, of Allerton, Iowa for the amount of $564,004.00. This project is part of the approved FY 2025-29 CIP with a total project budget of $1,155,000. Project has a completion date of September 30, 2025. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommend awarding the project to Nagel Construction, LLC, of Allerton, Iowa for the amount of $564,004.00. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Bid Summary II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Rudy Koester RK H2B RESOLUTION 2024- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE 11TH AND 17TH STREET CULVERTS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the 11th and 17th Street Culverts, described in the plans and specifications heretofore adopted by this Council on October 21, 2024, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Nagel Construction, LLC,of Allerton, IA Amount of bid:$564,004.00 Portion of project:All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 21st day of October, 2024. Mayor ATTEST: City Clerk 3737 Woodland Avenue, Suite 111 West Des Moines, IA 50266 Phone: 515.226.8859 Email: desmoines@whks.com Website: www.whks.com October 9, 2024 Honorable Mayor and City Council Members City of Waukee 230 West Hickman Road Waukee, Iowa 50263 RE: City of Waukee 11th and 17th Street Culverts Bid Tabulation and Recommendation of Award of Contract Dear Mayor and Council Members: The bid letting for the 11th and 17th Street Culverts project was held on October 8, 2024. Bids were received from nine (9) bidders. The bid package included alternates for cast-in-place or precast culvert structure types. The low bidder selected the cast-in-place culvert structure type. A summary of the bids is as follows: Bidder Alternate Total Bid Amount Nagel Construction, LLC, Allerton, IA Cast-in-Place $564,004.00 Gus Construction Co., Inc., Casey, IA Cast-in-Place $567,249.60 Jenco Construction Inc., Dallas Center, IA Cast-in-Place $648,348.60 Progressive Structures, LLC, Luxemburg, IA Precast $730,637.50 Holzworth Construction LLC, West Des Moines, IA Cast-in Place $754,955.20 S.M. Hentges & Sons, Inc., Jordan, MN Precast $844,427.41 Shekar Engineering, PLC, Des Moines, IA Cast-in-Place $907,464.52 MPS Engineers, PC dba Kingston Sertivces, Precast $1,027,989.00 P.C., Des Moines, IA Peterson Contractors, Inc., Reinbeck, IA Precast $1,037,775.40 The low bid was less than the Engineer’s Opinion of Probable Construction Cost of $772,358.50. Please find a detailed Bid Tabulation attached for your information. No errors were found compared to the apparent bids that change the low bid as read. We have reviewed the low bid and bid attachments and everything appears to be in order, including the experience of the low bidder. We recommend awarding the contract for this work to Nagel Construction, LLC, from Allerton, IA in the amount of $564,004.00. Appropriate contract documents will be prepared for signatures upon award of the contract by the City. Please let us know if you have any questions or need any additional information. We appreciate the opportunity to work with you and City staff on this project. City of Waukee October 9, 2024 Page 2 of 2 Sincerely, WHKS & CO. Casey V. Faber, P.E. Project Manager cc (w/enclosures): Becky Schuett, City of Waukee Rudy Koester, City of Waukee BID TABULATION (1 of 2) PROJECT: 11th and 17th Street Culverts LOCATION OF PROJECT: Waukee, IA WHKS PROJECT #: 9577 LETTING DATE-TIME-LOCATION: October 8, 2024 - 2:00 PM - City Hall - Waukee PREPARED BY: WHKS & Co. Unit Quantity Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price 1 EMBANKMENT-IN-PLACE CY 182.7 $30.00 $5,481.00 $10.00 $1,827.00 $22.00 $4,019.40 $23.00 $4,202.10 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 325.1 $15.00 $4,876.50 $10.00 $3,251.00 $7.00 $2,275.70 $10.00 $3,251.00 $0.00 3 FLOODED BACKFILL CY 125.0 $50.00 $6,250.00 $55.00 $6,875.00 $65.00 $8,125.00 $55.00 $6,875.00 $0.00 4 EXCAVATION, CLASS 20 CY 753 $25.00 $18,825.00 $15.00 $11,295.00 $18.00 $13,554.00 $16.00 $12,048.00 $0.00 5 GRANULAR MATERIAL FOR BLANKET CY 110.2 $90.00 $9,918.00 $50.00 $5,510.00 $75.00 $8,265.00 $45.00 $4,959.00 $0.00 6 STRUCTURAL CONCRETE (RCB CULVERT) CY 209.8 $725.00 $152,105.00 $585.00 $122,733.00 $644.00 $135,111.20 $700.00 $146,860.00 $0.00 7 REINFORCING STEEL LB 30,993 $2.00 $61,986.00 $1.35 $41,840.55 $1.00 $30,993.00 $2.00 $61,986.00 $0.00 8 ORNAMENTAL METAL RAILING LF 103.0 $350.00 $36,050.00 $300.00 $30,900.00 $215.00 $22,145.00 $215.00 $22,145.00 $0.00 9 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $3,000.00 $3,000.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $0.00 10 ENGINEERING FABRIC SY 335.5 $5.00 $1,677.50 $3.00 $1,006.50 $2.50 $838.75 $3.00 $1,006.50 $0.00 11 REVETMENT, CLASS E TON 240.1 $60.00 $14,406.00 $68.00 $16,326.80 $55.00 $13,205.50 $75.00 $18,007.50 $0.00 12 CONSTRUCTION SURVEY LS 1.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $0.00 13 MOBILIZATION LS 1.00 $33,000.00 $33,000.00 $25,000.00 $25,000.00 $15,500.00 $15,500.00 $17,000.00 $17,000.00 $0.00 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $40.00 $2,000.00 $58.00 $2,900.00 $25.00 $1,250.00 $0.00 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 355.0 $5.00 $1,775.00 $3.50 $1,242.50 $6.00 $2,130.00 $6.00 $2,130.00 $0.00 Total 11th Street Cast-in-Place Alternate $364,850.00 $275,807.35 $270,562.55 $309,720.10 $0.00 1 EMBANKMENT-IN-PLACE CY 197.5 $30.00 $5,925.00 $0.00 $0.00 $0.00 $10.00 $1,975.00 2 EXCAVATION, CLASS 10, CHANNEL CY 329.8 $15.00 $4,947.00 $0.00 $0.00 $0.00 $7.00 $2,308.60 3 FLOODED BACKFILL CY 132.3 $50.00 $6,615.00 $0.00 $0.00 $0.00 $36.00 $4,762.80 4 EXCAVATION, CLASS 20 CY 782 $25.00 $19,550.00 $0.00 $0.00 $0.00 $8.00 $6,256.00 5 GRANULAR MATERIAL FOR BLANKET CY 109.3 $90.00 $9,837.00 $0.00 $0.00 $0.00 $93.00 $10,164.90 6 ORNAMENTAL METAL RAILING LF 76.2 $350.00 $26,670.00 $0.00 $0.00 $0.00 $285.00 $21,717.00 7 PRECAST CONCRETE BOX CULVERT, 10 FT. X 5 FT. LF 184.0 $1,000.00 $184,000.00 $0.00 $0.00 $0.00 $930.00 $171,120.00 8 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 10 FT. X 5 FT. EACH 4 $22,500.00 $90,000.00 $0.00 $0.00 $0.00 $15,600.00 $62,400.00 9 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $0.00 $0.00 $0.00 $1,750.00 $1,750.00 10 ENGINEERING FABRIC SY 347.0 $5.00 $1,735.00 $0.00 $0.00 $0.00 $5.00 $1,735.00 11 REVETMENT, CLASS E TON 247.4 $60.00 $14,844.00 $0.00 $0.00 $0.00 $82.00 $20,286.80 12 CONSTRUCTION SURVEY LS 1.00 $6,000.00 $6,000.00 $0.00 $0.00 $0.00 $2,350.00 $2,350.00 13 MOBILIZATION LS 1.00 $38,500.00 $38,500.00 $0.00 $0.00 $0.00 $16,000.00 $16,000.00 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $0.00 $0.00 $0.00 $58.00 $2,900.00 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 330.0 $5.00 $1,650.00 $0.00 $0.00 $0.00 $6.00 $1,980.00 Total 11th Street Precast Alternate $422,773.00 $0.00 $0.00 $0.00 $327,706.10 1 EMBANKMENT-IN-PLACE CY 363.7 $30.00 $10,911.00 $10.00 $3,637.00 $22.00 $8,001.40 $23.00 $8,365.10 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 260.0 $15.00 $3,900.00 $10.00 $2,600.00 $7.50 $1,950.00 $10.00 $2,600.00 $0.00 3 REMOVAL OF EXISTING STRUCTURES LS 1.00 $5,000.00 $5,000.00 $9,000.00 $9,000.00 $1,700.00 $1,700.00 $1,000.00 $1,000.00 $0.00 4 FLOODED BACKFILL CY 119.1 $50.00 $5,955.00 $55.00 $6,550.50 $65.00 $7,741.50 $55.00 $6,550.50 $0.00 5 EXCAVATION, CLASS 20 CY 943 $25.00 $23,575.00 $15.00 $14,145.00 $18.00 $16,974.00 $16.00 $15,088.00 $0.00 6 GRANULAR MATERIAL FOR BLANKET CY 117.4 $90.00 $10,566.00 $50.00 $5,870.00 $75.00 $8,805.00 $50.00 $5,870.00 $0.00 7 STRUCTURAL CONCRETE (RCB CULVERT) CY 223.6 $725.00 $162,110.00 $585.00 $130,806.00 $644.00 $143,998.40 $700.00 $156,520.00 $0.00 8 REINFORCING STEEL LB 32,887 $2.00 $65,774.00 $1.35 $44,397.45 $1.00 $32,887.00 $2.00 $65,774.00 $0.00 9 ORNAMENTAL METAL RAILING LF 132.4 $350.00 $46,340.00 $300.00 $39,720.00 $215.00 $28,466.00 $215.00 $28,466.00 $0.00 10 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $3,000.00 $3,000.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $0.00 11 ENGINEERING FABRIC SY 338.3 $5.00 $1,691.50 $3.00 $1,014.90 $2.50 $845.75 $3.00 $1,014.90 $0.00 12 REVETMENT, CLASS E TON 235.6 $60.00 $14,136.00 $68.00 $16,020.80 $55.00 $12,958.00 $75.00 $17,670.00 $0.00 13 CONSTRUCTION SURVEY LS 1.00 $6,000.00 $6,000.00 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $0.00 14 MOBILIZATION LS 1.00 $37,000.00 $37,000.00 $5,000.00 $5,000.00 $15,500.00 $15,500.00 $18,000.00 $18,000.00 $0.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $40.00 $2,000.00 $58.00 $2,900.00 $25.00 $1,250.00 $0.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 410.0 $5.00 $2,050.00 $3.50 $1,435.00 $6.00 $2,460.00 $6.00 $2,460.00 $0.00 Total 17th Street Cast-in-Place Alternate $407,508.50 $288,196.65 $296,687.05 $338,628.50 $0.00 1 EMBANKMENT-IN-PLACE CY 360.4 $30.00 $10,812.00 $0.00 $0.00 $0.00 $10.00 $3,604.00 2 EXCAVATION, CLASS 10, CHANNEL CY 269.5 $15.00 $4,042.50 $0.00 $0.00 $0.00 $7.00 $1,886.50 3 REMOVAL OF EXISTING STRUCTURES LS 1.00 $5,000.00 $5,000.00 $0.00 $0.00 $0.00 $2,500.00 $2,500.00 4 FLOODED BACKFILL CY 125.5 $50.00 $6,275.00 $0.00 $0.00 $0.00 $36.00 $4,518.00 5 EXCAVATION, CLASS 20 CY 1,018 $25.00 $25,450.00 $0.00 $0.00 $0.00 $8.00 $8,144.00 6 GRANULAR MATERIAL FOR BLANKET CY 118.5 $90.00 $10,665.00 $0.00 $0.00 $0.00 $93.00 $11,020.50 7 STRUCTURAL CONCRETE (RCB CULVERT) CY 45.0 $725.00 $32,625.00 $0.00 $0.00 $0.00 $1,200.00 $54,000.00 8 REINFORCING STEEL LB 5,440 $2.00 $10,880.00 $0.00 $0.00 $0.00 $5.00 $27,200.00 9 ORNAMENTAL METAL RAILING LF 121.6 $350.00 $42,560.00 $0.00 $0.00 $0.00 $268.00 $32,588.80 10 PRECAST CONCRETE BOX CULVERT, 10 FT. X 5 FT. LF 190.0 $1,000.00 $190,000.00 $0.00 $0.00 $0.00 $930.00 $176,700.00 11 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 10 FT. X 5 FT. EACH 2 $22,500.00 $45,000.00 $0.00 $0.00 $0.00 $15,600.00 $31,200.00 12 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $0.00 $0.00 $0.00 $3,500.00 $3,500.00 13 ENGINEERING FABRIC SY 358.8 $5.00 $1,794.00 $0.00 $0.00 $0.00 $5.00 $1,794.00 14 REVETMENT, CLASS E TON 250.8 $60.00 $15,048.00 $0.00 $0.00 $0.00 $82.00 $20,565.60 15 CONSTRUCTION SURVEY LS 1.00 $6,000.00 $6,000.00 $0.00 $0.00 $0.00 $2,350.00 $2,350.00 16 MOBILIZATION LS 1.00 $42,000.00 $42,000.00 $0.00 $0.00 $0.00 $16,000.00 $16,000.00 17 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $0.00 $0.00 $0.00 $58.00 $2,900.00 18 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 410.0 $5.00 $2,050.00 $0.00 $0.00 $0.00 $6.00 $2,460.00 Total 17th Street Precast Alternate $462,701.50 $0.00 $0.00 $0.00 $402,931.40 Total Project Construction Cost $772,358.50 $564,004.00 $567,249.60 $648,348.60 $730,637.50 I hereby certify that this is a true and correct tabulation of the bids received on October 8th, 2024 for the 11th and 17th Street Culverts in Waukee, Iowa, and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Casey V. Faber License Number: 22283 My license renewal date is December 31, 2025 Pages covered by this seal: All Pages 17th Street Cast-in-Place Alternate Note incorrect extended price of $3,060 for item 18 and total of $731,237.50. 17th Street Precast Alternate Progressive Structures, LLCEngineer's Opinion Jenco Construction Inc. 11th Street Precast Alternate Item Item No. 11th Street Cast-in-Place Alternate Gus Construction Co., Inc.Nagel Construction, LLC L I CENSED PROFESSION A L E N G I N EER IOW A 22283 Faber Casey V. BID TABULATION (2 of 2) PROJECT: 11th and 17th Street Culverts LOCATION OF PROJECT: Waukee, IA WHKS PROJECT #: 9577 LETTING DATE-TIME-LOCATION: October 8, 2024 - 2:00 PM - City Hall - Waukee PREPARED BY: WHKS & Co. Unit Quantity Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price 1 EMBANKMENT-IN-PLACE CY 182.7 $25.00 $4,567.50 $0.00 $14.50 $2,649.15 $0.00 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 325.1 $10.00 $3,251.00 $0.00 $25.00 $8,127.50 $0.00 $0.00 3 FLOODED BACKFILL CY 125.0 $53.00 $6,625.00 $0.00 $75.00 $9,375.00 $0.00 $0.00 4 EXCAVATION, CLASS 20 CY 753 $12.00 $9,036.00 $0.00 $25.00 $18,825.00 $0.00 $0.00 5 GRANULAR MATERIAL FOR BLANKET CY 110.2 $110.00 $12,122.00 $0.00 $100.00 $11,020.00 $0.00 $0.00 6 STRUCTURAL CONCRETE (RCB CULVERT) CY 209.8 $850.00 $178,330.00 $0.00 $970.09 $203,524.88 $0.00 $0.00 7 REINFORCING STEEL LB 30,993 $2.00 $61,986.00 $0.00 $1.75 $54,237.75 $0.00 $0.00 8 ORNAMENTAL METAL RAILING LF 103.0 $300.00 $30,900.00 $0.00 $303.40 $31,250.20 $0.00 $0.00 9 TEMPORARY STREAM DIVERSION EACH 1 $7,000.00 $7,000.00 $0.00 $14,000.00 $14,000.00 $0.00 $0.00 10 ENGINEERING FABRIC SY 335.5 $3.00 $1,006.50 $0.00 $3.50 $1,174.25 $0.00 $0.00 11 REVETMENT, CLASS E TON 240.1 $75.00 $18,007.50 $0.00 $85.00 $20,408.50 $0.00 $0.00 12 CONSTRUCTION SURVEY LS 1.00 $5,000.00 $5,000.00 $0.00 $5,000.00 $5,000.00 $0.00 $0.00 13 MOBILIZATION LS 1.00 $20,000.00 $20,000.00 $0.00 $36,950.00 $36,950.00 $0.00 $0.00 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $0.00 $203.50 $10,175.00 $0.00 $0.00 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 355.0 $10.00 $3,550.00 $0.00 $6.60 $2,343.00 $0.00 $0.00 Total 11th Street Cast-in-Place Alternate $363,881.50 $0.00 $429,060.23 $0.00 $0.00 1 EMBANKMENT-IN-PLACE CY 197.5 $0.00 $10.00 $1,975.00 $0.00 $32.00 $6,320.00 $25.00 $4,937.50 2 EXCAVATION, CLASS 10, CHANNEL CY 329.8 $0.00 $16.00 $5,276.80 $0.00 $32.00 $10,553.60 $15.00 $4,947.00 3 FLOODED BACKFILL CY 132.3 $0.00 $70.00 $9,261.00 $0.00 $52.00 $6,879.60 $105.00 $13,891.50 4 EXCAVATION, CLASS 20 CY 782 $0.00 $12.00 $9,384.00 $0.00 $32.00 $25,024.00 $12.50 $9,775.00 5 GRANULAR MATERIAL FOR BLANKET CY 109.3 $0.00 $98.00 $10,711.40 $0.00 $64.00 $6,995.20 $130.00 $14,209.00 6 ORNAMENTAL METAL RAILING LF 76.2 $0.00 $330.00 $25,146.00 $0.00 $335.00 $25,527.00 $300.00 $22,860.00 7 PRECAST CONCRETE BOX CULVERT, 10 FT. X 5 FT. LF 184.0 $0.00 $900.00 $165,600.00 $0.00 $825.00 $151,800.00 $1,080.00 $198,720.00 8 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 10 FT. X 5 FT. EACH 4 $0.00 $17,000.00 $68,000.00 $0.00 $11,900.00 $47,600.00 $18,000.00 $72,000.00 9 TEMPORARY STREAM DIVERSION EACH 1 $0.00 $19,000.00 $19,000.00 $0.00 $5,400.00 $5,400.00 $6,500.00 $6,500.00 10 ENGINEERING FABRIC SY 347.0 $0.00 $3.00 $1,041.00 $0.00 $3.00 $1,041.00 $6.00 $2,082.00 11 REVETMENT, CLASS E TON 247.4 $0.00 $75.00 $18,555.00 $0.00 $72.00 $17,812.80 $65.00 $16,081.00 12 CONSTRUCTION SURVEY LS 1.00 $0.00 $3,500.00 $3,500.00 $0.00 $5,800.00 $5,800.00 $5,000.00 $5,000.00 13 MOBILIZATION LS 1.00 $0.00 $16,000.00 $16,000.00 $0.00 $18,500.00 $18,500.00 $11,500.00 $11,500.00 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $0.00 $125.00 $6,250.00 $0.00 $80.00 $4,000.00 $130.00 $6,500.00 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 330.0 $0.00 $13.50 $4,455.00 $0.00 $4.00 $1,320.00 $5.00 $1,650.00 Total 11th Street Precast Alternate $0.00 $364,155.20 $0.00 $334,573.20 $390,653.00 1 EMBANKMENT-IN-PLACE CY 363.7 $25.00 $9,092.50 $0.00 $14.50 $5,273.65 $0.00 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 260.0 $10.00 $2,600.00 $0.00 $25.00 $6,500.00 $0.00 $0.00 3 REMOVAL OF EXISTING STRUCTURES LS 1.00 $1,000.00 $1,000.00 $0.00 $17,550.00 $17,550.00 $0.00 $0.00 4 FLOODED BACKFILL CY 119.1 $53.00 $6,312.30 $0.00 $75.00 $8,932.50 $0.00 $0.00 5 EXCAVATION, CLASS 20 CY 943 $12.00 $11,316.00 $0.00 $25.00 $23,575.00 $0.00 $0.00 6 GRANULAR MATERIAL FOR BLANKET CY 117.4 $110.00 $12,914.00 $0.00 $100.00 $11,740.00 $0.00 $0.00 7 STRUCTURAL CONCRETE (RCB CULVERT) CY 223.6 $850.00 $190,060.00 $0.00 $970.09 $216,912.12 $0.00 $0.00 8 REINFORCING STEEL LB 32,887 $2.00 $65,774.00 $0.00 $1.75 $57,552.25 $0.00 $0.00 9 ORNAMENTAL METAL RAILING LF 132.4 $300.00 $39,720.00 $0.00 $304.59 $40,327.72 $0.00 $0.00 10 TEMPORARY STREAM DIVERSION EACH 1 $7,000.00 $7,000.00 $0.00 $14,000.00 $14,000.00 $0.00 $0.00 11 ENGINEERING FABRIC SY 338.3 $3.00 $1,014.90 $0.00 $3.50 $1,184.05 $0.00 $0.00 12 REVETMENT, CLASS E TON 235.6 $75.00 $17,670.00 $0.00 $85.00 $20,026.00 $0.00 $0.00 13 CONSTRUCTION SURVEY LS 1.00 $5,000.00 $5,000.00 $0.00 $5,000.00 $5,000.00 $0.00 $0.00 14 MOBILIZATION LS 1.00 $15,000.00 $15,000.00 $0.00 $36,950.00 $36,950.00 $0.00 $0.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $50.00 $2,500.00 $0.00 $203.50 $10,175.00 $0.00 $0.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 410.0 $10.00 $4,100.00 $0.00 $6.60 $2,706.00 $0.00 $0.00 Total 17th Street Cast-in-Place Alternate $391,073.70 $0.00 $478,404.29 $0.00 $0.00 1 EMBANKMENT-IN-PLACE CY 360.4 $0.00 $21.00 $7,568.40 $0.00 $32.00 $11,532.80 $24.00 $8,649.60 2 EXCAVATION, CLASS 10, CHANNEL CY 269.5 $0.00 $11.38 $3,066.91 $0.00 $32.00 $8,624.00 $14.00 $3,773.00 3 REMOVAL OF EXISTING STRUCTURES LS 1.00 $0.00 $5,000.00 $5,000.00 $0.00 $3,500.00 $3,500.00 $8,500.00 $8,500.00 4 FLOODED BACKFILL CY 125.5 $0.00 $65.00 $8,157.50 $0.00 $62.00 $7,781.00 $105.00 $13,177.50 5 EXCAVATION, CLASS 20 CY 1,018 $0.00 $16.50 $16,797.00 $0.00 $32.00 $32,576.00 $12.50 $12,725.00 6 GRANULAR MATERIAL FOR BLANKET CY 118.5 $0.00 $98.00 $11,613.00 $0.00 $64.00 $7,584.00 $125.00 $14,812.50 7 STRUCTURAL CONCRETE (RCB CULVERT) CY 45.0 $0.00 $1,200.00 $54,000.00 $0.00 $1,900.00 $85,500.00 $3,000.00 $135,000.00 8 REINFORCING STEEL LB 5,440 $0.00 $2.30 $12,512.00 $0.00 $12.00 $65,280.00 $21.00 $114,240.00 9 ORNAMENTAL METAL RAILING LF 121.6 $0.00 $335.00 $40,736.00 $0.00 $290.00 $35,264.00 $275.00 $33,440.00 10 PRECAST CONCRETE BOX CULVERT, 10 FT. X 5 FT. LF 190.0 $0.00 $905.00 $171,950.00 $0.00 $1,400.00 $266,000.00 $1,070.00 $203,300.00 11 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 10 FT. X 5 FT. EACH 2 $0.00 $25,000.00 $50,000.00 $0.00 $11,900.00 $23,800.00 $19,750.00 $39,500.00 12 TEMPORARY STREAM DIVERSION EACH 1 $0.00 $19,000.00 $19,000.00 $0.00 $5,400.00 $5,400.00 $6,500.00 $6,500.00 13 ENGINEERING FABRIC SY 358.8 $0.00 $3.00 $1,076.40 $0.00 $3.00 $1,076.40 $6.00 $2,152.80 14 REVETMENT, CLASS E TON 250.8 $0.00 $75.00 $18,810.00 $0.00 $72.00 $18,057.60 $65.00 $16,302.00 15 CONSTRUCTION SURVEY LS 1.00 $0.00 $3,500.00 $3,500.00 $0.00 $5,800.00 $5,800.00 $5,000.00 $5,000.00 16 MOBILIZATION LS 1.00 $0.00 $44,700.00 $44,700.00 $0.00 $110,000.00 $110,000.00 $21,500.00 $21,500.00 17 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 50.0 $0.00 $125.00 $6,250.00 $0.00 $80.00 $4,000.00 $130.00 $6,500.00 18 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 410.0 $0.00 $13.50 $5,535.00 $0.00 $4.00 $1,640.00 $5.00 $2,050.00 Total 17th Street Precast Alternate $0.00 $480,272.21 $0.00 $693,415.80 $647,122.40 Total Project Construction Cost $754,955.20 $844,427.41 $907,464.52 $1,027,989.00 $1,037,775.40 Note incorrect subtotal for 17th Street of $647,122.45 but correct total. Peterson Contractors, Inc. 11th Street Cast-in-Place Alternate 11th Street Precast Alternate Item No. Item Holzworth Construction LLC S.M. Hentges & Sons, Inc. Shekar Engineering, P.L.C.MPS Engineers, PC dba Kingston Services, P.C. 17th Street Cast-in-Place Alternate 17th Street Precast Alternate Note incorrect subtotal for 17th Street of $399,893.70 and total of $763,775.20. Note incorrect extended price for item 2 of $3,066.85 and total of $844,427.35.