HomeMy WebLinkAbout2024-10-21 I01E_08 Prairie Rose Trail_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: October 21, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Absolute Group for the Prairie Rose Trail Project increasing the contract amount by $35,106.30. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is for grading to reshape the west bank of the pond north of NW Douglas Parkway to eliminate steep drop off, unknown storm drain repairs at the east and west bridge abutments, addition of a concrete pier to support the trail tying into the box culvert under NW Douglas Parkway and installation of a rock trench to help drainage at the south end of the box culvert under NW Douglas Parkway. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $35,106.30. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Change Order No. 2 ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1E8 Absolute Group, Inc. PO Box 430 1800 Burr Oak Blvd Granger, IA 50109 Project: To: Description of Proposed Change: Item Quantity Units Unit Price Amount 1 1 LS 11,000.00$ 11,000.00$ 2 1 LS 1,500.00$ 1,500.00$ -$ -$ -$ Accepted: By: By: Date: Date: 12,500.00$ Total 2 City of Waukee Absolute Group, Inc. Additional Days Requested: Pond Grading - Dozer, Skid Loader, Excavator Mobe Description Pricing to reshape the west bank of the pond located north of Douglas Ave. Excess material will be spread onsite shown in the attachement. This price does not cover haul off of material. Figured 2.5 days with a grading crew consisting of 3 operators, dozer, skid loader, and excavator. Change Order Proposal Prairie Rose Trail City of Waukee Job Number: 03PM-24002 Date: 9/19/2024 Absolute Group, Inc. PO Box 430 1800 Burr Oak Blvd Granger, IA 50109 Project: To: Description of Proposed Change: Item Quantity Units Unit Price Amount 1 1 LS 10,570.00$ 10,570.00$ Accepted: By: By: Date: Date: 10,570.00$ SubTotal 1 Markup Total 1,057.00$ 11,627.00$ City of Waukee Absolute Group, Inc. Additional Days Requested: 60' Trail Bridge Revisions Description See attached description. Change Order Proposal Prairie Rose Trail City of Waukee Job Number: 03PM-24002 Date: 9/13/2024 Absolute Group, Inc. PO Box 430 1800 Burr Oak Blvd Granger, IA 50109 Project: To: Description of Proposed Change: Item Quantity Units Unit Price Amount 1 1 LS 3,163.00$ 3,163.00$ Accepted: By: By: Date: Date: 24" Clay Tile Repair Description Murphy Heavy Contracting discovered 24" clay tile while installing rip rap on the 60' Prairie Rose Trail bridge. The price below is to relace the damaged section of 24" clay tile with 24" corrugated plastic tile. Change Order Proposal Prairie Rose Trail City of Waukee Job Number: 03PM-24002 Date: 9/24/2024 City of Waukee Absolute Group, Inc. Additional Days Requested: 3,163.00$ SubTotal 1 Markup Total 316.30$ 3,479.30$ Absolute Group, Inc. PO Box 430 1800 Burr Oak Blvd Granger, IA 50109 Project: To: Description of Proposed Change: Item Quantity Units Unit Price Amount 1 12 EA 500.00$ 6,000.00$ 2 75 LF 20.00$ 1,500.00$ Accepted: By: By: Date: Date: 12"x60" Concrete Pier 3'x1' Rock Trench Description Piers under trail approaches at Douglas box culvert. Rock trench along trail north of Douglas box culvert. Change Order Proposal Prairie Rose Trail City of Waukee Job Number: 03PM-24002 Date: 9/10/2024 City of Waukee Absolute Group, Inc. Additional Days Requested:1 Total 7,500.00$