Loading...
HomeMy WebLinkAbout2024-10-07 Resolution 2024-438_Fee Schedule, Revised 1THE CITY OF WAUKEE, IOWA RESOLUTION 2024-438 ADOPTING THE CITY OF WAUKEE 2024 FEE SCHEDULE, REVISION NO.1 [GAS MAIN INSTALLATION CONSTRUCTION COSTS, GAS MAIN INSTALLATION MATERIAL COSTS, RESIDENTIAL GAS SERVICE CONSTRUCTION COSTS] IN THE NAME AND BY THE A UTHORITY OF THE CITY OF WA UKEE, IO WA WHEREAS, the City of Waukee, Iowa is a duly organized municipality within Dallas County; AND, WHEREAS, on December 18, 2023, the Waukee City Council approved the City of Waukee 2024 Fee Schedule (Resolution #2023-543); AND, WHEREAS, revisions are proposed to the 2024 Fee Schedule to update gas main installation and material pricing as shown in Exhibit A, which is attached. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 71' day of October, 2024, that the City of Waukee 2024 Fee Schedule, Revision No. 1 [Gas Main Installation Construction Costs, Gas Main Installation Material Costs, Residential Gas Service Construction Costs], is hereby approved and shall be in effect immediately. Attest:tMA/W �n 60 L4094 Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE R. Charles Bottenberg X Chris Crone X Rob Grove X Anna Bergman Pierce X Ben Sinclair X ni===-- Courtney Clarke, Mayor NAY ABSENT ABSTAIN EXHIBIT A Gas Main Installation Construction Costs Trenched Gas Main Per Linear Foot 2" PLS 30" Min $6.45 4" PLS 30" Min $8.39 6" PLS 30" Min $15.03 8" PLS 30" Min $24.31 10" PLS 30" Min $37.29 2" Steel 30" Min $18.31 4" Steel 30" Min $22.90 6" Steel 30" Min $44.02 8" Steel 30" Min $50.59 10" Steel 30" Min $60.90 Directional Bored Gas Main Per Linear Foot 1/2" PLS $17.69 1" PLS $17.69 2" PLS $17.69 4" PLS $24.77 6" PLS $44.23 8" PLS $59.83 10" PLS $96.09 1" Steel $19.46 2" Steel $19.46 4" Steel $26.55 6" Steel $46.01 8" Steel $76.92 10" Steel $110.54 Gas Services Per Linear Foot 1/2 PLS $11.49 1" PLS $11.49 2" PLS $13.26 4" PLS $27.35 6" PLS $34.19 1 " Steel $17.69 2" Steel $21.23 4" Steel $30.77 6" Steel $42.73 Gas Main Hot Tie In Per Each 1/2" PLS $354.09 1" PLS $211.62 2" PLS $442.62 4" PLS $796.70 6" PLS $1,053.10 8" PLS $1,794.85 1" Steel $1,053.10 2" Steel $1,388.87 4" Steel $2,213.04 6" Steel $2,213.04 8" Steel $2,654.13 Steel Gas Main Work Per Each 1" Steel Service Retire $961.24 2" Steel Service Retire $961.24 4" Steel Service Retire $1,367.80 6" Steel Service Retire $2,051.70 Frost Charges Per Linear Foot 6" to 12" Trench $3.23 13" to 18" Trench $6.44 19" to 24" Trench $8.96 Frost Charges Each 6" to 12" Bellhole $82.05 12" to 18" Bellhole $193.16 18" to 24" Bellhole $307.68 Welding Per Hour Welder Rate $124.54 Welder Helper $98.37 Welding Rig $44.02 Labor Rates Per Hour Supervisor $151.58 Foreman $127.93 Fuser $102.07 Helper $98.37 Laborer $74.09 Operator $101.97 Pipe Fitter $124.54 Truck Driver $101.97 Equipment Rates Per Hour Pick Up 1/2 ton $36.06 Pick Up 1 ton $41.10 2 ton dump truck with tools $52.83 Foreman truck with tools $36.69 Fuser Truck with Tools $36.69 Backhoe Rubber Tire $58.70 Backhoe with Breaker $66.04 Backhoe with Tamper $66.04 Excavator $113.01 Mini Excavator $60.75 Sideboom Tractor $95.39 Trencher Walk behind $45.56 Trencher Wheel $144.30 Boring Equipment 2" Missile $30.38 Boring Equipment 3-4" Missile $37.99 Bore Rig Small $455.67 Skid Steer $30.38 Pipe Trailer Stick $15.18 Pipe Trailer Coil $7.61 Vacuum Excavator $68.36 Pipe Strai htner $15.18 Generator $7.61 Water Pump $15.18 Jumping Jack Tamper $7.61 Air Compressor with Tools $22.79 Stopping Equipment Per Each 1" Steel Stop Low Pressure $85.48 1" Steel Stop high Pressure $0.00 2" Steel Stop Low Pressure $128.20 2" Steel Stop high Pressure $0.00 4" Steel Stop Low Pressure $153.85 4" Steel Stop high Pressure $0.00 6" Steel Stop low Pressure $0.00 6" Steel Stop high Pressure $0.00 8" Steel Stop low Pressure $0.00 8" Steel Stop high Pressure $0.00 10" Steel Stop low Pressure $0.00 10" Steel Stop high Pressure $0.00 2" Plastic Squeeze - off $8.55 4" Plastic Squeeze - off $12.83 6" Plastic Squeeze - off $17.09 8" Plastic Squeeze - off $68.68 10" Plastic Squeeze - off $0.00 1/2" - 1" Plastic Squeeze - off $8.55 By -Pass Per Each 1" PLS By -Pass $640.21 2" PLS By -Pass $782.47 4" PLS By -Pass $1,024.34 6" PLS By -Pass $1,365.78 1" Steel By -Pass $1,138.15 2" Steel By -Pass $1,821.04 4" Steel By -Pass $2,731.55 6" Steel By -Pass $0.00 8" Steel By -Pass $0.00 Miscellaneous Per Linear Foot Bell hole adder over 6' deep $0.00 Hand Di $44.23 Silt Fence $15.03 Rock Shield $17.69 Miscellaneous Per Each Anode 1 LB Installed $44.23 Anode 5 LB Installed $53.09 Anode 17 LB Installed $61.92 Test Station Installed $265.38 Line Markers Installed $132.69 1" PE Valve Installed $146.76 2" PE Valve Installed $220.13 4" PE Valve Installed $468.85 6" PE Valve Installed $625.16 1" Steel Valve Installed $249.48 2" Steel Valve Installed $535.65 4" Steel Valve Installed $587.02 6" Steel Valve Installed $1,041.96 Miscellaneous Per Square Foot Sod Removal & Replacement(Existing)_$5.32 Sod Replacement New $6.20 Asphalt Removal & Replacement $26.15 Concrete Removal & Replacement $30.97 Spreading Stone $79.61 Matting $26.55 Seeding $1.43 Miscellaneous Per Vertical Foot Extra Depth Ditch $2.65 Gas Main Installation Material Costs Per Each * 1" PE Ball Valve $48.64 2" PE Ball Valve $95.76 4" PE Ball Valve $304.00 6" PE Ball Valve $630.80 Line Markers $24.65 Test Station $59.35 Anode 1 LB $26.02 Anode 5 LB $71.75 Anode 17 LB $190.15 Valve Box w/ Cast Iron Ring and Lid $232.60 4" Butt Fusion Tee $22.71 4" Butt Fusion 90 Deg Bend $17.42 4" Butt Fusion Caps $10.57 4" X 2" Butt Fusion Reducer $10.43 2" Butt Fusion 90 Deg Bend $5.58 2" Butt Fusion Tee $6.99 2" Butt Fusion Caps $3.50 4" X 2" HV Tap Tee $118.75 6" Butt Fusion Tee $51.94 6" Butt Fusion 90 Deg Bend $43.84 6" Butt Fusion 45 Deg Bend $43.84 6" X 4" Butt Fusion Reducer $31.34 4" Butt Fusion 45 Deg Bend $17.42 Per Linear Foot)* 2" IPS Performance Pie $1.34 4" IPS Performance Pie $4.43 6" IPS Performance Pie $9.62 Rock Shield $13.00 Tracer Wire and Warning Tape $0.25 * Freight will be included as a separate line item on the final invoice Residential Gas Service Construction Costs Per Each Short Side Service $382.24 Long Side Service $382.24