HomeMy WebLinkAbout2024-10-07 Resolution 2024-438_Fee Schedule, Revised 1THE CITY OF WAUKEE, IOWA
RESOLUTION 2024-438
ADOPTING THE CITY OF WAUKEE 2024 FEE SCHEDULE, REVISION NO.1
[GAS MAIN INSTALLATION CONSTRUCTION COSTS, GAS MAIN INSTALLATION
MATERIAL COSTS, RESIDENTIAL GAS SERVICE CONSTRUCTION COSTS]
IN THE NAME AND BY THE A UTHORITY OF THE CITY OF WA UKEE, IO WA
WHEREAS, the City of Waukee, Iowa is a duly organized municipality within Dallas County;
AND,
WHEREAS, on December 18, 2023, the Waukee City Council approved the City of Waukee
2024 Fee Schedule (Resolution #2023-543); AND,
WHEREAS, revisions are proposed to the 2024 Fee Schedule to update gas main installation
and material pricing as shown in Exhibit A, which is attached.
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this
71' day of October, 2024, that the City of Waukee 2024 Fee Schedule, Revision No. 1 [Gas Main
Installation Construction Costs, Gas Main Installation Material Costs, Residential Gas Service
Construction Costs], is hereby approved and shall be in effect immediately.
Attest:tMA/W �n
60
L4094
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE:
AYE
R. Charles Bottenberg
X
Chris Crone
X
Rob Grove
X
Anna Bergman Pierce
X
Ben Sinclair
X
ni===--
Courtney Clarke, Mayor
NAY ABSENT ABSTAIN
EXHIBIT A
Gas Main Installation Construction Costs
Trenched Gas Main Per Linear Foot
2" PLS 30" Min
$6.45
4" PLS 30" Min
$8.39
6" PLS 30" Min
$15.03
8" PLS 30" Min
$24.31
10" PLS 30" Min
$37.29
2" Steel 30" Min
$18.31
4" Steel 30" Min
$22.90
6" Steel 30" Min
$44.02
8" Steel 30" Min
$50.59
10" Steel 30" Min
$60.90
Directional Bored Gas Main Per Linear Foot
1/2" PLS
$17.69
1" PLS
$17.69
2" PLS
$17.69
4" PLS
$24.77
6" PLS
$44.23
8" PLS
$59.83
10" PLS
$96.09
1" Steel
$19.46
2" Steel
$19.46
4" Steel
$26.55
6" Steel
$46.01
8" Steel
$76.92
10" Steel
$110.54
Gas Services Per Linear Foot
1/2 PLS
$11.49
1" PLS
$11.49
2" PLS
$13.26
4" PLS
$27.35
6" PLS
$34.19
1 " Steel
$17.69
2" Steel
$21.23
4" Steel
$30.77
6" Steel
$42.73
Gas Main Hot Tie In Per Each
1/2" PLS
$354.09
1" PLS
$211.62
2" PLS
$442.62
4" PLS
$796.70
6" PLS
$1,053.10
8" PLS
$1,794.85
1" Steel
$1,053.10
2" Steel
$1,388.87
4" Steel
$2,213.04
6" Steel
$2,213.04
8" Steel
$2,654.13
Steel Gas Main Work Per Each
1" Steel Service Retire
$961.24
2" Steel Service Retire
$961.24
4" Steel Service Retire
$1,367.80
6" Steel Service Retire
$2,051.70
Frost Charges Per Linear Foot
6" to 12" Trench
$3.23
13" to 18" Trench
$6.44
19" to 24" Trench
$8.96
Frost Charges Each
6" to 12" Bellhole
$82.05
12" to 18" Bellhole
$193.16
18" to 24" Bellhole
$307.68
Welding Per Hour
Welder Rate
$124.54
Welder Helper
$98.37
Welding Rig
$44.02
Labor Rates Per Hour
Supervisor
$151.58
Foreman
$127.93
Fuser
$102.07
Helper
$98.37
Laborer
$74.09
Operator
$101.97
Pipe Fitter
$124.54
Truck Driver
$101.97
Equipment Rates Per Hour
Pick Up 1/2 ton
$36.06
Pick Up 1 ton
$41.10
2 ton dump truck with tools
$52.83
Foreman truck with tools
$36.69
Fuser Truck with Tools
$36.69
Backhoe Rubber Tire
$58.70
Backhoe with Breaker
$66.04
Backhoe with Tamper
$66.04
Excavator
$113.01
Mini Excavator
$60.75
Sideboom Tractor
$95.39
Trencher Walk behind
$45.56
Trencher Wheel
$144.30
Boring Equipment 2" Missile
$30.38
Boring Equipment 3-4" Missile
$37.99
Bore Rig Small
$455.67
Skid Steer
$30.38
Pipe Trailer Stick
$15.18
Pipe Trailer Coil
$7.61
Vacuum Excavator
$68.36
Pipe Strai htner
$15.18
Generator
$7.61
Water Pump
$15.18
Jumping Jack Tamper
$7.61
Air Compressor with Tools
$22.79
Stopping Equipment Per Each
1" Steel Stop Low Pressure
$85.48
1" Steel Stop high Pressure
$0.00
2" Steel Stop Low Pressure
$128.20
2" Steel Stop high Pressure
$0.00
4" Steel Stop Low Pressure
$153.85
4" Steel Stop high Pressure
$0.00
6" Steel Stop low Pressure
$0.00
6" Steel Stop high Pressure
$0.00
8" Steel Stop low Pressure
$0.00
8" Steel Stop high Pressure
$0.00
10" Steel Stop low Pressure
$0.00
10" Steel Stop high Pressure
$0.00
2" Plastic Squeeze - off
$8.55
4" Plastic Squeeze - off
$12.83
6" Plastic Squeeze - off
$17.09
8" Plastic Squeeze - off
$68.68
10" Plastic Squeeze - off
$0.00
1/2" - 1" Plastic Squeeze - off
$8.55
By -Pass Per Each
1" PLS By -Pass
$640.21
2" PLS By -Pass
$782.47
4" PLS By -Pass
$1,024.34
6" PLS By -Pass
$1,365.78
1" Steel By -Pass
$1,138.15
2" Steel By -Pass
$1,821.04
4" Steel By -Pass
$2,731.55
6" Steel By -Pass
$0.00
8" Steel By -Pass
$0.00
Miscellaneous Per Linear Foot
Bell hole adder over 6' deep
$0.00
Hand Di
$44.23
Silt Fence
$15.03
Rock Shield
$17.69
Miscellaneous Per Each
Anode 1 LB Installed
$44.23
Anode 5 LB Installed
$53.09
Anode 17 LB Installed
$61.92
Test Station Installed
$265.38
Line Markers Installed
$132.69
1" PE Valve Installed
$146.76
2" PE Valve Installed
$220.13
4" PE Valve Installed
$468.85
6" PE Valve Installed
$625.16
1" Steel Valve Installed
$249.48
2" Steel Valve Installed
$535.65
4" Steel Valve Installed
$587.02
6" Steel Valve Installed
$1,041.96
Miscellaneous Per Square Foot
Sod Removal & Replacement(Existing)_$5.32
Sod Replacement New
$6.20
Asphalt Removal & Replacement
$26.15
Concrete Removal & Replacement
$30.97
Spreading Stone
$79.61
Matting
$26.55
Seeding
$1.43
Miscellaneous Per Vertical Foot
Extra Depth Ditch
$2.65
Gas Main Installation Material Costs
Per Each *
1" PE Ball Valve
$48.64
2" PE Ball Valve
$95.76
4" PE Ball Valve
$304.00
6" PE Ball Valve
$630.80
Line Markers
$24.65
Test Station
$59.35
Anode 1 LB
$26.02
Anode 5 LB
$71.75
Anode 17 LB
$190.15
Valve Box w/ Cast Iron Ring and Lid
$232.60
4" Butt Fusion Tee
$22.71
4" Butt Fusion 90 Deg Bend
$17.42
4" Butt Fusion Caps
$10.57
4" X 2" Butt Fusion Reducer
$10.43
2" Butt Fusion 90 Deg Bend
$5.58
2" Butt Fusion Tee
$6.99
2" Butt Fusion Caps
$3.50
4" X 2" HV Tap Tee
$118.75
6" Butt Fusion Tee
$51.94
6" Butt Fusion 90 Deg Bend
$43.84
6" Butt Fusion 45 Deg Bend
$43.84
6" X 4" Butt Fusion Reducer
$31.34
4" Butt Fusion 45 Deg Bend
$17.42
Per Linear Foot)*
2" IPS Performance Pie
$1.34
4" IPS Performance Pie
$4.43
6" IPS Performance Pie
$9.62
Rock Shield
$13.00
Tracer Wire and Warning Tape
$0.25
* Freight will be included as a separate line item on the final invoice
Residential Gas Service Construction Costs
Per Each
Short Side Service
$382.24
Long Side Service
$382.24