Loading...
HomeMy WebLinkAbout2024-11-04 I01H_01 Traffic Signal Enhancements, School and Trail Crossings_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 4, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Iowa Signal, Inc. for the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements Project, increasing the contract amount by $49,097.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 changes the Grand Prairie Parkway & SE Ashworth Road intersection from a cabinet modification to a cabinet replacement, replacing the existing 3-section EB/WB left turn head with 4-section FYA (Flashing Yellow Arrow) heads. The existing cabinet cannot be modified to provide the number of FYA phases included in the original plans. The FYA heads for the EB/WB lefts are to be consistent with other intersections throughout the City. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $49,097.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H1 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2022\122.0627.01\construction\ltr_2024-10-23_co-01_gpp-ashworth_cab-replace.docx October 23, 2024 Rudy Koester, P.E. Public Works Director City of Waukee 805 University Ave Waukee, IA 50263 RE: CHANGE ORDER NO. 1 TRAFFIC SIGNAL ENHANCEMENT S&A PROJECT NO.: 122.0627.01 IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25 Dear Mr. Koester: Change order #1 changes the Grand Prairie Pkwy & Ashworth Rd intersection from a cabinet modification to a cabinet replacement. It also replaces the existing 3-section EB/WB left turn heads with 4-section FYA heads. This change is necessary because the existing cabinet cannot be modified to provide the number of flashing yellow arrow phases as included in the original plans (the existing cabinet has a maximum of 4, but the plans called for 6). The FYA heads for the EB/WB lefts are to be consistent with other intersections throughout the City. Attached is change order #1 for the project. This change order increases the current contract amount of $917,492 by $49,097.00. The resulting new contract amount is $966,589.00. We recommend approving this change order to amend the original contract as shown in the attached change order form. Please contact me should you have any questions regarding this partial payment application. Sincerely, SNYDER & ASSOCIATES, INC. Andrew Houchin, P.E. Project Engineer Enclosure OWNER: City of Waukee PROJECT: Traffic Signal System Enhancement Project PROJECT #: 122.0627.01 To: You are directed to make the following changes in this contract: 1. Description of change to be made: 2. Reason for Change: 3. Settlement for the cost of making the change shall be as follows: Item No. Item Description Quantity Unit Unit Price Total Price 1. Item 0060 Signal Cabinet Modification -1 EACH $4,412.00 -$4,412.00 2. Item 0070 Signal Cabinet Replacement 1 EACH $50,405.00 $50,405.00 3.Item 0140 Traffic Signal, Replacement/ Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted 4 EACH $776.00 $3,104.00 TOTAL $49,097.00 4. This change order will result in a net change in the contract completion time of days and a net change in the cost of the project of $49097.00 divided as follows: Contract Contract Amount Completion Date Approved funds and contract completion date as per (Engineer's Estimate, Contract or last approved C.O.)$917,492.00 December 31, 2024 Change due to this C.O. (+ or -)$49,097.00 Totals including this C.O.:$966,589.00 December 31, 2024 The change described herein is understood, and the terms of settlement are hereby agreed to: Iowa Signal, Inc. CONTRACTOR By DATE: Snyder & Associates, Inc. ENGINEER By DATE: City of Waukee OWNER By DATE: CHANGE ORDER NO. 1 City, State, Zip Iowa Signal, Inc. Contractor 3711 SE Capitol Cir Grimes, IA 50111 Address This change is necessary because the existing cabinet cannot be modified to provide the number of flashing yellow arrow phases as included in the original plans (the existing cabinet has a maximum of 4, but the plans called for 6). The City is requesting FYA heads be provided for the EB/WB lefts for consistency with other intersections throughout the City. Change Grand Prairie Pkwy & Ashworth Rd intersection from a cabinet modification to a cabinet replacement. Also, replace the existing 3- section EB/WB left turn heads with 4-section FYA heads (4 each). V:\Projects\2022\122.0627.01\Construction\CO-01_2024-10-14_GPP-Ashworth_Cab-Replace.xlsx 10/23/24 6. DETAILED ESTIMATE OF WORK COMPLETED: APPLICATION FOR PARTIAL PAYMENT NO. 2 ITEM TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT NO. USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL. 1. 0.5 0.5 1.0 LS 2,700.00$ 1,350.00$ 1,350.00$ -$ -$ 2,700.00$ 0 -$ 0 -$ 0.00% 2. 0.5 0.5 1 LS 27,800.00$ 13,900.00$ 13,900.00$ -$ -$ 27,800.00$ 0.05 0.05 0.1 2,780.00$ 0 -$ 10.00% 3.1 1 LS 2,145.00$ -$ -$ -$ 2,145.00$ 2,145.00$ 0 -$ 0 -$ 0.00% 4.24 24 EA 1,634.00$ -$ 39,216.00$ -$ -$ 39,216.00$ 0 -$ 0 -$ 0.00% 5.88EA6,783.00$ -$ 54,264.00$ -$ -$ 54,264.00$ 0 -$ 0 -$ 0.00% 6. 2 5 7 EA 4,412.00$ 8,824.00$ 22,060.00$ -$ -$ 30,884.00$ 0 -$ 0 -$ 0.00% 7.47 11EA 50,405.00$ -$ 201,620.00$ 352,835.00$ -$ 554,455.00$ 0 -$ 0 -$ 0.00% 8. 2 8 4 14 EA 370.00$ 740.00$ 2,960.00$ 1,480.00$ -$ 5,180.00$ 0 -$ 0 -$ 0.00% 9.11 24 35 EA 370.00$ -$ -$ 4,070.00$ 8,880.00$ 12,950.00$ 0 -$ 0 -$ 0.00% 10. 4 6 10 EA 402.00$ 1,608.00$ 2,412.00$ -$ -$ 4,020.00$ 0 -$ 0 -$ 0.00% 11. 2 2 EA 850.00$ 1,700.00$ -$ -$ -$ 1,700.00$ 0 -$ 0 -$ 0.00% 12. 2 2 EA 550.00$ 1,100.00$ -$ -$ -$ 1,100.00$ 0 -$ 0 -$ 0.00% 13.18 18 EA 437.00$ -$ 7,866.00$ -$ -$ 7,866.00$ 0 -$ 0 -$ 0.00% 14.7221342EA 776.00$ -$ 5,432.00$ 17,072.00$ 10,088.00$ 32,592.00$ 0 -$ 0 -$ 0.00% 15. 10 5 15 EA 523.00$ 5,230.00$ 2,615.00$ -$ -$ 7,845.00$ 0 -$ 0 -$ 0.00% 16. 8 17 25 EA 751.00$ 6,008.00$ 12,767.00$ -$ -$ 18,775.00$ 0 -$ 0 -$ 0.00% 17.10 10 EA 10,800.00$ -$ -$ -$ 108,000.00$ 108,000.00$ 0 -$ 0 -$ 0.00% 18. 300 2,700 3000 LF 2.00$ 600.00$ 5,400.00$ -$ -$ 6,000.00$ 0 -$ 0 -$ 0.00% TAP+USTEP TAP Only USTEP Only City OVERALL PERCENT COMPLETE = 0.30% ORIGINAL CONTRACT = 41,060.00$ 371,862.00$ 375,457.00$ 129,113.00$ 917,492.00$ PREVIOUS PAY APPS = 1,390.00$ 1,390.00$ -$ -$ 2,780.00$ CURRENT PAY APP = -$ -$ -$ -$ -$ (Current less 3% retainage for Claim Forms) -$ -$ -$ -$ -$ CHANGE ORDER SUMMARY: ITEM CO TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT NO. DESCRIPTION # USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL. 6. Signal Cabinet Modification 1 -1 -1 EA 4,412.00$ -$ (4,412.00)$ -$ -$ (4,412.00)$ 0 -$ 0 -$ 0.00% 7. Signal Cabinet Replacement 1 1 1 EA 50,405.00$ -$ 50,405.00$ -$ -$ 50,405.00$ 0 -$ 0 -$ 0.00% 14. Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted 1 4 4 EA 776.00$ -$ -$ -$ 3,104.00$ 3,104.00$ 0 -$ 0 -$ 0.00% TAP+USTEP TAP Only USTEP Only City TOTAL CHANGE ORDERS = -$ 45,993.00$ -$ 3,104.00$ 49,097.00$ PREVIOUS CHANGE ORDERS = -$ -$ -$ -$ -$ CURRENT CHANGE ORDER = -$ -$ -$ -$ -$ TAP+USTEP TAP Only USTEP Only City TOTAL CONTRACT & CHANGE ORDERS 41,060.00$ 417,855.00$ 375,457.00$ 132,217.00$ 966,589.00$ UNIT UNIT COST CONTRACT ITEMS Div 1 Div 2 Div 1 Div 2 UNIT UNIT COST CURRENT PAY APP Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 PREVIOUS PAY APPS DESCRIPTION Traffic Control Mobilization Railroad Protective Liability Insurance for Union Pacific Railroad Co. Accessible Pedestrian Signal Push Button and Sign Rectangular Rapid Flashing Beacon Assembly, per Post Signal Cabinet Modification Signal Cabinet Replacement Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement, 16" Pedestrian Head, Hand/Person, Countdown CURRENT CHANGE ORDER Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED), Side of Pole Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted Uninterruptible Power Supply Signal Cable, 5c DIV 1 DIV 2 TOTAL PREVIOUS CHANGE ORDERS DIV 1 DIV 2 TOTAL Div 1 Div 2 DIV 1 DIV 2 TOTAL Div 1 Div 2 V:\Projects\2022\122.0627.01\Construction\PayApp02_2024-XX-XX_SignalEnhancement(TAP).xlsx