HomeMy WebLinkAbout2024-11-18 I01J_07 Stratford Crossing Park_Pmt Est 13-RetainageAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 18, 2024 AGENDA ITEM:Consideration of approval of Payment Estimate No. 13 (Release of Retainage) to Elder Corporation for the Stratford Crossing Park Project in the amount of $93,650.24. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Elder Corporation has completed the project, and all lien waivers have been received. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Payment Estimate No. 13 (Release of Retainage) PREPARED BY: Laurie Baker REVIEWED BY: Matt Jermier PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1J7 gēnus [ landscape architects ] 520 42ND STREET SUITE 400 DES MOINES, IA 50312 T 515 284 1010 WWW.GENUS-LA.COM November 12, 2024 Mr. Matt Jermier Parks and Recreation Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Stratford Crossing Park Construction Pay Voucher No. 13 Final Payment and Release of Retainage Genus Project No. 22024 Dear Mr. Jermier: Please find enclosed Construction Pay Voucher No. 13 in the amount of $93,650.24 for the above-referenced project. This payment shall complete all contracted payments and release of retainage to the Contractor, as the project is considered complete. Additionally, the Contractor has submitted the necessary lien waivers for project subcontractors. As a matter of record-keeping, the prior pay application noted total retainage as $93,650.25. Due to rounding of $0.01 on a previous submittal, it has been determined that the amounted noted on Pay Application No. 13 is correct and makes the contract whole. Genus recommends that the City of Waukee approve Construction Pay Voucher No. 13 for Elder Corporation. Don’t hesitate to reach out if you have questions or need additional information. Sincerely, Brett Douglas, ASLA, PLA Principal CC: Nick Yeast, Elder Corporation Daniel Laughridge, City of Waukee APPLICATION NO.: INV40522 PERIOD TO: 10/31/2024 JOB NUMBER: 23N104 CONTRACT DATE: 3/20/2023 TO OWNER:City of Waukee 230 W. Hickman Road Waukee, IA 50263 Project Name: Stratford Crossing Park Project Location 1250 NW Yorktown Drive Waukee, IA 50263 FROM CONTRACTOR:Elder Corporation 5088 E. University Avenue Des Moines, IA 50327 PAGE 1 OF 6 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the owner, and that the current payment shown herein is now due. Application is made for payment, as shown below, in connection with the Contract. Continutation Sheet is attached. 1. ORIGINAL CONTRACT SUM $ 1,847,776.90 $ 25,227.702. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1+/-2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on Page 2) 5. RETAINAGE $ 1,873,004.60 1,873,004.60 CONTRACTOR: ELDER CORPORATION \\loLzj?MDate::By: $a. 5% of Completed Work (Column D + E on Paae 2) ____% of Stored Material (Column F on Page 2) Total Retainage (Line 5a + 5b or Total in Column 1 page 2 _ 0.00 State of Iowa County of Polk Subscribed and sworn to before me this b.i day of $0.00 Notary Public: My Commission Expires: KAYLf F(?ese4 Gommissim) Number 818178$ 1,873,004.606. TOTAL EARNED LESS RETENTION_____________ (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE _ W)y Gm 'ten Empiresjam,$ 1,779,354.36 CERTIFICATION FOR PAYMENT $93,650.24 In Accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Owner certifies that to the best of his knowledge, information and belief Work has progressed as indicated, the quality of the work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. 9. BALANCE TO FINISH INCLUDING RETAINAGE (Line 3 less Line 6)$0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS $AMOUNT CERTIFIEDTotal changes approved in previous months by owner 66,112.15 -40,884.45 Date::By:Total approved this Month TOTALS 66,112.15 -40,884.45 Net changes by Change Order 25,227.70 93,650.24 11.12.24 PAGE 2 OF 6 CONTINUATION SHEET APPLICATION AND CERTIFICATE FOR PAYMENT , containing Contractor's signed Certification, is attached. In tabulations, below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. INV40522 10/31/2024 23N104 3/20/2023 APPLICATION NO. PERIOD TO JOB NUMBER CONTRACT DATE IHGE FDAB C %BalanceCompleted and Stored to Date (D+E+F) Materials Presently Stored (Not in D or E) Work Completed Retainage if Variable Rate (G/C)toDescription of Work Scheduled Value Item Number FinishFrom Previous Applications (D + E) This Period (C-G) 0.000.001006,800.00 6,600.00 2,500.00 2,499.00 6,200.00 29,563.00 7,342.50 4,115.00 3,564.00 41,334.65 3,100.00 12,000.00 4,000.00 94,696.00 9,990.00 2,304.00 5,500.00 19,200.00 4,880.00 15,000.00 2,800.00 2,700.00 2,880.00 1,488.00 1,700.00 6,000.00 11,620.00 57,480.00 55,410.00 Alt 3 Mobilization Alt 3 Construction Stakina Alt 3 TemD Rock Construction Alt 3 Class 13 Waste Alt 3 Clearina & Grubbina Alt 3 ToDsoil. StriD Salvaae Alt 3 Excavation Class 10 Alt 3 Embankment In Place Alt 3 Storm Sewer RCP 15" Mobilization Alt 3 Sw-512 Intake 24" RCP Alt 3 Erosion Control Alt 3 SWPPP Maintenance Alt 3 Shared Use Path PCC 6" Alt 3 Shared Use Path PCC 8" Alt 3 Shrubs Alt 3 Ornamental Trees Alt 3 Overstorv Trees Alt 3 Everareen Trees Construction Stakina Alt 3 Waterina For Plants TemD Rock Construction Entrar Sidewalk Removal Curb Grindina Clearina & Grubbina Alt 3 DR-201. 15" RCP Alt 3 Seed-Lawn ToDsoil. StriD. Salvaae. ResDe Excavation Class 10 1001 0.00 0.006,800.00 6,600.00 2,500.00 2,499.00 6,200.00 29,563.00 7,342.50 4,115.00 3,564.00 41,334.65 3,100.00 12,000.00 4,000.00 94,696.00 9,990.00 2,304.00 5,500.00 19,200.00 4,880.00 15,000.00 2,800.00 2,700.00 2,880.00 1,488.00 1,700.00 6,000.00 11,620.00 57,480.00 55,410.00 6,800.00 6,600.00 2,500.00 2,499.00 6,200.00 29,563.00 7,342.50 4,115.00 3,564.00 41,334.66 3,100.00 12,000.00 4,000.00 94,696.00 9,990.00 2,304.00 5,500.00 19,200.00 4,880.00 15,000.00 2,800.00 2,700.00 2,880.00 1,488.00 1,700.00 6,000.00 11,620.00 57,480.00 55,410.00 0.000.0010010020.00 0.00 0.000.0010010030.00 0.00 0.000.0010010040.00 0.00 0.000.0010010050.000.00 0.000.0010010060.000.00 0.000.001001007 0.000.00 0.000.0010010080.000.00 0.000.0010010090.000.00 0.000.001001010 0.00-0.01 0.000.0010010110.000.00 0.000.0010010120.00 0.00 0.000.0010010130.000.00 0.000.0010010140.000.00 0.000.0010010150.000.00 0.000.001001016 0.000.00 0.000.0010010170.000.00 0.000.0010010180.000.00 0.000.001001019 0.00 0.00 0.000.0010010200.000.00 0.000.0010010210.00 0.00 0.000.0010010300.00 0.00 0.000.0010010400.000.00 0.000.0010010500.000.00 0.000.0010010600.00 0.00 0.000.001001100 0.000.00 0.000.0010012000.000.00 0.000.001002010 0.000.00 0.000.001002020 0.000.00 PAGE 3 OF 6 CONTINUATION SHEET APPLICATION AND CERTIFICATE FOR PAYMENT , containing Contractor's signed Certification, is attached. In tabulations, below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NO.: INV40522 PERIOD TO: 10/31/2024 23N104 CONTRACT DATE: 3/20/2023 JOB NUMBER IHD E F GBAC %BalanceCompleted and Stored to Date (D+E+F) Work Completed Materials Presently Stored (Not in D or E) Retainage if Variable Rate (G/C)toItem Number Description of Work Scheduled Value FinishFrom Previous Applications (D + E) This Period (C-G) 0.000.00Embankement In Place Excavation CL 10 Waste Onsite 18in Soil Matrix Site Electrical Storm Sewer HDPE 12" Storm Sewer HDPE 18" Storm Sewer RCP 24" Subdrain 4" Subdrain 6" Subdrain Outlet 4" Subdrain Outlet 6" Subdrain Cleanout 4" Subdrain Cleanout 6” DR-203 12” CMP DR-203 18" CMP SW-505 Intake NvioDlast SW-512 Intake 18" NvioDlast SW-512 Intake 24" NvioDlast SW-512 Intake 24" RCP Connect to Existina Intake Sanitarv Trenched PVC 4" Sanitarv Trenchless PVC 4" Sanitarv Fittinas Sanitarv Sewer Cleanout Water Main Trenched 6" Water Main Trenchless 6” Water Main Fittinas Water Service 2" CoDDer TaDDina Sleeve & Valve Hvdrant Assembly 1002030 2040 2050 12,108.25 10.447.50 53.932.50 58,300.00 15,504.00 15,330.00 3,129.00 40,315.00 9,735.00 1,500.00 1,000.00 3,320.00 3,320.00 1,100.00 660.00 5,000.00 3,000.00 3,600.00 4,000.00 2,200.00 15,562.00 35,649.00 660.00 5,200.00 23,256.00 12,852.00 2,184.00 4,000.00 11,000.00 6,800.00 12,108.25 10.447.50 53.932.50 58,300.00 15,504.00 15,330.00 3,129.00 40,315.00 9,735.00 1,500.00 1,000.00 3,320.00 3,320.00 1,100.00 660.00 5,000.00 3,000.00 3,600.00 4,000.00 2,200.00 15,562.00 35,649.00 660.00 5,200.00 23,256.00 12,852.00 2,184.00 4,000.00 11,000.00 6,800.00 12,108.25 10.447.50 53.932.50 58,300.00 15,504.00 15,330.00 3,129.00 40,315.00 9,735.00 1,500.00 1,000.00 3,320.00 3,320.00 1,100.00 660.00 5,000.00 3,000.00 3,600.00 4,000.00 2,200.00 15,562.00 35,649.00 660.00 5,200.00 23,256.00 12,852.00 2,184.00 4,000.00 11,000.00 6,800.00 0.00 0.00 0.000.001000.000.00 0.000.001000.000.00 0.000.0030101000.00 0.00 0.000.0030201000.00 0.00 0.000.0010030300.00 0.00 0.00 0.0010030400.000.00 0.000.0030501000.00 0.00 0.000.0010030600.00 0.00 0.000.0010030700.00 0.00 0.000.0010030800.00 0.00 0.000.0030901000.00 0.00 0.000.0031001000.00 0.00 0.000.0010031100.00 0.00 0.00 0.0010031200.00 0.00 0.000.0010031300.00 0.00 0.000.0010031400.000.00 0.00 0.0031501000.00 0.00 0.000.0010031600.000.00 0.000.0010031700.00 0.00 0.000.0010031800.000.00 0.000.0031901000.00 0.00 0.000.0010032000.00 0.00 0.000.0010032100.00 0.00 0.000.0010032200.000.00 0.000.001003230 3240 0.000.00 0.000.001000.00 0.00 0.000.0010032500.00 0.00 0.000.0010032600.00 0.00 0.000.0010032700.00 0.00 PAGE 4 OF 6 CONTINUATION SHEET APPLICATION AND CERTIFICATE FOR PAYMENT , containing Contractor's signed Certification, is attached. In tabulations, below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NO.: INV40522 PERIOD TO: 10/31/2024 23N104 3/20/2023 JOB NUMBER CONTRACT DATE HGEFDBCA Balance%Completed and Stored to Date (D+E+F) Work Completed Materials Presently Stored (Not in D or E) Retainage if Variable Rate (G/C)toDescription of Work Scheduled Value Item Number FinishFrom Previous Applications (D + E) This Period (C-G) 0.000.0032,000.00 4,000.00 379.50 324,474.00 138,180.00 10,875.00 7,952.00 9,720.00 5,800.00 121.00 2,490.00 26,611.00 3,000.00 3,400.00 440.00 37,700.00 3,320.00 21,054.00 1,100.00 10,656.00 3,850.00 48,000.00 15,250.00 3,492.00 28,914.00 4,575.00 14,000.00 77,724.00 7,074.00 550.00 1003280Erosion Control Items SWPPP Maintenance Sidewalk PCC 4" Sidewalk PCC 6” Driveway PCC 8” Turned Down PCC Walk PCC Beam Curb PCC Curb Parkina Lot StriDDina & Symbol ADA Parkina Sians & Post Detectable Warnina Plates Basketball Court Pavement Basketball Court Paint Markina Basketball Pole. Backboard&Ri Entry Sian Footina Amended Plantina Soil 18" Shredded Hardwood Mulch Perennials #1 CNT Bulbs Shrubs Ornamental Trees Overstorv Trees Everareen Trees Bluearass Sod Seed-Lawn Seed- Native Mix Waterina For Plants PCC Subslab PCC Plavaround Curb PCC ADA RamD 0.0032,000.00 4,000.00 379.50 324,474.00 138,180.00 10,875.00 7,952.00 9,720.00 5,800.00 121.00 2,490.00 26,611.00 3,000.00 3,400.00 440.00 37,700.00 3,320.00 21,054.00 1,100.00 10,656.00 3,850.00 48,000.00 15,250.00 3,492.00 28,914.00 4,575.00 14,000.00 77,724.00 7,074.00 550.00 32,000.00 4,000.00 379.50 324,474.00 138,180.00 10,875.00 7,952.00 9,720.00 5,800.00 121.00 2,490.00 26,611.00 3,000.00 3,400.00 440.00 37,700.00 3,320.00 21,054.00 1,100.00 10,656.00 3,850.00 48,000.00 15,250.00 3,492.00 28,914.00 4,575.00 14,000.00 77,724.00 7,074.00 550.00 0.00 0.000.001003290 4010 4020 4030 4040 4050 4060 4070 4080 4090 4100 0.000.00 0.000.001000.000.00 0.000.001000.000.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.000.00 0.000.001000.00 0.00 0.000.0010041100.000.00 0.000.001004120 4130 5010 5020 0.00 0.00 0.000.001000.000.00 0.000.001000.000.00 0.000.001000.000.00 0.000.0010050300.00 0.00 0.000.0010050400.000.00 0.000.0010050500.000.00 0.000.0010050600.000.00 0.000.0010050700.000.00 0.000.001005080 0.000.00 0.000.0010050900.00 0.00 0.000.0010051000.000.00 0.000.0010051100.000.00 0.000.0010051200.000.00 0.000.001006010 6020 0.000.00 0.000.001000.00 0.00 0.000.0010060300.000.00 PAGE 5 OF 6 CONTINUATION SHEET APPLICATION AND CERTIFICATE FOR PAYMENT , containing Contractor's signed Certification, is attached. In tabulations, below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NO. PERIOD TO JOB NUMBER CONTRACT DATE INV40522 10/31/2024 23N104 3/20/2023 HE GDFA B C %BalanceWork Completed Materials Presently Stored (Not in D or E) Completed and Stored to Date (D+E+F) Retainage if Variable Rate (G/C) toItem Number Description of Work Scheduled Value FinishFrom Previous Applications (D + E) This Period (C-G) 0.00 0.006040 16' Timber Bench Restroom Blda Install Restroom Plumbina Restroom HVAC Restroom Footina Restroom Structural StooD Restroom PCC Slab Interior Restroom Amenities ODen-Air Shelter 20X24 Open-Air Shelter 16X16 Address Numbers Faux Stone Wrap On Poles Swinaset Subdrain Repair Rearade Trail <@ West Side Rmv Forms Rearade Pave (a) V Survey (3) West Side Alt 1 BBall Court Pavement Alt 1 BBall Court Paint Markin Alt 1 BBall Pole Anchor Bolts Relocate 6 Trees (a). ROW Lift Rental Scour Stop (® Detention Basin Trail Repairs Haulina Dirt to Fill Areas 9,300.00 23,000.00 18,000.00 8,400.00 10,000.00 6,600.00 2,772.00 21,300.00 28,000.00 21,000.00 250.00 20,000.00 849.75 2,900.00 2,600.00 1,100.00 27,248.00 1,200.00 3,400.00 634.45 3,668.50 750.00 1,700.00 16,550.00 7,150.00 1009,300.00 23,000.00 18,000.00 8,400.00 10,000.00 6,600.00 2,772.00 21,300.00 28,000.00 21,000.00 250.00 20,000.00 849.75 2,900.00 2,600.00 1,100.00 27,248.00 1,200.00 3,400.00 634.45 3,668.50 750.00 1,700.00 16,550.00 7,150.00 9,300.00 23,000.00 18,000.00 8,400.00 10,000.00 6,600.00 2,772.00 21,300.00 28,000.00 21,000.00 250.00 20,000.00 849.75 2,900.00 2,600.00 1,100.00 27,248.00 1,200.00 3,400.00 634.45 3,668.50 750.00 1,700.00 16,550.00 7,150.00 0.00 0.00 0.000.001007010 7020 0.00 0.00 0.00 0.001000.00 0.00 0.000.0010070300.00 0.00 0.000.0010070400.00 0.00 0.00 0.0070501000.00 0.00 0.00 0.0070601000.00 0.00 0.000.001007070 7080 7090 7100 0.00 0.00 0.00 0.001000.000.00 0.00 0.001000.000.00 0.00 0.001000.00 0.00 0.000.0010071100.00 0.00 0.000.001007120 7130 7140 7150 8010 8020 8030 9000 9002 0.00 0.00 0.00 0.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.00 0.00 0.000.001000.000.00 0.000.001000.00 0.00 0.000.0010090030.00 0.00 0.000.0010090040.000.00 0.000.001009005 12001 0.000.00 0.001000.000.00 0.00 PAGE 6 OF 6 CONTINUATION SHEET APPLICATION AND CERTIFICATE FOR PAYMENT , containing Contractor's signed Certification, is attached. In tabulations, below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NO.: INV40522 PERIOD TO: 10/31/2024 JOB NUMBER: 23N104 CONTRACT DATE: 3/20/2023 IHF GDEA B C BalanceCompleted and Stored to Date (D+E+F) %Work Completed Materials Presently Stored (Not in D or E) Retainage if Variable Rate (G/C) toDescription of Work Item Number Scheduled Value FinishFrom Previous Applications (D + E) This Period (C-G) 100.00TOTALS1,873,004.60 (001)1,873,004.601,873,004.61