HomeMy WebLinkAbout2024-12-02 I07A-B Kettlestone Peak Commercial Plat 1_ Final Plat, Site PlanAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 2, 2024 AGENDA ITEM:Consideration of approval of resolutions approving a final plat and site plan for Kettlestone Peak Commercial Plat 1 FORMAT:Resolutions SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a final plat and site plan for a multitenant commercial building including restaurants and retail spaces. The project includes the construction of a single-story building that will include 9 suites/tenant spaces for restaurant and retail uses. The building is 20,177 square feet in area and 24 feet in height. A trash enclosure is provided at the north side of the site. Both ends of the building include a drive-thru lane and window for potential tenants. A monument sign is shown at the southwest corner of the site adjacent to Grand Prairie Parkway. The final plat includes combining two lots into one lot. The final plat includes existing and proposed detention easements for the existing detention pond, and public utility easements along the property lines adjacent to the public streets. Two accesses are proposed into the site off SE Pleasant View Drive. A 5-foot wide sidewalk will be provided adjacent to the property along SE Pleasant View Drive. An existing 10-foot wide trail is provided adjacent to the site along Grand Prairie Parkway. A pedestrian connection is provided into the site from the sidewalk along SE Pleasant View Drive that runs north behind the proposed building and an additional 6-foot wide path will be located along the front of the building. A total of 225 parking spaces are required, they are providing 226 spaces, including 7 accessible spaces. A total of 22 bicycle parking spaces are being provided to comply with the requirements of the Kettlestone Design Guidelines. The site will be serviced with all public utilities. Stormwater detention will be provided with the detention pond located at the northwest corner of the site. A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is approximately 50%. Street trees will be installed along SE Pleasant View Drive with additional trees along the eastern and northern side of the property. The required amount of plantings are being provided per the Landscape and Open Space Ordinance and the Kettlestone Design Guidelines. The elevations of the building will be constructed of mostly brick and fiber cement panels in different color variations. The trash enclosure will be composed of brick to match the building. I7A-B FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the final plat and site plan request at their meeting on November 12, 2024, and recommended approval: Approval of a Final Plat and Site Plan for Kettlestone Peak Commercial (1105 SE Pleasant View Drive) Andy Kass, Community Development Director, introduced the request for approval of a final plat and site plan for a commercial development, as requested by Timbercrest Homes, LLC, represented by Jared Jurray of Civil Design Advantage. The property is generally located east of Grand Prairie Parkway and north of SE Pleasant View Drive containing approximately 5.95-acres. The property is currently platted as two lots. The project includes the construction of a single-story building that will include nine suites/tenant spaces for restaurant and retail uses. The building is 20,177 square feet in area and 24 feet in height. A trash enclosure is provided at the north side of the site. Both ends of the building include a drive- thru lane and window for potential tenants. A monument sign is shown at the southwest corner of the site adjacent to Grand Prairie Parkway. The final plat includes combining the two lots into one lot and also includes existing and proposed detention easements for the existing detention pond, with public utility easements along the property lines adjacent to the public streets. Two accesses are proposed into the site from SE Pleasant View Drive. A five-foot wide sidewalk will be provided along SE Pleasant View Drive. An existing 10-foot-wide trail is provided along Grand Prairie Parkway. A pedestrian connection is provided into the site from the sidewalk along SE Pleasant View Drive that runs north behind the proposed building and an additional six-foot wide path will be located along the front of the building. A total of 225 parking spaces are required, with 226 spaces, including seven accessible spaces being provided. A total of 22 bicycle parking spaces are being provided to comply with the requirements of the Kettlestone Design Guidelines. All public utilities are provided to the site. Stormwater detention will be provided with the detention pond located at the northwest corner of the site. A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is approximately 50%.Street trees will be installed along SE Pleasant View Drive with additional trees along the eastern and northern side of the property. The required amount of plantings are being provided per the Landscape and Open Space Ordinance and the Kettlestone Design Guidelines. The elevations of the building will be constructed of mostly brick and fiber cement panel in different color variations. The photometric plan that was submitted complies with the requirements of the Site Plan Ordinance. The final plat and site plan are in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Kettlestone Design Guidelines, and Comprehensive Plan. Staff recommends approval of the final plat for Kettlestone Peak Commercial and the site plan for Kettlestone Peak Commercial subject to any remaining staff comments and review of legal documents. Discussion as follows: General discussion of the location of the grease interceptors, which will be located underground. Discussion of the reason for the entrance signage location away from Grand Prairie Parkway; including utilizing the pond and uncovered concrete pad for scenic outdoor seating options 3-5 months of the year. Motion by Commissioner Koelker for approval of a Final Plat for Kettlestone Peak Commercial Plat 1, seconded by Commissioner Broderick. Ayes: Broderick, Koelker, Streit, Lohse, and Bankole. Nays: None. Motion carried. Motion by Commissioner Lohse for approval of a Site Plan for Kettlestone Peak Commercial (1105 SE Pleasant View Drive), seconded by Commissioner Bankole. Ayes: Broderick, Koelker, Streit, Lohse, and Bankole. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the final plat and site plan for Kettlestone Peak Commercial subject to remaining staff comments and review of the legal documents. RECOMMENDATION: Approve the resolutions. ATTACHMENTS: I. Proposed Resolutions II. Staff Report III. Final Plat IV. Site Plan V. Building Elevations PREPARED BY:Elizabeth Cramblet, City Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE FINAL PLAT FOR KETTLESTONE PEAK COMMERCOIAL PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, Timbercrest Homes, LLC, has requested final plat approval of Kettlestone Peak Commercial Plat 1 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on November 12, 2024, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Kettlestone Peak Commercial Plat 1 and the documents relating thereto will comply with section §176 – Subdivision Regulations of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 2nd day of December, 2024, that the Final Plat for Kettlestone Peak Commercial Plat 1 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1.Public Utility Easement; 2.Storm Sewer Easement; and 3.Declaration of Private Easements ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE SITE PLAN FOR KETTLESTONE PEAK COMMERCIAL IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Kettlestone Peak Commercial, subject to remaining staff comments on November 12, 2024; AND, WHEREAS, the Site Plan for Kettlestone Peak Commercial is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Kettlestone Peak Commercial is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 2nd day of December, 2024, that the Site Plan for Kettlestone Peak Commercial is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Kettlestone Peak Commercial Site Plan and Final Plat PREPARED BY: Elizabeth Cramblet – City Planner REPORT DATE: November 7, 2024 MEETING DATE: November 12, 2024 GENERAL INFORMATION Owner/Applicant:Timbercrest Homes, LLC Owner’s Representative: Jared Murray, P.E., Civil Design Advantage Request:The applicant is requesting approval of a final plat and site plan for a multitenant commercial building including restaurants and retail spaces. Location and Size:Property is generally located east of Grand Prairie Parkway and north of SE Pleasant View Drive containing approximately 5.95-acres. Property Address: 1105 SE Pleasant View Drive AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. November 12, 2024 2 of 3 LAND USES AND ZONING Location Existing Land Use Kettlestone Master Plan Current Zoning Property in Question Vacant - Undeveloped Retail Community K-RC (Kettlestone Retail Community District) North Vacant - Undeveloped Retail Community & Multi Family Stacked High C-4 (Office Park Commercial District) & K-RC (Kettlestone Retail Community District) South Vacant – Undeveloped Office K-RR (Kettlestone Retail Regional District) East Vacant – Undeveloped Multi Family Stacked High K-OF (Kettlestone Office District) West Vacant - Undeveloped Office K-OF (Kettlestone Office District) BACKGROUND The subject property is located within the Kettlestone Corridor and includes 5.95-acres. The property is currently platted as two lots, Lots 1 and 2 of Kettlestone Peak. The property is located east of Grand Prairie Parkway and north of SE Pleasant View Drive. PROJECT DESCRIPTION The project includes the construction of a single-story building that will include 9 suites/tenant spaces for restaurant and retail uses. The building is 20,177 square feet in area and 24 feet in height. A trash enclosure is provided at the north side of the site. Both ends of the building include a drive-thru lane and window for potential tenants. A monument sign is shown at the southwest corner of the site adjacent to Grand Prairie Parkway. The final plat includes combining the two lots into one lot. The final plat includes existing and proposed detention easements for the existing detention pond, and public utility easements along the property lines adjacent to the public streets. ACCESS AND PARKING Two accesses are proposed into the site off SE Pleasant View Drive. A 5-foot wide sidewalk will be provided adjacent to the property along SE Pleasant View Drive. An existing 10-foot wide trail is provided adjacent to the site along Grand Prairie Parkway. A pedestrian connection is provided into the site from the sidewalk along SE Pleasant View Drive that runs north behind the proposed building and an additional 6-foot wide path will be located along the front of the building. A total of 225 parking spaces are required for the proposed site plan and they are providing 226 spaces, including 7 accessible spaces. A total of 22 bicycle parking spaces are being provided to comply with the requirements of the Kettlestone Design Guidelines. UTILITIES All public utilities are provided to the site. Stormwater detention will be provided with the detention pond located at the northwest corner of the site. November 12, 2024 3 of 3 EASEMENTS All proposed easements have been indicated on the final plat. LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is approximately 50%.Street trees will be installed along SE Pleasant View Drive with additional trees along the eastern and northern side of the property. The required amount of plantings are being provided per the Landscape and Open Space Ordinance and the Kettlestone Design Guidelines. ELEVATIONS The elevations of the building will be constructed of mostly brick and fiber cement panel in different color variations. Elevations of the proposed building have been provided for review. The trash enclosure will be constructed of brick to match the building. PHOTOMETRIC PLAN A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan Ordinance. STAFF RECOMMENDATION The final plat and site plan are in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Kettlestone Design Guidelines, and Comprehensive Plan. Staff recommends approval of the final plat for Kettlestone Peak Commercial Plat 1 and the site plan for Kettlestone Peak Commercial subject to any remaining staff comments and review of the legal documents. SE PLEASANT V I E W D R I V E G R A N D P R A I R I E P A R K W A Y LOT 1 Δ = 1 4 ° 5 7 ' 5 4 " ( M ) , 1 4 ° 5 7 ' 5 2 " ( R ) L = 4 1 4 . 6 4 ' ( M ) , 4 1 4 . 6 2 ' ( R ) R = 1 5 8 7 . 5 0 ' ( M & R ) C H = 4 1 3 . 4 6 ' ( M ) , 4 1 3 . 4 4 ' ( R ) C H B = N 0 9 ° 1 3 ' 3 6 " W ( M ) , N 0 9 ° 1 3 ' 1 1 " W ( R ) N83°26'03"E 628 . 1 7 ' ( M ) N83°26'04"E 628 . 1 3 ' ( R ) S 0 6 ° 3 3 ' 5 6 " E 4 2 8 . 0 2 ' ( M ) S 0 6 ° 3 3 ' 5 5 " E 4 2 8 . 0 0 ' ( R ) S83°26'07"W 45 8 . 9 3 ' ( M ) S83°26'05"W 45 8 . 9 8 ' ( R ) N79°31'06"W 51.17'(M) N79°30'24"W 51.13'(R) S83°25'54"W 101.13'(M) S83°26'05"W 101.12'(R) KETTLESTONE PEAK COMMERCIAL PLAT 1 FINAL PLAT ENGINEER / SURVEYOR CI V I L D E S I G N A D V A N T A G E 2408.671 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 1 1S T S U B M I T T A L 10 / 1 5 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E P E A K CO M M E R C I A L P L A T 1 2N D S U B M I T T A L 10 / 3 1 / 2 4 3R D S U B M I T T A L 11 / 1 8 / 2 4 1 FI N A L P L A T LEGENDOWNER / DEVELOPER ZONING BULK REGULATIONS DATE OF SURVEY PLAT DESCRIPTION NOTES INDEX LEGEND PRELIMIN A R Y NOT FOR C O N S T R U C T I O N VICINITY MAP WAUKEE, IOWA CITY OF WAUKEE CORPORATE LIMITS SITE SE UNIVERSITY AVE GR A N D P R A I R I E P K W Y SE A L I C E ' S R D I-80 SE ASHWORTH RD ASHWORTH RD UNIVERSITY AVE KETTLESTONE PEAK COMMERCIAL 4121 NW URBANDALE DRIVE, URBANDALE, IOWA 50322 PH: (515) 369-4400 Fax: (515) 369-4410 CIVIL DESIGN ADVANTAGE UTILITY WARNING CONSTRUCTION SCHEDULE DEVELOPMENT SUMMARY SUBMITTAL DATES SURVEYOR ZONING INDEX OF SHEETSVICINITY MAP GENERAL LEGEND ENGINEER OWNER / APPLICANT LEGAL DESCRIPTION DATE OF SURVEY BENCHMARK SITE PLAN FOR: WAUKEE, IOWA l l l l l l l l l l www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call NOTES KETTLESTONE PEAK COMMERCIAL WAUKEE, IOWA C1.0 CITY OF WAUKEE CORPORATE LIMITS SITE SE UNIVERSITY AVE GR A N D P R A I R I E P K W Y SE A L I C E ' S R D I-80 SE ASHWORTH RD ASHWORTH RD UNIVERSITY AVE PROJECT SITE ADDRESS DE T A I L S CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 C2.0 CLASS 'A' 6" INTEGRAL CURB AND SIDEWALK 12" SUBGRADE PREPARATION ROCK APRON FOR PIPE OUTLET RCP APRON FOOTING DETAIL INTEGRAL 6" STANDARD CURB CURB RAMP FOR CLASS B OR C SIDEWALKDETECTABLE WARNING DETAILHYDRANT ASSEMBLY DETAILHYDRANT ASSEMBLY DETAILSW-203 SANITARY CLEANOUT ° SANITARY SEWER SERVICE RISER DE T A I L S CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 C2.1TYPICAL SIGN POST4'X4' MODIFIED SW-513 INTAKE (ST-2)TYPICAL WET BOTTOM POND SECTION BIKE RACK ORIFICE PLATE DETAIL (ST-3) BUILDING #1 1-STORY 9 SUITES TIMB E R C R E S T H O M E S , L L C SEC 4 - 7 8 - 2 6 ZONI N G : K - O F (KET T L E S T O N E O F F I C E D I S T R I C T ) BRIC K T O W N E P I P E R L C SEC 4 - 7 8 - 2 6 ZONI N G : C - 4 SE PLEASANT VIEW DRIVE GR A N D P R A I R I E P A R K W A Y OV E R A L L L A Y O U T A N D H Y D R A N T C O V E R A G E CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 C3.0 FIRE SAFETY CONSTRUCTION NOTE GR A N D P R A I R I E P A R K W A Y BUILDING #1 1-STORY 9 SUITES SUITE 101 2124 SF SUITE 102 1750 SF SUITE 103 1750 SF SUITE 104 1750 SF SUITE 105 5565 SF SUITE 106 1614 SF SUITE 107 1750 SF SUITE 108 1750 SF SUITE 109 2124 SF CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 DI M E N S I O N P L A N C4.0 TRAFFIC CONTROL NOTES PAVEMENT THICKNESS SIGN LEGEND VAN ACCESSIBLE GENERAL NOTES BUILDING #1 1-STORY 9 SUITES SUITE 101 2124 SF SUITE 102 1750 SF SUITE 103 1750 SF SUITE 104 1750 SF SUITE 105 5565 SF SUITE 106 1614 SF SUITE 107 1750 SF SUITE 108 1750 SF SUITE 109 2124 SF CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 DI M E N S I O N P L A N C4.1 SE PLEASANT VIEW DRIVE GR A N D P R A I R I E P A R K W A Y BUILDING #1 1-STORY 9 SUITES SUITE 101 2124 SF SUITE 102 1750 SF SUITE 103 1750 SF SUITE 104 1750 SF CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 DI M E N S I O N P L A N C4.2 SE PLEASANT VIEW DRIVE BUILDING #1 1-STORY 9 SUITES SUITE 101 2124 SF SUITE 102 1750 SF SUITE 103 1750 SF SUITE 104 1750 SF CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 DI M E N S I O N P L A N C4.3 GR A N D P R A I R I E P A R K W A Y BUILDING #1 F.F.E.=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 GR A D I N G P L A N C5.0 GRADING NOTES AREA OF DISTURBANCE = 5.89 AC BUILDING #1 F.F.E.=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 GR A D I N G P L A N C5.1 SE PLEASANT VIEW DRIVE GR A N D P R A I R I E P A R K W A Y BUILDING #1 F.F.E.=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 GR A D I N G P L A N C5.2 SE PLEASANT VIEW DRIVE BUILDING #1 F.F.E.=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 GR A D I N G P L A N C5.3 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 GR A D I N G P L A N C5.4 DETAIL 'A'DETAIL 'B' DETAIL 'C' DETAIL 'D'DETAIL 'E'DETAIL 'F'DETAIL 'G' DETAIL 'H'DETAIL 'I' TSB #1 R DA #1 5.89 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l SE PLEASANT VI E W D R I V E G R A N D P R A I R I E P A R K W A Y l l l l l l ll l l l l lll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllllllllllllllllllll llllll l l l l ll l l l l l l l lllllllllllllllllllllllllllllllllll l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l EROSION AND SEDIMENT CONTROL PLAN R l l l l l l TSB # SWPPP LEGEND KETTLESTONE PEAK COMMERCIAL VICINITY MAP WAUKEE, IOWA KETTLESTONE PEAK COMMERCIAL DISCHARGE POINT SUMMARY STABILIZATION QUANTITIES ER O S I O N A N D S E D I M E N T C O N T R O L P L A N NOTES: CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 CITY OF WAUKEE CORPORATE LIMITS SITE SE UNIVERSITY AVE GR A N D P R A I R I E P K W Y SE A L I C E ' S R D I-80 SE ASHWORTH RD ASHWORTH RD UNIVERSITY AVE C6.0 GR A N D P R A I R I E P A R K W A Y BUILDING #1 1-STORY 9 SUITES FFE=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 UT I L I T Y P L A N C7.0 UTILITY NOTES BUILDING #1 1-STORY 9 SUITES FFE=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 UT I L I T Y P L A N C7.1 SE PLEASANT VIEW DRIVE GR A N D P R A I R I E P A R K W A Y BUILDING #1 1-STORY 9 SUITES FFE=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 UT I L I T Y P L A N C7.2 SE PLEASANT VIEW DRIVE BUILDING #1 1-STORY 9 SUITES FFE=1046.17 CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 UT I L I T Y P L A N C7.3 SE PLEASANT VIEW DRIVE GR A N D P R A I R I E P A R K W A Y ® ® ® ® ® PLANT SCHEDULE LA N D S C A P E P L A N CI V I L D E S I G N A D V A N T A G E 2408.671 KE T T L E S T O N E P E A K C O M M E R C I A L EN G I N E E R : J M M TE C H : J D S / C W O RE V I S I O N S DA T E WA U K E E , I O W A 1S T S U B M I T T A L 09 / 1 7 / 2 0 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2N D S U B M I T T A L 10 / 0 1 / 2 0 2 4 3R D S U B M I T T A L 10 / 1 5 / 2 0 2 4 4T H S U B M I T T A L 10 / 3 1 / 2 0 2 4 5T H S U B M I T T A L 11 / 1 8 / 2 0 2 4 L1.0 · · · LANDSCAPE NOTES OPEN SPACE REQUIREMENTS OFF-STREET PARKING AREAS STREET TREE REQUIREMENTS PARKING LANDSCAPE REQUIREMENTS 1. REFER TO ADDITIONAL NOTES AND REQUIREMENTS ON ALL OTHER DOCUMENTS AND OTHER DISCIPLINES DOCUMENTS. 2. ALL CONDUIT RUNS & SERVICE LINES SHALL BE GROUPED TOGETHER IN A NEAT & ORDERLY MANNER AND SHOULD PENETRATE THE WALL AT THE LOWEST POINT AND ARE NOT TO RUN OVER THE TOP OF PARAPET. ALL OTHER CONDUITS & JUNCTION BOXES FOR EXTERIOR FIXTURES & EQUIPMENT SHALL BE FULLY CONCEALED WITHIN THE BUILDING CONSTRUCTION. 3. ALL HORIZONTAL TRANSITIONS BETWEEN DIFFERENT MATERIALS SHALL BE FLASHED CONTINUOUS FROM UP BEHIND UPPER MATERIAL AND EXTEND OVER TO EXTERIOR FACE OF LOWER MATERIAL WITH DRIP EDGE. 4. ANY RETURNS OR BLIND ELEVATIONS NOT SHOWN SHALL BE SIMILAR IN MATERIAL AND MAKEUP TO ADJACENT CONDITIONS OR OTHER SIMILAR CONDITIONS. 5. NO EXPOSED MASONRY/MATERIAL CORES. MASONRY RETURNS AT WINDOWS/OPENINGS ARE REQUIRED IF FRAMING IS NOT DEEP ENOUGH TO PROVIDE CLOSURE AT THE BACKSIDE OF MASONRY FOR AN EFFECTIVELY SEALED JOINT. 6. MATERIALS ABOVE CANOPIES & AWNINGS TO BE CONTINUED DOWN BEHIND THEM U.O.N., TYP. 7. ANY EXPOSED ROOFING MEMBRANE VISIBLE FROM A PUBLIC RIGHT AWAY MUST MATCH THE PRIMARY WALL MATERIAL COLOR. 8. INSTALL VERTICAL EXPANSION JOINTS PER STRUCTURAL OR MINIMAL AT COLUMN/GRID LINES AND AT THE HEAD OF DOOR JAMBS/OPENINGS OR AS OTHERWISE NOTED OR WHERE REQUIRED PER STANDARD MATERIAL PRACTICE TO REDUCE STRESS CRACKING. NO CONTROL JOINT/EXPANSION JOINT AT MAIN STRUCTURAL BEARING LOCATIONS. VERIFY JOINTS WITH ARCHITECT. 9. CAULK & SEAL ALL TRANSITION-CONTROL-EXPANSION AT ALL EXTERIOR MATERIALS. 10. INSULATE AND SEAL TO ENSURE ADEQUATE AIR INFILTRATION BARRIER AROUND ALL EXTERIOR PENETRATIONS TO PREVENT WATER AND SPRINKLER PIPE FREEZING. 11. WHERE EXTERIOR PAVING ADJACENT TO BUILDING, TOP OF PAVING TO BE 1/4" LOWER THAN INTERIOR FINISH FLOOR, SLOPING CONTINUOUSLY AWAY FROM BUILDING A MINIMUM OF 5’. WHERE DOOR STOOP, 48" OUT FROM DOOR 1:48(2%) MAX. SLOPE, AFTER 48" AWAY FROM DOOR 1:20(5%) MAXIMUM SLOPE TO PUBLIC WAY. (REFER TO CIVIL) 12. WHERE NO EXTERIOR PAVING ADJACENT TO BUILDING, TOP OF FINISHED LANDSCAPE A MINIMUM OF 4" BELOW INTERIOR FINISH FLOOR AND 4” BELOW EXTERIOR WALL FLASHING/WEEPS, SLOPING CONTINUOUSLY AWAY FROM BUILDING A MINIMUM OF 5’. (REFER TO CIVIL) 13. ADDRESS SHALL BE PROVIDED ON STREET SIDE OF BUILDING AND ON MONUMENT SIGN. NUMBERS A MINIMUM 5 INCH CONTRASTING COLOR NUMBERS WITH MINIMUM 1/2" STROKE. 14. IF ANY SIGNAGE OR SIGN BASE IS SHOWN IT IS FOR REFERENCE ONLY, FINAL DESIGNS AND/OR ALLOWANCES SHALL BE DETERMINED WITH APPROVED SIGNAGE PERMIT(S). ACTUAL DETAILS & DIMENSIONS MAY VARY AND ARE SUBJECT TO CHANGE. ALL DRAWINGS ARE SUBJECT TO AUTHORITY HAVING JURISDICTION APPROVAL. SIGNAGE SHOWN DOES NOT REPRESENT ALLOWABLE SIGNAGE PERMITTING/APPROVAL OF ALL SIGNAGE PER CURRENT CITY ORDINANCE BY OTHERS. GENERAL EXTERIOR ELEVATION NOTES TYPICAL U.O.N. • EXPOSED CONCRETE: GRIND SMOOTH & RUB/COAT WITH CEMENT SLURRY. • EXPOSED LINTELS: GALVANIZED & PAINTED TO MATCH ADJACENT MATERIAL ABOVE. • FASCIA & SOFFIT: METAL PREFINISHED TO MATCH ADJACENT ROOF COLOR. • SCUPPERS, GUTTERS & DOWNSPOUTS: METAL PREFINISHED TO MATCH ADJ. MATERIAL. • CAULKS & SEALANTS: COLOR MATCHED TO ADJACENT MATERIAL. • HOLLOW METAL MAN DOORS & FRAMES: PAINTED TO MATCH ADJACENT MATERIAL. • LOUVERS: METAL PRE-FINISHED TO MATCH ADJACENT MATERIAL COLOR. MISC EXTERIOR MATERIAL FINISHES LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" 1.06.0 0.9 2.03.04.05.0 PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 AWN-1 FCP-1 FCP-1 SF-1 VIS COP-1 FCP-2 LT-1 COP-2 FCP-3 BR-1VIS SF-1 OVERFLOW SCUPPER 1 A-301 1 A-301 10 5 B 10 1 B TOP OF GLAZING 110' - 0" FCP-1 FCP-1 MA T C H L I N E " A " TYP. TYP. TYP. PROPOSED RTU LOCATIONS BEHIND PARAPET, TYP. LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" 7.012.012.1 11.0 10.0 9.0 8.0 PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 COP-2 BR-1 RL-1 FCP-3 RL-1 BR-1 FCP-1 LT-1 COP-1 FCP-2 BR-1 LT-1 BR-1 FCP-1 FCP-3 COP-2 RL-1 BR-1 10 5 B 10 5 C 10 5 D 01 1 10 6 B 10 7 B 10 8 B 10 9 B TOP OF GLAZING 110' - 0" 2 A-312 3 A-312 3 A-311 2 A-313 TYP. TYP. MA T C H L I N E " A " TYP. TYP.TYP. TYP.TYP. LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" F DE PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 BR-1 RL-1 FCP-1 FCP-3RL-1 BR-1 COP-2 FCP-2 COP-1 BR-1 FCP-1 1 A-313 TOP OF GLAZING 110' - 0" RL-1 BR-1 A-202 2 A-202 3 A-202 1 A-201 2 A-201 1 A-202 4 A-2013 M A T C H L I N E " A " MA T C H L I N E " B "MATCHLINE "C"Sheet No. Sheet Title Proj. No.Proj. Mgr. Th i s d r a w i n g h a s b e e n p r e p a r e d b y th e A r c h i t e c t , o r u n d e r t h e Ar c h i t e c t ' s d i r e c t s u p e r v i s i o n . T h i s dr a w i n g i s p r o v i d e d a s a n in s t r u m e n t o f s e r v i c e b y t h e De s i g n e r / A r c h i t e c t a n d i s i n t e n d e d fo r u s e o n t h i s p r o j e c t o n l y . A n y re p r o d u c t i o n , u s e , o r d i s c l o s u r e o f in f o r m a t i o n c o n t a i n e d h e r e i n wit h o u t t h e p r i o r w r i t t e n c o n s e n t o f th e A r c h i t e c t i s s t r i c t l y p r o h i b i t e d . (C ) C o p y r i g h t 2 0 2 4 b y S i m o n s o n & As s o c i a t e s A r c h i t e c t s , L . L . C . NO T F O R C O N S T R U C T I O N SAA J: \ 2 0 2 4 \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e R e t a i l , W a u k e e , I A \C A D - A r c h \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e . r v t 10 / 1 1 / 2 0 2 4 9 : 1 5 : 1 9 A M LA R S O N K E T T L E S T O N E R E T A I L SE P l e a s a n t V i e w D r . / G r a n d P r a i r i e P k w y Wa u k e e , I A 24068 A-201 EXTERIOR ELEVATIONS TKW EXTERIOR MATERIAL LEGEND MAT. LABEL MATERIAL DESCRIPTION AWN-1 AWNING, PRE-ENGINEERED, FABRIC AWNING ON ALUMINUM FRAME; COLOR: BLACK. BR-1 FULL BED, MODULAR SIZE BRICK. FINISH: WHITE W/ NATURAL MORTAR. GLEN GERY ASPEN WHITE WIRECUT OR EQUAL. COP-1 METAL COPING SYSTEM: PRE-FINISHED BREAK METAL; COLOR: FIRESTONE MATTE BLACK OR SIM. COP-2 FIBER-CEMENT PANEL CORNICE; COLOR: BLACK FCP-1 FIBER-CEMENT SMOOTH LAP SIDING, NOMINAL 6" EXPOSURE. PAINTED: OFF-WHITE. ALTERNATIVE: STEEL SIDING, INSTALLED HORIZONTALLY. QUALITY EDGE VESTA SIDING, #280 WHITE. FCP-2 FIBER-CEMENT SMOOTH PANEL SIDING. 4'X8' W/ ALUMINUM FLASHING. PAINTED: DARK GRAY. FCP-3 NICHIHA VINTAGE WOOD: CEDAR. ALTERNATE: QUALITY EDGE VESTA SIDING #482 GILDED GRAIN. LT-1 EXTERIOR WALL SCONCE LIGHT FIXTURE. FINISH: MATTE BLACK. RL-1 BRICK ROWLOCK. MATCH BR-1. SF-1 T.B. ALUMINUM STOREFRONT FRAMING: CLEAR ANODIZED FINISH TR-1 ACCENT TRIM. FINISH: BLACK. VIS 1” INSULATED VISION GLASS: CLEAR W/ LOW E COATING SCALE:1/8" = 1'-0"1 WEST ELEVATION SCALE:1/8" = 1'-0"2 NORTHWEST ELEVATION SCALE:1/8" = 1'-0"3 NORTHEAST ELEVATION Re v . # I s s u e / R e v i s i o n D a t e 1 P R E L I M I N A R Y E X T E L E V A T I O N S 0 8 - 2 9 - 2 0 2 4 2 I S S U E D F O R B U D G E T P R I C I N G 0 9 - 1 0 - 2 0 2 4 3 S I T E P L A N S U B M I T T A L 0 9 - 1 6 - 2 0 2 4 4 S I T E P L A N S U B M I T T A L 1 0 - 1 1 - 2 0 2 4 TOTAL WALL: 3,686 SF FENESTRATION: 1,375 SF (37%) KEY PLAN NORTH TYPICAL U.O.N. • EXPOSED CONCRETE: GRIND SMOOTH & RUB/COAT WITH CEMENT SLURRY. • EXPOSED LINTELS: GALVANIZED & PAINTED TO MATCH ADJACENT MATERIAL ABOVE. • FASCIA & SOFFIT: METAL PREFINISHED TO MATCH ADJACENT ROOF COLOR. • SCUPPERS, GUTTERS & DOWNSPOUTS: METAL PREFINISHED TO MATCH ADJ. MATERIAL. • CAULKS & SEALANTS: COLOR MATCHED TO ADJACENT MATERIAL. • HOLLOW METAL MAN DOORS & FRAMES: PAINTED TO MATCH ADJACENT MATERIAL. • LOUVERS: METAL PRE-FINISHED TO MATCH ADJACENT MATERIAL COLOR. MISC EXTERIOR MATERIAL FINISHES LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" 7.0 12.0 12.111.010.09.08.0 PARAPET 1 122' - 0" PARAPET 2 124' - 0" COP-2 FCP-3 RL-1 BR-1BR-1AWN-1 FCP-1 FCP-1 LT-1 FCP-2 COP-1 SF-1 VIS LT-1 VIS SF-1 COP-2 BR-1 10 5 A 10 6 A 10 7 A 10 8 A 10 9 A TOP OF GLAZING 110' - 0" MA T C H L I N E " B " LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 FCP-3 LT-1 BR-1 LT-1RL-1VIS SF-1 COP-2 1 A-312 10 4 A 10 5 A 10 6 A TOP OF GLAZING 110' - 0" MA T C H L I N E " B " MA T C H L I N E " C " FCP-2 TR-1 SO U T H E A S T EA S T LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" 1.0 6.0 0.9 2.0 3.0 4.0 5.0 PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 LT-1 COP-2 FCP-1 AWN-1 FCP-1 COP-2 FCP-2 COP-1 RL-1BR-1 LT-1 VIS SF-1 1 A-301 1 A-301 1 A-311 10 1 A 10 2 A 10 3 A 10 4 A 10 5 A TOP OF GLAZING 110' - 0" 2 A-311 MA T C H L I N E " C " COP-2 BR-1 LEVEL 1 100' - 0" CLEAR HEIGHT 114' - 0" A CB PARAPET 1 122' - 0" PARAPET 2 124' - 0" BR-1 COP-2 FCP-1 FCP-1 AWN-1 VIS SF-1 FCP-2 COP-1 COP-2 AWN-1 FCP-3 RL-1 BR-1 RL-1 BR-1 FCP-1 BR-1 RL-1 BR-1 TOP OF GLAZING 110' - 0" 1. REFER TO ADDITIONAL NOTES AND REQUIREMENTS ON ALL OTHER DOCUMENTS AND OTHER DISCIPLINES DOCUMENTS. 2. ALL CONDUIT RUNS & SERVICE LINES SHALL BE GROUPED TOGETHER IN A NEAT & ORDERLY MANNER AND SHOULD PENETRATE THE WALL AT THE LOWEST POINT AND ARE NOT TO RUN OVER THE TOP OF PARAPET. ALL OTHER CONDUITS & JUNCTION BOXES FOR EXTERIOR FIXTURES & EQUIPMENT SHALL BE FULLY CONCEALED WITHIN THE BUILDING CONSTRUCTION. 3. ALL HORIZONTAL TRANSITIONS BETWEEN DIFFERENT MATERIALS SHALL BE FLASHED CONTINUOUS FROM UP BEHIND UPPER MATERIAL AND EXTEND OVER TO EXTERIOR FACE OF LOWER MATERIAL WITH DRIP EDGE. 4. ANY RETURNS OR BLIND ELEVATIONS NOT SHOWN SHALL BE SIMILAR IN MATERIAL AND MAKEUP TO ADJACENT CONDITIONS OR OTHER SIMILAR CONDITIONS. 5. NO EXPOSED MASONRY/MATERIAL CORES. MASONRY RETURNS AT WINDOWS/OPENINGS ARE REQUIRED IF FRAMING IS NOT DEEP ENOUGH TO PROVIDE CLOSURE AT THE BACKSIDE OF MASONRY FOR AN EFFECTIVELY SEALED JOINT. 6. MATERIALS ABOVE CANOPIES & AWNINGS TO BE CONTINUED DOWN BEHIND THEM U.O.N., TYP. 7. ANY EXPOSED ROOFING MEMBRANE VISIBLE FROM A PUBLIC RIGHT AWAY MUST MATCH THE PRIMARY WALL MATERIAL COLOR. 8. INSTALL VERTICAL EXPANSION JOINTS PER STRUCTURAL OR MINIMAL AT COLUMN/GRID LINES AND AT THE HEAD OF DOOR JAMBS/OPENINGS OR AS OTHERWISE NOTED OR WHERE REQUIRED PER STANDARD MATERIAL PRACTICE TO REDUCE STRESS CRACKING. NO CONTROL JOINT/EXPANSION JOINT AT MAIN STRUCTURAL BEARING LOCATIONS. VERIFY JOINTS WITH ARCHITECT. 9. CAULK & SEAL ALL TRANSITION-CONTROL-EXPANSION AT ALL EXTERIOR MATERIALS. 10. INSULATE AND SEAL TO ENSURE ADEQUATE AIR INFILTRATION BARRIER AROUND ALL EXTERIOR PENETRATIONS TO PREVENT WATER AND SPRINKLER PIPE FREEZING. 11. WHERE EXTERIOR PAVING ADJACENT TO BUILDING, TOP OF PAVING TO BE 1/4" LOWER THAN INTERIOR FINISH FLOOR, SLOPING CONTINUOUSLY AWAY FROM BUILDING A MINIMUM OF 5’. WHERE DOOR STOOP, 48" OUT FROM DOOR 1:48(2%) MAX. SLOPE, AFTER 48" AWAY FROM DOOR 1:20(5%) MAXIMUM SLOPE TO PUBLIC WAY. (REFER TO CIVIL) 12. WHERE NO EXTERIOR PAVING ADJACENT TO BUILDING, TOP OF FINISHED LANDSCAPE A MINIMUM OF 4" BELOW INTERIOR FINISH FLOOR AND 4” BELOW EXTERIOR WALL FLASHING/WEEPS, SLOPING CONTINUOUSLY AWAY FROM BUILDING A MINIMUM OF 5’. (REFER TO CIVIL) 13. ADDRESS SHALL BE PROVIDED ON STREET SIDE OF BUILDING AND ON MONUMENT SIGN. NUMBERS A MINIMUM 5 INCH CONTRASTING COLOR NUMBERS WITH MINIMUM 1/2" STROKE. 14. IF ANY SIGNAGE OR SIGN BASE IS SHOWN IT IS FOR REFERENCE ONLY, FINAL DESIGNS AND/OR ALLOWANCES SHALL BE DETERMINED WITH APPROVED SIGNAGE PERMIT(S). ACTUAL DETAILS & DIMENSIONS MAY VARY AND ARE SUBJECT TO CHANGE. ALL DRAWINGS ARE SUBJECT TO AUTHORITY HAVING JURISDICTION APPROVAL. SIGNAGE SHOWN DOES NOT REPRESENT ALLOWABLE SIGNAGE PERMITTING/APPROVAL OF ALL SIGNAGE PER CURRENT CITY ORDINANCE BY OTHERS. GENERAL EXTERIOR ELEVATION NOTES A-202 2 A-202 3 A-202 1 A-201 2 A-201 1 A-202 4 A-2013 M A T C H L I N E " A " MA T C H L I N E " B "MATCHLINE "C"Sheet No. Sheet Title Proj. No.Proj. Mgr. Th i s d r a w i n g h a s b e e n p r e p a r e d b y th e A r c h i t e c t , o r u n d e r t h e Ar c h i t e c t ' s d i r e c t s u p e r v i s i o n . T h i s dr a w i n g i s p r o v i d e d a s a n in s t r u m e n t o f s e r v i c e b y t h e De s i g n e r / A r c h i t e c t a n d i s i n t e n d e d fo r u s e o n t h i s p r o j e c t o n l y . A n y re p r o d u c t i o n , u s e , o r d i s c l o s u r e o f in f o r m a t i o n c o n t a i n e d h e r e i n wit h o u t t h e p r i o r w r i t t e n c o n s e n t o f th e A r c h i t e c t i s s t r i c t l y p r o h i b i t e d . (C ) C o p y r i g h t 2 0 2 4 b y S i m o n s o n & As s o c i a t e s A r c h i t e c t s , L . L . C . NO T F O R C O N S T R U C T I O N SAA J: \ 2 0 2 4 \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e R e t a i l , W a u k e e , I A \C A D - A r c h \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e . r v t 10 / 1 1 / 2 0 2 4 9 : 1 5 : 2 1 A M LA R S O N K E T T L E S T O N E R E T A I L SE P l e a s a n t V i e w D r . / G r a n d P r a i r i e P k w y Wa u k e e , I A 24068 A-202 EXTERIOR ELEVATIONS TKW SCALE:1/8" = 1'-0"1 SOUTHEAST ELEVATION SCALE:1/8" = 1'-0"2 CENTER ELEVATION SCALE:1/8" = 1'-0"3 EAST ELEVATION SCALE:1/8" = 1'-0"4 SOUTH ELEVATION Re v . # I s s u e / R e v i s i o n D a t e 1 P R E L I M I N A R Y E X T E L E V A T I O N S 0 8 - 2 9 - 2 0 2 4 2 I S S U E D F O R B U D G E T P R I C I N G 0 9 - 1 0 - 2 0 2 4 3 S I T E P L A N S U B M I T T A L 0 9 - 1 6 - 2 0 2 4 4 S I T E P L A N S U B M I T T A L 1 0 - 1 1 - 2 0 2 4 EXTERIOR MATERIAL LEGEND MAT. LABEL MATERIAL DESCRIPTION AWN-1 AWNING, PRE-ENGINEERED, FABRIC AWNING ON ALUMINUM FRAME; COLOR: BLACK. BR-1 FULL BED, MODULAR SIZE BRICK. FINISH: WHITE W/ NATURAL MORTAR. GLEN GERY ASPEN WHITE WIRECUT OR EQUAL. COP-1 METAL COPING SYSTEM: PRE-FINISHED BREAK METAL; COLOR: FIRESTONE MATTE BLACK OR SIM. COP-2 FIBER-CEMENT PANEL CORNICE; COLOR: BLACK FCP-1 FIBER-CEMENT SMOOTH LAP SIDING, NOMINAL 6" EXPOSURE. PAINTED: OFF-WHITE. ALTERNATIVE: STEEL SIDING, INSTALLED HORIZONTALLY. QUALITY EDGE VESTA SIDING, #280 WHITE. FCP-2 FIBER-CEMENT SMOOTH PANEL SIDING. 4'X8' W/ ALUMINUM FLASHING. PAINTED: DARK GRAY. FCP-3 NICHIHA VINTAGE WOOD: CEDAR. ALTERNATE: QUALITY EDGE VESTA SIDING #482 GILDED GRAIN. LT-1 EXTERIOR WALL SCONCE LIGHT FIXTURE. FINISH: MATTE BLACK. RL-1 BRICK ROWLOCK. MATCH BR-1. SF-1 T.B. ALUMINUM STOREFRONT FRAMING: CLEAR ANODIZED FINISH TR-1 ACCENT TRIM. FINISH: BLACK. VIS 1” INSULATED VISION GLASS: CLEAR W/ LOW E COATING TOTAL WALL: 1,680 SF FENESTRATION: 158 SF (10%) TOTAL WALL: 2,381 SF FENESTRATION: 913 SF (38%) TOTAL WALL: 1,173 SF FENESTRATION: 380 SF (32%) TOTAL WALL: 2,377 SF FENESTRATION: 913 SF (38%) KEY PLAN PROPOSED RTU LOCATIONS BEHIND PARAPET, TYP. 18 ' - 0 " 10' - 0" 8" 7' - 0 " 1' - 4 3 / 4 " 7' - 0 " 8" THICKENED SLAB (SEE CIVIL) ALL EXPOSED STEEL TO BE GALV. & PAINTED. 6"x6"x1/4" GALV. TUBE STEEL COLUMN. SUBMERGE 48" MIN. INTO FOOTING. 2' - 6 " 3' - 0 " 5' - 8 3 / 4 " 3' - 0 " 2' - 6 " DUMPER - 4 YARD DUMPER - 4 YARD A-5022 A-502 3 4 A-502 5 A-502 LEVEL 1 100' - 0" PREFINISHED METAL COPING THIN BRICK OVER CMU. BRICK TO MATCH BUILDING. METAL PAINTED TO MATCH METAL COPING. 4' - 0 " 7' - 4 " TREX BOARDS ON STEEL GATE FRAME LEVEL 1 100' - 0" PREFINISHED METAL COPING THIN BRICK OVER CMU. BRICK TO MATCH BUILDING. 4' - 0 " 7' - 4 " SLOPE 1/4"/FT 6"@ EDGE TYP. GRADE PIPE BOLLARDS PAINTED, EXPOSED 42" TREATED 2X8 GUARD RAIL ANCHOR TO BLOCK WALL W/ 1/2" EXP. BOLTS @ 16" O.C. 6" CONCRETE DUMPSTER PAD 7' - 4 " #5 @ 48" O.C. - GROUT CELLS SOLID #5 @ 48" O.C. 1'-6" TRENCH FOOTING THIN BRICK OVER 8x8x16 CMU W/ INTERGAL WATER REPELLANT BOND BEAM 5/8" DIA. BAR SIDE FRONT 1/4" PLATE 5/8" I.D. RING 3/8" DIA. HOLE 5/8" I.D. SPRING 5/8" I.D. RING 3/8" DIA. HOLE 2" 3' - 0 " 5" 2" 4 3 / 4 " 1 ' - 0 " 4 3 / 4 " 3 3 / 4 " 6 1 / 2 " 1 3 / 4 " 6X6X1//4 GALV. STEEL TUBE - PAINT 3/4" DIA. STEEL HINGE PIN (WELDED TO STEEL TUBE) 3/4" DIA. STEEL HINGE SLEEVE (BOLTED TO DOOR) METAL FRAMING W/ TREX COMPOSITE DECKING GRADE THIN BRICK OVER 8x8x16 CMU W/ INTERGAL WATER REPELLANT 6" THICK CONCRETE DUMPSTER PAD TREATED 2X8 WOOD GUARD RAIL ANCHOR TO BRICK WALL AT HEIGHT OF DUMPSTER PINS PIPE BOLLARD FOUNDATION TREX BOARDS ON STEEL FRAME GATES T.S. 3x2x3/16 FRAME & CROSS BRACE @ GATE DOORS PREFINISHED SHT MTL CAP OVER EPDM OVER TREATED WOOD BLOCKING T.S. 6x6x1/4 CORNER POSTS @ GATE DOORS 3' - 6 " 3 ' - 2 " SLOPE TOP 4' - 0 " 3' - 6 " 1' - 4" PAINTED BLACK ALUMINUM HORIZONTAL RAILING. PAINTED BLACK ALUMINUM BALUSTERS 4" 3 3 / 4 " PAINTED BLACK ALUMINUM POSTS. BOLTED W/ PAINTED BASE PLATE TO CONCRETE PATIO SURFACE. SOLID SURFACE DRINK RAIL W/ SUPPORT BRACKETS AS REQUIRED. 3 15/16" *SEE CIVIL FOR EXTENT OF PATIO RAILING SCALE:1 1/2" = 1'-0"7 TRASH HINGE SCALE:3/4" = 1'-0"6 TRASH PIN Sheet No. Sheet Title Proj. No.Proj. Mgr. Th i s d r a w i n g h a s b e e n p r e p a r e d b y th e A r c h i t e c t , o r u n d e r t h e Ar c h i t e c t ' s d i r e c t s u p e r v i s i o n . T h i s dr a w i n g i s p r o v i d e d a s a n in s t r u m e n t o f s e r v i c e b y t h e De s i g n e r / A r c h i t e c t a n d i s i n t e n d e d fo r u s e o n t h i s p r o j e c t o n l y . A n y re p r o d u c t i o n , u s e , o r d i s c l o s u r e o f in f o r m a t i o n c o n t a i n e d h e r e i n wit h o u t t h e p r i o r w r i t t e n c o n s e n t o f th e A r c h i t e c t i s s t r i c t l y p r o h i b i t e d . (C ) C o p y r i g h t 2 0 2 4 b y S i m o n s o n & As s o c i a t e s A r c h i t e c t s , L . L . C . NO T F O R C O N S T R U C T I O N SAA J: \ 2 0 2 4 \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e R e t a i l , W a u k e e , I A \C A D - A r c h \ 2 4 0 6 8 L a r s o n K e t t l e s t o n e . r v t 9/ 3 0 / 2 0 2 4 8 : 4 3 : 5 9 A M LA R S O N K E T T L E S T O N E R E T A I L SE P l e a s a n t V i e w D r . / G r a n d P r a i r i e P k w y Wa u k e e , I A 24068 A-502 TRASH ENCLOSURE TKW Re v . # I s s u e / R e v i s i o n D a t e 3 S I T E P L A N S U B M I T T A L 0 9 - 1 6 - 2 0 2 4 SCALE:1/4" = 1'-0"1 TRASH ENCLOSURE FLOOR PLAN SCALE:1/4" = 1'-0"2 FRONT ELEVATION SCALE:1/4" = 1'-0"3 SIDE ELEVATION (REAR SIMILAR) SCALE:1/4" = 1'-0"4 TRASH ENCLOSURE SECTION SCALE:1/4" = 1'-0"5 ENCLOSURE CROSS SECTION SCALE:3/4" = 1'-0"8 PATIO RAILING DETAIL