Loading...
HomeMy WebLinkAbout2025-01-06 Resolution 2025-026_Accept Public Improvements, 2023 Asphalt Overlay, Ashworth Dr-4th St to 10th StRESOLUTION 2025-026 RESOLUTION ACCEPTING THE 2023 ASPHALT OVERLAY IMPROVEMENTS: ASHWORTH DRIVE FROM 4TH TO IOTH STREET WHEREAS, on the 2 1 " day of February, 2023, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Grimes Asphalt & Paving Corp. of Des Moines, IA, for the construction of certain public improvements generally described as the 2023 Asphalt Overlay Improvements: Ashworth Drive from 4th to 1 Oth Street; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on January 2, 2025: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $551,162.73, as shown in the report of the Engineer. PASSED AND APPROVED this 6t' day of January, 2025. ATTEST: City Clerk RESULTS OF VOTE: AYE R. Charles Bottenberg X Chris Crone X Rob Grove X Anna Bergman Pierce X Ben Sinclair X 00-'� Mayor NAY ABSENT ABSTAIN