Loading...
HomeMy WebLinkAbout2025-01-20 I03A-C Kettlestone Central Retail Ph 1_Preliminary Plat, Final Plat, Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 20, 2025 AGENDA ITEM: Consideration of approval of resolutions approving a preliminary plat, final plat, and site plan for Kettlestone Central – Retail Phase 1 / Kettlestone Central South Plat 2 FORMAT: Resolutions SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a preliminary plat/site plan and final plat for a commercial development, located south of SE Westown Parkway and east of Grand Prairie Parkway, containing 25.94-acres. The project includes the first phase of development for Kettlestone Central Retail. Phase 1 includes a total of two retail buildings. Each building is proposed to be 15,200 square feet in area and 28-feet in height. Each building will include outdoor patio space along the east sides. Two trash enclosures will be provided with this first phase. A monument sign is proposed at the entrance off of Grand Prairie Parkway, along the west side of the site. The final plat includes six lots and two outlots. The two proposed buildings are located on Lots 1 and 3. Each building is located on its own lot. The final plat includes ingress/egress easements to provide access throughout the development. Two accesses will be provided into the site at this time. One off of Grand Prairie Parkway and one off of SE Westown Parkway. Several future accesses are planned. A total of 146 parking spaces are required for this first phase of the project and a total of 392 spaces are provided. Public utilities are provided to the site, but all utilities internal to the site will be private utilities to be privately owned and maintained by an owner’s association. Stormwater detention will be provided in a pond located at the south side of the site, within Lot 6. The pond will also be privately owned and maintained by an owner’s association. A minimum of 20% of the site is required to be open space, they are providing 79%. The required amount of plantings are being provided. The elevations of the buildings will be constructed of mostly brick and fiber cement siding and panel in different color variations as well as storefront glazing. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat, final plat, and site plan request at their meeting on January 14, 2025, and recommended approval: I3A-C Approval of a Preliminary Plat, Final Plat and Site Plan for Kettlestone Central – Retail Phase 1 Melissa DeBoer, Planning Coordinator, introduced the request for approval of a preliminary plat/site plan and final plat for a commercial development, as requested by Caliber Land Company, LLC, represented by Nikki Neal, ASLA, with Civil Design Advantage. The property is located within the Kettlestone Corridor, south of Westown Parkway and east of Grand Prairie Parkway, containing approximately 25.94 acres. The property was rezoned in Fall 2022. The project includes the first phase of development for Kettlestone Central Retail. Phase I includes a total of two retail buildings. Each building is proposed to be 15,200 square feet in area and 28-feet in height. The site plan shows a private drive located between the two buildings that will provide a main street feel for the overall development. Parking areas are located around the entire site, including parking on the main drive between the two buildings. Each building will include outdoor patio space along the east. The site plan shows two trash enclosures, one along the north side of the proposed parking lot and one along the south side of the proposed parking lot. A monument sign is proposed at the entrance from Grand Prairie Parkway, along the west side of the site. The final plat identifies six lots and two outlots. Lots 1-5 and both outlots are zoned K-RC, Kettlestone Retail Community District. Lot 6 is zoned K-MU, Kettlestone Mixed Use District. The two proposed buildings are proposed on lots 1 and 3. Each building is on its own lot. The final plat includes ingress/egress easements to provide access throughout the development. Two accesses will be provided into the site at this time, one from Grand Prairie Parkway and one from SE Westown Parkway. Several future accesses are planned from the surrounding public streets at time of future development. Ingress/egress easements will provide access across the private drives throughout the development. A total of 146 parking spaces are required for this first phase of the project, and a total of 392 spaces are provided, including 16 accessible parking stalls. The parking provided with this phase will also serve future phases of development. The site plan also shows future parking to be constructed with future development. The site plan also shows bicycle parking provided in accordance with the Kettlestone Design Guidelines. A ten-foot-wide trail exists along Grand Prairie Parkway at the west side of the site. Pedestrian accesses will be provided into the overall site from this existing trail. Private sidewalks are shown throughout the development to provide internal pedestrian access across the site as well as provide access to adjacent lots. Future trails and sidewalks will be provided along adjacent public streets with future development. Public utilities are provided to the site, but all utilities internal to the site will be private utilities to be privately owned and maintained. Storm water detention will be provided in a pond located to the south side of the site, within Lot 6. The pond will be privately owned and maintained. A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 79%. Plantings are being provided in compliance with the Landscape & Open Space Ordinance and the Kettlestone Design Guidelines. Building elevations are proposed to be constructed of brick and fiber cement siding and panel in different color variations as well as storefront glazing. Both buildings are single-story and 28-feet in height at the maximum height. A photometric plan has been submitted and complies with the requirements of the Site Plan Ordinance and the Kettlestone Design Guidelines. All proposed easements have been indicated on the final plat. Private utility easements are provided across the site. Public ingress/egress easements are provided for access across the site. A private storm water detention easement is provided for the private pond within Lot 6. There are no parkland dedication requirements associated with this phase of the development as there is no residential proposed at this time. Parkland dedication will be required with future residential phases of the mixed-use portion of the development, to the east of this phase. The subject property is within the Kettlestone Corridor. The land use shown within the Kettlestone Master Plan for the subject property is office. The Kettlestone Master Plan is intended to act as a guide for land use while at the same time allowing for flexibility of land uses. The intent is that the land use designations can move based upon market demands. The property was rezoned in 2022 to allow for retail and mixed- use development. The proposed preliminary plat/site plan and final plat are in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Comprehensive Plan, and Kettlestone Design Guidelines. Staff recommends approval subject to any remaining staff comments and review of legal documents. Discussion as follows: • General discussion of future development, parking, trash enclosures, drive aisles and access points • Review of approval process for future tenants requesting drive through access Motion by Commissioner Tessau for approval of a preliminary plat for Kettlestone Central – Retail Phase 1, seconded by Commissioner Bankole. Ayes: Broderick, Koelker, Beenken, Tessau, Lohse and Bankole. Nays: None. Motion carried. Motion by Commissioner Broderick for approval of a final plat for Kettlestone Central South Plat 2, seconded by Commissioner Lohse. Ayes: Broderick, Koelker, Beenken, Tessau, Lohse and Bankole. Nays: None. Motion carried. Motion by Commissioner Koelker for approval of a site plan for Kettlestone Central – Retail Phase I, seconded by Commissioner Tessau. Ayes: Broderick, Koelker, Beenken, Tessau, Lohse and Bankole. Nays: None. Motion carried. RECOMMENDATION: Approve the resolutions. ATTACHMENTS: I. Proposed Resolutions II. Staff Report III. Preliminary Plat/Site Plan IV. Final Plat V. Building Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE PRELIMINARY PLAT FOR KETTLESTONE CENTRAL – RETAIL PHASE 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval of a Preliminary Plat for Kettlestone Central – Retail Phase 1 on January 14, 2025; AND, WHEREAS, the Preliminary Plat for Kettlestone Central – Retail Phase 1 is in general conformance with section §176 - Subdivision Regulations of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 20th day of January, 2025 that the Preliminary Plat for Kettlestone Central – Retail Phase 1 be approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE FINAL PLAT FOR KETTLESTONE CENTRAL SOUTH PLAT 2 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, CALIBER LAND COMPANY, LLC, has requested final plat approval of Kettlestone Central South Plat 2 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on January 14, 2025, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Kettlestone Central South Plat 2 and the documents relating thereto will comply with section §176 – Subdivision Regulations of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 20th day of January, 2025, that the Final Plat for Kettlestone Central South Plat 2 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1. Public Utility Easement; 2. Public Ingress/Egress Easement; 3. Sanitary Sewer Easement; 4. Public Storm Sewer Easement; 5. Storm Water Management Facility Maintenance Covenant and Permanent Easement Agreement; 6. Private Overland Flowage Easement; 7. Private Storm Sewer Easement; 8. Private Sanitary Sewer Easement; 9. Private Water Main Easement; and 10. Exclusive Use Restrictive Covenant. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE SITE PLAN FOR KETTLESTONE CENTRAL – RETAIL PHASE 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Kettlestone Central – Retail Phase 1, subject to remaining staff comments on January 14, 2025; AND, WHEREAS, the Site Plan for Kettlestone Central – Retail Phase 1 is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Kettlestone Central – Retail Phase 1 is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 20th day of January, 2025, that the Site Plan for Kettlestone Central – Retail Phase 1 is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Kettlestone Central – Retail Phase 1 – Preliminary Plat / Site Plan and Kettlestone Central South Plat 2 Final Plat PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: January 10, 2025 MEETING DATE: January 14, 2025 GENERAL INFORMATION Owner/Applicant: Caliber Land Company, LLC Owner’s Representative: Nikki Neal, ASLA with Civil Design Advantage Request: The applicant is requesting approval of a preliminary plat/site plan and final plat for a commercial development. Location and Size: Property is located south of SE Westown Parkway and east of Grand Prairie Parkway, containing approximately 25.94 acres. AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. January 10, 2025 2 of 4 LAND USES AND ZONING Location Existing Land Use Kettlestone Master Plan / Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Office / Business Park K-RC (Kettlestone Retail Community District) and K-MU (Kettlestone Mixed Use District) North Vacant – Undeveloped Office & Retail / Business Park & Neighborhood Commercial K-RR (Kettlestone Retail Regional District) South UnityPoint Clinic / Undeveloped Office / Business Park K-OF (Kettlestone Office District) East Under Construction – DWR Dance Studio and Kettlestone Central Lofts (Apartments) Office / Business Park K-RC (Kettlestone Retail Community District) West Vacant – Undeveloped Office & Retail / Business Park & Neighborhood Commercial K-RC (Kettlestone Retail Community District) and K-OF (Kettlestone Office District) BACKGROUND The subject property is located within the Kettlestone Corridor and includes 25.94-acres. The property was rezoned in Fall 2022. PROJECT DESCRIPTION The project includes the first phase of development for Kettlestone Central Retail. Phase 1 includes a total of two retail buildings. Each building is proposed to be 15,200 square feet in area and 28-feet in height. The site plan shows a private drive located between the two buildings that will provide a main street feel for the overall development. Parking areas are located around the entire site, including parking on the main drive between the two buildings. Each building will include outdoor patio space along the east. The site plan shows two trash enclosures, one along the north side of the proposed parking lot and one along the south side of the proposed parking lot. A monument sign is proposed at the entrance off of Grand Prairie Parkway, along the west side of the site. The final plat identifies six lots and two outlots. Lots 1-5 and both outlots are zoned K-RC, Kettlestone Retail Community District. Lot 6 is zoned K-MU, Kettlestone Mixed Use District. The two proposed buildings are proposed on Lots 1 and 3. Each building is on its own lot. The final plat includes ingress/egress easements to provide access throughout the development. ACCESS AND PARKING Two accesses will be provided into the site at this time. One off of Grand Prairie Parkway and one off of SE Westown Parkway. Several future accesses are planned off of the surrounding public streets at time of future development. Ingress/egress easements will provide access across the private drives throughout the development. January 10, 2025 3 of 4 A total of 146 parking spaces are required for this first phase of the project and a total of 392 spaces are provided, including 16 accessible parking stalls. The parking provided with this phase of development will also serve the future phases of development. The site plan also shows future parking to be constructed with future development. The site plan also shows bicycle parking being provided in accordance with the Kettlestone Design Guidelines. SIDEWALKS/TRAILS A ten-foot-wide trail exists along Grand Prairie Parkway at the west side of the site. Pedestrian accesses will be provided into the overall site from this existing trail. Private sidewalks are shown throughout the development in order to provide internal pedestrian access across the site as well as provide access to adjacent lots. Future trails and sidewalks will be provided along adjacent public streets with future development. UTILITIES Public utilities are provided to the site, but all utilities internal to the site will be private utilities to be privately owned and maintained. Storm water detention will be provided in a pond located at the south side of the site, within Lot 6. The pond will be privately owned and maintained. LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 79%. Plantings are being provided throughout the site in compliance with the Landscape & Open Space Ordinance and the Kettlestone Design Guidelines. ELEVATIONS The elevations of the buildings are proposed to be constructed of brick and fiber cement siding and panel in different color variations as well as storefront glazing. Both buildings are single-story and 28-feet in height at the maximum height. Elevations of the proposed buildings have been provided for review. LIGHTING PLAN A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan Ordinance and the Kettlestone Design Guidelines. Several parking lot light fixtures are proposed as well as wall- mounted light fixtures. EASEMENTS All proposed easements have been indicated on the final plat. Private utility easements are provided across the site. Public ingress/egress easements are provided for access across the site. A private storm water detention easement is provided for the private pond within Lot 6. PARKLAND DEDICATION There are no parkland dedication requirements associated with this phase of the development as there is no residential proposed at this time. Parkland dedication will be required with the future residential phases of the mixed-use portion of the development, to the east of this phase. COMPREHENSIVE PLAN The subject property is within the Kettlestone Corridor. The land use shown within the Kettlestone Master Plan for the subject property is office. The Kettlestone Master Plan is intended to act as a guide for land use while at the same time allowing for flexibility of land uses. The intent is that the land use designations can January 10, 2025 4 of 4 move based upon market demands. The property was rezoned in 2022 to allow for retail and mixed-use development. STAFF RECOMMENDATION The proposed preliminary plat/site plan and final plat are in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Comprehensive Plan, and Kettlestone Design Guidelines. Staff recommends approval subject to any remaining staff comments and review of the legal documents. Kettlestone Central - Retail Phase 1 UTILITY WARNING EXISTING/ PROPOSED USE DEVELOPMENT SUMMARY SUBMITTAL DATES ARCHITECT PROJECT SITE ADDRESS SURVEYOR OWNER/APPLICANT INDEX OF SHEETS GENERAL LEGEND ENGINEER LEGAL DESCRIPTION DATE OF SURVEY BENCHMARKS Kettlestone Central - Retail Phase 1 SITE PLAN/PRELIMINARY PLAT FOR: WAUKEE, IOWA www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call VICINITY MAP WAUKEE, IOWA PA R K W A Y PR A I R I E GR A N D SE W A C O P L A C E / 9 8 T H S T R E E T ASHWORTH ROA D INT E R S T A T E 8 0 SITE SE WESTOWN PARKWAY 4121 NW URBANDALE DRIVE, URBANDALE, IA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE PRELIMIN A R Y NOT FOR C O N S T R U C T I O N PRELIMIN A R Y NOT FOR C O N S T R U C T I O N l l l l l l ZONING & BULK REGULATIONS – – – – – BUILDINGS TT T T T T T T T SHEET C1.1 SHEET C1.2 SHEET C1.3 SHEET C1.4 SHEET C1.5 SHEET C1.6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y R E F E R E N C E P L A N C1.0 DEMOLITION NOTES TRAFFIC CONTROL NOTES SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.1 SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.2 GR A N D P R A I R I E P A R K W A Y LOT 1 LOT 2 LOT 3 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.3 SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.4 GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 LOT 7 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.5 SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / D E M O L I T I O N P L A N C1.6 TT T T T T T T T T T LOT 4 LOT 3 OUTLOT 'Z' OUTLOT 'Y' LOT 5 LOT 2LOT 1 LOT 6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y GR A N D P R A I R I E P A R K W A Y SE G L A C I E R T R A I L SE G L A C I E R T R A I L SE TALLGRASS L A N E LOT 7 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: PR E L I M I N A R Y P L A T C2.1 TT T T T T T T T 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 150 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S T T LOT 4 LOT 3 OUTLOT 'Z' OUTLOT 'Y' LOT 5 LOT 2LOT 1 LOT 6 LOT 7 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: PR E L I M I N A R Y P L A T C2.2 TT T T T T T T T T T LOT 4 LOT 3 OUTLOT 'Z' OUTLOT 'Y' LOT 5 LOT 2LOT 1 LOT 6 LOT 7 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: PR E L I M I N A R Y P L A T C2.3 TT T T T T T T T T T SHEET C3.1 SHEET C3.2 SHEET C3.3 SHEET C3.4 SHEET C3.5 SHEET C3.6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N R E F E R E N C E P L A N C3.0 GENERAL NOTES PAVEMENT THICKNESS T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.1 SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.2 T PROPOSED BUILDING 15,200 SF GR A N D P R A I R I E P A R K W A Y PROPOSED BUILDING 15,200 SF PROPOSED PATIO 1,800 SF PROPOSED PATIO 1,800 SF LOT 1 LOT 2 LOT 3 LOT 4 MAIN STREET WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.3 SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 MAIN STREET WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.4 PROPOSED BUILDING 15,800 SF GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 LOT 7 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.5 SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DI M E N S I O N P L A N C3.6 TT T T T T T T T T T SHEET C4.1 SHEET C4.2 SHEET C4.3 SHEET C4.4 SHEET C4.5 SHEET C4.6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G R E F E R E N C E P L A N C4.0 GRADING NOTES T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.1 SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.2 T GR A N D P R A I R I E P A R K W A Y LOT 1 LOT 2 LOT 3 LOT 4 F.F.E.=1043.20F.F.E.=1042.20 F.F.E.=1039.30 F.F.E.=1043.20F.F.E.=1042.20 F.F.E.=1039.30 F.F.E.=1041.20 F.F.E.=1039.30 F.F.E.=1041.20 TC = 1 0 3 9 . 7 1 TC = 1 0 3 9 . 7 2 TC = 1 0 3 9 . 6 5 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.3 SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 F.F.E.=1044.20 F.F.E.=1044.20 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.4 GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 EXISTING STORM WATER DETENTION (POND 1) TOP OF BERM EL=1030.00 100 YEAR EL=1028.15 NORMAL POOL EL=1022.17 LOT 7 LOT 6 F.F.E.=1039.30 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.5 SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 EXISTING STORM WATER DETENTION (POND 1) TOP OF BERM EL=1030.00 100 YEAR EL=1028.15 NORMAL POOL EL=1022.17 EXISTING STORM WATER DETENTION (POND 1A) TOP OF BERM EL=1036.00 100 YEAR EL=1034.17 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.6 F.F.E.=1039.30 TC = 1 0 3 9 . 6 9 TC = 1 0 3 9 . 7 1 TC = 1 0 3 9 . 7 2 TC = 1 0 3 9 . 6 5 TC = 1 0 3 9 . 7 8 TC= 1 0 4 0 . 4 2 TC = 1 0 3 9 . 7 8 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.7GRADING ENLARGEMENT #1 T F.F.E.=1039.30 F.F.E.=1039.30 TC = 1 0 4 0 . 4 2 TC = 1 0 3 9 . 7 8 TC= 1 0 3 9 . 6 9 TC = 1 0 3 9 . 7 1 TC = 1 0 3 9 . 6 5 TC = 1 0 3 9 . 7 2 TC = 1 0 3 9 . 7 8 TC = 1 0 3 9 . 7 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.8GRADING ENLARGEMENT #2 F.F.E.=1039.30 TC= 1 0 4 0 . 4 2 TC = 1 0 3 9 . 7 8 TC = 1 0 3 9 . 7 8 TC = 1 0 3 9 . 7 2 F.F.E.=1039.30 TC = 1 0 3 9 . 7 8 TC = 1 0 4 0 . 4 2 TC = 1 0 3 9 . 7 8 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.9 GRADING ENLARGEMENT #4 GRADING ENLARGEMENT #3 TC = 1 0 3 9 . 7 8 TC = 1 0 3 9 . 7 8 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: GR A D I N G P L A N C4.10GRADING ENLARGEMENT #5 TT T T T T T T T T T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y SHEET C5.1 SHEET C5.2 SHEET C5.3 SHEET C5.4 SHEET C5.5 SHEET C5.6 l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllll lllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllllllllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L R E F E R E N C E P L A N C5.0 R TSB # l l l l TST # SWPPP LEGEND DISCHARGE POINT SUMMARY NOTES: STABILIZATION QUANTITIES T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll l l l l l l l l l l l l l l lll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.1 SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l DA #2 8.65 AC l ll l l l l l l l l l l l l l lll lll lll lll lll l l l l l l l l l l l l l l l l l l l l l l l l llllll l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.2 T GR A N D P R A I R I E P A R K W A Y LOT 1 LOT 2 LOT 3 LOT 4 R l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l DA #1 8.30 AC DA #1 8.16 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.3 SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 R l l l l l l l l l l l l l l l l l l l l l l l l l DA #2 2.23 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.4 GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 l l l l l l l l l l l l l l l l l l l l lll l l lllllllllllllllllllllllll l l l lllllllllllllllllllllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l LOT 7 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.5 SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 lll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.6 TT T T T T T T T T T SHEET C6.1 SHEET C6.2 SHEET C6.3 SHEET C6.4 SHEET C6.5 SHEET C6.6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y R E F E R E N C E P L A N C6.0 UTILITY NOTES 15 0 ' H Y D R A N T 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.1 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.2 15 0 ' H Y D R A N T 15 0 ' H Y D R A N T 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S T GR A N D P R A I R I E P A R K W A Y LOT 1 LOT 2 LOT 3 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.3 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.4 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 LOT 7 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.5 150' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T RA D I U S 15 0 ' H Y D R A N T RA D I U S SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: UT I L I T Y P L A N C6.6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DE T A I L S C7.1 l l 7 INTEGRAL 6" STANDARD CURB 3 6" INTEGRAL CURB AND SIDEWALK 4 ACCESSIBLE PARKING SIGN 5 LIGHT DUTY PCC PAVING 2 STANDARD DUTY PCC PAVING 1 HEAVY DUTY PCC PAVING6PCC SIDEWALK 8 GENERAL FEATURES OF AN ACESSIBLE SIDEWALK 9 CURB RAMPS - GENERAL SECTION 10 SUDAS TYPE A DRIVEWAY 11 CURB RAMPS WITHIN INTERSECTION WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: DE T A I L S C7.21CITY OF WAUKEE HYDRANT (DWG NO. 34, REV. 2) 2 ROOF DRAIN CONNECTION 4 SW-506 MODIFIED INTAKE 3 FOREBAY RIPRAP 5 FENCE DETAIL Base Material Uniform Zinc Coating (Hot Dip) Zinc Phosphate Coating Epoxy Primer 17 16" 112" FLAT MOUNT Acrylic Topcoat Bracket Options 51 2" Varies With Height 2" Nom. Standard Heights 3', 31 2', 4', 5', 6' 36" Min. Footing Depth 118" 112" MONTAGE PLUS Rail (See Cross- Section Below) TM Post 21 2" x 16ga 1 3 4" 18ga Picket 2 RAKING DIRECTIONAL ARROW Welded panel can be raked 30" over 8' with arrow pointing down grade. MONTAGE PLUS RAIL Specially formed high strength architectural shape. TM PROFUSION WELDING PROCESS No exposed welds, Good Neighbor profile - Same appearance on both sides TM MONTAGE PLUS RAILTM E-COAT COATING SYSTEM DOUBLE RING Adornament option 2 TYPICAL31516" 8' O.C. Nom. 3 BX111BX112/117BX114 UNIVERSAL BOULEVARDLINE BOULEVARD BRACKETBRACKET BRACKET 3 NOTES: 1.) Post size depends on fence height and wind loads. See MONTAGE PLUS specifications for post sizing chart. 2.) Third rail required for Double Rings. 3.) Available in 3" air space and/or Flush Bottom on most heights. TM Values shown are nominal and not to be used for installation purposes. See product specification for installation requirements. SCALE:NJBDR: CK: SH . 1of 1 Date 09/21/11 AMERISTAR R REV: MONTAGE PLUS MAJESTIC 2/3-RAIL DO NOT SCALE e Title: BS 1RMISO COMMERCIAL STRENGTH WELDED STEEL PANEL PRE-ASSEMBLED TT T T T T T T T T T SHEET L1.1 SHEET L1.2 SHEET L1.3 SHEET L1.4 SHEET L1.5 SHEET L1.6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y ™ ® ® PLANT SCHEDULE WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E R E F E R E N C E P L A N L1.0 LANDSCAPE NOTES OPEN SPACE STREET TREES PARKING SETBACK AREA T SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y OUTLOT Z OUTLOT Y LOT 1 LOT 2 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.1 SE WESTOWN P A R K W A Y SE G L A C I E R T R A I L LOT 5 LOT 2 LOT 6 OUTLOT Y WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.2 T GR A N D P R A I R I E P A R K W A Y LOT 1 LOT 2 LOT 3 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.3 SE G L A C I E R T R A I L LOT 6LOT 2 LOT 4 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.4 GR A N D P R A I R I E P A R K W A Y SE TALLGRASS L A N E LOT 4 LOT 3 LOT 7 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.5 SE TALLGRASS L A N E SE G L A C I E R T R A I L LOT 4 LOT 6 WA U K E E , I O W A RE V I S I O N S DR A F T E D : EN G I N E E R : CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - L O T S 1 - 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2409.711 12/17/2024 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.6 LOT 4 LOT 3 OUTLOT 'Z' OUTLOT 'Y'LOT 5 LOT 2LOT 1 S01°19'28"E 86.18'(M&R) Δ=15°00'15" L=141.41' R=540.00' CH=141.01' CHB=S13°16'30"W (M&R) Δ=92°49'51" L=40.51' R=25.00' CH=36.22' CHB=S25°38'18"E (M&R) N83°47'58"E 618 . 1 9 ' ( M & R ) N42 ° 0 8 ' 2 3 " E 154 . 8 3 ' ( M & R ) N0 0 ° 2 7 ' 1 6 " E 11 0 0 . 2 4 ' ( M & R ) N51°03'50"W 25.38'(M&R) S83°56'10"W 148.38'(M&R) S83°56'10"W 548 . 0 6 ' ( M & R ) S80°28'07"W 82.67'(M&R) S83°56'10"W 133.71'(M&R) S0 0 ° 2 7 ' 1 6 " W 82 0 . 7 3 ' ( M & R ) S03°55'22"W 68.88'(M&R) S42°11'43"W 27.03'(M&R) Δ=24°08'49" L= 2 9 9 . 2 2 ' R=710.00' CH= 2 9 7 . 0 1 ' CHB=S84°07'38 " E (M&R) LOT 6 S89°28'40"W 51.78'(M&R) LOT 7 KETTLESTONE CENTRAL SOUTH PLAT 2 FINAL PLAT CI V I L D E S I G N A D V A N T A G E 2409.711 EN G I N E E R : TE C H : WA U K E E , I O W A 5 FI R S T S U B M I T T A L 09 / 2 4 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E C E N T R A L SO U T H P L A T 2 SE C O N D S U B M I T T A L 10 / 0 8 / 2 4 TH I R D S U B M I T T A L 10 / 2 2 / 2 4 FO U R T H S U B M I T T A L 11 / 0 5 / 2 4 EA S E M E N T R E V I S I O N S 12 / 0 9 / 2 4 RE V I S E D 12 / 3 0 / 2 4 1 INDEX LEGEND PRELIMI N A R Y NOT FOR C O N S T R U C T I O N SE TALLGRASS L A N E SE G L A C I E R T R A I L SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y FI N A L P L A T ENGINEER / SURVEYOR LEGEND OWNER / DEVELOPER PLAT DESCRIPTION NOTES VICINITY MAP WAUKEE, IOWA PA R K W A Y PR A I R I E GR A N D SE W A C O P L A C E / 9 8 T H S T R E E T ASHWORTH ROA D SE WESTOWN PARKWAY CURVE DATA ZONING & BULK REGULATIONS – – – – – DATE OF SURVEY SEE SHEETS 2 & 4 SEE SHEETS 3 & 5 SITE OUTLOT 'Z' OUTLOT 'Y' LOT 5 LOT 2LOT 1 S01°19'28"E 86.18'(M&R) Δ=15°00'15" L=141.41' R=540.00' CH=141.01' CHB=S13°16'30"W (M&R) Δ=92°49'51" L=40.51' R=25.00' CH=36.22' CHB=S25°38'18"E (M&R)N83°47'58"E 618 . 1 9 ' ( M & R ) N42 ° 0 8 ' 2 3 " E 154 . 8 3 ' ( M & R ) N0 0 ° 2 7 ' 1 6 " E 11 0 0 . 2 4 ' ( M & R ) S0 0 ° 2 7 ' 1 6 " W 82 0 . 7 3 ' ( M & R ) Δ=24°08'49" L= 2 9 9 . 2 2 ' R=710.00' CH= 2 9 7 . 0 1 ' CHB=S84°07'38 " E (M&R) LOT 6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y SE G L A C I E R T R A I L CI V I L D E S I G N A D V A N T A G E 2409.711 EN G I N E E R : TE C H : WA U K E E , I O W A 5 FI R S T S U B M I T T A L 09 / 2 4 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E C E N T R A L SO U T H P L A T 2 SE C O N D S U B M I T T A L 10 / 0 8 / 2 4 TH I R D S U B M I T T A L 10 / 2 2 / 2 4 FO U R T H S U B M I T T A L 11 / 0 5 / 2 4 EA S E M E N T R E V I S I O N S 12 / 0 9 / 2 4 RE V I S E D 12 / 3 0 / 2 4 2 KETTLESTONE CENTRAL SOUTH PLAT 2 FINAL PLAT FI N A L P L A T LOT 4 LOT 3 N51°03'50"W 25.38'(M&R) S83°56'10"W 148.38'(M&R) S83°56'10"W 548 . 0 6 ' ( M & R ) S80°28'07"W 82.67'(M&R) S83°56'10"W 133.71'(M&R) S0 0 ° 2 7 ' 1 6 " W 82 0 . 7 3 ' ( M & R ) S03°55'22"W 68.88'(M&R) S42°11'43"W 27.03'(M&R) LOT 6 GR A N D P R A I R I E P A R K W A Y SE G L A C I E R T R A I L SE TALLGRASS L A N E S89°28'40"W 51.78'(M&R) LOT 7 CI V I L D E S I G N A D V A N T A G E 2409.711 EN G I N E E R : TE C H : WA U K E E , I O W A 5 FI R S T S U B M I T T A L 09 / 2 4 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E C E N T R A L SO U T H P L A T 2 SE C O N D S U B M I T T A L 10 / 0 8 / 2 4 TH I R D S U B M I T T A L 10 / 2 2 / 2 4 FO U R T H S U B M I T T A L 11 / 0 5 / 2 4 EA S E M E N T R E V I S I O N S 12 / 0 9 / 2 4 RE V I S E D 12 / 3 0 / 2 4 3 KETTLESTONE CENTRAL SOUTH PLAT 2 FINAL PLAT FI N A L P L A T OUTLOT 'Z' OUTLOT 'Y' LOT 5 LOT 2LOT 1 S01°19'28"E 86.18'(M&R) Δ=15°00'15" L=141.41' R=540.00' CH=141.01' CHB=S13°16'30"W (M&R) Δ=92°49'51" L=40.51' R=25.00' CH=36.22' CHB=S25°38'18"E (M&R)N83°47'58"E 618 . 1 9 ' ( M & R ) N42 ° 0 8 ' 2 3 " E 154 . 8 3 ' ( M & R ) N0 0 ° 2 7 ' 1 6 " E 11 0 0 . 2 4 ' ( M & R ) S0 0 ° 2 7 ' 1 6 " W 82 0 . 7 3 ' ( M & R ) Δ=24°08'49" L= 2 9 9 . 2 2 ' R=710.00' CH= 2 9 7 . 0 1 ' CHB=S84°07'38 " E (M&R) LOT 6 SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y SE G L A C I E R T R A I L CI V I L D E S I G N A D V A N T A G E 2409.711 EN G I N E E R : TE C H : WA U K E E , I O W A 5 FI R S T S U B M I T T A L 09 / 2 4 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E C E N T R A L SO U T H P L A T 2 SE C O N D S U B M I T T A L 10 / 0 8 / 2 4 TH I R D S U B M I T T A L 10 / 2 2 / 2 4 FO U R T H S U B M I T T A L 11 / 0 5 / 2 4 EA S E M E N T R E V I S I O N S 12 / 0 9 / 2 4 RE V I S E D 12 / 3 0 / 2 4 4 KETTLESTONE CENTRAL SOUTH PLAT 2 FINAL PLAT FI N A L P L A T LOT 4 LOT 3 N51°03'50"W 25.38'(M&R) S83°56'10"W 148.38'(M&R) S83°56'10"W 548 . 0 6 ' ( M & R ) S80°28'07"W 82.67'(M&R) S83°56'10"W 133.71'(M&R) S0 0 ° 2 7 ' 1 6 " W 82 0 . 7 3 ' ( M & R ) S03°55'22"W 68.88'(M&R) S42°11'43"W 27.03'(M&R) LOT 6 GR A N D P R A I R I E P A R K W A Y SE G L A C I E R T R A I L SE TALLGRASS L A N E S89°28'40"W 51.78'(M&R) LOT 7 CI V I L D E S I G N A D V A N T A G E 2409.711 EN G I N E E R : TE C H : WA U K E E , I O W A 5 FI R S T S U B M I T T A L 09 / 2 4 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : KE T T L E S T O N E C E N T R A L SO U T H P L A T 2 SE C O N D S U B M I T T A L 10 / 0 8 / 2 4 TH I R D S U B M I T T A L 10 / 2 2 / 2 4 FO U R T H S U B M I T T A L 11 / 0 5 / 2 4 EA S E M E N T R E V I S I O N S 12 / 0 9 / 2 4 RE V I S E D 12 / 3 0 / 2 4 5 KETTLESTONE CENTRAL SOUTH PLAT 2 FINAL PLAT FI N A L P L A T RTU BEYOND ROOF LINE BEYOND S1B2 B1B1B1B1B1B1B1B1B1 S1 ALUMINUM AWNING WITH STEEL SUPPORTS B1RTU BEYOND ROOF LINE BEYOND B3B3 B3B3 B3 B3 B3 S1 B1 B1 S1 ALUMINUM AWNING WITH STEEL SUPPORTS S1 RTU BEYOND RTU BEYOND RTU BEYONDRTU BEYOND ROOF LINE BEYOND B1 B2 S1 S1 B1 B3 S1 B3 B3 B3 B3 B3 B3 A301 1 ALUMINUM AWNING WITH STEEL SUPPORTS RTU BEYOND RTU BEYONDRTU BEYOND RTU BEYOND ROOF LINE BEYOND B3 B3 B3 B3 B3 B3 S1 S1 S1 B3 B1 B1 S1 B1 B1B1B1 B1 S1 A301 1 ALUMINUM AWNING WITH STEEL SUPPORTS ALUMINUM AWNING WITH STEEL SUPPORTS STEEL C-CHANNEL SCALE:1/8" = 1'-0"3 SOUTH ELEVATION SCALE:1/8" = 1'-0"2 NORTH ELEVATION 3611 NE Otterview Cir. #42 Ankeny, IA 50021 Phone: (515) 597-5457 Fax: (515) 597-5461 www.jcorpdesignbuild.com CONTENTS: SHEET NO: PROJECT NO: PR O J E C T : 1 REVISIONS: 3 2 A201 23-017 Ke t t l e s t o n e C e n t r a l C o m m e r c i a l 12 / 03 / 2024 Elevations Lo t 1 SCALE:1/8" = 1'-0"4 EAST ELEVATION SCALE:1/8" = 1'-0"1 WEST ELEVATION MATERIAL SCHEDULE - EAST Type Mark Description Area Percentage Glazing 1077 SF 26% B1 Modular Brick - Light 331 SF 8% B2 Modular Brick - Dark 85 SF 2% B3 Modular Brick - Red 1478 SF 36% S1 Fiber Cement Panel Siding - Black 1135 SF 28% MATERIAL SCHEDULE - SOUTH Type Mark Description Area Percentage Glazing 796 SF 39% B1 Modular Brick - Light 432 SF 21% B2 Modular Brick - Dark 378 SF 19% S1 Fiber Cement Panel Siding - Black 435 SF 21% MATERIAL SCHEDULE - NORTH Type Mark Description Area Percentage Glazing 540 SF 21% B1 Modular Brick - Light 461 SF 18% B3 Modular Brick - Red 1042 SF 40% S1 Fiber Cement Panel Siding - Black 568 SF 22% MATERIAL SCHEDULE - WEST Type Mark Description Area Percentage Glazing 1504 SF 32% B1 Modular Brick - Light 1221 SF 26% B3 Modular Brick - Red 1250 SF 26% S1 Fiber Cement Panel Siding - Black 760 SF 16% RTU BEYOND ROOF LINE BEYOND B1 S1 B3 B3B3 B3 B3 B3B3 B3 B3 B1 S1 RTU BEYOND ROOF LINE BEYOND S1 B2 B1 B1 B1 B1 B1 B1B1B1B1 S1 RTU BEYOND RTU BEYOND RTU BEYOND RTU BEYOND RTU BEYOND ROOF LINE BEYOND B3 B3 B3B3 B3 B3 S1 B3 B1 S1 S1 B2 B1 RTU BEYOND RTU BEYONDRTU BEYOND RTU BEYONDRTU BEYOND ROOF LINE BEYOND B3B3 B3 B3 B3B3 S1S1 S1 B3 B1 B1 S1 B1B1B1B1B1 S1 SCALE:1/8" = 1'-0"3 SOUTH ELEVATION SCALE:1/8" = 1'-0"2 NORTH ELEVATION 3611 NE Otterview Cir. #42 Ankeny, IA 50021 Phone: (515) 597-5457 Fax: (515) 597-5461 www.jcorpdesignbuild.com CONTENTS: SHEET NO: PROJECT NO: PR O J E C T : 1 REVISIONS: 3 2 A201 23-017 Ke t t l e s t o n e C e n t r a l C o m m e r c i a l 11 / 06 / 2024 Elevations Lo t 3 SCALE:1/8" = 1'-0"4 EAST ELEVATION SCALE:1/8" = 1'-0"1 WEST ELEVATION MATERIAL SCHEDULE - EAST Type Mark Description Area Percentage Glazing 1279 SF 31% B1 Modular Brick - Light 338 SF 8% B2 Modular Brick - Dark 85 SF 2% B3 Modular Brick - Red 1279 SF 31% S1 Fiber Cement Panel Siding - Black 1170 SF 28% MATERIAL SCHEDULE - NORTH Type Mark Description Area Percentage Glazing 796 SF 39% B1 Modular Brick - Light 432 SF 21% B2 Modular Brick - Dark 379 SF 18% S1 Fiber Cement Panel Siding - Black 442 SF 22% MATERIAL SCHEDULE - SOUTH Type Mark Description Area Percentage Glazing 516 SF 20% B1 Modular Brick - Light 151 SF 6% B3 Modular Brick - Red 1318 SF 50% S1 Fiber Cement Panel Siding - Black 629 SF 24% MATERIAL SCHEDULE - WEST Type Mark Description Area Percentage Glazing 1504 SF 36% B1 Modular Brick - Light 668 SF 16% B3 Modular Brick - Red 1254 SF 30% S1 Fiber Cement Panel Siding - Black 752 SF 18% 24'-0" 10 ' - 0 " 3 A1 1'-0"22'-0"1'-0" 10 ' - 0 " 1' - 0 " 3 A1 11'-6"11'-6" 9' - 0 " 10' LONG x 6" DIA CONCRETE FILLED GATE POST ENCASED IN FOOTING WITH 6'-0" ABOVE GRADE (1)-#5 CONT. T&B #4's @ 24" O.C. #4's @ 48" O.C. (1)-#4 CONT. 4' - 0 " 6' - 0 " 1'-0" METAL ENCLOSURE GATE METAL ENCLOSURE GATEMODULAR BRICK 6' - 0 " METAL CAP MODULAR BRICK 3611 NE Otterview Circle #42 Ankeny, IA 50021 Phone: (515) 597-5457 www.jcorpdesignbuild.com CONTENTS: SHEET NO: PROJECT NO: PR O J E C T : REVISIONS: A1 23-017 Ke t t l e s t o n e C e n t r a l C o m m e r c i a l 11 / 05 / 2024 Dumpster Enclosure Details SCALE:1/2" = 1'-0"4 PLAN SCALE:1/2" = 1'-0"5 FOUNDATION PLAN SCALE:1" = 1'-0"3 SECTION SCALE:3/8" = 1'-0"1 FRONT ELEVATION SCALE:3/8" = 1'-0"2 SIDE ELEVATION