HomeMy WebLinkAbout2025-01-20 Resolution 2025-054_Accept Public Improvements, Street Resurfacing, Ashworth Dr and Waco PlRESOLUTION 2025-054
RESOLUTION ACCEPTING THE WAUKEE STREET
RESURFACING: ASHWORTH DRIVE FROM 2ND TO 4TH
STREET/WACO PLACE FROM ASHWORTH ROAD TO
WILSON STREET
WHEREAS, on the 71h day of September, 2021, the Mayor and Clerk of the City of
Waukee, Iowa, entered into a construction contract with Grimes Asphalt & Paving Corp. of Des
Moines, IA, for the construction of certain public improvements generally described as the Waukee
Street Resurfacing: Ashworth Drive from 2nd to 4th Street/Waco Place from Ashworth Road to
Wilson Street; and
WHEREAS, the contractor has fully completed the construction of the public
improvements in accordance with the terms and conditions of the contract and plans and
specifications, as shown by the certificate of the Engineer filed with the Clerk on January 15, 2025:
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
WAUKEE, STATE OF IOWA:
Section 1. That the report of the Engineer be and the same is hereby approved and adopted,
and the public improvements are hereby approved and accepted as having been fully completed in
accordance with the plans, specifications and form of contract and the total final construction cost
thereof is hereby determined to be $458,553.72, as shown in the report of the Engineer.
PASSED AND APPROVED this 20th day of January, 2025.
Mayor
ATTEST:
City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
R. Charles Bottenberg X
Chris Crone X
Rob Grove X
Anna Bergman Pierce X
Ben Sinclair X