Loading...
HomeMy WebLinkAbout2025-02-03 I01I 2025 Fee Schedule, Revision 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 3, 2025 AGENDA ITEM:Consideration of approval of a resolution adopting City of Waukee 2025 Fee Schedule, Revision No. 1 [Gas Charges, Equipment Rates (Per Hour)] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The gas installer provided the per hour cost for a medium size trencher resulting in the need for a revision of the schedule of fees. Including this equipment rate will allow staff to accurately determine gas main extension costs for private developments and city capital projects. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Resolution II. City of Waukee 2025 Fee Schedule PREPARED BY:Rudy Koester REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1I THE CITY OF WAUKEE, IOWA RESOLUTION 2025 - ADOPTING THE CITY OF WAUKEE 2025 FEE SCHEDULE, REVISION NO. 1 [GAS CHARGES, EQUIPMENT RATES (PER HOUR)] IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Iowa is a duly organized municipality within Dallas County; AND, WHEREAS, on December 16, 2024, the Waukee City Council approved the City of Waukee 2025 Fee Schedule (Resolution #2024-543); AND, WHEREAS, revisions are proposed to the 2025 Fee Schedule to update gas main installation equipment pricing as shown in Exhibit A, which is attached. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 3rd day of February, 2025, that the City of Waukee 2025 Fee Schedule, Revision No. 1 [Gas Charges, Equipment Rates (Per Hour)], is hereby approved and shall be in effect immediately. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair EXHIBIT A Equipment Rates (Per Hour) Pick Up 1/2 ton $24.00 Pick Up 1 ton $26.00 2 ton dump truck with tools $40.00 Foreman truck with tools $28.00 Fuser Truck with Tools $30.00 Backhoe (Rubber Tire) $39.00 Backhoe with Breaker $45.00 Backhoe with Tamper $45.00 Excavator $85.00 Mini Excavator $34.00 Sideboom Tractor $125.00 Trencher Walk behind $38.00 Trencher Wheel $160.00 Boring Equipment 2" Missile $8.00 Boring Equipment 3-4" Missile $8.00 Bore Rig Small $60.00 Skid Steer $35.00 Pipe Trailer Stick $10.00 Pipe Trailer Coil $5.00 Vacuum Excavator $225.00 Pipe Straightner $11.00 Generator $7.00 Water Pump $5.00 Jumping Jack Tamper $13.00 Air Compressor with Tools $17.00 Mud Truck $51.00 24x 40 Drill Rig $105.00 Vac Trailer up to 800 Gallon $37.00 Roller $55.00 Equipment Trailer T10 - T45 $12.00 Trailer Foreman Enclosed $6.00 Plow Up to 150 Track $145.00 Walk Behind Service Plow $35.00 Medium Size Trencher $87.50