Loading...
HomeMy WebLinkAbout2025-02-18 H01B Alice's Rd Improvements Phase 1A_Concur with Award of ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 18, 2025 AGENDA ITEM:Consideration of approval of resolution concurring with awarding contract [Alice’s Road Improvements Phase 1A Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: Bids were received on February 4, 2025, with eleven general contractors submitting bids. The engineer’s estimate for the project was $5,894,000.00. The low bid was submitted by Concrete Technologies, Inc. of Grimes, Iowa for $4,294,120.31. This bid is approximately 27% below the engineer’s estimate. This project is included in the draft FY 2026-2030 Capital Improvements Plan with a total project budget of $3,000,000.00. Snyder and Associates recommends awarding the project to Concrete Technologies, Inc. of Grimes, Iowa for $4,294,120.31. The Clive City Council awarded the contract to Concrete Technologies, Inc. of Grimes, Iowa for $4,294,120.31 at their February 13, 2025 regular meeting. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: Waukee is responsible for 50% of the total project construction costs which are currently estimated to be $2,295,380.90. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommends concurring with the City of Clive’s awarding of the project to Concrete Technologies, Inc. of Grimes, Iowa for $4,294,120.31. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Resolution II. Letter of Recommendation III. Bid Tab Summary PREPARED BY:Rudy Koester REVIEWED BY:Rudy Koester RK H1B RESOLUTION 2025- RESOLUTION CONSENTING TO THE CITY OF CLIVE’S MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE ALICE’S ROAD IMPROVEMENTS PHASE 1A BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the City of Waukee consents to the following bid for the construction of certain public improvements described in general as the Alice's Road Improvements Phase 1A, described in the plans and specifications heretofore adopted by this Council on February 18, 2025, being accepted by the City of Clive, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Concrete Technologies, Inc.,of Grimes, IA Amount of bid:$4,294,120.31 Portion of project:All construction work Section 2.That the Clerk is hereby directed to notify the City of Clive that the City of Waukee consents to the City of Clive’s execution of the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 18th day of February, 2025. Mayor ATTEST: City Clerk V:\Projects\2023\123.1396.01\AdvertisingLetting\LTR_2025-02-05_AwardRecommendationPhase1A.docx February 5, 2025 Mr. Jeff May Public Works Director City of Clive 2123 NW 111th Street Clive, IA 50325 RE: RECEIPT OF BIDS AND RECOMMENDATION OF AWARD ALICE’S ROAD IMPROVEMENT PHASE 1A Dear Jeff: Bids were received for the Alice’s Road Improvement Phase 1A project at 2:00 p.m. on Tuesday, February 4, 2025. Eleven bids were received and opened ranging from $4,294,120.31 to $6,275,781.31. Our opinion of probable construction cost was $5,894,000. The low bid was submitted by Concrete Technologies, Inc. of Grimes, Iowa. We were pleased with the interest from contractors and the number of bids received. Upon inspection of the bids, several bidders were found to have errors in their bid calculations, however, these errors did not affect the outcome of the letting. The low bidder is primarily a paving contractor and therefore able to self-perform a large component of the work. They also own a ready-mix concrete company, CTI Ready Mix, LLC, and their location is near the project site. CTI has experience with similar sized projects in the area and for the City of Clive and Waukee. We recommend award of the contract to the low bidder, Concrete Technologies, Inc. They have a long history of successful projects and are fully capable of successfully carrying out the requirements of the contract. Sincerely, SNYDER & ASSOCIATES, INC. Nathan Carhoff, P.E. Project Manager TABULATION OF BIDS Alice's Road Improvements Phase 1A City of Clive and Waukee S&A Project No. 123.1396.01 Bid Date/Time: February 4, 2025 at 2:00 PM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE EARTHWORK 1 CLEARING AND GRUBBING LS 1 50,000.00$ 50,000.00$ 24,745.00$ 24,745.00$ 11,900.00$ 11,900.00$ 24,500.00$ 24,500.00$ 24,500.00$ 24,500.00$ 16,000.00$ 16,000.00$ 24,500.00$ 24,500.00$ 20,000.00$ 20,000.00$ 13,300.00$ 13,300.00$ 11,900.00$ 11,900.00$ 29,000.00$ 29,000.00$ 18,000.00$ 18,000.00$ 2 TOPSOIL, ON-SITE CY 8,286 10.00$ 82,860.00$ 8.05$ 66,702.30$ 8.00$ 66,288.00$ 8.00$ 66,288.00$ 8.00$ 66,288.00$ 16.00$ 132,576.00$ 7.00$ 58,002.00$ 10.00$ 82,860.00$ 16.00$ 132,576.00$ 7.00$ 58,002.00$ 14.30$ 118,489.80$ 14.60$ 120,975.60$ 3 SOIL QUALITY RESTORATION SY 8,725 10.00$ 87,250.00$ 6.55$ 57,148.75$ 6.50$ 56,712.50$ 6.50$ 56,712.50$ 6.50$ 56,712.50$ 10.00$ 87,250.00$ 6.20$ 54,095.00$ 8.00$ 69,800.00$ 7.00$ 61,075.00$ 15.00$ 130,875.00$ 5.55$ 48,423.75$ 15.90$ 138,727.50$ 4 EXCAVATION, CLASS 10 CY 33,964 10.00$ 339,640.00$ 6.05$ 205,482.20$ 5.60$ 190,198.40$ 6.00$ 203,784.00$ 5.40$ 183,405.60$ 10.00$ 339,640.00$ 7.50$ 254,730.00$ 18.00$ 611,352.00$ 15.00$ 509,460.00$ 7.50$ 254,730.00$ 11.75$ 399,077.00$ 14.40$ 489,081.60$ 5 BELOW GRADE EXCAVATION (CORE OUT)CY 730 20.00$ 14,600.00$ 2.50$ 1,825.00$ 2.50$ 1,825.00$ 2.50$ 1,825.00$ 2.50$ 1,825.00$ 40.00$ 29,200.00$ 20.00$ 14,600.00$ 50.00$ 36,500.00$ 11.00$ 8,030.00$ 20.00$ 14,600.00$ 22.00$ 16,060.00$ 22.00$ 16,060.00$ 6 SUBGRADE PREPARATION SY 18,883 4.00$ 75,532.00$ 1.50$ 28,324.50$ 1.50$ 28,324.50$ 1.50$ 28,324.50$ 1.50$ 28,324.50$ 2.00$ 37,766.00$ 1.00$ 18,883.00$ 3.75$ 70,811.25$ 1.70$ 32,101.10$ 1.00$ 18,883.00$ 0.55$ 10,385.65$ 8.50$ 160,505.50$ 7 SUBGRADE TREATMENT, CEMENT STABILIZATION SY 18,159 8.00$ 145,272.00$ 8.35$ 151,627.65$ 8.65$ 157,075.35$ 9.00$ 163,431.00$ 8.28$ 150,356.52$ 8.70$ 157,983.30$ 8.28$ 150,356.52$ 10.00$ 181,590.00$ 10.00$ 181,590.00$ 8.30$ 150,719.70$ 8.85$ 160,707.15$ 9.20$ 167,062.80$ 8 SUBBASE, MODIFIED, 6"SY 18,159 15.00$ 272,385.00$ 11.50$ 208,828.50$ 11.45$ 207,920.55$ 11.42$ 207,375.78$ 11.42$ 207,375.78$ 12.00$ 217,908.00$ 9.75$ 177,050.25$ 12.50$ 226,987.50$ 14.00$ 254,226.00$ 9.75$ 177,050.25$ 11.25$ 204,288.75$ 22.00$ 399,498.00$ 9 REMOVAL OF STRUCTURE EA 1 1,500.00$ 1,500.00$ 1,232.00$ 1,232.00$ 1,220.00$ 1,220.00$ 1,220.00$ 1,220.00$ 1,220.00$ 1,220.00$ 9,650.00$ 9,650.00$ 4,500.00$ 4,500.00$ 5,000.00$ 5,000.00$ 1,800.00$ 1,800.00$ 4,500.00$ 4,500.00$ 1,800.00$ 1,800.00$ 6,000.00$ 6,000.00$ 10 REMOVAL OF KNOWN PIPE CULVERT, CMP, LESS THAN OR EQUAL TO 36"LF 220 20.00$ 4,400.00$ 10.10$ 2,222.00$ 10.00$ 2,200.00$ 10.00$ 2,200.00$ 10.00$ 2,200.00$ 31.00$ 6,820.00$ 20.00$ 4,400.00$ 15.00$ 3,300.00$ 30.00$ 6,600.00$ 20.00$ 4,400.00$ 50.00$ 11,000.00$ 11.00$ 2,420.00$ 11 REMOVAL OF KNOWN PIPE CULVERT, RCP, LESS THAN OR EQUAL TO 36"LF 193 20.00$ 3,860.00$ 10.10$ 1,949.30$ 10.00$ 1,930.00$ 10.00$ 1,930.00$ 10.00$ 1,930.00$ 49.00$ 9,457.00$ 20.00$ 3,860.00$ 15.00$ 2,895.00$ 36.00$ 6,948.00$ 20.00$ 3,860.00$ 53.00$ 10,229.00$ 25.00$ 4,825.00$ 12 REMOVAL OF KNOWN PIPE CULVERT, CMP, GREATER THAN 36"LF 202 40.00$ 8,080.00$ 30.30$ 6,120.60$ 30.00$ 6,060.00$ 30.00$ 6,060.00$ 30.00$ 6,060.00$ 52.00$ 10,504.00$ 30.00$ 6,060.00$ 17.00$ 3,434.00$ 49.00$ 9,898.00$ 30.00$ 6,060.00$ 57.00$ 11,514.00$ 11.00$ 2,222.00$ 13 COMPACTION TESTING LS 1 10,000.00$ 10,000.00$ 5,050.00$ 5,050.00$ 7,610.00$ 7,610.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 1,650.00$ 1,650.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 18,600.00$ 18,600.00$ 5,000.00$ 5,000.00$ 2,060.00$ 2,060.00$ 8,000.00$ 8,000.00$ 14 TRENCH COMPACTION TESTING LS 1 5,000.00$ 5,000.00$ 8,080.00$ 8,080.00$ 7,610.00$ 7,610.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 6,300.00$ 6,300.00$ 7,500.00$ 7,500.00$ 15,000.00$ 15,000.00$ 5,600.00$ 5,600.00$ 7,500.00$ 7,500.00$ 5,871.00$ 5,871.00$ 12,000.00$ 12,000.00$ SEWERS AND DRAINS 15 STORM SEWER, TRENCHED, UNCLASSIFIED, 15" LF 23 70.00$ 1,610.00$ 116.05$ (1)2,669.15$ 115.00$ 2,645.00$ 115.00$ 2,645.00$ 115.00$ 2,645.00$ 254.00$ 5,842.00$ 150.00$ 3,450.00$ 110.00$ 2,530.00$ 61.00$ 1,403.00$ 150.00$ 3,450.00$ 228.00$ 5,244.00$ 62.00$ 1,426.00$ 16 STORM SEWER, TRENCHED, RCP, 15"LF 1,043 80.00$ 83,440.00$ 72.50$ 75,617.50$ 72.00$ 75,096.00$ 72.00$ 75,096.00$ 72.00$ 75,096.00$ 77.00$ 80,311.00$ 95.00$ 99,085.00$ 85.00$ 88,655.00$ 73.00$ 76,139.00$ 95.00$ 99,085.00$ 172.00$ 179,396.00$ 126.00$ 131,418.00$ 17 STORM SEWER, TRENCHED, RCP, 18"LF 128 90.00$ 11,520.00$ 74.75$ 9,568.00$ 74.00$ 9,472.00$ 74.00$ 9,472.00$ 74.00$ 9,472.00$ 54.50$ 6,976.00$ 97.00$ 12,416.00$ 80.00$ 10,240.00$ 79.00$ 10,112.00$ 97.00$ 12,416.00$ 166.00$ 21,248.00$ 130.00$ 16,640.00$ 18 STORM SEWER, TRENCHED, RCP, 24"LF 693 100.00$ 69,300.00$ 87.85$ 60,880.05$ 87.00$ 60,291.00$ 87.00$ 60,291.00$ 87.00$ 60,291.00$ 98.00$ 67,914.00$ 122.00$ 84,546.00$ 108.00$ 74,844.00$ 92.00$ 63,756.00$ 122.00$ 84,546.00$ 212.00$ 146,916.00$ 146.00$ 101,178.00$ 19 STORM SEWER, TRENCHED, RCP, 30"LF 778 120.00$ 93,360.00$ 113.10$ 87,991.80$ 112.00$ 87,136.00$ 112.00$ 87,136.00$ 112.00$ 87,136.00$ 120.00$ 93,360.00$ 170.00$ 132,260.00$ 135.00$ 105,030.00$ 124.00$ 96,472.00$ 170.00$ 132,260.00$ 258.00$ 200,724.00$ 170.00$ 132,260.00$ 20 STORM SEWER, TRENCHED, RCAP, 22.5" X 36.25" (30" EQUIVALENT)LF 182 160.00$ 29,120.00$ 171.70$ 31,249.40$ 170.00$ 30,940.00$ 170.00$ 30,940.00$ 170.00$ 30,940.00$ 206.00$ 37,492.00$ 200.00$ 36,400.00$ 135.00$ 24,570.00$ 230.00$ 41,860.00$ 200.00$ 36,400.00$ 318.00$ 57,876.00$ 290.00$ 52,780.00$ 21 STORM SEWER, TRENCHED, RCP, 60"LF 78 350.00$ 27,300.00$ 277.75$ 21,664.50$ 275.00$ 21,450.00$ 275.00$ 21,450.00$ 275.00$ 21,450.00$ 323.00$ 25,194.00$ 330.00$ 25,740.00$ 312.00$ 24,336.00$ 320.00$ 24,960.00$ 330.00$ 25,740.00$ 434.00$ 33,852.00$ 470.00$ 36,660.00$ 22 STORM SEWER, TRENCHED, RCP, 66"LF 285 370.00$ 105,450.00$ 313.10$ 89,233.50$ 310.00$ 88,350.00$ 310.00$ 88,350.00$ 310.00$ 88,350.00$ 357.00$ 101,745.00$ 385.00$ 109,725.00$ 365.00$ 104,025.00$ 350.00$ 99,750.00$ 385.00$ 109,725.00$ 630.00$ 179,550.00$ 515.00$ 146,775.00$ 23 REMOVAL OF STORM SEWER, RCP, LESS THAN OR EQUAL TO 24"LF 307 5.00$ 1,535.00$ 12.10$ 3,714.70$ 12.00$ 3,684.00$ 12.00$ 3,684.00$ 12.00$ 3,684.00$ 49.00$ 15,043.00$ 25.00$ 7,675.00$ 17.00$ 5,219.00$ 34.00$ 10,438.00$ 25.00$ 7,675.00$ 55.00$ 16,885.00$ 25.00$ 7,675.00$ 24 PIPE APRON, UNCLASSIFIED, 15"EA 1 750.00$ 750.00$ 577.50$ 577.50$ 572.00$ 572.00$ 572.00$ 572.00$ 572.00$ 572.00$ 750.00$ 750.00$ 850.00$ 850.00$ 1,750.00$ 1,750.00$ 1,000.00$ 1,000.00$ 850.00$ 850.00$ 3,150.00$ 3,150.00$ 316.00$ 316.00$ 25 PIPE APRON, RCP, 18"EA 1 1,500.00$ 1,500.00$ 1,090.00$ 1,090.00$ 1,080.00$ 1,080.00$ 1,080.00$ 1,080.00$ 1,080.00$ 1,080.00$ 1,050.00$ 1,050.00$ 1,250.00$ 1,250.00$ 1,225.00$ 1,225.00$ 1,500.00$ 1,500.00$ 1,250.00$ 1,250.00$ 1,800.00$ 1,800.00$ 865.00$ 865.00$ 26 PIPE APRON, RCP, 24"EA 3 2,500.00$ 7,500.00$ 1,280.00$ 3,840.00$ 1,270.00$ 3,810.00$ 1,270.00$ 3,810.00$ 1,270.00$ (1)3,810.00$ 1,550.00$ 4,650.00$ 1,400.00$ 4,200.00$ 1,425.00$ 4,275.00$ 1,600.00$ 4,800.00$ 1,400.00$ 4,200.00$ 2,000.00$ 6,000.00$ 1,050.00$ 3,150.00$ 27 PIPE APRON, RCP, 60"EA 1 4,200.00$ 4,200.00$ 3,915.00$ 3,915.00$ 3,880.00$ 3,880.00$ 3,880.00$ 3,880.00$ 3,880.00$ 3,880.00$ 5,100.00$ 5,100.00$ 3,650.00$ 3,650.00$ 4,850.00$ 4,850.00$ 4,100.00$ 4,100.00$ 3,650.00$ 3,650.00$ 4,800.00$ 4,800.00$ 3,400.00$ 3,400.00$ 28 PIPE APRON, RCP, 66"EA 2 5,000.00$ 10,000.00$ 7,470.00$ 14,940.00$ 7,400.00$ 14,800.00$ 7,400.00$ 14,800.00$ 7,400.00$ 14,800.00$ 8,400.00$ 16,800.00$ 3,950.00$ 7,900.00$ 8,800.00$ 17,600.00$ 5,600.00$ 11,200.00$ 3,950.00$ 7,900.00$ 5,400.00$ 10,800.00$ 3,700.00$ 7,400.00$ 29 FOOTING FOR CONCRETE PIPE APRON, RCP 18"EA 1 800.00$ 800.00$ 424.00$ 424.00$ 420.00$ 420.00$ 420.00$ 420.00$ 420.00$ 420.00$ 1,100.00$ 1,100.00$ 675.00$ 675.00$ 625.00$ 625.00$ 3,000.00$ 3,000.00$ 675.00$ 675.00$ 785.00$ 785.00$ 1,250.00$ 1,250.00$ 30 FOOTING FOR CONCRETE PIPE APRON, RCP, 24"EA 3 1,000.00$ 3,000.00$ 555.00$ 1,665.00$ 550.00$ 1,650.00$ 550.00$ 1,650.00$ 550.00$ 1,650.00$ 1,300.00$ 3,900.00$ 775.00$ 2,325.00$ 625.00$ 1,875.00$ 2,600.00$ 7,800.00$ 775.00$ 2,325.00$ 785.00$ 2,355.00$ 1,500.00$ 4,500.00$ 31 FOOTING FOR CONCRETE PIPE APRON, RCP, 60"EA 1 1,200.00$ 1,200.00$ 1,150.00$ 1,150.00$ 1,140.00$ 1,140.00$ 1,140.00$ 1,140.00$ 1,140.00$ 1,140.00$ 1,800.00$ 1,800.00$ 1,350.00$ 1,350.00$ 1,750.00$ 1,750.00$ 4,600.00$ 4,600.00$ 1,350.00$ 1,350.00$ 1,650.00$ 1,650.00$ 2,800.00$ 2,800.00$ 32 FOOTING FOR CONCRETE PIPE APRON, RCP, 66"EA 2 1,500.00$ 3,000.00$ 1,210.00$ 2,420.00$ 1,200.00$ 2,400.00$ 1,200.00$ 2,400.00$ 1,200.00$ 2,400.00$ 2,250.00$ 4,500.00$ 1,550.00$ 3,100.00$ 1,875.00$ 3,750.00$ 4,000.00$ 8,000.00$ 1,550.00$ 3,100.00$ 1,850.00$ 3,700.00$ 2,900.00$ 5,800.00$ 33 PIPE APRON GUARD, RCP, 18"EA 1 500.00$ 500.00$ 262.50$ 262.50$ 260.00$ 260.00$ 260.00$ 260.00$ 260.00$ 260.00$ 700.00$ 700.00$ 950.00$ 950.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 950.00$ 950.00$ 640.00$ 640.00$ 1,250.00$ 1,250.00$ 34 PIPE APRON GUARD, RCP, 24"EA 1 800.00$ 800.00$ 373.50$ 373.50$ 370.00$ 370.00$ 370.00$ 370.00$ 370.00$ 370.00$ 800.00$ 800.00$ 1,150.00$ 1,150.00$ 600.00$ 600.00$ 1,300.00$ 1,300.00$ 1,150.00$ 1,150.00$ 800.00$ 800.00$ 1,550.00$ 1,550.00$ 35 PIPE APRON GUARD, RCP, 66"EA 1 1,500.00$ 1,500.00$ 6,970.00$ 6,970.00$ 6,900.00$ 6,900.00$ 6,900.00$ 6,900.00$ 6,900.00$ 6,900.00$ 7,400.00$ 7,400.00$ 2,800.00$ 2,800.00$ 8,000.00$ 8,000.00$ 3,200.00$ 3,200.00$ 2,800.00$ 2,800.00$ 3,400.00$ 3,400.00$ 4,100.00$ 4,100.00$ 36 SUBDRAIN, TYPE 1, 6"LF 4,232 15.00$ 63,480.00$ 14.10$ 59,671.20$ 13.25$ 56,074.00$ 14.00$ 59,248.00$ 14.00$ 59,248.00$ 20.00$ 84,640.00$ 23.00$ 97,336.00$ 25.75$ 108,974.00$ 19.00$ 80,408.00$ 23.00$ 97,336.00$ 33.00$ 139,656.00$ 18.00$ 76,176.00$ 37 SUBDRAIN CLEANOUT, TYPE A-1, 6"EA 4 400.00$ 1,600.00$ 668.60$ 2,674.40$ 475.00$ 1,900.00$ 662.00$ 2,648.00$ 662.00$ 2,648.00$ 650.00$ 2,600.00$ 900.00$ 3,600.00$ 775.00$ 3,100.00$ 630.00$ 2,520.00$ 900.00$ 3,600.00$ 1,800.00$ 7,200.00$ 670.00$ 2,680.00$ 38 SUBDRAIN OUTLETS AND CONNECTIONS, CMP, 6"EA 37 400.00$ 14,800.00$ 327.00$ 12,099.00$ 325.00$ 12,025.00$ 324.00$ 11,988.00$ 324.00$ 11,988.00$ 240.00$ 8,880.00$ 400.00$ 14,800.00$ 525.00$ 19,425.00$ 820.00$ 30,340.00$ 400.00$ 14,800.00$ 575.00$ 21,275.00$ 280.00$ 10,360.00$ WATER MAIN AND APPURTENANCES 39 WATER MAIN, TRENCHED, PVC, 12"LF 2497 85.00$ 212,245.00$ 62.60$ 156,312.20$ 62.00$ 154,814.00$ 62.00$ 154,814.00$ 62.00$ 154,814.00$ 87.00$ 217,239.00$ 80.00$ 199,760.00$ 67.50$ 168,547.50$ 71.00$ 177,287.00$ 80.00$ 199,760.00$ 119.00$ 297,143.00$ 108.00$ 269,676.00$ 40 FITTING LB 2006 10.00$ 20,060.00$ 9.55$ 19,157.30$ 9.50$ 19,057.00$ 9.50$ 19,057.00$ 9.50$ 19,057.00$ 16.00$ 32,096.00$ 22.00$ 44,132.00$ 18.50$ 37,111.00$ 14.00$ 28,084.00$ 22.00$ 44,132.00$ 20.50$ 41,123.00$ 16.50$ 33,099.00$ 41 WATER SERVICE STUB, COPPER, 1"EA 3 2,500.00$ 7,500.00$ 1,515.00$ 4,545.00$ 1,500.00$ 4,500.00$ 1,500.00$ (1)4,500.00$ 1,500.00$ 4,500.00$ 3,350.00$ 10,050.00$ 2,250.00$ 6,750.00$ 2,100.00$ 6,300.00$ 4,000.00$ 12,000.00$ 2,250.00$ 6,750.00$ 4,200.00$ 12,600.00$ 3,300.00$ 9,900.00$ 42 WATER SERVICE STUB, PVC, 2"EA 1 2,300.00$ 2,300.00$ 2,395.00$ 2,395.00$ 2,375.00$ 2,375.00$ 2,375.00$ 2,375.00$ 2,375.00$ 2,375.00$ 5,000.00$ 5,000.00$ 3,875.00$ 3,875.00$ 3,000.00$ 3,000.00$ 5,600.00$ 5,600.00$ 3,875.00$ 3,875.00$ 5,550.00$ 5,550.00$ 5,000.00$ 5,000.00$ 43 VALVE, GATE, 12"EA 9 4,000.00$ 36,000.00$ 4,040.00$ 36,360.00$ 4,000.00$ 36,000.00$ 4,000.00$ 36,000.00$ 4,000.00$ 36,000.00$ 4,000.00$ 36,000.00$ 4,450.00$ 40,050.00$ 4,650.00$ 41,850.00$ 4,800.00$ 43,200.00$ 4,450.00$ 40,050.00$ 4,300.00$ 38,700.00$ 5,200.00$ 46,800.00$ 44 FIRE HYDRANT ASSEMBLY EA 5 7,500.00$ 37,500.00$ 6,365.00$ 31,825.00$ 6,300.00$ 31,500.00$ 6,300.00$ 31,500.00$ 6,300.00$ 31,500.00$ 7,000.00$ 35,000.00$ 7,350.00$ 36,750.00$ 7,500.00$ 37,500.00$ 9,400.00$ 47,000.00$ 7,350.00$ 36,750.00$ 8,500.00$ 42,500.00$ 9,500.00$ 47,500.00$ 45 ALTERNATE FIRE HYDRANT ASSEMBLY EA 5 7,500.00$ 37,500.00$ 6,565.00$ 32,825.00$ 6,500.00$ 32,500.00$ 6,500.00$ 32,500.00$ 6,500.00$ 32,500.00$ 7,300.00$ 36,500.00$ 7,650.00$ 38,250.00$ 7,800.00$ 39,000.00$ 9,600.00$ 48,000.00$ 7,650.00$ 38,250.00$ 8,600.00$ 43,000.00$ 9,800.00$ 49,000.00$ 46 VALVE BOX ADJUSTMENT EA 7 500.00$ 3,500.00$ 247.00$ 1,729.00$ 245.00$ 1,715.00$ 245.00$ 1,715.00$ 245.00$ 1,715.00$ 1,000.00$ 7,000.00$ 1,750.00$ 12,250.00$ 525.00$ 3,675.00$ 275.00$ 1,925.00$ 1,750.00$ 12,250.00$ 525.00$ 3,675.00$ 340.00$ 2,380.00$ 47 FIRE HYDRANT ADJUSTMENT EA 5 2,000.00$ 10,000.00$ 2,220.00$ 11,100.00$ 2,200.00$ 11,000.00$ 2,200.00$ 11,000.00$ 2,200.00$ 11,000.00$ 2,550.00$ 12,750.00$ 2,285.00$ 11,425.00$ 3,325.00$ 16,625.00$ 1,400.00$ 7,000.00$ 2,285.00$ 11,425.00$ 3,550.00$ 17,750.00$ 6,700.00$ 33,500.00$ 48 FIRE HYDRANT RELOCATION EA 2 3,500.00$ 7,000.00$ 1,185.00$ 2,370.00$ 1,175.00$ 2,350.00$ 1,175.00$ 2,350.00$ 1,175.00$ 2,350.00$ 4,000.00$ 8,000.00$ 3,265.00$ 6,530.00$ 3,625.00$ 7,250.00$ 2,800.00$ 5,600.00$ 3,265.00$ 6,530.00$ 8,600.00$ 17,200.00$ 6,200.00$ 12,400.00$ 49 FIRE HYDRANT ASSEMBLY REMOVAL EA 5 1,500.00$ 7,500.00$ 267.50$ 1,337.50$ 265.00$ 1,325.00$ 265.00$ 1,325.00$ 265.00$ 1,325.00$ 1,200.00$ 6,000.00$ 1,700.00$ 8,500.00$ 1,000.00$ 5,000.00$ 1,300.00$ 6,500.00$ 1,700.00$ 8,500.00$ 2,200.00$ 11,000.00$ 3,100.00$ 15,500.00$ 50 VALVE REMOVAL EA 1 600.00$ 600.00$ 267.50$ 267.50$ 265.00$ 265.00$ 265.00$ 265.00$ 265.00$ 265.00$ 2,900.00$ 2,900.00$ 6,400.00$ 6,400.00$ 1,000.00$ 1,000.00$ 600.00$ 600.00$ 6,400.00$ 6,400.00$ 9,400.00$ 9,400.00$ 600.00$ 600.00$ 51 VALVE BOX REMOVAL EA 6 250.00$ 1,500.00$ 151.50$ 909.00$ 150.00$ 900.00$ 150.00$ 900.00$ 150.00$ 900.00$ 725.00$ 4,350.00$ 400.00$ 2,400.00$ 500.00$ 3,000.00$ 277.00$ 1,662.00$ 400.00$ 2,400.00$ 650.00$ 3,900.00$ 240.00$ 1,440.00$ STRUCTURES FOR SANITARY AND STORM 52 MANHOLE, TYPE SW-401, 48" EA 3 5,500.00$ 16,500.00$ 5,960.00$ 17,880.00$ 5,900.00$ 17,700.00$ 5,900.00$ 17,700.00$ 5,900.00$ 17,700.00$ 5,300.00$ 15,900.00$ 3,350.00$ 10,050.00$ 3,550.00$ 10,650.00$ 5,600.00$ 16,800.00$ 3,350.00$ 10,050.00$ 4,400.00$ 13,200.00$ 5,900.00$ 17,700.00$ 53 MANHOLE, TYPE SW-404 (4'X9') EA 1 30,000.00$ 30,000.00$ 46,460.00$ 46,460.00$ 46,000.00$ 46,000.00$ 46,000.00$ (2)46,000.00$ 46,000.00$ 46,000.00$ 52,000.00$ 52,000.00$ 33,000.00$ 33,000.00$ 55,500.00$ 55,500.00$ 18,400.00$ 18,400.00$ 33,000.00$ 33,000.00$ 56,500.00$ 56,500.00$ 24,500.00$ 24,500.00$ 54 MANHOLE, TYPE SW-404 (6'X10') EA 1 35,000.00$ 35,000.00$ 51,500.00$ 51,500.00$ 51,000.00$ 51,000.00$ 51,000.00$ (2)51,000.00$ 51,000.00$ 51,000.00$ 47,600.00$ 47,600.00$ 37,750.00$ 37,750.00$ 49,500.00$ 49,500.00$ 27,100.00$ 27,100.00$ 37,750.00$ 37,750.00$ 57,500.00$ 57,500.00$ 26,000.00$ 26,000.00$ 55 HYDRODYNAMIC SEPARATOR EA 2 65,000.00$ 130,000.00$ 53,530.00$ 107,060.00$ 53,000.00$ 106,000.00$ 53,000.00$ (2)106,000.00$ 53,000.00$ 106,000.00$ 53,000.00$ 106,000.00$ 46,500.00$ 93,000.00$ 52,750.00$ 105,500.00$ 63,000.00$ 126,000.00$ 46,500.00$ 93,000.00$ 70,550.00$ 141,100.00$ 49,500.00$ 99,000.00$ 56 INTAKE, TYPE SW-501 EA 1 5,500.00$ 5,500.00$ 7,070.00$ 7,070.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 7,000.00$ 3,900.00$ 3,900.00$ 6,000.00$ 6,000.00$ 3,175.00$ 3,175.00$ 6,800.00$ 6,800.00$ 6,000.00$ 6,000.00$ 6,550.00$ 6,550.00$ 5,300.00$ 5,300.00$ 57 INTAKE, TYPE SW-505 EA 10 6,500.00$ 65,000.00$ 7,070.00$ 70,700.00$ 7,000.00$ 70,000.00$ 7,000.00$ 70,000.00$ 7,000.00$ 70,000.00$ 6,250.00$ 62,500.00$ 5,200.00$ 52,000.00$ 5,250.00$ 52,500.00$ 6,100.00$ 61,000.00$ 5,200.00$ 52,000.00$ 8,900.00$ 89,000.00$ 7,000.00$ 70,000.00$ 58 INTAKE, TYPE SW-506 EA 14 8,500.00$ 119,000.00$ 10,500.00$ 147,000.00$ 10,400.00$ 145,600.00$ 10,400.00$ 145,600.00$ 10,400.00$ 145,600.00$ 8,350.00$ 116,900.00$ 12,250.00$ 171,500.00$ 8,500.00$ 119,000.00$ 10,500.00$ 147,000.00$ 12,250.00$ 171,500.00$ 11,550.00$ 161,700.00$ 14,500.00$ 203,000.00$ 59 INTAKE, TYPE SW-512, 24" DIA.EA 1 3,000.00$ 3,000.00$ 4,545.00$ 4,545.00$ 4,500.00$ 4,500.00$ 4,500.00$ (1)4,500.00$ 4,500.00$ 4,500.00$ 2,750.00$ 2,750.00$ 3,000.00$ 3,000.00$ 2,250.00$ 2,250.00$ 2,300.00$ 2,300.00$ 3,000.00$ 3,000.00$ 2,400.00$ 2,400.00$ 2,800.00$ 2,800.00$ 60 INTAKE, TYPE SW-513 (4'X4')EA 1 3,500.00$ 3,500.00$ 7,775.00$ 7,775.00$ 7,700.00$ 7,700.00$ 7,700.00$ 7,700.00$ 7,700.00$ 7,700.00$ 6,700.00$ 6,700.00$ 13,750.00$ 13,750.00$ 6,000.00$ 6,000.00$ 6,300.00$ 6,300.00$ 13,750.00$ 13,750.00$ 7,250.00$ 7,250.00$ 7,700.00$ 7,700.00$ 61 REMOVE MANHOLE EA 2 1,000.00$ 2,000.00$ 303.00$ 606.00$ 300.00$ 600.00$ 300.00$ 600.00$ 300.00$ 600.00$ 1,900.00$ 3,800.00$ 950.00$ 1,900.00$ 750.00$ 1,500.00$ 900.00$ 1,800.00$ 950.00$ 1,900.00$ 2,350.00$ 4,700.00$ 600.00$ 1,200.00$ 62 REMOVE INTAKE EA 4 500.00$ 2,000.00$ 303.00$ 1,212.00$ 300.00$ 1,200.00$ 300.00$ 1,200.00$ 300.00$ 1,200.00$ 1,900.00$ 7,600.00$ 950.00$ 3,800.00$ 750.00$ 3,000.00$ 750.00$ 3,000.00$ 950.00$ 3,800.00$ 2,350.00$ 9,400.00$ 600.00$ 2,400.00$ STREETS AND RELATED WORK 63 PAVEMENT, PCC, 9"SY 15487 85.00$ 1,316,395.00$ 66.85$ 1,035,305.95$ 65.75$ 1,018,270.25$ 63.50$ 983,424.50$ 81.25$ 1,258,318.75$ 68.50$ 1,060,859.50$ 72.00$ 1,115,064.00$ 70.00$ 1,084,090.00$ 73.00$ 1,130,551.00$ 83.00$ 1,285,421.00$ 69.00$ 1,068,603.00$ 66.85$ 1,035,305.95$ 64 TEMPORARY PAVEMENT SY 601 70.00$ 42,070.00$ 55.75$ 33,505.75$ 55.00$ 33,055.00$ 55.65$ (1)33,445.65$ 55.00$ 33,055.00$ 57.00$ 34,257.00$ 57.72$ (1)34,689.72$ 60.00$ 36,060.00$ 68.00$ 40,868.00$ 55.00$ 33,055.00$ 57.00$ 34,257.00$ 55.75$ 33,505.75$ 65 CONCRETE MEDIAN SY 657 60.00$ 39,420.00$ 82.50$ 54,202.50$ 95.00$ 62,415.00$ 83.25$ 54,695.25$ 70.15$ 46,088.55$ 84.50$ 55,516.50$ 56.21$ (1)36,929.97$ 110.00$ 72,270.00$ 79.00$ 51,903.00$ 85.00$ 55,845.00$ 102.00$ 67,014.00$ 82.50$ 54,202.50$ 66 CONCRETE MEDIAN, DOWELED SY 680 120.00$ 81,600.00$ 75.75$ 51,510.00$ 77.00$ 52,360.00$ 68.60$ 46,648.00$ 71.25$ 48,450.00$ 77.50$ 52,700.00$ 71.16$ (1)48,388.80$ 78.00$ 53,040.00$ 80.00$ 54,400.00$ 120.00$ 81,600.00$ 78.00$ 53,040.00$ 75.75$ 51,510.00$ 67 CONCRETE MEDIAN, MAINTENANCE CURB SY 617 90.00$ 55,530.00$ 72.50$ 44,732.50$ 85.00$ 52,445.00$ 177.00$ 109,209.00$ 77.00$ 47,509.00$ 74.50$ 45,966.50$ 141.12$ (1)87,071.04$ 100.00$ 61,700.00$ 84.00$ 51,828.00$ 120.00$ 74,040.00$ 75.00$ 46,275.00$ 72.50$ 44,732.50$ 68 PCC PAVEMENT SAMPLES AND TESTING LS 1 7,000.00$ 7,000.00$ 14,500.00$ 14,500.00$ 7,750.00$ 7,750.00$ 18,000.00$ (2)18,000.00$ 10,000.00$ 10,000.00$ 14,900.00$ 14,900.00$ 8,500.00$ 8,500.00$ 17,500.00$ 17,500.00$ 22,000.00$ 22,000.00$ 20,000.00$ 20,000.00$ 15,000.00$ 15,000.00$ 14,500.00$ 14,500.00$ 69 REMOVAL OF SIDEWALK AND SHARED USE PATH SY 195 10.00$ 1,950.00$ 10.10$ 1,969.50$ 6.00$ 1,170.00$ 10.00$ 1,950.00$ 10.00$ 1,950.00$ 13.00$ 2,535.00$ 10.00$ 1,950.00$ 12.50$ 2,437.50$ 5.75$ 1,121.25$ 10.00$ 1,950.00$ 8.25$ 1,608.75$ 30.00$ 5,850.00$ 70 REMOVAL OF DRIVEWAY SY 887 6.00$ 5,322.00$ 10.10$ 8,958.70$ 6.00$ 5,322.00$ 10.00$ 8,870.00$ 10.00$ 8,870.00$ 13.00$ 11,531.00$ 10.00$ 8,870.00$ 12.50$ 11,087.50$ 6.90$ 6,120.30$ 10.00$ 8,870.00$ 5.35$ 4,745.45$ 28.00$ 24,836.00$ 71 SHARED USE PATH, PCC, 6"SY 2472 65.00$ 160,680.00$ 47.45$ 117,296.40$ 47.50$ 117,420.00$ 45.40$ 112,228.80$ 48.50$ 119,892.00$ 48.50$ 119,892.00$ 46.63$ (1)115,269.36$ 50.00$ 123,600.00$ 56.00$ 138,432.00$ 50.00$ 123,600.00$ 49.00$ 121,128.00$ 47.45$ 117,296.40$ 72 SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATH SY 2954 4.00$ 11,816.00$ 3.05$ 9,009.70$ 3.00$ 8,862.00$ 3.00$ 8,862.00$ 3.00$ 8,862.00$ 2.50$ 7,385.00$ 3.00$ 8,862.00$ 3.75$ 11,077.50$ 2.80$ 8,271.20$ 3.00$ 8,862.00$ 4.25$ 12,554.50$ 16.00$ 47,264.00$ 73 SIDEWALK, PCC, 5"SY 16 65.00$ 1,040.00$ 76.75$ 1,228.00$ 75.00$ 1,200.00$ 127.50$ 2,040.00$ 65.00$ 1,040.00$ 78.00$ 1,248.00$ 150.00$ 2,400.00$ 80.00$ 1,280.00$ 70.00$ 1,120.00$ 65.00$ 1,040.00$ 79.00$ 1,264.00$ 76.75$ 1,228.00$ 74 DETECTABLE WARNINGS SF 340 60.00$ 20,400.00$ 51.50$ 17,510.00$ 50.00$ 17,000.00$ 50.00$ 17,000.00$ 55.00$ 18,700.00$ 53.00$ 18,020.00$ 50.00$ 17,000.00$ 55.00$ 18,700.00$ 56.00$ 19,040.00$ 55.00$ 18,700.00$ 53.00$ 18,020.00$ 51.50$ 17,510.00$ 75 DRIVEWAY, PAVED, PCC, 6"SY 1082 70.00$ 75,740.00$ 53.50$ 57,887.00$ 56.00$ 60,592.00$ 59.70$ 64,595.40$ 49.25$ 53,288.50$ 55.00$ 59,510.00$ 64.10$ (1)69,356.20$ 55.00$ 59,510.00$ 78.00$ 84,396.00$ 55.00$ 59,510.00$ 55.00$ (3)59,510.00$ 53.50$ 57,887.00$ 76 DRIVEWAY, GRANULAR, 6"SY 403 20.00$ 8,060.00$ 12.10$ 4,876.30$ 12.00$ 4,836.00$ 12.00$ 4,836.00$ 12.00$ 4,836.00$ 13.00$ 5,239.00$ 35.00$ 14,105.00$ 18.00$ 7,254.00$ 13.50$ 5,440.50$ 35.00$ 14,105.00$ 17.25$ (3)6,951.75$ 14.00$ 5,642.00$ 77 TEMPORARY GRANULAR SURFACING TON 950 20.00$ 19,000.00$ 45.45$ 43,177.50$ 45.00$ 42,750.00$ 45.00$ 42,750.00$ 45.00$ 42,750.00$ 49.00$ 46,550.00$ 45.00$ 42,750.00$ 55.00$ 52,250.00$ 38.00$ 36,100.00$ 45.00$ 42,750.00$ 47.50$ (3)45,125.00$ 42.00$ 39,900.00$ 78 SHARED USE PATH ASSURANCE TESTING LS 1 3,000.00$ 3,000.00$ 1,825.00$ 1,825.00$ 7,500.00$ 7,500.00$ 2,463.87$ 2,463.87$ 3,000.00$ 3,000.00$ 2,400.00$ 2,400.00$ 5,000.00$ 5,000.00$ 2,500.00$ 2,500.00$ 2,300.00$ 2,300.00$ 7,500.00$ 7,500.00$ 1.00$ (3)1.00$ 2,500.00$ 2,500.00$ 79 PAVEMENT REMOVAL SY 8,255 12.00$ 99,060.00$ 10.10$ 83,375.50$ 8.50$ 70,167.50$ 10.00$ 82,550.00$ 10.00$ 82,550.00$ 8.00$ 66,040.00$ 10.00$ 82,550.00$ 12.50$ 103,187.50$ 10.00$ 82,550.00$ 10.00$ 82,550.00$ 5.75$ (3)47,466.25$ 22.00$ 181,610.00$ TRAFFIC CONTROL 80 PAINTED PAVEMENT MARKINGS, SOLVENT/WATERBORNE STA 16.3 175.00$ 2,852.50$ 63.60$ 1,036.68$ 63.00$ 1,026.90$ 63.00$ 1,026.90$ 110.00$ 1,793.00$ 66.00$ 1,075.80$ 110.00$ 1,793.00$ 65.00$ 1,059.50$ 123.00$ 2,004.90$ 63.00$ 1,026.90$ 113.00$ (3)1,841.90$ 63.00$ 1,026.90$ 81 PAINTED PAVEMENT MARKINGS, DURABLE STA 37.7 250.00$ 9,425.00$ 234.75$ (1)8,850.08$ 230.00$ 8,671.00$ 230.00$ 8,671.00$ 250.00$ 9,425.00$ 241.50$ 9,104.55$ 250.00$ 9,425.00$ 235.00$ 8,859.50$ 280.00$ 10,556.00$ 230.00$ 8,671.00$ 260.00$ (3)9,802.00$ 230.00$ 8,671.00$ 82 PAINTED SYMBOLS AND LEGENDS, SOLVENT/WATERBORNE EA 3 400.00$ 1,200.00$ 101.00$ 303.00$ 100.00$ 300.00$ 100.00$ 300.00$ 100.00$ 300.00$ 105.00$ 315.00$ 100.00$ 300.00$ 105.00$ 315.00$ 111.00$ 333.00$ 100.00$ 300.00$ 103.00$ (3)309.00$ 100.00$ 300.00$ 83 PAINTED SYMBOLS AND LEGENDS, DURABLE EA 14 500.00$ 7,000.00$ 267.50$ 3,745.00$ 265.00$ 3,710.00$ 265.00$ 3,710.00$ 550.00$ 7,700.00$ 279.00$ 3,906.00$ 550.00$ 7,700.00$ 275.00$ 3,850.00$ 615.00$ 8,610.00$ 265.00$ 3,710.00$ 570.00$ (3)7,980.00$ 265.00$ 3,710.00$ 84 PAVEMENT MARKINGS REMOVED STA 11.6 75.00$ 870.00$ 101.00$ 1,171.60$ 100.00$ 1,160.00$ 100.00$ 1,160.00$ 175.00$ 2,030.00$ 105.00$ 1,218.00$ 175.00$ 2,030.00$ 105.00$ 1,218.00$ 195.00$ 2,262.00$ 100.00$ 1,160.00$ 180.00$ (3)2,088.00$ 100.00$ 1,160.00$ 85 SYMBOLS AND LEGENDS REMOVED EA 3 100.00$ 300.00$ 101.00$ 303.00$ 100.00$ 300.00$ 100.00$ 300.00$ 100.00$ 300.00$ 105.00$ 315.00$ 100.00$ 300.00$ 105.00$ 315.00$ 111.00$ 333.00$ 100.00$ 300.00$ 103.00$ (3)309.00$ 100.00$ 300.00$ 86 GROOVES CUT FOR PAVEMENT MARKINGS STA 34.4 150.00$ 5,160.00$ 186.75$ 6,424.20$ 185.00$ 6,364.00$ 185.00$ 6,364.00$ 200.00$ 6,880.00$ 194.00$ 6,673.60$ 200.00$ 6,880.00$ 200.00$ 6,880.00$ 223.00$ 7,671.20$ 185.00$ 6,364.00$ 206.00$ (3)7,086.40$ 185.00$ 6,364.00$ 87 GROOVES CUT FOR SYMBOLS AND LEGENDS EA 14 75.00$ 1,050.00$ 212.00$ 2,968.00$ 210.00$ 2,940.00$ 210.00$ 2,940.00$ 225.00$ 3,150.00$ 220.00$ 3,080.00$ 225.00$ 3,150.00$ 220.00$ 3,080.00$ 250.00$ 3,500.00$ 210.00$ 2,940.00$ 232.00$ (3)3,248.00$ 210.00$ 2,940.00$ 88 TEMPORARY TRAFFIC CONTROL LS 1 50,000.00$ 50,000.00$ 19,500.00$ 19,500.00$ 20,000.00$ 20,000.00$ 19,300.00$ 19,300.00$ 33,200.00$ 33,200.00$ 20,300.00$ 20,300.00$ 33,200.00$ 33,200.00$ 25,000.00$ 25,000.00$ 37,000.00$ 37,000.00$ 35,000.00$ 35,000.00$ 34,000.00$ 34,000.00$ 38,000.00$ 38,000.00$ 89 PORTABLE DYNAMIC MESSAGE SIGN CDAY 56 300.00$ 16,800.00$ 70.70$ 3,959.20$ 70.00$ 3,920.00$ 70.00$ 3,920.00$ 100.00$ 5,600.00$ 73.50$ 4,116.00$ 100.00$ 5,600.00$ 75.00$ 4,200.00$ 111.00$ 6,216.00$ 70.00$ 3,920.00$ 103.00$ (3)5,768.00$ 70.00$ 3,920.00$ 90 TRAFFIC SIGNS EA 51 250.00$ 12,750.00$ 252.50$ 12,877.50$ 250.00$ 12,750.00$ 250.00$ 12,750.00$ 75.00$ 3,825.00$ 265.00$ 13,515.00$ 75.00$ 3,825.00$ 255.00$ 13,005.00$ 84.00$ 4,284.00$ 250.00$ 12,750.00$ 77.00$ (3)3,927.00$ 250.00$ 12,750.00$ 91 PERMANENT ROAD CLOSURE, URBAN, SI-182 EA 1 750.00$ 750.00$ 1,515.00$ 1,515.00$ 1,500.00$ 1,500.00$ 1,500.00$ 1,500.00$ 2,150.00$ 2,150.00$ 1,575.00$ 1,575.00$ 2,150.00$ 2,150.00$ 1,600.00$ 1,600.00$ 2,400.00$ 2,400.00$ 1,500.00$ 1,500.00$ 2,200.00$ 2,200.00$ 1,500.00$ 1,500.00$ 92 PERFORATED SQUARE STEEL TUBE POSTS LF 400.0 15.00$ 6,000.00$ 15.15$ 6,060.00$ 15.00$ 6,000.00$ 15.00$ 6,000.00$ 25.00$ 10,000.00$ 15.75$ 6,300.00$ 25.00$ 10,000.00$ 16.00$ 6,400.00$ 28.00$ 11,200.00$ 15.00$ 6,000.00$ 26.00$ (3)10,400.00$ 15.00$ 6,000.00$ 93 PERFORATED SQUARE STEEL TUBE ANCHORS, SINGLE BREAKAWAY ANCHOR EA 32 90.00$ 2,880.00$ 101.00$ 3,232.00$ 100.00$ 3,200.00$ 100.00$ 3,200.00$ 75.00$ 2,400.00$ 105.00$ 3,360.00$ 75.00$ 2,400.00$ 105.00$ 3,360.00$ 84.00$ 2,688.00$ 100.00$ 3,200.00$ 77.00$ 2,464.00$ 100.00$ 3,200.00$ 94 REMOVE AND REINSTALL TRAFFIC SIGNS EA 2 500.00$ 1,000.00$ 202.00$ 404.00$ 200.00$ 400.00$ 200.00$ 400.00$ 350.00$ 700.00$ 210.00$ 420.00$ 350.00$ 700.00$ 210.00$ 420.00$ 400.00$ 800.00$ 200.00$ 400.00$ 360.00$ 720.00$ 200.00$ 400.00$ 95 REMOVE AND SALVAGE TRAFFIC SIGN ASSEMBLY EA 10 250.00$ 2,500.00$ 252.50$ 2,525.00$ 250.00$ 2,500.00$ 250.00$ 2,500.00$ 50.00$ 500.00$ 265.00$ 2,650.00$ 50.00$ 500.00$ 260.00$ 2,600.00$ 55.00$ 550.00$ 250.00$ 2,500.00$ 52.00$ 520.00$ 250.00$ 2,500.00$ SITE WORK AND LANDSCAPING 96 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 1 AC 3.3 4,000.00$ 13,200.00$ 3,940.00$ 13,002.00$ 3,900.00$ 12,870.00$ 3,900.00$ 12,870.00$ 4,000.00$ 13,200.00$ 4,100.00$ 13,530.00$ 3,900.00$ 12,870.00$ 4,000.00$ 13,200.00$ 4,000.00$ 13,200.00$ 3,900.00$ 12,870.00$ 3,700.00$ 12,210.00$ 3,900.00$ 12,870.00$ 97 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, BEE MIX AC 6.5 6,000.00$ 39,000.00$ 4,240.00$ 27,560.00$ 4,200.00$ 27,300.00$ 4,200.00$ 27,300.00$ 4,300.00$ 27,950.00$ 4,400.00$ 28,600.00$ 4,200.00$ 27,300.00$ 4,300.00$ 27,950.00$ 4,300.00$ 27,950.00$ 4,200.00$ 27,300.00$ 4,000.00$ 26,000.00$ 4,200.00$ 27,300.00$ 98 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 4 AC 4.7 50,000.00$ 235,000.00$ 2,020.00$ 9,494.00$ 2,000.00$ 9,400.00$ 2,000.00$ 9,400.00$ 2,150.00$ 10,105.00$ 2,100.00$ 9,870.00$ 2,000.00$ 9,400.00$ 2,100.00$ 9,870.00$ 1,800.00$ 8,460.00$ 2,000.00$ 9,400.00$ 1,600.00$ 7,520.00$ 2,000.00$ 9,400.00$ 99 SWPPP PREPARATION LS 1 4,000.00$ 4,000.00$ 1,615.00$ 1,615.00$ 1,600.00$ 1,600.00$ 1,600.00$ 1,600.00$ 1,800.00$ 1,800.00$ 1,700.00$ 1,700.00$ 1,600.00$ 1,600.00$ 2,000.00$ 2,000.00$ 2,230.00$ 2,230.00$ 1,600.00$ 1,600.00$ 2,100.00$ 2,100.00$ 1,600.00$ 1,600.00$ 100 SWPPP MANAGEMENT LS 1 6,000.00$ 6,000.00$ 4,545.00$ 4,545.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,500.00$ 4,800.00$ 4,800.00$ 4,700.00$ 4,700.00$ 4,500.00$ 4,500.00$ 5,000.00$ 5,000.00$ 4,700.00$ 4,700.00$ 4,500.00$ 4,500.00$ 4,300.00$ 4,300.00$ 4,500.00$ 4,500.00$ 101 FILTER SOCK, 9"LF 9,500 3.00$ 28,500.00$ 1.50$ 14,250.00$ 1.50$ 14,250.00$ 1.50$ 14,250.00$ 1.50$ 14,250.00$ 1.60$ 15,200.00$ 1.50$ 14,250.00$ 1.50$ 14,250.00$ 1.95$ 18,525.00$ 1.50$ 14,250.00$ 2.00$ 19,000.00$ 1.50$ 14,250.00$ 102 FILTER SOCK, REMOVAL LF 9,500 1.00$ 9,500.00$ 0.20$ 1,900.00$ 0.20$ 1,900.00$ 0.20$ 1,900.00$ 0.25$ 2,375.00$ 0.20$ 1,900.00$ 0.20$ 1,900.00$ 0.20$ 1,900.00$ 0.06$ 570.00$ 0.20$ 1,900.00$ 0.05$ 475.00$ 0.20$ 1,900.00$ 103 TEMPORARY RECP, TYPE 1 SY 1,953 3.00$ 5,859.00$ 1.20$ 2,343.60$ 1.20$ 2,343.60$ 1.20$ 2,343.60$ 1.25$ 2,441.25$ 1.25$ 2,441.25$ 1.20$ 2,343.60$ 1.20$ 2,343.60$ 1.70$ 3,320.10$ 1.20$ 2,343.60$ 2.00$ 3,906.00$ 1.20$ 2,343.60$ 104 TEMPORARY RECP, TYPE3 SY 6,567 5.50$ 36,118.50$ 1.50$ 9,850.50$ 1.50$ 9,850.50$ 1.50$ 9,850.50$ 1.55$ 10,178.85$ 1.60$ 10,507.20$ 1.50$ 9,850.50$ 1.50$ 9,850.50$ 2.20$ 14,447.40$ 1.50$ 9,850.50$ 2.00$ 13,134.00$ 1.50$ 9,850.50$ 105 RIP RAP, CLASS E TON 1,473 60.00$ 88,380.00$ 80.80$ 119,018.40$ 80.00$ 117,840.00$ 65.00$ 95,745.00$ 65.00$ 95,745.00$ 75.00$ 110,475.00$ 65.00$ 95,745.00$ 72.50$ 106,792.50$ 100.00$ 147,300.00$ 65.00$ 95,745.00$ 84.00$ 123,732.00$ 76.00$ 111,948.00$ 106 SILT FENCE LF 4,271 3.00$ 12,813.00$ 1.50$ 6,406.50$ 1.50$ 6,406.50$ 1.50$ 6,406.50$ 1.55$ 6,620.05$ 1.60$ 6,833.60$ 1.50$ 6,406.50$ 1.50$ 6,406.50$ 1.95$ 8,328.45$ 1.50$ 6,406.50$ 2.00$ 8,542.00$ 1.50$ 6,406.50$ 107 SILT FENCE, REMOVAL OF DEVICE LF 4,271 1.00$ 4,271.00$ 0.05$ 213.55$ 0.01$ 42.71$ 0.01$ 42.71$ 0.05$ 213.55$ 0.01$ 42.71$ 0.01$ 42.71$ 0.01$ 42.71$ 0.06$ 256.26$ 0.05$ 213.55$ 0.05$ 213.55$ 0.01$ 42.71$ 108 STABILIZED CONSTRUCTION ENTRANCE SY 67 50.00$ 3,350.00$ 40.40$ 2,706.80$ 40.00$ 2,680.00$ 40.00$ 2,680.00$ 40.00$ 2,680.00$ 30.00$ 2,010.00$ 15.00$ 1,005.00$ 50.00$ 3,350.00$ 48.00$ 3,216.00$ 15.00$ 1,005.00$ 54.00$ 3,618.00$ 90.00$ 6,030.00$ 109 EROSION CONTROL MULCHING, HYDROMULCHING AC 8.8 1,500.00$ 13,200.00$ 1,825.00$ 16,060.00$ 1,800.00$ 15,840.00$ 1,800.00$ 15,840.00$ 1,900.00$ 16,720.00$ 1,890.00$ 16,632.00$ 1,800.00$ 15,840.00$ 2,000.00$ 17,600.00$ 2,000.00$ 17,600.00$ 1,800.00$ 15,840.00$ 1,900.00$ 16,720.00$ 1,800.00$ 15,840.00$ 110 INLET PROTECTION DEVICE, DROP IN EA 49 250.00$ 12,250.00$ 126.25$ 6,186.25$ 125.00$ 6,125.00$ 125.00$ 6,125.00$ 130.00$ 6,370.00$ 132.00$ 6,468.00$ 125.00$ 6,125.00$ 125.00$ 6,125.00$ 170.00$ 8,330.00$ 125.00$ 6,125.00$ 155.00$ 7,595.00$ 125.00$ 6,125.00$ 111 INLET PROTECTION DEVICE, MAINTENANCE EA 49 25.00$ 1,225.00$ 25.25$ 1,237.25$ 25.00$ 1,225.00$ 25.00$ 1,225.00$ 35.00$ 1,715.00$ 26.00$ 1,274.00$ 25.00$ 1,225.00$ 25.00$ 1,225.00$ 56.00$ 2,744.00$ 25.00$ 1,225.00$ 26.00$ 1,274.00$ 25.00$ 1,225.00$ 112 GATES, FIELD FENCE, 16'EA 2 3,500.00$ 7,000.00$ 808.00$ 1,616.00$ 800.00$ 1,600.00$ 800.00$ 1,600.00$ 890.00$ 1,780.00$ 840.00$ 1,680.00$ 800.00$ 1,600.00$ 1,600.00$ 3,200.00$ 1,700.00$ 3,400.00$ 800.00$ 1,600.00$ 1,600.00$ 3,200.00$ 800.00$ 1,600.00$ 113 FIELD FENCE LF 43 50.00$ 2,150.00$ 32.30$ 1,388.90$ 32.00$ 1,376.00$ 32.00$ 1,376.00$ 45.00$ 1,935.00$ 34.00$ 1,462.00$ 32.00$ 1,376.00$ 35.00$ 1,505.00$ 36.00$ 1,548.00$ 32.00$ 1,376.00$ 29.00$ 1,247.00$ 32.00$ 1,376.00$ 114 BIORETENTION LS 1 120,000.00$ 120,000.00$ 95,850.00$ 95,850.00$ 100,000.00$ 100,000.00$ 94,900.00$ 94,900.00$ 98,550.00$ 98,550.00$ 108,000.00$ 108,000.00$ 94,900.00$ 94,900.00$ 110,000.00$ 110,000.00$ 110,000.00$ 110,000.00$ 125,000.00$ 125,000.00$ 105,000.00$ 105,000.00$ 98,000.00$ 98,000.00$ MISCELLANEOUS 115 JOINT UTILITY TRENCH, TRENCHED LF 1140 100.00$ 114,000.00$ 40.40$ 46,056.00$ 40.00$ 45,600.00$ 40.00$ 45,600.00$ 40.00$ 45,600.00$ 42.00$ 47,880.00$ 40.00$ 45,600.00$ 42.00$ 47,880.00$ 56.00$ (1)63,840.00$ 40.00$ 45,600.00$ 41.00$ 46,740.00$ 40.00$ 45,600.00$ 116 JOINT UTILITY TRENCH, TRENCHLESS LF 960 130.00$ 124,800.00$ 43.45$ 41,712.00$ 43.00$ 41,280.00$ 43.00$ 41,280.00$ 43.00$ 41,280.00$ 45.50$ 43,680.00$ 43.00$ 41,280.00$ 45.00$ 43,200.00$ 54.00$ 51,840.00$ 43.00$ 41,280.00$ 44.00$ 42,240.00$ 43.00$ 41,280.00$ 117 HANDHOLES, TYPE IV EA 33 3,500.00$ 115,500.00$ 1,240.00$ 40,920.00$ 1,230.00$ 40,590.00$ 1,230.00$ 40,590.00$ 1,230.00$ 40,590.00$ 1,300.00$ 42,900.00$ 1,230.00$ 40,590.00$ 1,500.00$ 49,500.00$ 1,300.00$ 42,900.00$ 1,230.00$ 40,590.00$ 1,300.00$ 42,900.00$ 1,230.00$ 40,590.00$ 118 CONSTRUCTION SURVEY LS 1 50,000.00$ 50,000.00$ 26,775.00$ 26,775.00$ 29,400.00$ 29,400.00$ 26,500.00$ 26,500.00$ 31,500.00$ 31,500.00$ 3,800.00$ 3,800.00$ 35,000.00$ 35,000.00$ 30,000.00$ 30,000.00$ 34,000.00$ 34,000.00$ 45,000.00$ 45,000.00$ 27,000.00$ 27,000.00$ 38,000.00$ 38,000.00$ 119 MOBILIZATION LS 1 322,000.00$ 322,000.00$ 102,300.00$ 102,300.00$ 164,000.00$ 164,000.00$ 150,000.00$ 150,000.00$ 210,948.00$ 210,948.00$ 190,600.00$ 190,600.00$ 416,750.00$ 416,750.00$ 225,000.00$ 225,000.00$ 312,000.00$ 312,000.00$ 495,000.00$ 495,000.00$ 330,000.00$ 330,000.00$ 625,000.00$ 625,000.00$ 120 MAINTENANCE OF POSTAL SERVICES LS 1 10,000.00$ 10,000.00$ 3,795.00$ 3,795.00$ 1,200.00$ 1,200.00$ 1,200.00$ 1,200.00$ 7,200.00$ 7,200.00$ 1,260.00$ 1,260.00$ 1,200.00$ 1,200.00$ 4,500.00$ 4,500.00$ 6,500.00$ 6,500.00$ 1,200.00$ 1,200.00$ 1,500.00$ 1,500.00$ 15,000.00$ 15,000.00$ 121 MAINTENANCE OF SOLID WASTE COLLECTION LS 1 10,000.00$ 10,000.00$ 4,860.00$ 4,860.00$ 11,000.00$ 11,000.00$ 10,100.00$ 10,100.00$ 1,000.00$ 1,000.00$ 5,000.00$ 5,000.00$ 12,000.00$ 12,000.00$ 5,500.00$ 5,500.00$ 2,500.00$ 2,500.00$ 15,000.00$ 15,000.00$ 18,000.00$ 18,000.00$ 15,000.00$ 15,000.00$ 122 CONCRETE WASHOUT LS 1 4,000.00$ 4,000.00$ 9,775.00$ 9,775.00$ 10,500.00$ 10,500.00$ 18,000.00$ 18,000.00$ 10,500.00$ 10,500.00$ 10,000.00$ 10,000.00$ 4,000.00$ 4,000.00$ 10,000.00$ 10,000.00$ 5,600.00$ 5,600.00$ 15,000.00$ 15,000.00$ 10,000.00$ 10,000.00$ 10,500.00$ 10,500.00$ TOTAL BID:5,894,000.00$ 4,294,120.31$ 4,307,396.26$ 4,330,316.46$ 4,593,188.40$ 4,850,705.51$ 4,977,000.17$ 5,298,608.06$ 5,384,574.66$ 5,394,495.00$ 5,744,842.65$ 6,275,781.31$ BID SECURITY:10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% Notes: (1)Miscalculated item total. Does not effect bid outcome. (2)Unit price missing decimal on bid form, interpreted unit price based on item total. Does not effect bid outcome. (3)Bid form appears to have been photocopied and rows do not match up. However, bid total matches. Does not effect bid outcome. 5 CORELL CONTRACTOR, INC. WEST DES MOINES, IA UNIT PRICEUNIT PRICE ENGINEER'S ESTIMATE CONCRETE TECHNOLOGIES GRIMES, IA UNIT PRICE MANATT'S INC. JOHNSTON, IA UNIT PRICE ALLIANCE CONSTRUCTION URBANDALE, IA UNIT PRICE 21 3 4 ALL STAR CONCRETE LLC JOHNSTON, IA 7 REILLY CONSTRUCTION, INC. OSSIAN, IA UNIT PRICE 6 CASTOR CONSTRUCTION LLC FORT DODGE, IA UNIT PRICE 11 CJ MOYNA & SONS, LLC ELKADER, IA UNIT PRICE 10 ELDER CORPORATION DES MOINES, IA UNIT PRICE 8 SM HENTGES & SONS, INC. JORDAN, MN UNIT PRICE 9 ABSOLUTE GROUP GRANGER, IA UNIT PRICE V:\Projects\2023\123.1396.01\AdvertisingLetting\BIDTAB_2025-02-04_AlicesRoadPhase1A.xlsxBIDTAB_2025-02-04_AlicesRoadPhase1A.xlsx