Loading...
HomeMy WebLinkAbout2025-02-18 I01H_05 Traffic Signal Enhancements, School & Trail Crossings_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 18, 2025 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Iowa Signal, Inc. for the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements Project, increasing the contract amount by $12,848.50. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is to provide signal heads at consistent positions for the eastbound and westbound right turn lanes on US 6. Currently there may or may not be a signal head on the mast arm over the right turn lane. Similarly, there may or may not be a side-of-pole signal head present. This change order will make it so there is both a signal head on the mast arm over the right turn lane and a side of pole signal head for all EB and WB signals on US 6. Additionally, it revises the project completion date to April 30, 2025 due to the time needed order and install the heads for the change order as well as additional shipping delays for the cabinets needed to complete the work in the original bid. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price by the amount of $12,848.50. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 2 PREPARED BY:Rudy Koester REVIEWED BY:Sara Kappos SKK I1H5 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2022\122.0627.01\construction\ltr_2025-01-30_co-02_us6-rightturnheads.docx January 30, 2025 Rudy Koester, P.E. Public Works Director City of Waukee 805 University Ave Waukee, IA 50263 RE: CHANGE ORDER NO. 2 TRAFFIC SIGNAL ENHANCEMENT S&A PROJECT NO.: 122.0627.01 IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25 Dear Mr. Koester: The purpose of change order #2 is to provide signal heads at consistent positions for the eastbound and westbound right turn lanes on US 6. Currently there may or may not be a signal head on the mast arm over the right turn lane. Similarly, there may or may not be a side-of-pole signal head present. This change order will make it so there is both a signal head on the mast arm over the right turn lane and a side of pole signal head for EB and WB signals on US 6. Additionally, it revises the completion date to April 30, 2025 due to the time needed order and install the heads for the change order as well as additional delays for the cabinets needed to complete the work in the original bid. Attached is change order #2 for the project. This change order increases the current contract amount of $966,589.00 by $12,848.50. The resulting new contract amount is $979,437.50. This change order also revises contract completion date from December 31, 2024 to April 30, 2025. We recommend approving this change order to amend the original contract as shown in the attached change order form. Please contact me should you have any questions regarding this partial payment application. Sincerely, SNYDER & ASSOCIATES, INC. Andrew Houchin, P.E. Project Engineer Enclosure OWNER: City of Waukee PROJECT: Traffic Signal System Enhancement Project PROJECT #: 122.0627.01 To: You are directed to make the following changes in this contract: 1. Description of change to be made: 2. Reason for Change: 3. Settlement for the cost of making the change shall be as follows: Item No. Item Description Quantity Unit Unit Price Total Price 0180 Signal Cable 5c 205 LF $2.00 $410.00 (new) 8001 Signal Cable 7c 875 LF $2.50 $2,187.50 (new) 8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-Arm Mounted 3 EACH $650.00 $1,950.00 (new) 8003 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Side of Pole Mounted 2 EACH $475.00 $950.00 (new) 8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted 3 EACH $776.00 $2,328.00 (new) 8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Side of Pole Mounted 1 EACH $523.00 $523.00 (new) 8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate, Mast-Arm Mounted 3 EACH $850.00 $2,550.00 (new) 8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate, Side of Pole Mounted 2 EACH $650.00 $1,300.00 (new) 8008 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-Arm Mounted 1 EACH $650.00 $650.00 TOTAL $12,848.50 4. This change order will result in a net change in the contract completion time of 120 days and a net change in the cost of the project of $12848.50 divided as follows: Contract Contract Amount Completion Date Approved funds and contract completion date as per (Engineer's Estimate, Contract or last approved C.O.) $966,589.00 December 31, 2024 Change due to this C.O. (+ or -) $12,848.50 120 Totals including this C.O.:$979,437.50 April 30, 2025 CHANGE ORDER NO. 2 City, State, Zip Iowa Signal, Inc. Contractor 3711 SE Capitol Cir Grimes, IA 50111 Address This change was requested by City staff. Currently, signal heads at several intersections are only located on either the mast arm or the side of pole, resulting in an inconsistent experience for drivers on the corridor. Providing heads on both the mast arm and side of pole can be especially beneficial for EB and WB traffic during dawn and dusk when glare may affect drivers' ability to see the traffic signal heads. The contract completion date needs to be extended for two reasons. First, the signal heads required for this work have an expected delivery date of approximate 30 to 45 days after ordering. The City provided email approval for the work 10/23/24. Depending on weather, the contractor may not be able to install the new traffic signal heads before the original completion date. Second, the delivery of the signal cabinets for the work in the original bid has been delayed to November 15 for the supplier, likely resulting in an early December delivery to the contractor. This change order is to provide signal heads at consistent positions for the eastbound and westbound right turn lanes on US 6. Currently there may or may not be a signal head on the mast arm over the right turn lane. Similarly, there may or may not be a side-of-pole signal head present. This change order will make it so there is both a signal head on the mast arm over the right turn lane and a side of pole signal head for EB and WB signals on US 6. Additionally, it revises the completion date to April 30, 2025 due to the time needed order and install the heads for the change order as well as additional delays for the cabinets needed to complete the work in the original bid. V:\Projects\2022\122.0627.01\Construction\CO-02_2024-11-04_US6-RightTurnHeads.xlsx The change described herein is understood, and the terms of settlement are hereby agreed to: Iowa Signal, Inc. CONTRACTOR By DATE: Snyder & Associates, Inc. ENGINEER By DATE: City of Waukee OWNER By DATE: V:\Projects\2022\122.0627.01\Construction\CO-02_2024-11-04_US6-RightTurnHeads.xlsx 11/4/24 6. DETAILED ESTIMATE OF WORK COMPLETED: APPLICATION FOR PARTIAL PAYMENT NO. 2 ITEM TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT NO. USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL. 0010 0.5 0.5 1.0 LS 2,700.00$ 1,350.00$ 1,350.00$ -$ -$ 2,700.00$ 0 -$ 0 -$ 0.00% 0020 0.5 0.5 1 LS 27,800.00$ 13,900.00$ 13,900.00$ -$ -$ 27,800.00$ 0.05 0.05 0.1 2,780.00$ 0 -$ 10.00% 0030 1 1 LS 2,145.00$ -$ -$ -$ 2,145.00$ 2,145.00$ 0 -$ 0 -$ 0.00% 0040 24 24 EA 1,634.00$ -$ 39,216.00$ -$ -$ 39,216.00$ 0 -$ 0 -$ 0.00% 0050 88EA6,783.00$ -$ 54,264.00$ -$ -$ 54,264.00$ 0 -$ 0 -$ 0.00% 0060 2 5 7 EA 4,412.00$ 8,824.00$ 22,060.00$ -$ -$ 30,884.00$ 0 -$ 0 -$ 0.00% 0070 47 11EA 50,405.00$ -$ 201,620.00$ 352,835.00$ -$ 554,455.00$ 0 -$ 0 -$ 0.00% 0080 2 8 4 14 EA 370.00$ 740.00$ 2,960.00$ 1,480.00$ -$ 5,180.00$ 0 -$ 0 -$ 0.00% 0090 11 24 35 EA 370.00$ -$ -$ 4,070.00$ 8,880.00$ 12,950.00$ 0 -$ 0 -$ 0.00% 0100 4 6 10 EA 402.00$ 1,608.00$ 2,412.00$ -$ -$ 4,020.00$ 0 -$ 0 -$ 0.00% 0110 2 2 EA 850.00$ 1,700.00$ -$ -$ -$ 1,700.00$ 0 -$ 0 -$ 0.00% 0120 2 2 EA 550.00$ 1,100.00$ -$ -$ -$ 1,100.00$ 0 -$ 0 -$ 0.00% 0130 18 18 EA 437.00$ -$ 7,866.00$ -$ -$ 7,866.00$ 0 -$ 0 -$ 0.00% 0140 7221342EA 776.00$ -$ 5,432.00$ 17,072.00$ 10,088.00$ 32,592.00$ 0 -$ 0 -$ 0.00% 0150 10 5 15 EA 523.00$ 5,230.00$ 2,615.00$ -$ -$ 7,845.00$ 0 -$ 0 -$ 0.00% 0160 8 17 25 EA 751.00$ 6,008.00$ 12,767.00$ -$ -$ 18,775.00$ 0 -$ 0 -$ 0.00% 0170 10 10 EA 10,800.00$ -$ -$ -$ 108,000.00$ 108,000.00$ 0 -$ 0 -$ 0.00% 0180 300 2,700 3000 LF 2.00$ 600.00$ 5,400.00$ -$ -$ 6,000.00$ 0 -$ 0 -$ 0.00% TAP+USTEP TAP Only USTEP Only City OVERALL PERCENT COMPLETE = 0.30% ORIGINAL CONTRACT = 41,060.00$ 371,862.00$ 375,457.00$ 129,113.00$ 917,492.00$ PREVIOUS PAY APPS = 1,390.00$ 1,390.00$ -$ -$ 2,780.00$ CURRENT PAY APP = -$ -$ -$ -$ -$ (Current less 3% retainage for Claim Forms) -$ -$ -$ -$ -$ Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED), Side of Pole Mounted Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted Uninterruptible Power Supply Signal Cable, 5c DIV 1 DIV 2 TOTAL Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate, Mast-Arm Mounted Traffic Signal, Replacement, 16" Pedestrian Head, Hand/Person, Countdown Accessible Pedestrian Signal Push Button and Sign Rectangular Rapid Flashing Beacon Assembly, per Post Signal Cabinet Modification Signal Cabinet Replacement Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted DESCRIPTION Traffic Control Mobilization Railroad Protective Liability Insurance for Union Pacific Railroad Co. CURRENT PAY APP Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 PREVIOUS PAY APPS UNIT UNIT COST CONTRACT ITEMS V:\Projects\2022\122.0627.01\Construction\PayApp02_2024-XX-XX_SignalEnhancement(TAP).xlsx CHANGE ORDER SUMMARY: ITEM CO TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT NO. DESCRIPTION # USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL. 0060 Signal Cabinet Modification 1 -1 -1 EA 4,412.00$ -$ (4,412.00)$ -$ -$ (4,412.00)$ 0 -$ 0 -$ 0.00% 0070 Signal Cabinet Replacement 1 1 1 EA 50,405.00$ -$ 50,405.00$ -$ -$ 50,405.00$ 0 -$ 0 -$ 0.00% 0140 Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted 1 4 4 EA 776.00$ -$ -$ -$ 3,104.00$ 3,104.00$ 0 -$ 0 -$ 0.00% 0180 Signal Cable 5c 2 205 205 EA 2.00$ -$ -$ -$ 410.00$ 410.00$ 0 -$ 0 -$ 0.00% 8001 Signal Cable 7c 2 875 875 EA 2.50$ -$ -$ -$ 2,187.50$ 2,187.50$ 0 -$ 0 -$ 0.00% 8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-Arm Mounted 2 3 3 EA 650.00$ -$ -$ -$ 1,950.00$ 1,950.00$ 0 -$ 0 -$ 0.00% 8003 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Side of Pole Mounted 2 2 2 EA 475.00$ -$ -$ -$ 950.00$ 950.00$ 0 -$ 0 -$ 0.00% 8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted 2 3 3 EA 776.00$ -$ -$ -$ 2,328.00$ 2,328.00$ 0 -$ 0 -$ 0.00% 8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Side of Pole Mounted 2 1 1 EA 523.00$ -$ -$ -$ 523.00$ 523.00$ 0 -$ 0 -$ 0.00% 8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate, Mast-Arm Mounted 2 3 3 EA 850.00$ -$ -$ -$ 2,550.00$ 2,550.00$ 0 -$ 0 -$ 0.00% 8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate, Side of Pole Mounted 2 2 2 EA 650.00$ -$ -$ -$ 1,300.00$ 1,300.00$ 0 -$ 0 -$ 0.00% 8008 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-Arm Mounted 2 1 1 EA 650.00$ -$ -$ -$ 650.00$ 650.00$ 0 -$ 0 -$ 0.00% TAP+USTEP TAP Only USTEP Only City TOTAL CHANGE ORDERS = -$ 45,993.00$ -$ 15,952.50$ 61,945.50$ PREVIOUS CHANGE ORDERS = -$ -$ -$ -$ -$ CURRENT CHANGE ORDER = -$ -$ -$ -$ -$ TAP+USTEP TAP Only USTEP Only City TOTAL CONTRACT & CHANGE ORDERS 41,060.00$ 417,855.00$ 375,457.00$ 145,065.50$ 979,437.50$ DIV 1 DIV 2 TOTAL Div 1 Div 2 DIV 1 DIV 2 TOTAL Div 1 Div 2 CURRENT CHANGE ORDERPREVIOUS CHANGE ORDERS Div 1 Div 2 Div 1 Div 2 UNIT UNIT COST V:\Projects\2022\122.0627.01\Construction\PayApp02_2024-XX-XX_SignalEnhancement(TAP).xlsx 1 Andrew Houchin From:Andrew Houchin Sent:Thursday, October 10, 2024 4:38 PM To:Wayne Lesley Cc:shane@iowasignal.com; Rudy Koester P.E. (rkoester@waukee.org); Todd Knox Subject:TAP-T-8177(601)--8V-25 - Waukee Signal Enhancements CO Request Wayne, The City of Waukee would like to add right turn signal heads EB and WB along Hickman Rd wherever there aren’t any currently (i.e. they want right turn heads on both mast arms and side of pole for both direc#ons throughout the corridor). The City would like to accomplish this through a change order to the Waukee Signal Enhancements project. Can you please provide a quote for the work described in detail below? Also, let us know if you would have any concerns with equipment lead #mes or anything else with this request. 1. Hickman & 10th St a. Install 5-sec#on right turn head on EB mast arm 2. Hickman & 6th St a. Install 5-sec#on right turn head on EB mast arm b. Replace exis#ng 3-sec#on head with 5-sec#on right turn head on SOP c. Install new 4-sec#on FYA right turn head on WB mast arm 3. Hickman & 4th St a. Install 3-sec#on circular head on EB mast arm b. Install 3-sec#on circular head on EB SOP c. Install 3-sec#on circular head on WB mast arm d. Install 3-sec#on circular head on WB SOP 4. Hickman & 2nd St a. Install 3-sec#on circular head on EB mast arm b. Install new 4-sec#on FYA right turn head on WB mast arm 5. Hickman & Warrior Ln a. Install 5-sec#on right turn head on EB mast arm b. Install 5-sec#on right turn head on EB SOP c. Install 4-sec#on FYA right turn head on WB mast arm 6. Hickman & Archer Ave (Private Drive) a. Install 5-sec#on right turn head on EB SOP b. Install 4-sec#on FYA right turn head on WB SOP Total Change Order Quan##es Item Number Description Unit Quantity New Item Traffic Signal, New, 12” R,Y,G (All LED) w/ Backplate, Mast-Arm Mounted EA 3 New Item Traffic Signal, New, 12” R,Y,G (All LED), Side of Pole Mounted EA 2 New Item Traffic Signal, New, 12” R,Y>,FY>,G> (All LED), w/ Backplate, Mast-Arm Mounted EA 3 New Item Traffic Signal, New, 12” R,Y>,FY>,G> (All LED), Side of Pole Mounted EA 1 New Item Traffic Signal, New, 12” R,Y,G,Y>,G> (All LED), w/ Backplate, Mast-Arm Mounted EA 3 2 New Item Traffic Signal, New, 12” R,Y,G,Y>,G> (All LED), Side of Pole Mounted EA 2 New Item Traffic Signal, Replacement, 12” R,Y,G,Y>,G> (All LED), Side of Pole Mounted EA 1 18 Signal Cable, 5c LF Proposed by contractor New Item Signal Cable, 7c LF Proposed by contractor Thanks, Andrew Houchin, P.E. (he/him) Traffic Engineer P: 515.964.2020 x2644 | C: 515.480.0116 2727 SW Snyder Blvd, Ankeny, IA 50023 Snyder-Associates.com Change Order Quote Waukee Signal Enhancement TAP-T-8177(601)--8V-25 Adding right turn signal heads at Hickman & 10th, Hickman & 6th, Hickman & 4th, Hickman & 2nd, Hickman & Warrior Ln, Hickman & Archer Ave Thank you! Item # Description Unit Quantity Amount Total New TS, New, 12” R,Y,G(All LED)w/Backplate, Mast-Arm Mounted EA 3 $650 $1950 New TS New, 12” R,Y,G (All LED) Side of Pole Mounted EA 2 $475 $950 New TS New, 12”, R,Y>FY>,G>(All LED) w/Backplate, Mast-Arm Mounted EA 3 $776 $2328 New TS New, 12” R,Y>,FY>,G>(All LED), Side of Pole Mounted EA 1 $523 $523 New TS New, 12” R,Y,G,Y>,G>(All LED) w/Backplate, Mast Arm Mounted EA 3 $850 $2550 New TS New, 12” R,Y,G,Y>,G>(All LED) Side of Pole Mounted EA 2 $650 $1300 New TS, Replacement 12” R,Y,G,Y>,G>(All LED) Side of pole mounted EA 1 $650 $650 18 Signal Cable, 5c LF 205 $2 $410 New Signal Cable, 7c LF 875 $2.50 $2187.50 Iowa Signal Inc. 3711 SE Capitol Circle Grimes, IA 50111 Wayne@iowasignal.com/515-249-5076 Heather@iowasignal.com/515-971-0251 www.swarco.com/mccain SWARCO McCain, Inc., 2365 Oak Ridge Way, Vista, CA 92081, USA T.+1 760-727-8100, E. info.us@swarco.com 1/1 Cristina Besaw General Traffic Controls 2915 11th Ave SW Spencer IA 51301 Oct.24.2024 Subject: PO 6705/ ORD004570949 Delay Dear Cristina, We regret to inform you that we are experiencing a delay with the cabinet units under PO# 6705 /ORD004570949 due to multiple shortages with various material components to the ATC cabinet and controllers we find the need to adjust the completion timeline of your order. The new completion to all units under PO 6705/ ORD004570949 is projected to be November 15th 2024. Should any additional delays on this order occur our team will contact you as soon as possible. If you should have any questions or need further information, please do not hesitate to contact me. Sincerely, Suzie Gomez Account Executive E.sgomez@mccain-inc.com T.+1-760-734-5091 M.+1-760-908-4006 www.mccain-inc.comwww.