HomeMy WebLinkAbout2025-02-18 I01H_05 Traffic Signal Enhancements, School & Trail Crossings_Change Order 2AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: February 18, 2025
AGENDA ITEM:Consideration of approval of Change Order No. 2 to Iowa Signal, Inc. for
the Traffic Signal Enhancements, Waukee School & Trail Crossing
Improvements Project, increasing the contract amount by $12,848.50.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is to provide signal heads at
consistent positions for the eastbound and westbound right turn lanes on US 6. Currently there may
or may not be a signal head on the mast arm over the right turn lane. Similarly, there may or may
not be a side-of-pole signal head present. This change order will make it so there is both a signal
head on the mast arm over the right turn lane and a side of pole signal head for all EB and WB
signals on US 6. Additionally, it revises the project completion date to April 30, 2025 due to the
time needed order and install the heads for the change order as well as additional shipping delays
for the cabinets needed to complete the work in the original bid.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order increases the contract price by the amount of $12,848.50.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Letter of Recommendation
II. Change Order No. 2
PREPARED BY:Rudy Koester
REVIEWED BY:Sara Kappos SKK
I1H5
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM
v:\projects\2022\122.0627.01\construction\ltr_2025-01-30_co-02_us6-rightturnheads.docx
January 30, 2025
Rudy Koester, P.E.
Public Works Director
City of Waukee
805 University Ave
Waukee, IA 50263
RE: CHANGE ORDER NO. 2
TRAFFIC SIGNAL ENHANCEMENT
S&A PROJECT NO.: 122.0627.01
IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25
Dear Mr. Koester:
The purpose of change order #2 is to provide signal heads at consistent positions for the eastbound
and westbound right turn lanes on US 6. Currently there may or may not be a signal head on the
mast arm over the right turn lane. Similarly, there may or may not be a side-of-pole signal head
present. This change order will make it so there is both a signal head on the mast arm over the
right turn lane and a side of pole signal head for EB and WB signals on US 6. Additionally, it
revises the completion date to April 30, 2025 due to the time needed order and install the heads
for the change order as well as additional delays for the cabinets needed to complete the work in
the original bid.
Attached is change order #2 for the project. This change order increases the current contract
amount of $966,589.00 by $12,848.50. The resulting new contract amount is $979,437.50. This
change order also revises contract completion date from December 31, 2024 to April 30, 2025. We
recommend approving this change order to amend the original contract as shown in the attached
change order form.
Please contact me should you have any questions regarding this partial payment application.
Sincerely,
SNYDER & ASSOCIATES, INC.
Andrew Houchin, P.E.
Project Engineer
Enclosure
OWNER: City of Waukee PROJECT: Traffic Signal System Enhancement Project
PROJECT #: 122.0627.01
To:
You are directed to make the following changes in this contract:
1. Description of change to be made:
2. Reason for Change:
3. Settlement for the cost of making the change shall be as follows:
Item No. Item Description Quantity Unit Unit Price Total Price
0180 Signal Cable 5c 205 LF $2.00 $410.00
(new) 8001 Signal Cable 7c 875 LF $2.50 $2,187.50
(new) 8002 Traffic Signal, New, 12" R,Y,G (All LED) w/
Backplate, Mast-Arm Mounted
3 EACH $650.00 $1,950.00
(new) 8003 Traffic Signal, New, 12" R,Y,G (All LED) w/
Backplate, Side of Pole Mounted
2 EACH $475.00 $950.00
(new) 8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED)
w/ Backplate, Mast-Arm Mounted
3 EACH $776.00 $2,328.00
(new) 8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED)
w/ Backplate, Side of Pole Mounted
1 EACH $523.00 $523.00
(new) 8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED)
w/ Backplate, Mast-Arm Mounted
3 EACH $850.00 $2,550.00
(new) 8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED)
w/ Backplate, Side of Pole Mounted
2 EACH $650.00 $1,300.00
(new) 8008 Traffic Signal, New, 12" R,Y,G (All LED) w/
Backplate, Mast-Arm Mounted
1 EACH $650.00 $650.00
TOTAL $12,848.50
4. This change order will result in a net change in the contract completion time of 120 days and a net change
in the cost of the project of $12848.50 divided as follows:
Contract Contract
Amount Completion Date
Approved funds and contract completion date as per (Engineer's
Estimate, Contract or last approved C.O.) $966,589.00 December 31, 2024
Change due to this C.O. (+ or -) $12,848.50 120
Totals including this C.O.:$979,437.50 April 30, 2025
CHANGE ORDER NO. 2
City, State, Zip
Iowa Signal, Inc.
Contractor
3711 SE Capitol Cir
Grimes, IA 50111
Address
This change was requested by City staff. Currently, signal heads at several intersections are only located on either the mast arm or the
side of pole, resulting in an inconsistent experience for drivers on the corridor. Providing heads on both the mast arm and side of pole can
be especially beneficial for EB and WB traffic during dawn and dusk when glare may affect drivers' ability to see the traffic signal heads.
The contract completion date needs to be extended for two reasons. First, the signal heads required for this work have an expected
delivery date of approximate 30 to 45 days after ordering. The City provided email approval for the work 10/23/24. Depending on weather,
the contractor may not be able to install the new traffic signal heads before the original completion date. Second, the delivery of the signal
cabinets for the work in the original bid has been delayed to November 15 for the supplier, likely resulting in an early December delivery to
the contractor.
This change order is to provide signal heads at consistent positions for the eastbound and westbound right turn lanes on US 6. Currently
there may or may not be a signal head on the mast arm over the right turn lane. Similarly, there may or may not be a side-of-pole signal
head present. This change order will make it so there is both a signal head on the mast arm over the right turn lane and a side of pole
signal head for EB and WB signals on US 6.
Additionally, it revises the completion date to April 30, 2025 due to the time needed order and install the heads for the change order as
well as additional delays for the cabinets needed to complete the work in the original bid.
V:\Projects\2022\122.0627.01\Construction\CO-02_2024-11-04_US6-RightTurnHeads.xlsx
The change described herein is understood, and the terms of settlement are hereby agreed to:
Iowa Signal, Inc.
CONTRACTOR
By DATE:
Snyder & Associates, Inc.
ENGINEER
By DATE:
City of Waukee
OWNER
By DATE:
V:\Projects\2022\122.0627.01\Construction\CO-02_2024-11-04_US6-RightTurnHeads.xlsx
11/4/24
6. DETAILED ESTIMATE OF WORK COMPLETED:
APPLICATION FOR PARTIAL PAYMENT NO. 2
ITEM TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0010 0.5 0.5 1.0 LS 2,700.00$ 1,350.00$ 1,350.00$ -$ -$ 2,700.00$ 0 -$ 0 -$ 0.00%
0020 0.5 0.5 1 LS 27,800.00$ 13,900.00$ 13,900.00$ -$ -$ 27,800.00$ 0.05 0.05 0.1 2,780.00$ 0 -$ 10.00%
0030 1 1 LS 2,145.00$ -$ -$ -$ 2,145.00$ 2,145.00$ 0 -$ 0 -$ 0.00%
0040 24 24 EA 1,634.00$ -$ 39,216.00$ -$ -$ 39,216.00$ 0 -$ 0 -$ 0.00%
0050 88EA6,783.00$ -$ 54,264.00$ -$ -$ 54,264.00$ 0 -$ 0 -$ 0.00%
0060 2 5 7 EA 4,412.00$ 8,824.00$ 22,060.00$ -$ -$ 30,884.00$ 0 -$ 0 -$ 0.00%
0070 47 11EA 50,405.00$ -$ 201,620.00$ 352,835.00$ -$ 554,455.00$ 0 -$ 0 -$ 0.00%
0080 2 8 4 14 EA 370.00$ 740.00$ 2,960.00$ 1,480.00$ -$ 5,180.00$ 0 -$ 0 -$ 0.00%
0090 11 24 35 EA 370.00$ -$ -$ 4,070.00$ 8,880.00$ 12,950.00$ 0 -$ 0 -$ 0.00%
0100 4 6 10 EA 402.00$ 1,608.00$ 2,412.00$ -$ -$ 4,020.00$ 0 -$ 0 -$ 0.00%
0110 2 2 EA 850.00$ 1,700.00$ -$ -$ -$ 1,700.00$ 0 -$ 0 -$ 0.00%
0120 2 2 EA 550.00$ 1,100.00$ -$ -$ -$ 1,100.00$ 0 -$ 0 -$ 0.00%
0130 18 18 EA 437.00$ -$ 7,866.00$ -$ -$ 7,866.00$ 0 -$ 0 -$ 0.00%
0140 7221342EA 776.00$ -$ 5,432.00$ 17,072.00$ 10,088.00$ 32,592.00$ 0 -$ 0 -$ 0.00%
0150 10 5 15 EA 523.00$ 5,230.00$ 2,615.00$ -$ -$ 7,845.00$ 0 -$ 0 -$ 0.00%
0160 8 17 25 EA 751.00$ 6,008.00$ 12,767.00$ -$ -$ 18,775.00$ 0 -$ 0 -$ 0.00%
0170 10 10 EA 10,800.00$ -$ -$ -$ 108,000.00$ 108,000.00$ 0 -$ 0 -$ 0.00%
0180 300 2,700 3000 LF 2.00$ 600.00$ 5,400.00$ -$ -$ 6,000.00$ 0 -$ 0 -$ 0.00%
TAP+USTEP TAP Only USTEP Only City OVERALL PERCENT COMPLETE = 0.30%
ORIGINAL CONTRACT = 41,060.00$ 371,862.00$ 375,457.00$ 129,113.00$ 917,492.00$
PREVIOUS PAY APPS = 1,390.00$ 1,390.00$ -$ -$ 2,780.00$
CURRENT PAY APP = -$ -$ -$ -$ -$
(Current less 3% retainage for Claim Forms) -$ -$ -$ -$ -$
Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted
Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G>
(All LED), Side of Pole Mounted
Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G>
(All LED) w/ Backplate, Mast-Arm Mounted
Uninterruptible Power Supply
Signal Cable, 5c
DIV 1 DIV 2 TOTAL
Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted
Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted
Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/
Backplate, Mast-Arm Mounted
Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate,
Mast-Arm Mounted
Traffic Signal, Replacement, 16" Pedestrian Head,
Hand/Person, Countdown
Accessible Pedestrian Signal Push Button and Sign
Rectangular Rapid Flashing Beacon Assembly, per Post
Signal Cabinet Modification
Signal Cabinet Replacement
Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted
DESCRIPTION
Traffic Control
Mobilization
Railroad Protective Liability Insurance for Union Pacific
Railroad Co.
CURRENT PAY APP
Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 Div 1 Div 2
PREVIOUS PAY APPS
UNIT UNIT COST
CONTRACT ITEMS
V:\Projects\2022\122.0627.01\Construction\PayApp02_2024-XX-XX_SignalEnhancement(TAP).xlsx
CHANGE ORDER SUMMARY:
ITEM CO TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. DESCRIPTION # USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0060 Signal Cabinet Modification 1 -1 -1 EA 4,412.00$ -$ (4,412.00)$ -$ -$ (4,412.00)$ 0 -$ 0 -$ 0.00%
0070 Signal Cabinet Replacement 1 1 1 EA 50,405.00$ -$ 50,405.00$ -$ -$ 50,405.00$ 0 -$ 0 -$ 0.00%
0140
Traffic Signal, Replacement/Modifcation, 12"
<R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm
Mounted
1 4 4 EA 776.00$ -$ -$ -$ 3,104.00$ 3,104.00$ 0 -$ 0 -$ 0.00%
0180 Signal Cable 5c 2 205 205 EA 2.00$ -$ -$ -$ 410.00$ 410.00$ 0 -$ 0 -$ 0.00%
8001 Signal Cable 7c 2 875 875 EA 2.50$ -$ -$ -$ 2,187.50$ 2,187.50$ 0 -$ 0 -$ 0.00%
8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate,
Mast-Arm Mounted 2 3 3 EA 650.00$ -$ -$ -$ 1,950.00$ 1,950.00$ 0 -$ 0 -$ 0.00%
8003 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate,
Side of Pole Mounted 2 2 2 EA 475.00$ -$ -$ -$ 950.00$ 950.00$ 0 -$ 0 -$ 0.00%
8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 776.00$ -$ -$ -$ 2,328.00$ 2,328.00$ 0 -$ 0 -$ 0.00%
8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/
Backplate, Side of Pole Mounted 2 1 1 EA 523.00$ -$ -$ -$ 523.00$ 523.00$ 0 -$ 0 -$ 0.00%
8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 850.00$ -$ -$ -$ 2,550.00$ 2,550.00$ 0 -$ 0 -$ 0.00%
8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/
Backplate, Side of Pole Mounted 2 2 2 EA 650.00$ -$ -$ -$ 1,300.00$ 1,300.00$ 0 -$ 0 -$ 0.00%
8008 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate,
Mast-Arm Mounted 2 1 1 EA 650.00$ -$ -$ -$ 650.00$ 650.00$ 0 -$ 0 -$ 0.00%
TAP+USTEP TAP Only USTEP Only City
TOTAL CHANGE ORDERS = -$ 45,993.00$ -$ 15,952.50$ 61,945.50$
PREVIOUS CHANGE ORDERS = -$ -$ -$ -$ -$
CURRENT CHANGE ORDER = -$ -$ -$ -$ -$
TAP+USTEP TAP Only USTEP Only City
TOTAL CONTRACT & CHANGE ORDERS 41,060.00$ 417,855.00$ 375,457.00$ 145,065.50$ 979,437.50$
DIV 1 DIV 2 TOTAL
Div 1 Div 2
DIV 1 DIV 2 TOTAL
Div 1 Div 2
CURRENT CHANGE ORDERPREVIOUS CHANGE ORDERS
Div 1 Div 2 Div 1 Div 2
UNIT UNIT COST
V:\Projects\2022\122.0627.01\Construction\PayApp02_2024-XX-XX_SignalEnhancement(TAP).xlsx
1
Andrew Houchin
From:Andrew Houchin
Sent:Thursday, October 10, 2024 4:38 PM
To:Wayne Lesley
Cc:shane@iowasignal.com; Rudy Koester P.E. (rkoester@waukee.org); Todd Knox
Subject:TAP-T-8177(601)--8V-25 - Waukee Signal Enhancements CO Request
Wayne,
The City of Waukee would like to add right turn signal heads EB and WB along Hickman Rd wherever there aren’t any
currently (i.e. they want right turn heads on both mast arms and side of pole for both direc#ons throughout the
corridor). The City would like to accomplish this through a change order to the Waukee Signal Enhancements project.
Can you please provide a quote for the work described in detail below? Also, let us know if you would have any
concerns with equipment lead #mes or anything else with this request.
1. Hickman & 10th St
a. Install 5-sec#on right turn head on EB mast arm
2. Hickman & 6th St
a. Install 5-sec#on right turn head on EB mast arm
b. Replace exis#ng 3-sec#on head with 5-sec#on right turn head on SOP
c. Install new 4-sec#on FYA right turn head on WB mast arm
3. Hickman & 4th St
a. Install 3-sec#on circular head on EB mast arm
b. Install 3-sec#on circular head on EB SOP
c. Install 3-sec#on circular head on WB mast arm
d. Install 3-sec#on circular head on WB SOP
4. Hickman & 2nd St
a. Install 3-sec#on circular head on EB mast arm
b. Install new 4-sec#on FYA right turn head on WB mast arm
5. Hickman & Warrior Ln
a. Install 5-sec#on right turn head on EB mast arm
b. Install 5-sec#on right turn head on EB SOP
c. Install 4-sec#on FYA right turn head on WB mast arm
6. Hickman & Archer Ave (Private Drive)
a. Install 5-sec#on right turn head on EB SOP
b. Install 4-sec#on FYA right turn head on WB SOP
Total Change Order Quan##es
Item Number Description Unit Quantity
New Item Traffic Signal, New, 12” R,Y,G (All LED) w/ Backplate,
Mast-Arm Mounted EA 3
New Item Traffic Signal, New, 12” R,Y,G (All LED), Side of Pole
Mounted EA 2
New Item Traffic Signal, New, 12” R,Y>,FY>,G> (All LED), w/
Backplate, Mast-Arm Mounted EA 3
New Item Traffic Signal, New, 12” R,Y>,FY>,G> (All LED), Side of
Pole Mounted EA 1
New Item Traffic Signal, New, 12” R,Y,G,Y>,G> (All LED), w/
Backplate, Mast-Arm Mounted EA 3
2
New Item Traffic Signal, New, 12” R,Y,G,Y>,G> (All LED), Side of
Pole Mounted EA 2
New Item Traffic Signal, Replacement, 12” R,Y,G,Y>,G> (All LED),
Side of Pole Mounted EA 1
18 Signal Cable, 5c LF Proposed by
contractor
New Item Signal Cable, 7c LF Proposed by
contractor
Thanks,
Andrew Houchin, P.E. (he/him)
Traffic Engineer
P: 515.964.2020 x2644 | C: 515.480.0116
2727 SW Snyder Blvd, Ankeny, IA 50023
Snyder-Associates.com
Change Order Quote
Waukee Signal Enhancement TAP-T-8177(601)--8V-25
Adding right turn signal heads at Hickman & 10th, Hickman & 6th, Hickman & 4th,
Hickman & 2nd, Hickman & Warrior Ln, Hickman & Archer Ave
Thank you!
Item # Description Unit Quantity Amount Total
New TS, New, 12” R,Y,G(All
LED)w/Backplate, Mast-Arm
Mounted
EA 3 $650 $1950
New TS New, 12” R,Y,G (All LED) Side
of Pole Mounted
EA 2 $475 $950
New TS New, 12”, R,Y>FY>,G>(All
LED) w/Backplate, Mast-Arm
Mounted
EA 3 $776 $2328
New TS New, 12” R,Y>,FY>,G>(All
LED), Side of Pole Mounted
EA 1 $523 $523
New TS New, 12” R,Y,G,Y>,G>(All
LED) w/Backplate, Mast Arm
Mounted
EA 3 $850 $2550
New TS New, 12” R,Y,G,Y>,G>(All
LED) Side of Pole Mounted
EA 2 $650 $1300
New TS, Replacement 12”
R,Y,G,Y>,G>(All LED) Side of
pole mounted
EA
1
$650 $650
18 Signal Cable, 5c LF 205 $2 $410
New Signal Cable, 7c LF 875 $2.50 $2187.50
Iowa Signal Inc.
3711 SE Capitol Circle
Grimes, IA 50111
Wayne@iowasignal.com/515-249-5076
Heather@iowasignal.com/515-971-0251
www.swarco.com/mccain
SWARCO McCain, Inc., 2365 Oak Ridge Way, Vista, CA 92081, USA
T.+1 760-727-8100, E. info.us@swarco.com
1/1
Cristina Besaw
General Traffic Controls
2915 11th Ave SW
Spencer IA 51301
Oct.24.2024
Subject: PO 6705/ ORD004570949 Delay
Dear Cristina,
We regret to inform you that we are experiencing a delay with the cabinet units under PO#
6705 /ORD004570949 due to multiple shortages with various material components to the ATC
cabinet and controllers we find the need to adjust the completion timeline of your order.
The new completion to all units under PO 6705/ ORD004570949 is projected to be November
15th 2024. Should any additional delays on this order occur our team will contact you as soon
as possible.
If you should have any questions or need further information, please do not hesitate to contact
me.
Sincerely,
Suzie Gomez
Account Executive
E.sgomez@mccain-inc.com
T.+1-760-734-5091
M.+1-760-908-4006
www.mccain-inc.comwww.