AGENDA ITEM:Consideration of approval of Payment Estimate No. 2 to Iowa Signal,
Inc. for the Traffic Signal Enhancements project in the amount of
$652,850.45.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Iowa Signal, Inc. requested Payment Estimate No. 2
for the work completed on the Traffic Signal Enhancements, Waukee School & Trail Crossing
Improvements project in the amount of $652,850.45. Snyder & Associates has reviewed the
payment estimate and recommends payment.
The partial payment is for the pay period July 1, 2024 to January 30, 2025. This pay estimate is
for the installation of Rectangular Rapid Flashing Beacons (RRFBs) and stored materials.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $652,850.45
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Payment Estimate No. 2
ATTACHMENTS: I. Letter of Recommendation
II. Payment Estimate No. 2
PREPARED BY:Rudy Koester
REVIEWED BY:Sara Kappos SKK
I1H6
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM
v:\projects\2022\122.0627.01\construction\ltr_2025-01-30_payapp02_signalenhancement(tap).docx
January 30, 2025
Rudy Koester, P.E.
Public Works Director
City of Waukee
805 University Ave
Waukee, IA 50263
RE: PARTIAL PAYMENT APPLICATION NO. 2
TRAFFIC SIGNAL ENHANCEMENT
S&A PROJECT NO.: 122.0627.01
IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25
Dear Mr. Koester:
Partial payment application #2 is for installation of the RRFB’s and for stockpiled materials. Per
Iowa DOT’s standard specification 1109.05, payment for stockpiled materials that are stored off-
site should be for 90% of the cost of the materials, not to exceed 80% of the authorized amount for
each bid item. There were not any bid items where 90% of the invoiced amount exceeded 80% of
the authorized amount for that bid item.
Attached is partial payment application #2 for the project. The project utilizes 3% retainage, per
the Iowa DOT’s maximum. We recommend the payment of $652,850.45 to the contractor, Iowa
Signal, Inc. This represents about 67% of the total project cost, less withheld retainage.
Please contact me should you have any questions regarding this partial payment application.
Sincerely,
SNYDER & ASSOCIATES, INC.
Andrew Houchin, P.E.
Project Engineer
Enclosure
PROJECT: Traffic Signal Enhancement SNYDER & ASSOCIATES PROJECT NO.: 122.0627.01
IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25
OWNER: Waukee
CONTRACTOR: Iowa Signal, Inc.
ADDRESS: 3711 SE Capitol Circle, Grimes, IA 50111
DATE: 1/30/2025 PAYMENT PERIOD: 7/1/2024
to 1/30/2025
1. CONTRACT SUMMARY:
Original Contract Amount:917,492.00$ CONTRACT PERIOD: COMPLETION DATE
Contract Completion Date: December 31, 2024
Net Change by Change Order:61,945.50$
Contract Amount to Date:979,437.50$
2. WORK SUMMARY:Extension by Change Order: April 30, 2025
Total Work Performed to Date:675,821.70$
Retainage: 3%$20,274.65
Total Earned Less Retainage:655,547.05$
Less Previous Applications for Payment: 2,696.60$
AMOUNT DUE THIS APPLICATION:652,850.45$
3. CONTRACTOR'S CERTIFICATION:
The undersigned CONTRACTOR certifies that:
(1) all previous progress payments received from OWNER on account of Work done under the contract referred to above have been
applied to discharge in full all obligations of CONTRACTOR incurred in connection with the Work covered by prior Applications for
Payment; and
(2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by the application for Payment are free
and clear of all liens, claims, security interests, and encumbrances
Iowa Signal, Inc.
CONTRACTOR
By DATE:
4. ENGINEER'S APPROVAL:
Payment of the above AMOUNT DUE THIS APPLICATION is recommended:
Snyder & Associates, Inc.
ENGINEER
By DATE:
5. OWNER'S APPROVAL
OWNER
By DATE:
APPLICATION FOR PARTIAL PAYMENT NO. 2
V:\Projects\2022\122.0627.01\Construction\PayApp02_2025-01-30_SignalEnhancement(TAP).xlsx
1/30/25
6. DETAILED ESTIMATE OF WORK COMPLETED:
APPLICATION FOR PARTIAL PAYMENT NO. 2
ITEM TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0010 0.5 0.5 1.0 LS 2,700.00$ 1,350.00$ 1,350.00$ -$ -$ 2,700.00$ 0 -$ 0 -$ 0.00%
0020 0.5 0.5 1.0 LS 27,800.00$ 13,900.00$ 13,900.00$ -$ -$ 27,800.00$ 0.05 0.05 0.1 2,780.00$ 0 -$ 10.00%
0030 1 1 LS 2,145.00$ -$ -$ -$ 2,145.00$ 2,145.00$ 0 -$ 0 -$ 0.00%
0040 24 24 EA 1,634.00$ -$ 39,216.00$ -$ -$ 39,216.00$ 0 -$ $28,695.60 N/A 28,695.60$ 73.17%
0050 8 8 EA 6,783.00$ -$ 54,264.00$ -$ -$ 54,264.00$ 0 -$ 8 8 54,264.00$ 100.00%
0060 2 5 7 EA 4,412.00$ 8,824.00$ 22,060.00$ -$ -$ 30,884.00$ 0 -$ $2,459.06 $6,147.64 N/A 8,606.70$ 27.87%
0070 4 7 11 EA 50,405.00$ -$ 201,620.00$ 352,835.00$ -$ 554,455.00$ 0 -$ $0.00 $146,448.00 $256,284.00 $0.00 N/A 402,732.00$ 72.64%
0080 2 8 4 14 EA 370.00$ 740.00$ 2,960.00$ 1,480.00$ -$ 5,180.00$ 0 -$ $270.00 $1,080.00 $540.00 N/A 1,890.00$ 36.49%
0090 11 24 35 EA 370.00$ -$ -$ 4,070.00$ 8,880.00$ 12,950.00$ 0 -$ $1,485.00 $3,240.00 N/A 4,725.00$ 36.49%
0100 4 6 10 EA 402.00$ 1,608.00$ 2,412.00$ -$ -$ 4,020.00$ 0 -$ $529.20 $793.80 N/A 1,323.00$ 32.91%
0110 2 2 EA 850.00$ 1,700.00$ -$ -$ -$ 1,700.00$ 0 -$ $1,135.80 N/A 1,135.80$ 66.81%
0120 2 2 EA 550.00$ 1,100.00$ -$ -$ -$ 1,100.00$ 0 -$ 0 -$ 0.00%
0130 18 18 EA 437.00$ -$ 7,866.00$ -$ -$ 7,866.00$ 0 -$ $5,751.00 N/A 5,751.00$ 73.11%
0140 7 22 13 42 EA 776.00$ -$ 5,432.00$ 17,072.00$ 10,088.00$ 32,592.00$ 0 -$ $3,975.30 $12,493.80 $7,382.70 N/A 23,851.80$ 73.18%
0150 10 5 15 EA 523.00$ 5,230.00$ 2,615.00$ -$ -$ 7,845.00$ 0 -$ $3,834.00 $1,917.00 N/A 5,751.00$ 73.31%
0160 8 17 25 EA 751.00$ 6,008.00$ 12,767.00$ -$ -$ 18,775.00$ 0 -$ $4,399.20 $9,348.30 N/A 13,747.50$ 73.22%
0170 10 10 EA 10,800.00$ -$ -$ -$ 108,000.00$ 108,000.00$ 0 -$ $79,200.00 N/A 79,200.00$ 73.33%
0180 300 2,700 3000 LF 2.00$ 600.00$ 5,400.00$ -$ -$ 6,000.00$ 0 -$ 0 -$ 0.00%
Highlighted = Payment for stored materials
TAP+USTEP TAP Only USTEP Only City OVERALL PERCENT COMPLETE = 69.15%
ORIGINAL CONTRACT = 41,060.00$ 371,862.00$ 375,457.00$ 129,113.00$ 917,492.00$
PREVIOUS PAY APPS = 1,390.00$ 1,390.00$ -$ -$ 2,780.00$
CURRENT PAY APP = 12,627.26$ 258,420.64$ 270,802.80$ 89,822.70$ 631,673.40$
Traffic Signal, Replacement/Modification, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted
Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G>
(All LED), Side of Pole Mounted
Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G>
(All LED) w/ Backplate, Mast-Arm Mounted
Uninterruptible Power Supply
Signal Cable, 5c
DIV 1 DIV 2 TOTAL
Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted
Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted
Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/
Backplate, Mast-Arm Mounted
Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate,
Mast-Arm Mounted
Traffic Signal, Replacement, 16" Pedestrian Head,
Hand/Person, Countdown
Accessible Pedestrian Signal Push Button and Sign
Rectangular Rapid Flashing Beacon Assembly, per Post
Signal Cabinet Modification
Signal Cabinet Replacement
Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted
DESCRIPTION
Traffic Control
Mobilization
Railroad Protective Liability Insurance for Union Pacific
Railroad Co.
CURRENT PAY APP
Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 Div 1 Div 2
PREVIOUS PAY APPS
UNIT UNIT COST
CONTRACT ITEMS
V:\Projects\2022\122.0627.01\Construction\PayApp02_2025-01-30_SignalEnhancement(TAP).xlsx
CHANGE ORDER SUMMARY:
ITEM CO TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. DESCRIPTION # USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0060 Signal Cabinet Modification 1 -1 -1 EA 4,412.00$ -$ (4,412.00)$ -$ -$ (4,412.00)$ 0 -$ -1 -1 (4,412.00)$ 100.00%
0070 Signal Cabinet Replacement 1 1 1 EA 50,405.00$ -$ 50,405.00$ -$ -$ 50,405.00$ 0 -$ $35,829.00 N/A 35,829.00$ 71.08%
0140
Traffic Signal, Replacement/Modifcation, 12"
<R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm
Mounted
1 4 4 EA 776.00$ -$ -$ -$ 3,104.00$ 3,104.00$ 0 -$ $2,271.60 N/A 2,271.60$ 73.18%
0180 Signal Cable 5c 2 205 205 EA 2.00$ -$ -$ -$ 410.00$ 410.00$ 0 -$ 0 -$ 0.00%
8001 Signal Cable 7c 2 875 875 EA 2.50$ -$ -$ -$ 2,187.50$ 2,187.50$ 0 -$ 0 -$ 0.00%
8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate,
Mast-Arm Mounted 2 3 3 EA 650.00$ -$ -$ -$ 1,950.00$ 1,950.00$ 0 -$ $1,436.40 N/A 1,436.40$ 73.66%
8003 Traffic Signal, New, 12" R,Y,G (All LED), Side of Pole
Mounted 2 2 2 EA 475.00$ -$ -$ -$ 950.00$ 950.00$ 0 -$ $655.20 N/A 655.20$ 68.97%
8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 776.00$ -$ -$ -$ 2,328.00$ 2,328.00$ 0 -$ $1,692.90 N/A 1,692.90$ 72.72%
8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED), Side of
Pole Mounted 2 1 1 EA 523.00$ -$ -$ -$ 523.00$ 523.00$ 0 -$ $404.10 N/A 404.10$ 77.27%
8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 850.00$ -$ -$ -$ 2,550.00$ 2,550.00$ 0 -$ $2,006.10 N/A 2,006.10$ 78.67%
8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED), Side of
Pole Mounted 2 2 2 EA 650.00$ -$ -$ -$ 1,300.00$ 1,300.00$ 0 -$ $990.00 N/A 990.00$ 76.15%
8008 Traffic Signal, Replacement, 12" R,Y,G,Y>,G> (All
LED), Side of Pole Mounted 2 1 1 EA 650.00$ -$ -$ -$ 650.00$ 650.00$ 0 -$ $495.00 N/A 495.00$ 76.15%
Highlighted = Payment for stored materials
TAP+USTEP TAP Only USTEP Only City
TOTAL CHANGE ORDERS = -$ 45,993.00$ -$ 15,952.50$ 61,945.50$
PREVIOUS PAY APPS = -$ -$ -$ -$ -$
CURRENT PAY APP = -$ 31,417.00$ -$ 9,951.30$ 41,368.30$
TAP+USTEP TAP Only USTEP Only City
TOTAL CONTRACT & CHANGE ORDERS 41,060.00$ 417,855.00$ 375,457.00$ 145,065.50$ 979,437.50$
PREVIOUS PAY APPS TOTAL CONTRACT & CHANGE ORDERS 1,390.00$ 1,390.00$ -$ -$ 2,780.00$
CURRENT PAY APP TOTAL CONTRACT & CHANGE ORDERS 12,627.26$ 289,837.64$ 270,802.80$ 99,774.00$ 673,041.70$
(Current less 3% retainage for Claim Forms) 12,248.44$ 281,142.51$ 262,678.72$ 96,780.78$ 652,850.45$
DIV 1 DIV 2 TOTAL
Div 1 Div 2
DIV 1 DIV 2 TOTAL
Div 1 Div 2
CURRENT PAY APPPREVIOUS PAY APPS
Div 1 Div 2 Div 1 Div 2
UNIT UNIT COST
V:\Projects\2022\122.0627.01\Construction\PayApp02_2025-01-30_SignalEnhancement(TAP).xlsx
Summary of Stored Materials
Vendor Invoice Item Description Bid Item Bid Item Description
TAP+
USTEP TAP Only USTEP Only City
TAP+
USTEP TAP Only USTEP Only City
TAP+
USTEP TAP Only USTEP Only City
TAP+
USTEP TAP Only USTEP Only City
General Traffic Controls Signal Cabinet Replacement. No Controller 0070 Signal Cabinet Replacement $159,240.00 $278,670.00 $39,810.00 $143,316.00 $250,803.00 $35,829.00
General Traffic Controls Uniterruptable Power Supply 0170 Uniterruptable Power Supply $88,000.00 $79,200.00
Traffic Control Corporation 2B+ Module 0070 Signal Cabinet Replacement $3,480.00 $6,090.00 $3,132.00 $5,481.00
Mobotrex Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted 0080 Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted $300.00 $1,200.00 $600.00 $270.00 $1,080.00 $540.00
Mobotrex Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted 0090 Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted $1,650.00 $3,600.00 $1,485.00 $3,240.00
Mobotrex Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted 0100 Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted $588.00 $882.00 $529.20 $793.80
Mobotrex Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate,
Mast-Arm Mounted 0110 Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate,
Mast-Arm Mounted $1,262.00 $1,135.80
Mobotrex Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted 0140 Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted $4,417.00 $13,882.00 $8,203.00 $3,975.30 $12,493.80 $7,382.70
Mobotrex Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED), Side of Pole Mounted 0150 Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All
LED), Side of Pole Mounted $4,260.00 $2,130.00 $3,834.00 $1,917.00
Mobotrex Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted 0160 Traffic Signal, Replacement/Modifcation, 12" R,Y>,FY>,G> (All
LED) w/ Backplate, Mast-Arm Mounted $4,888.00 $10,387.00 $4,399.20 $9,348.30
Mobotrex Accessible Pedestrian Signal Push Button and Sign 0040 Accessible Pedestrian Signal Push Button and Sign $31,884.00 $28,695.60
Mobotrex Signal Cabinet Modification 0060 Signal Cabinet Modification $2,732.29 $6,830.71 $2,459.06 $6,147.64
Mobotrex Traffic Signal, Replacement, 16" Pedestrian Head,
Hand/Person, Countdown 0130 Traffic Signal, Replacement, 16" Pedestrian Head,
Hand/Person, Countdown $6,390.00 $5,751.00
Mobotrex Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted 0140 Traffic Signal, Replacement/Modifcation, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted $2,524.00 $2,271.60
Mobotrex Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-
Arm Mounted 8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate, Mast-
Arm Mounted $1,596.00 $1,436.40
Mobotrex Traffic Signal, New, 12" R,Y,G (All LED), Side of Pole Mounted 8003 Traffic Signal, New, 12" R,Y,G (All LED), Side of Pole Mounted $728.00 $655.20
Mobotrex Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate,
Mast-Arm Mounted 8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/ Backplate,
Mast-Arm Mounted $1,881.00 $1,692.90
Mobotrex Traffic Signal, New, 12" R,Y>,FY>,G> (All LED), Side of Pole
Mounted 8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED), Side of Pole
Mounted $449.00 $404.10
Mobotrex Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate,
Mast-Arm Mounted 8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/ Backplate,
Mast-Arm Mounted $2,229.00 $2,006.10
Mobotrex Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) , Side of Pole
Mounted 8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) , Side of Pole
Mounted $1,100.00 $990.00
Mobotrex Traffic Signal, Replacement, 12" R,Y,G,Y>,G> (All LED) , Side
of Pole Mounted 8008 Traffic Signal, Replacement, 12" R,Y,G,Y>,G> (All LED) , Side
of Pole Mounted $550.00 $495.00
Original Contract Change Order
Invoice Amount 90% of Invoice Amount
Original Contract Change Order
V:\Projects\2022\122.0627.01\Construction\PayApp02_2025-01-30_SignalEnhancement(TAP)_StoredMatsSummary.xlsm