Loading...
HomeMy WebLinkAbout2025-03-17 I01H_05 University Ave Area Improvements Phase 1_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 17, 2025 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 1 to Elder Corporation for the University Avenue Area Improvements Phase 1 Project, increasing the contract in the amount of $3,450.20. FORMAT:Consent SYNOPSIS INCLUDING PRO & CON: Change Order No.1 is for modifications to the storm sewer network and driveway curb and gutter along the west side of the Public Works driveway to capture additional runoff from the site. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $3,450.20. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Change Order No.1 ATTACHMENTS: I. Change Order No.1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1H5 S-H Project No.: 4203290 March 10, 2025 Rudy Koester, Public Works Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #1 – Review and Recommendation to Approve University Avenue Area Improvements - Phase 1 Dear Mr. Koester: Please find attached Change Order #1 for the University Avenue Area Improvements - Phase 1 project. The change order includes the following items: • Storm Sewer Structures and Pipe • Driveway Pavement Removal and Replacement The proposed storm sewer network along the west sid e of the Public Works west driveway is being modified to better accommodate the elevation of an existing pipe being connected to the new syste m and to capture additional runoff from the site. The driveway curb and gutter removal and replacement is expanded slightly to fit the new storm sewer structure location. We have reviewed the change order items and unit prices, and both are in line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $3,450.20 to the construction contract for the University Avenue Area Improvements - Phase 1 with Elder Corporation of Des Moines, IA. Sincerely, SHIVE-HATTERY, INC. Blake T. Peterson, PE Civil Engineer Enc. Change Order #1 CITY OF WAUKEE 230 W HICKMAN ROAD WAUKEE, IOWA 50263 Contractor: 5088 E. University Avenue Des Moines, IA 50327 $10,068,807.00 1/20/2025 20 LF $ 76.00 5.00 $ 380.00 21 LF $ 96.00 2.00 $ 192.00 60 EA $ 8,275.00 1.00 $ 8,275.00 64 EA $ 10,900.00 -1.00 $ (10,900.00) 73 SY $ 75.70 8.00 $ 605.60 79 SY $ 12.20 8.00 $ 97.60 CO-1.1 EA $ 4,800.00 1.00 $ 4,800.00 $ 3,450.20 $10,068,807.00 $0.00 $10,068,807.00 $3,450.20 $10,072,257.20 0.03% 0 Days 0 Days November 21, 2025 May 31, 2026 Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Inc. Signature: Name: Title: Title: Date: University Avenue Area Improvements - Phase 1 4203290 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description MANHOLE, SW-401, 48 IN. THE CONTRACT IS CHANGED AS FOLLOWS: Items 20, 21, 60, 64, 73, and 79 are modified and Item CO-1.1 is added to align contract quantities with the storm sewer network design as revised by Plan Change 1. Plan Change 1 revises the storm sewer network along the west edge of the Public Works west driveway to better accommodate the elevation of an existing pipe being connected to the new system and to capture additional runoff from the site. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Contractor: Elder Corporation Elder Corporation Signature: Name: REMOVAL OF DRIVEWAY The Landscaping/Site Restoration/Final Completion Contract Time will be changed by STORM SEWER, TRENCHED, RCP, 24 IN. INTAKE, SW-516 INTAKE, SW-506 The Grading/Structure/Utility/Paving Contract Time will be changed by The date of Grading/Structure/Utility/Paving Completion as of the date of this Change Order therefore is PAVEMENT, PCC, 8 IN. CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Landscaping/Site Restoration/Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 1 TOTAL The Original Contract Sum was Unit March 10, 2025 STORM SEWER, TRENCHED, RCP, 18 IN. P:\Projects\DM\4203290\Construction\_University Avenue Phase 1\CASupport\Change Orders\01\ChangeOrder01_UniversityAvenuePhase1.xlsx 1 of 1 Nick Tometich Project Manager Blake Peterson, PE Project Engineer Brad Deets City Administrator Date: 2025.03.11 14:16:04-05'00' 03/12/2025