Loading...
HomeMy WebLinkAbout2025-03-17 I07 Civic Master Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 17, 2025 AGENDA ITEM: Consideration of approval of a resolution approving resolution approving City of Waukee Civic Master Plan FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The City of Waukee began acquiring property that is included as part of the proposed Waukee Civic Master Plan in 2018. The intent of the land acquisition was to develop future civic spaces and buildings for our growing community. In January 2024, the City, in collaboration with SVPA Architects and Confluence began the process to develop a vision and master plan for the property, which is approximately 220-acres in area. To begin the process, staff and city councilmembers along with the entire Confluence team participated in a design charette to generate ideas, themes, and concepts for the property. The results from the design charette produced many of the themes and concepts reflected in the proposed plan. In addition to the design charette, staff and city councilmembers along with the consultant team took trips to the Minneapolis/St. Paul and Kansas City metro areas to tour precedent projects, generate ideas and concepts for the plan, and to see real examples of how to execute a plan that creates a place that is vibrant and active. Over the course of the planning process several concepts were developed and reviewed by the design team and City staff. The final concept for the Civic Master Plan was completed in January 2025 and is a refinement of all previous concepts. The proposed plan includes areas for civic spaces (buildings, park areas, recreation areas), expansion of Sugar Creek Golf Course to an 18-hole course, a diversity of residential uses, mixed use, commercial uses, the realignment of 6th Street, an extension of 10th Street, and additions to the trail network. The size of the property allows the City to have ample space to develop civic buildings and parks/recreation spaces needed in the future. The inclusion of residential, commercial, and mixed-use areas in the plan provides the opportunity to help create a vibrant and active district while also providing a funding source to construct future civic improvements within the area through the sale of property for private development. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the Waukee Civic Master Plan at their meeting on February 25, 2025, and recommended approval: Approval of the Waukee Civic Master Plan Andy Kass, Community Development Director, introduced the request for approval of the Waukee Civic Master Plan. Roger Silver, of Confluence, was introduced and gave a presentation on the project. I7 The City of Waukee began acquiring property as part of the proposed Waukee Civic Master Plan in 2018. The intent was to develop future civic spaces and buildings for our growing community. In January 2024, in collaboration with SVPA Architects and Confluence, began the process to develop a master plan for the property, which is approximately 220-acres in area. The final concept was completed in January 2025 and is a refinement of all previous concepts. The proposed plan incudes areas for civic spaces (buildings, park areas, recreation areas), expansion of Sugar Creek Golf Course to an 18-hole course, a diversity of residential uses, mixed use, commercial uses, realignment of 6th Street, an extension of 10th Street, and additions to the trail network. The inclusion of residential, commercial, and mixed-use areas in the plan provides the opportunity to help create a vibrant and active district while also providing a funding source to construct future civic improvements within the area through the sale of property for private development. The plan includes narratives for each area of the property, architectural theming for future civic buildings, and a proposed phasing plan and timeline. Initial phases of improvements will largely focus on infrastructure improvements, such as the construction of 10th Street, stormwater detention, and University Avenue improvements. Civic building construction, park improvements and the expansion of Sugar Creek Golf Course will occur as funding becomes available over the next several years. The proposed plan addresses the space needs of the city and sets the stage for a unique area that will be the geographic center of our community in the future. Staff recommends approval of the Waukee Civic Master Plan. Discussion as follows: • General discussion of street realignment • Discussion of acquiring properties that are shown within the overall plan but not yet owned by the city • General overview of the timeline and project phases Motion by Commissioner Beenken for the approval of the Waukee Civic Master Plan, seconded by Commissioner Broderick. Ayes: Broderick, Streit, Bankole, Beenken, Lohse, and Tuel. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff would recommend approval of the resolution. RECOMMENDATION: Approve the resolution ATTACHMENTS: I. Proposed Resolution II. Planning & Zoning Commission Memo II. Waukee Civic Master Plan PREPARED BY: Andy Kass, Community Development Director REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING AND ADOPTING THE CITY OF WAUKEE OF CIVIC MASTER PLAN IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City’s current Comprehensive Plan was adopted in order to provide valuable guidance and vision to the City in planning for future growth and development and included area specific for development of a civic campus (Resolution #19-103); AND, WHEREAS, the City of Waukee has acquired property for development of a future civic campus area; AND, WHEREAS, the unprecedented growth that Waukee has experienced in recent years in regards to increases in City staff and the population of the community have made it necessary to proactively plan for a future civic campus; AND, WHEREAS, the final draft of the City of Waukee Civic Master Plan was approved by the Planning and Zoning Commission on February 25, 2025; AND, NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 17th day of March 2025 that it hereby approves and adopts the City of Waukee Civic Master Plan. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair M emo Waukee City Hall 230 Highway 6 Waukee IA 50263 Office: (515) 987-4522 Cell: (515) 705-8231 Facsimile: (515) 987-1845 To: Planning and Zoning Commissioners From: Andy Kass, AICP – Community Development Director Date: February 21, 2025 Re: Waukee Civic Master Plan Attach: Waukee Civic Master Plan Booklet BACKGROUND The City of Waukee began acquiring property that is included as part of the proposed Waukee Civic Master Plan in 2018. The intent of the land acquisition was to develop future civic spaces and buildings for our growing community. In January 2024, the City, in collaboration with SVPA Architects and Confluence began the process to develop a vision and master plan for the property, which is approximately 220-acres in area. To begin the process, staff members along with the entire Confluence team participated in a design charette to generate ideas, themes, and concepts for the property. The results from the design charette produced many of the themes and concepts reflected in the proposed plan. In addition to the design charette, staff along with members of the consultant team took trips to the Minneapolis/St. Paul and Kansas City metro areas to tour precedent projects, generate ideas and concepts for the plan, and to see real examples of how to execute a plan that creates a place that is vibrant and active. Over the course of the planning process several concepts were developed and reviewed by the design team and City staff. The final concept for the Civic Master Plan was completed in January 2025 and is a refinement of all previous concepts. The proposed plan includes areas for civic spaces (buildings, park areas, recreation areas), expansion of Sugar Creek Golf Course to an 18-hole course, a diversity of residential uses, mixed use, commercial uses, the realignment of 6th Street, an extension of 10th Street, and additions to the trail network. The size of the property allows the City to have ample space to develop civic buildings and parks/recreation spaces needed in the future. The inclusion of residential, commercial, and mixed-use areas in the plan provides the opportunity to help create a vibrant and active district while also providing a funding source to construct future civic improvements within the area through the sale of property for private development. The plan includes narratives for each area of the property, architectural theming for future civic buildings, and a proposed phasing plan and timeline. Initial phases of improvements to the property will largely focus on infrastructure improvements such as construction of 10th Street, stormwater detention, and University Avenue improvements. Civic building construction, park improvements, and the expansion of Sugar Creek Golf Course will occur as funding becomes available to construct such projects over the next several years. STAFF RECOMMENDATION The proposed plan addresses the space needs of the City and sets the stage for a unique area that will be the geographic center of our community into the future. Staff would recommend approval of the Waukee Civic Master Plan. An innovative, sustainable vision for Waukee’s new Civic Campus, creating a vibrant and diverse center for the entire community. CIVIC MASTER PLAN DATE CREATEDJanuary 22, 2025 WAUKEE, IA REPORT BOOKLET 32WAUKEE CIVIC MASTER PLAN STEERING COMMITTEE »Brad Deets / City Administrator »Nick Osborne / Assistant City Administrator »Andy Kass/ Community Development Director »Rudy Koester/ Public Works Director, City Engineer »Matt Jermier / Parks & Recreation Director CITY COUNCIL MEMBERS »Courtney Clarke / Mayor »Ben Sinclair / Council Member »Chris Crone / Council Member »Rob Grove / Council Member »Charlie Bottenberg / Council Member »Anna Bergman Pierce / Council Member CONSULTANT TEAM ACKNOWLEDGMENTS The City of Waukee would like to sincerely thank all individuals, organizations, and teams who assisted in drafting the Waukee Civic Master Plan. Your expertise, commitment, and collaboration have been instrumental in shaping this comprehensive vision. Special appreciation goes to the City of Waukee staff and leadership for their guidance and support throughout the process. Your dedication has ensured that this plan reflects the highest standards of excellence and serves as a roadmap for the future development of our community. Thank you for your hard work and contributions to this important project. COLLABORATING FIRMS: INDEX TABLE OF CONTENTS PROJECT UNDERSTANDING PHASING & IMPLEMENTATION APPENDIXES 1 MASTER PLANNING2 3 IMPLEMENTATION & BENCHMARKING4 5 1-1 Executive Summary 6 2-1 Concept Development Process 28 3-1 Phasing Sequence & Diagrams 68 4-1 Comprehensive Plan Analysis 82 5-1 Kansas Trip Booklet 88 1-2 Study Area Overview 7 2-2 Final Concept Narrative 38 3-2 Architectural Theming 72 5-2 Minneapolis City Trip Booklet 144 1-3 Initial Programming 9 1-4 Site Analysis 10 2-3 Final Concept Diagrams 40 3-3 Architectural Benchmarking 75 4-2 Financial Analysis 84 5-3 Charette Concepts & Sketches (By Group) 172 1-5 Precedent Project 14 2-4 Detailed Enlargement Areas 44 3-4 Sustainability Theming 76 1-6 Design Charette Summary & Stakeholder Interviews 20 1-7 Trip Summaries (Minneapolis & Kansas City) 24 SECTION ONE / P ROJECT UNDERSTANDING 1-1 /EXECUTIVE SUMMARY 1-2 / STUDY AREA OVERVIEW 1-3 / INITIAL PROGRAMMING 1-4 / SITE ANALYSIS 1-5 / PRECEDENT PROJECTS 1-6 / DESIGN CHARETTE SUMMARY & STAKEHOLDER INTERVIEWS 1-7 / TRIP SUMMARIES (MINNEAPOLIS & KANSAS CITY) 6 7 9 10 14 20 24 1 76WAUKEE CIVIC MASTER PLAN PROJECT SUMMARY This plan outlines strategic growth, enhanced public spaces, and development guidelines to support Waukee’s long-term goals for vibrant, resilient, and inclusive urban spaces Location: Waukee, IA Study Area: 216 Acres Area+Golf:360 Acres Start Date: January 1, 2024 Contact : City of Waukee Development Services (515) 978-9533 EXECUTIVE SUMMARY PLAN OVERVIEW & PURPOSE The Waukee Civic Master Plan serves as a strategic framework to guide the development and enhancement of Waukee’s civic core. Positioned at a critical juncture of growth within the Des Moines metropolitan region, Waukee is experiencing rapid expansion in both population and infrastructure. This Master Plan aims to align the city’s vision with actionable steps that foster community engagement, sustainable growth, and long-term civic vitality. It provides a roadmap for creating vibrant public spaces, while respecting the city’s character and heritage. The purpose of the Master Plan is to address Waukee’s evolving needs while maintaining a balanced approach to development. The Plan prioritizes efficient land use, infrastructure investments, and thoughtful integration of cultural, recreational, and administrative functions. By consolidating these elements, the city seeks to create a cohesive and dynamic civic hub that meets the demands of current and future residents. KEY OBJECTIVES Establish a Civic Identity Create a centralized, recognizable civic district that reflects the community’s values and aspirations. This includes integrating key municipal buildings, public spaces, and landmarks to strengthen Waukee’s identity. Enhance Accessibility and Connectivity Improve pedestrian, bicycle, and vehicular access throughout the civic district, connecting it seamlessly to adjacent neighborhoods and regional infrastructure. Support Community Engagement Develop spaces that encourage public participation, cultural activities, and social interaction, fostering a sense of belonging and pride within the community. CONCLUSION The Waukee Civic Master Plan is a proactive response to the city’s rapid growth and increasing demand for civic services and amenities. By addressing immediate needs while anticipating future challenges, the Plan ensures that Waukee remains a thriving and cohesive community. This document serves as a blueprint for the city’s vision, fostering a legacy of collaboration, innovation, and excellence for generations to come. STUDY AREA OVERVIEW OVERALL RELATIONSHIP TO REGION At a regional scale, the site is located within the Des Moines metropolitan area, west of Des Moines and near cities like Urbandale, Clive, and West Des Moines. Its strategic position along key transportation routes, including Interstate 80 and Hickman Road, provides excellent regional connectivity and access to economic and cultural hubs. Waukee’s role as a rapidly growing suburban community within this dynamic region makes the site a critical anchor for future development, aligning with broader metropolitan growth trends. The site’s accessibility positions it as an ideal location for fostering connections between Waukee and neighboring communities while supporting regional mobility and economic activity. Within Waukee, the site lies on the city’s southern edge, adjacent to residential neighborhoods and expanding commercial areas. It serves as a transition between urbanized zones and the open, agricultural landscapes to the west and south, making it a gateway for balanced growth. Surrounded by parks, and green spaces, the site offers an opportunity to create a vibrant civic hub that integrates recreational, cultural, and community-focused functions. FIGURE 1.2 / STUDY AREA IN RELATION TO REGION FIGURE 1.3 / STUDY AREA IN RELATION TO WAUKEE CITY LIMITS SECTION 1 98WAUKEE CIVIC MASTER PLAN STUDY AREA OVERVIEW RELATIONSHIP TO WAUKEE 2040 COMPREHENSIVE PLAN PREFERRED LAND USE MAP The highlighted project area, as depicted in the Waukee 2040 Comprehensive Plan Preferred Land Use Map, is predominantly designated for Park (green) and Open Space (light green). This area prioritizes the preservation of natural features and recreational amenities, creating opportunities for community engagement, outdoor activities, and ecological conservation. Its integration into the city’s urban fabric supports the vision of a livable and sustainable community, offering accessible green spaces that enhance the quality of life for residents. Additionally, its proximity to Medium Density Residential areas ensures that the parks and open spaces serve as essential amenities for nearby neighborhoods, fostering a harmonious balance between development and natural preservation. KEY DISTRICTS IN WAUKEE “Civic Campus (A Mixed Use Town Center)” The project area was highlighted as a pivotal element in the Imagine Waukee 2040 Plan, designated as the “Civic Campus,” envisioned to serve as a vibrant, mixed-use town center and community hub. Two major conceptual alternatives have been proposed for its development. Both alternatives aim to provide a central location for municipal, cultural, and recreational facilities, ensuring a well- integrated space for the community. Predicted uses include a City Hall, library, performing or arts center, aquatic center, ice skating arena, field house, adult softball complex, FIGURE 1.5 / CIVIC CAMPUS ALTERNATIVE A FIGURE 1.6 / CIVIC CAMPUS ALTERNATIVE B INITIAL PROGRAMMING 3-34 Waukee Comprehensive Plan | 2040 Civic Campus (A Mixed Use Town Center) The idea of creating a Civic Campus in the heart of Waukee, near the intersection of University Avenue and Ute Avenue, achieves the following objectives: »It creates a central gathering place / destination for the entire community, serving all of Waukee at full build-out »It provides a central location for various municipal, cultural and athletic facilities Waukee 2040 Comprehensive Plan Concept Development Jan, 2018Waukee 2040 Comprehensive Plan Concept Development Sept, 2017 300’ 600’ 900’1500’N SCALE 1:300 Wauke e P k w y . Ne w C o u n t y R d E x t e n s i o n U A v e n u e Ut e A v e SE L A G r a n t P k w y . Wa r r i o r L n SE University Ave ExtensionSE University Ave 310th St To DowntownWaukee Public Works Waukee Cemetery WarriorParkWaukee Schools Bus Maint. Fac.Greenway Connecti o n Expanded Sugar Creek Golf Course Civic Campus Future Expansion Field House& Ice Arena Parkway Extension Office / Service Office / Service Adult Softball Complex Optional Future Expansion ALTERNATIVE A Sug a r C r e e k Sug a r C r e e k Recreational Center Waukee 2040 Comprehensive Plan Concept Development Jan, 2018Waukee 2040 Comprehensive Plan Concept Development Sept, 2017 300’ 600’ 900’1500’N SCALE 1:300 Sug a r C r e e k Waukee P k w y . Ne w C o u n t y R d E x t e n s i o n U A v e n u e Ut e A v e SE L A G r a n t P k w y . SE University Ave ExtensionSE University Ave 310th St To DowntownWaukee Modify Collector Road Alignment to West Warr i o r L n Public Works Waukee Cemetery WarriorParkWaukee Schools Bus Maint. Fac.Greenway Connecti o n Expanded Sugar Creek Golf Course Expanded Sugar Creek Golf Course Field House Recreational Center Parkway Extension ALTERNATIVE B Civic Campus Adult Softball Complex Future Expansion Optional Future Expansion Sug a r C r e e k 3-34 Waukee Comprehensive Plan | 2040 Civic Campus (A Mixed Use Town Center) The idea of creating a Civic Campus in the heart of Waukee, near the intersection of University Avenue and Ute Avenue, achieves the following objectives: »It creates a central gathering place / destination for the entire community, serving all of Waukee at full build-out »It provides a central location for various municipal, cultural and athletic facilities Waukee 2040 Comprehensive Plan Concept Development Jan, 2018Waukee 2040 Comprehensive Plan Concept Development Sept, 2017 300’ 600’ 900’1500’N SCALE 1:300 Wauke e P k w y . Ne w C o u n t y R d E x t e n s i o n U A v e n u e Ut e A v e SE L A G r a n t P k w y . Wa r r i o r L n SE University Ave ExtensionSE University Ave 310th St To DowntownWaukee Public Works Waukee Cemetery WarriorParkWaukee Schools Bus Maint. Fac.Greenwa y Connecti o n Expanded Sugar Creek Golf Course Civic Campus Future Expansion Field House& Ice Arena Parkway Extension Office / Service Office / Service Adult Softball Complex Optional Future Expansion ALTERNATIVE A Sug a r C r e e k Sug a r C r e e k Recreational Center Waukee 2040 Comprehensive Plan Concept Development Jan, 2018Waukee 2040 Comprehensive Plan Concept Development Sept, 2017 300’ 600’ 900’1500’N SCALE 1:300 Sug a r C r e e k Waukee P k w y . Ne w C o u n t y R d E x t e n s i o n U A v e n u e Ut e A v e SE L A G r a n t P k w y . SE University Ave ExtensionSE University Ave 310th St To DowntownWaukee Modify Collector Road Alignment to West Warr i o r L n Public Works Waukee Cemetery WarriorParkWaukee Schools Bus Maint. Fac.Greenway Connecti o n Expanded Sugar Creek Golf Course Expanded Sugar Creek Golf Course Field House Recreational Center Parkway Extension ALTERNATIVE B Civic Campus Adult Softball Complex Future Expansion Optional Future Expansion Sug a r C r e e k FIGURE 1.4 / 2040 LAND USE PLAN, WAUKEE COMPREHENSIVE PLAN and the potential addition of a soccer complex. The Civic Campus is also expected to expand the Sugar Creek Golf Course and integrate parks, trails, and open spaces to create a central destination for events and activities. It is intended to be the heart of the Sugar Creek area, supporting various office and service uses while connecting neighborhoods and enhancing community life. SECTION 1 Waukee Civic Master Plan booklet provides a comprehensive and visually engaging overview of the planning and design process for Waukee’s new civic area. The planning process engaged with property owners, developers, and city stakeholders to shape a vision that aligns with the city’s goals for sustainable growth, community integration, and aesthetic continuity. VISIONING AND CONCEPTUAL PLANNING The Waukee Civic Master Plan was shaped through a collaborative visioning and conceptual planning process. This phase focused on aligning community goals with a framework for civic growth, emphasizing a vibrant, inclusive, and functional urban environment. Conceptual plans outlined ideas for land use, connectivity, public spaces, and infrastructure. The visioning process included a charrette and stakeholder interviews. During the charrette, stakeholders and landscape architects presented, discussed, and refined various concepts. Alongside this, interviews with stakeholders provided additional insights to ensure the selected design reflected their aspirations and aligned with future growth priorities. This phase established a cohesive strategy integrating residential, commercial, and public realms, prioritizing flexibility, accessibility, and cultural vibrancy to enhance community interaction and quality of life. PROGRAM REQUIREMENTS Program requirements, based on visioning outcomes, guide the Master Plan’s implementation. These include provisions for single-family and multi-family housing to address diverse residential needs, flexible open spaces to support future recreational uses, and expansion of the golf course and an associated hotel to boost local tourism and economic growth. The plan emphasizes creating multi-functional civic spaces and integrating mixed-use developments to foster dynamic and sustainable growth. Connectivity enhancements, including pedestrian and bike-friendly networks, are prioritized to link residential, commercial, and recreational areas effectively. The program underscores the importance of balancing development with natural features, ensuring that new projects align with Waukee’s character and growth objectives. By focusing on adaptability, the Master Plan provides a framework for meeting current demands while preparing for future opportunities. In summary, the program requirements outline a strategic path to achieving a cohesive and resilient civic environment that supports vibrant community life and sustainable development. LAND USES »Balance residential, commercial, recreational, and civic uses. »Encourage mixed-use developments near key civic and recreational areas. »Integrate parks and open spaces into planning to enhance community interaction. »Preserve natural features and ensure compatibility with the city’s growth strategy. SUSTAINABILITY »Provide adaptable spaces to accommodate long-term recreational and community needs. »Ensure efficient land use and infrastructure planning to support future expansion. »Incorporate sustainable practices in large-scale projects such as housing and recreational facilities.. CONNECTIVITY »Develop pedestrian and bike-friendly pathways connecting neighborhoods, civic hubs, and recreational spaces. »Enhance roadway systems with improved signage and traffic flow for greater accessibility. »Promote alternatives to car travel, focusing on walkable and accessible designs. INFRASTRUCTURE »Support expansion of multi-family and single-family housing to meet diverse needs. »Provide flexible open spaces for future recreational and community uses. »Expand and modernize civic facilities, including enhancements to the golf course. 1110WAUKEE CIVIC MASTER PLAN GENERAL CONDITION The project site is located south of University Avenue between 6th Street And U Avenue. Predominately rolling agricultural fields slope toward Sugar Creek flowing southeast at a diagonal through the northern portion of the site. Minimal tree cover follows existing windbreaks as well as the creek corridor. There are 2 existing houses with several associated outbuildings. FIGURE 1.7 / GENERAL CONDITION MAP SITE ANALYSIS Surrounding features include: 1. Single family residential to the southeast. 2. Agricultural fields planned for future development to the south and west. 3. A public 9 hole golf course (Sugar Creek) to the east. 4. Waukee Public Works and School Bus maintenance facility to the north. SITE ELEVATION The Digital Elevation Model (DEM) provides critical elevation information that is essential for understanding the topography of the site. By using DEM data, this analysis accurately depicts the variation in terrain, highlighting areas of higher and lower elevation across the study area. Such information is crucial for site planning, hydrological studies, and understanding drainage patterns, as well as determining appropriate locations for construction and landscaping. FIGURE 1.8 / SITE ELEVATION MAP SITE ANALYSIS The site has an elevation range of 81.3 feet with the highest portion located in the southwest area at 1044.2 feet and the lowest area located in the east at 962.9 feet where Sugar Creek flows east under 6th Street. Such a gradient could indicate a natural drainage flow towards the lower- lying green regions, making these areas more prone to potential water accumulation. SECTION 1 CEMETERY S & SW DESIRABLE WIND DIRECTION IN WINTER LEGENDLEGEND MAX HEIGHT 1044.2 ft AGRICULTURAL FIELD MIN HEIGHT 962.9 ft U A V E 310 TH ST UNIVERSITY AVE 6 T H S T UNIVERSITY AVE RE-ALIGNMENT FUTURE STREET CONNECTION FUTURE STREET CONNECTION FUTURE STREET CONNECTION N & NW UNDESIRABLE WIND DIRECTION IN WINTER S & SW DESIRABLE SUMMER DIRECTION IN WINTER SCHOOL BUS FACILITY VACANT BUILDING EXISTING GOLF COURSE EXISTING RESIDENTIAL AREA EXISTING HOUSE WAUKEE CEMETERY DEVELOPING RESIDENTIAL WAUKEE PUBLIC WORKS 1312WAUKEE CIVIC MASTER PLAN SLOPE The slope map is essential for understanding the site’s topography and identifying gradient variations. It helps determine areas suitable for construction, assess drainage patterns, and evaluate potential erosion risks, aiding effective planning and decision-making. Topography in the site ranges from very flat in the southwestern portion of the site to gentler slopes as drainage courses collect field runoff toward the creek. Along the banks of the creek the slopes increase with some eroded bank areas along the meander of the main channel. These sections shown in yellow to red, concentrated towards the center and northwest, suggest potential erosion or drainage flow paths that need careful consideration. FIGURE 1.9 / SLOPE MAP SITE ANALYSIS SOIL The soil map is crucial for understanding the types of soils across the site, which influences land suitability for construction, vegetation, and stormwater management. Knowing soil properties helps in planning grading, determining foundation requirements, and identifying areas prone to erosion or requiring specific stabilization. Clarion / Nicollete / Webster soil association dominates the majority of the site. These soils are among the most productive prime class A soils in Iowa for crop production with CSR ratings in the 85-100 range. They have deep profiles and excellent water holding capacity although they commonly have poor drainage. The Coland soils found along the creek tend to have deep, poorly drained profiles formed in alluvium. FIGURE 1.10 / SOILS MAP SITE ANALYSIS SECTION 1 0 - 2 2 - 5 5 - 9 9 - 14 14 - 20 20 - 30 30 - 40 40 - 75 LEGEND- PERCENT SLOPE Clarion loam, Bemis moraine, 6 to 10 percent slopes Canisteo clay loam, Bemis moraine, 0 to 2 percent slopes Clarion loam, Bemis moraine, 2 to 6 percent slopes Clarion loam, Bemis moraine, 6 to 10 percent slopes, moderately eroded Storden loam, Bemis moraine, 10 to 22 percent slopes, moderately eroded Coland-Terril complex, 2 to 5 percent slopes Clarion loam, 9 to 14 percent slopes, moderately eroded Webster clay loam, Bemis moraine, 0 to 2 percent slopes Nicollet loam, 1 to 3 percent slopes LEGEND 1514WAUKEE CIVIC MASTER PLAN CIVIC PRECEDENT PROJECTS CIVIC The Waukee Civic Campus is proposed to include a new city hall, library, and large public park surrounding a new 23 acre lake. The master plan considers location, orientation, and interconnecting spaces for new civic buildings as well as connections to adjacent park elements. In addition to creating interesting architecture, building relationships to safe pedestrian routes and expanded urban plaza areas are intended to promote active programming of exterior spaces. Each location depicted on this page was visited during one of the group tours in 2024. FIGURE 1.11 / MERRIAM, KS CIVIC COMPLEX FIGURE 1.14 / LIBRARY WITH COMMUNITY VENUE IN OLATHE, KS FIGURE 1.12 / COMMUNITY CENTER IN MAPLE GROVE, MN FIGURE 1.13 / CIVIC PLAZA IN LENEXA, KS PRECEDENT PROJECTS COMMERCIAL / MIXED USE Planning for a variety of commercial areas is a key component to ensure a vibrant and active community center during days, evenings, and weekends. A mix of office and residential uses within elevated floors or nearby buildings enrich the diversity of spaces where Waukee residents can work and live. Architectural styles that compliment each other but allow for variety of colors and scales add visual interest and create an environment where people can enjoy spending a few hours exploring. Close proximity to site elements such as the lake, green mall, or a wide shopping street adds to the experience with trails providing safe and comfortable interconnections. FIGURE 1.18 / POTENTIAL FOR MULTIPLE STORIES FIGURE 1.19 / FLEXIBILITY FOR EVENTSFIGURE 1.15 / THOUGHTFUL DESIGN OF “BETWEEN” AREAS FIGURE 1.20 / ALTERNATIVE DESIGN FOR STREET PARKINGFIGURE 1.16 / VARIETY AND COHESION OF DESIGN ELEMENTS FIGURE 1.17 / VARIETY OF USES ALONG LAKE SECTION 1 1716WAUKEE CIVIC MASTER PLAN PRECEDENT PROJECTS RESIDENTIAL & SENIOR LIVING Multi-family buildings that offer premium style and finishes while enjoying easy access to all the amenities of the new civic campus will appeal to a wide variety of people. Trail connections to and from parks and commercial areas enhance the feeling of being a part of the community. Incorporating areas for high quality senior housing ensures that the area that the area remains active and vibrant while increasing weekday use of all the amenities. Overlooking a pond, lake, and golf course will attract retirees who are ready to give up the daily upkeep of a house and enjoy living in a community with so many nearby options. Senior facilities with a range of comprehensive care levels can make a single facility suitable for people of all abilities and needs. Residents of all ages will be attracted to the close proximity of parks, trails, shopping, restaurants, and FIGURE 1.21 / EXAMPLE OF MULTI-FAMILY FIGURE 1.22 / CREATING ADJACENT OPEN SPACES THAT PEOPLE ENJOY USING FIGURE 1.22 / EXAMPLE OF SENIOR FACILITY FIGURE 1.23 / EXAMPLE OF MULTI-FAMILY ALONG GOLF COURSE PRECEDENT PROJECTS PARK AMENITIES People visit parks for many reasons. The more variety a park offers, the more attractive it will be to residents. With ample parking and easy access via trails, bridges, and underpasses, the entire community can safely visit and explore the campus. With options for active users and peaceful scenic areas for relaxation, residents of all ages can find multiple reasons to spend time in the area. Proposed amenities could include: * Boat house with watercraft rental * Large open lawn space * Fishing Piers * Sport courts / pickelball * Multiple rentable park shelters * Skate Park * Community Garden * Sculpture / Art Installations FIGURE 1.27 / OUTDOOR ACTIVITIES FOR ALL SEASONS FIGURE 1.28 / LARGE OPEN PARK SPACES NEAR LAKEFIGURE 1.24 / BOAT HOUSE WITH WATERCRAFT RENTAL FIGURE 2.3 / INPUT REGARDING CORRIDOR CHALLENGES FIGURE 1.29 / SPORT COURTS FOR ACTIVE USERSFIGURE 1.25 / WATER ACCESS AND BICYCLE PARKING FIGURE 1.26 / EXAMPLE OF PEDESTRIAN BRIDGE SECTION 1 1918WAUKEE CIVIC MASTER PLAN PRECEDENT PROJECTS PRECEDENT PROJECTS LAKE & TRAILS The proposed lake is approximately 23 acres in size. A large island in the north portion will add interest and provide additional shoreline access as well as a wind buffer near the proposed boat house. A variety of shoreline treatments will include hardscape and natural edges. People need access to, across, and on the water but in targeted locations to minimize cost and encourage the majority of the lake to have a natural shoreline appearance. Trails will be provided throughout the campus with internal site connections as well as routes to the rest of Waukee. Trail widths may widen in areas of higher expected use such as around the civic center or pavilion area. In some areas, trails may be split or provide color distinction to separate bike and pedestrian traffic. FIGURE 1.33 / EXAMPLE OF STONE EDGE FIGURE 1.34 / SEPARATION OF BIKE AND PEDESTRIAN FIGURE 1.30 / VARIETY OF EDGE LAKE EDGE TREATMENTS FIGURE 1.35 / REASONS TO BE ON OR NEAR WATERFIGURE 1.31 / VALUE OF WIDE UNDER BRIDGE CONNECTION FIGURE 1.32 / USE OF COLOR TO DISTINGUISH ROUTES PLAZA, PAVILION, & FESTIVAL SPACES Creating the spaces and structures to host large gatherings for city wide festivals is a major feature of the park area. A community pavilion will provide a large sheltered space for hosting farmer’s markets, art fairs, and many other programmed events. Large open lawn areas sloping toward the lake will provide a great space for concerts or firework displays. A large urban plaza located between City Hall and the Library will be centered on the main view axis and serve as the hub for most large events. With amazing views across the lake and down toward the commercial core, this plaza will be the iconic center of the campus. FIGURE 1.39 / URBAN PLAZA FIGURE 1.40 /EVENT STAGE FIGURE 1.36 / LAKESIDE DINING PATIOS FIGURE 1.41 / COMMUNITY PAVILIONFIGURE 1.37 / ABLE TO HOST CITY FESTIVALS FIGURE 1.38 / LARGE OPEN SPACE FOR EVENTS SECTION 1SECTION 1SECTION 1 2120WAUKEE CIVIC MASTER PLAN DESIGN CHARETTE SUMMARY PLANNING PROCESS Working with City staff to establish basic design parameters, Confluence organized a company wide charette to allow 8 teams of Landscape Architects and Planners to come up with 8 unique Master Plan concepts. The event was held in March of 2024 and each team presented their ideas and concept to members of the City Council , staff, and steering committee members. After review of all the ideas presented, 2 were chosen to develop into detailed concepts, although elements of several other designs were considered for incorporation into the plan. FIGURE 1.45 / INPUT REGARDING CORRIDOR CHALLENGES FIGURE 1.45 / CHARETTE GROUP PRESENTATION DESIGN CHARETTE SUMMARY FIGURE 1.42 / CHARETTE GROUP PRESENTATION FIGURE 1.44 / DISCUSSION AND CONVERSATION DURING THE CHARETTE FIGURE 1.43/ CHARETTE GROUP PRESENTATION FIGURE 1.47 / DESIGN CHARETTE IDEA SKETCH- GROUP 1 FIGURE 1.46 / DISCUSSION AND CONVERSATION DURING THE CHARETTE FIGURE 1.48 / DESIGN CHARETTE IDEA SKETCH- GROUP 3 FIGURE 1.49 / DESIGN CHARETTE IDEA SKETCH- GROUP 2 FIGURE 1.50 / DESIGN CHARETTE IDEA SKETCH- GROUP 4 SECTION 1 2322WAUKEE CIVIC MASTER PLAN STAKEHOLDER INTERVIEWS PROCESS In March of 2024, several individual and small group interviews were conducted with key stakeholders for the City of Waukee. Community leaders including elected officials, and department directors met with members of the design team to share their thoughts and vision for the new Civic Campus. SUMMARY Vision: Common themes for an overall vision include: •Destination and central location for Civic Uses •Large park area surrounding lake with civic uses to include City Hall and Library •Welcoming and walkable with bridges and underpasses for connectivity •Vibrant and diverse spaces to encourage activity throughout the week + evenings •Room to grow, sensible phasing •Expansion of Sugar Creek Golf Course to 18 holes INTERVIEWED: Courtney Clarke, Mayor Anna Bergman Pierce, Council Member Ben Sinclair, Council Member Charlie Bottenberg, Council Member Chris Crone, Council Member Rob Grove, Council Member Brad Deets, City Administrator Nick Osborne, Assistant City Administrator Andy Kass, Community Development Director Rudy Koester, Public Works Director Matt Jermier, Parks & Recreation Director Kristine Larson, Library Director The Charrette and Stake holder Interviews resulted in a vision for vibrant, connected civic spaces with parks, community amenities, and mixed-use developments. ELEMENTS Civic buildings such as City Hall and LibraryA 23 acre lake with additional ponds, water features, and kayak launch / boat house B Rentable Shelters & Spaces, Community Pavillion, Recreation FacilitiesC Commercial, Residential, Mixed Use, & Senior Housing strategically locatedD Space for community festivals, farmers market, community garden, pickleballE Aquatic Center, Golf Course, Hotel, RestaurantsF SECTION 1 FIGURE 1.44 / COLLABORATION WITH STEERING COMMITTEE MEMBERS DESIGN CHARETTE SUMMARY FIGURE 1.51 / DESIGN CHARETTE IDEA SKETCH- GROUP 5 FIGURE 1.52 / DESIGN CHARETTE IDEA SKETCH- GROUP 7 FIGURE 1.53 / DESIGN CHARETTE IDEA SKETCH- GROUP 6 FIGURE 1.54 / DESIGN CHARETTE IDEA SKETCH- GROUP 8 Based on insights gathered from stakeholder interviews, the following uses are being considered: 2524WAUKEE CIVIC MASTER PLAN TRIP SUMMARIES TRIP SUMMARIES MINNEAPOLIS / ST.PAUL TOUR In May of 2024, The design team, including City staff, toured 6 locations in the twin cities. Sites were chosen to examine areas where a variety of land uses surround central lake features. Locations included: - Cobbelstone Lakes - Apple Valley - Viking Lakes - Eagan - Highland Bridge - St. Paul - Arbor Lakes - Maple Grove - Excelsior & Grand - St. Louis Park - Centennial Lakes - Edina The group studied design features that included the following: * Building Scale & Setbacks * Open Space Size / Location * Multi-Purpose Trails * Bridge Features * Lake edge treatments Additional information and imagery can be found in the appendix. FIGURE 1.55 / HIGHLAND BRIDGE (OLD FORD MOTORPLANT) IN ST. PAUL, MINNESOTA FIGURE 1.57 / CENTENNIAL LAKES / PROMENADE - EDINA, MINNESOTA FIGURE 1.56 / ARBOR LAKES / TOWN GREEN / CENTRAL PARK IN MAPLE GROVE, MINNESOTA FIGURE 1.58 / VIKING LAKES - EAGAN, MINNESOTA KANSAS CITY TOUR In September of 2024, The design team, including City staff and several members of City Council, toured 9 locations in the Kansas City Area. Sites were chosen to focus on Civic buildings and there surrounding uses. Locations included: - Kauffman Legacy Park - Merriam Community Center - Lenexa City Center - Olathe & Johnson County Civic Campus - Meadowbrook Park - Prairie Village Civic Campus - Raymore City Hall - Paragon Star - Lee’s Summit Market Plaza The group studied design features that included the following: * Building Design & Adjacent Uses * Streetscape & Parking design * Smaller Scale Retail * Lake edge treatments * Sports and Recreation Facilities Additional information and imagery can be found in the appendix. FIGURE 1.63 / LENEXA CITY CENTER / LENEXA, KSFIGURE 1.60 / CORPORATE WOODS / OVERLAND PARK, KS FIGURE 1.61 /MEADOWBROOK PARK /PRAIRIE VILLAGE FIGURE 1.59 / COMMERCIAL IN NEW LONGVIEW FIGURE 1.62 / KAUFFMAN LEGACY PARK / KANSAS CITY, MO SECTION 1 SECTION TWO / MASTER PLANNING 2-1 / CONCEPT DEVELOPMENT PROCESS 2-2 / FINAL CONCEPT NARRATIVE 2-3 / FINAL CONCEPT DIAGRAMS 2-4 / DETAILED ENLARGEMENT AREAS 28 38 40 44 2 2928WAUKEE CIVIC MASTER PLAN SECTION 2 EVOLUTION OF MASTER PLAN CONCEPTS: APRIL 2024 - JANUARY 2025 The Waukee Civic Master Plan represents a culmination of collaborative efforts undertaken between April 2024 and January 2025. This process was guided by a vision to create a sustainable, well-connected, and community-oriented development. By engaging city officials, stakeholders, and the public, the master plan evolved through iterative refinements of initial concepts into a final design that integrates diverse land uses, promotes accessibility, and enhances quality of life. The planning process began with a charrette in March2024, where the foundational ideas for Concepts A and B were developed. These initial concepts explored varying approaches to land use zoning, circulation, and community integration. Throughout the following months, these concepts were revised in response to feedback gathered during stakeholder meetings and city consultations. A third concept, Concept C, was introduced in October 2024, incorporating new ideas emphasizing sustainability, walkability, and public engagement. By January 2025, the final concept was completed, blending the strongest features of all three concepts into a cohesive and strategic plan. KEY DATES AND MILESTONES 1- APRIL 4, 2024 – INITIAL CONCEPT DEVELOPMENT: Concepts A and B were developed during the charrette, offering distinct visions for the site’s layout and functionality. Concept A focused on a balanced mix of commercial and residential spaces, while Concept B emphasized residential development with community-oriented spaces. 2- AUGUST 24, 2024 – CONCEPT REFINEMENT: Updated versions of Concepts A and B were presented, addressing stakeholder priorities and improving integration between land uses and community spaces. Pedestrian accessibility and circulation were key focus areas during this phase. 3- OCTOBER 24, 2024 – INTRODUCTION OF CONCEPT C: Concept C was unveiled, introducing a vision centered on sustainability, green spaces, and walkability. Concepts A and B were further refined independently to reflect feedback from stakeholders. JANUARY 22, 2025 – FINAL CONCEPT: The final concept synthesized elements from all three initial concepts, achieving a balanced mix of residential, commercial, and civic spaces. Sustainable practices and community engagement were prioritized, ensuring the design aligned with long-term goals for a vibrant, connected community. PLANNING PROCESS HIGHLIGHTS This iterative planning process was instrumental in addressing functional, spatial, and aesthetic needs for the site. The integration of stakeholder feedback ensured that the evolving designs aligned with the aspirations of the community while adapting to site-specific conditions. Each concept iteration brought new insights, resulting in a master plan that prioritizes sustainability, connectivity, and livability for Waukee’s residents. Attachments: Concept A and B (April 24, 2024) Concept A and B (August 24, 2024) Concept A, B, and C (October 24, 2024) Final Concept (January 22, 2025) CONCEPT DEVELOPMENT This page is intentionally left blank. • 3130WAUKEE CIVIC MASTER PLAN PRELIMINARY CONCEPTS FIGURE 2.1 / CONCEPT A- APRIL 2024 APRIL 24 2024 / CONCEPT A SECTION 2 APRIL 24 2024 / CONCEPT B SECTION 2PRELIMINARY CONCEPTS FIGURE 2.2 / CONCEPT B- APRIL 2024 SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 1. APRIL 4, 2024 – INITIAL CONCEPT DEVELOPMENT: CONCEPT A AND B In the early stages, two distinct concepts—Concept A and Concept B—were developed. These concepts presented initial ideas for the site’s layout, land use distribution, and circulation. CONCEPT A: The concept proposed a balanced mix of commercial and residential spaces, with a clear emphasis on creating a vibrant community area. Open space areas were designed to be central to the concept, including recreational zones and pathways that connect different sections of the site. DEVELOPMENT FOCUS: The primary aim was to explore land use zoning, circulation patterns, and community integration. The concepts were developed with a focus on functional layouts and basic accessibility, providing a foundation for more detailed adjustments in later stages. 1. APRIL 4, 2024 – INITIAL CONCEPT DEVELOPMENT: CONCEPT A AND B CONCEPT B: This concept featured a stronger focus on residential development, with areas dedicated to multi-family housing and senior housing units. Commercial zones were smaller and strategically placed along the edges of the site, facilitating easy access while maintaining the residential atmosphere. green spacesThe concepts were developed with a focus on functional layouts and basic accessibility, providing a foundation for more detailed adjustments in later stages. 3332WAUKEE CIVIC MASTER PLAN PRELIMINARY CONCEPTS FIGURE 2.3 / CONCEPT A- AUGUST 2024 AUGUST 24 2024 / CONCEPT A SECTION 2 AUGUST 24 2024 / CONCEPT B SECTION 2PRELIMINARY CONCEPTS FIGURE 2.4 / CONCEPT B- AUGUST 2024 SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING PLAY LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING LUXURY TOWNHOMES SENIOR HOUSING 2. AUGUST 24, 2024 – CONCEPT REFINEMENT (CONCEPT A AND B) August 24, 2024 – New Concepts (Concept A and Concept B) In August 2024, new versions of Concept A and Concept B were created in response to updated stakeholder feedback and more detailed site analysis. These concepts addressed new priorities and adjusted the original strategies to better align with the project’s goals. CONCEPT A: This concept continued to emphasize a mixed-use development, but with revised layouts that more effectively integrated commercial, residential, and public space areas. The circulation system was optimized for better accessibility, with enhanced pedestrian connections and road networks that encouraged walking and cycling. DEVELOPMENT FOCUS: The key focus of this phase was to better integrate community spaces and improve accessibility between land uses. The aim was to provide better connectivity and more livable spaces based on evolving stakeholder priorities. SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 2. AUGUST 24, 2024 – CONCEPT REFINEMENT (CONCEPT A AND B) CONCEPT B: Focus shifted to increase the amount of community-oriented space, including parks and public squares designed to foster social interaction. Commercial areas were more integrated with the residential spaces to improve convenience for residents, creating a more cohesive community experience. SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 3534WAUKEE CIVIC MASTER PLAN PRELIMINARY CONCEPTS FIGURE 2.5 / CONCEPT A- OCTOBER 2024 OCTOBER 24 2024 / CONCEPT A SECTION 2 OCTOBER 24 2024 / CONCEPT B SECTION 2PRELIMINARY CONCEPTS FIGURE 2.6 / CONCEPT B- OCTOBER 2024 LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING HOTEL SUGAR CREEK - GOLF LAYOUT HOLE NUMBER YARDAGE PAR 1 430 4 2 169 3 3 450 5 4 149 3 5 362 4 6 507 5 7 294 4 8 346 4 9 202 3 TOTAL 2909 35 10 382 4 11 176 3 12 381 4 13 310 4 14 337 4 15 360 4 16 334 4 17 191 3 18 475 5 TOTAL 2946 35 OVERALL 5855 70 LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING LUXURY TOWNHOMES SENIOR HOUSING SUGAR CREEK - GOLF LAYOUT HOLE NUMBER YARDAGE PAR 1 380 4 2 177 3 3 337 4 4 414 4 5 533 5 6 355 4 7 208 3 8 363 4 9 445 4 TOTAL 3212 35 10 310 4 11 383 4 12 201 3 13 512 5 14 165 3 15 408 4 16 165 3 17 372 4 18 550 5 TOTAL 2493 35 OVERALL 5705 70 3. OCTOBER 24, 2024 – INTRODUCTION OF CONCEPT C, ALONG WITH CONCEPT A AND B In October 2024, Concept C was introduced, providing a new vision for the site, while Concept A and Concept B were presented as new, independent concepts. CONCEPT A: This concept continued to emphasize a mixed-use development, but with enhanced pedestrian networks and more integrated community spaces. It focused on making the site more walkable and ensuring better connections between residential, commercial, and recreational areas. More attention was given to incorporating sustainable design features, such as green roofs and stormwater management solutions. DEVELOPMENT FOCUS: Concept A and Concept B in October were generated independently, focusing on the needs of residential communities and commercial integration based on the feedback received. Concept C was developed to integrate new ideas related to sustainability, walkability, and community involvement. It was an attempt to create a green and connected environment that encourages pedestrian mobility and reduces car dependency. SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 3. OCTOBER 24, 2024 – INTRODUCTION OF CONCEPT C, ALONG WITH CONCEPT A AND B CONCEPT B: This version focused on the development of a residential-centric community with increased open spaces and recreational amenities designed for residents. Commercial areas were kept at the edges to preserve the residential character, while enhancing community gathering spaces within the center of the site. SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 3736WAUKEE CIVIC MASTER PLAN PRELIMINARY CONCEPTS FIGURE 2.7 / CONCEPT C- OCTOBER 2024 OCTOBER 24 2024 / CONCEPT C SECTION 2 JANUARY 22 2025 SECTION 2FINAL CONCEPT FIGURE 2.8 / FINAL CONCEPT- JANUARY 2025 LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING HOTEL SUGAR CREEK - GOLF LAYOUT HOLE NUMBER YARDAGE PAR 1 430 4 2 169 3 3 419 4 4 149 3 5 476 5 6 507 5 7 294 4 8 346 4 9 202 3 TOTAL 2992 35 10 382 4 11 176 3 12 381 4 13 310 4 14 176 3 15 369 4 16 386 4 17 251 4 18 475 5 TOTAL 2906 35 OVERALL 5898 70 LEGEND CIVIC COMMERCIAL SINGLE FAMILY HOUSING MULTI FAMILY HOUSING SENIOR HOUSING MIXED USE HOTEL UNIVERSITY AVE. WAUKEE PUBLIC WORKS WAUKEE CEMETERY WARRIOR PARK WAUKEE WATER TOWER CATHOLIC CHURCH 310TH ST. 1 1 T H S T . 6 T H S T 1 0 T H S T 12 ACRES 10.2 ACRES 1.3 ACRES UPPER POND 2.7 ACRES 3. OCTOBER 24, 2024 – INTRODUCTION OF CONCEPT C, ALONG WITH CONCEPT A AND B CONCEPT C: Concept C proposed a more environmentally sustainable layout with a greater emphasis on public transit, community-oriented spaces, and walkability. It introduced larger green spaces, more pedestrian pathways, and areas dedicated to community engagement. Public spaces such as parks and plazas were given priority to enhance social interaction. PLAY SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 4. JANUARY 22, 2025 – FINAL CONCEPT The final concept, developed in January 2025, integrates the best features of Concept A, Concept B, and Concept C, bringing together the distinct approaches in a cohesive design. The goal was to create a sustainable, well-connected, and community-focused development. FINAL DESIGN FEATURES: The final layout reflects a balanced mix of residential, commercial, and civic spaces, ensuring functional integration of all zones. Pedestrian pathways and green spaces were integrated throughout the site to ensure accessibility and enhance the overall living experience. The design incorporated sustainable practices and prioritizes public spaces, public transport, and community hubs. DEVELOPMENT FOCUS: The final concept was developed by integrating the strongest elements of all previous concepts, creating a cohesive master plan that addresses sustainability, connectivity, and community needs. The design reflects a careful balance of land use, circulation systems, and public spaces, ensuring that the site functions as a vibrant, connected, and sustainable community. SKATE PARK LEGEND CIVIC COMMERCIAL MULTI FAMILY HOUSING MIXED USE SENIOR HOUSING 3938WAUKEE CIVIC MASTER PLAN SECTION 2FINAL CONCEPT NARRATIVE FINAL CONCEPT NARRATIVE The Final Concept for the Waukee Civic Master Plan represents the culmination of extensive stakeholder feedback, iterative design processes, and site analysis. Developed to meet the growing demands for residential, commercial, and civic spaces, the final design prioritizes community engagement, sustainability, and mobility. The plan fosters a vibrant and interconnected community, creating spaces for residents to live, work, and engage with nature. This concept integrates the diverse needs of future residents with environmental, social, and economic considerations, ensuring a balanced and sustainable development. LAND USE AND ZONING The Final Concept incorporates a diverse range of land uses to ensure that the community is dynamic and functional. The site is divided into clearly defined zones: Residential, Commercial, Civic, and Recreational, each designed to serve the evolving needs of the community. RESIDENTIAL ZONES: The residential areas are carefully distributed throughout the site, with a balanced mix of single-family housing, multi-family housing, and senior housing. These areas are strategically placed to offer a range of living options to meet the diverse needs of residents while ensuring close proximity to key amenities such as parks, schools, and retail centers. Multi-family housing areas are concentrated in more central parts of the site to provide easy access to commercial and civic spaces. Single-family housing and senior housing are located in quieter areas, ensuring peaceful residential environments with scenic views of the surrounding green spaces. COMMERCIAL ZONES: The commercial areas are positioned to provide easy access for both residents and visitors. These areas include a variety of retail spaces, offices, and services designed to create a lively town center. The commercial zones are strategically placed along key transportation routes to promote connectivity and ease of access. The integration of commercial spaces within walking distance of residential neighborhoods encourages a live-work-play environment, reducing the need for long commutes and fostering local economic growth. CIVIC SPACES: Central to the final concept are civic spaces designed to foster a sense of community and provide essential services. These areas include community centers, healthcare facilities, and public gathering spaces. These spaces are located close to residential areas, ensuring that residents have convenient access to services and opportunities for social interaction. Parks and open spaces are incorporated into the civic areas, providing places for relaxation and outdoor activities. RECREATIONAL AREAS: The final design places a strong emphasis on recreational areas. A variety of outdoor spaces such as parks, walking trails, playgrounds, and sports facilities are distributed across the site. These recreational spaces are linked through a network of pedestrian and bicycle pathways, creating an interconnected environment where residents can easily access green spaces and outdoor amenities. Water features, green corridors, and tree-lined streets are incorporated to enhance the overall aesthetic appeal and ecological value of the site. CIRCULATION AND MOBILITY A key feature of the final concept is its emphasis on improving connectivity and mobility across the site. The circulation system is designed to prioritize pedestrians and cyclists while providing efficient routes for vehicles and public transportation. PEDESTRIAN AND BICYCLE CONNECTIVITY: Pedestrian- friendly pathways are integrated throughout the site, ensuring safe and convenient access to parks, schools, and commercial areas. The network of bicycle paths connects key destinations, promoting cycling as a sustainable transportation option. These paths are carefully integrated into the landscape to encourage physical activity and reduce reliance on cars. ROAD NETWORK: The road network is designed for optimal traffic flow, with main arteries providing quick access to key areas of the development. Secondary roads and local streets are designed with calming measures to ensure safe access to residential neighborhoods and community spaces. The road system is balanced to ensure that vehicles can circulate efficiently without dominating the streetscape, allowing pedestrians and cyclists to move freely. PUBLIC TRANSPORTATION: The final concept also includes provisions for future public transportation, with designated bus stops and transit hubs integrated into the design. These hubs are located at strategic points within the site to ensure that public transportation is accessible This page is intentionally left blank. • 4140WAUKEE CIVIC MASTER PLAN OVERALL FINAL CONCEPT - LAND USE DIAGRAM FIGURE 2.9 / OVERALL FINAL CONCEPT - LAND USE DIAGRAM SECTION 2 OVERALL FINAL CONCEPT - ROADWAY NETWORK DIAGRAM FIGURE 2.10 / OVERALL FINAL CONCEPT - ROADWAY NETWORK DIAGRAM SECTION 2 LEGEND COMMERCIAL MIXED USE RESIDENTIAL SENIOR HOUSING CIVIC / PUBLIC PARK / OPEN SPACE GOLF COURSE LEGEND MAIN ROADWAY NETWORK ROADS & PARKING PAVEMENTS 4342WAUKEE CIVIC MASTER PLAN OVERALL FINAL CONCEPT - PEDESTRIAN CIRCULATION FIGURE 2.11 / OVERALL FINAL CONCEPT - PEDESTRIAN CIRCULATION SECTION 2 OVERALL FINAL CONCEPT - GREEN SPACE & TREE CANOPY FIGURE 2.12 / OVERALL FINAL CONCEPT - TREE CANOPY DIAGRAM SECTION 2 LEGEND PEDESTRIAN NETWORK GOLF COURSE PEDESTRIAN NETWORK PEDESTRIAN UNDERPASS PEDESTRIAN BRIDGE PLAZA ART FEATURE LEGEND TREE CANOPY GREEN SPACE GOLF COURSE GOLF COURSE - NATIVE PLANTING GOLF COURSE - FAIRWAYS GOLF COURSE - GREENS 4544WAUKEE CIVIC MASTER PLAN KEY AREAS OF THE PLAN The Waukee Civic Master Plan envisions a dynamic and interconnected community by focusing on eight key areas, each contributing to the city’s growth, vibrancy, and quality of life. This plan integrates recreational, civic, residential, and commercial spaces to create a balanced and thriving environment. The Park Area serves as a recreational hub with pickleball courts, a skate park, trails, and spaces for community events, promoting physical activity and social engagement. The Civic Area includes a new City Hall, a library, and an incubator space, fostering civic pride, cultural exchange, and economic development. The Northwest Residential Area offers medium-density housing with seamless access to parks and trails, ensuring a balance of urban living and natural beauty. The West/Central Mixed-Use Area blends residential, commercial, and recreational spaces, designed as a pedestrian-friendly landmark at a key intersection. The Athletics/Indoor Sports Facility provides indoor and outdoor spaces for diverse sporting events, complemented by retail and ample parking for convenience. The Southwest Retail Commercial Area enhances accessibility to daily essentials, including dining options and a modern gas station, strategically located near high- traffic zones. The Senior Living and Townhomes section offers tranquil, high-end housing near a golf course and lake, designed for connectivity and accessibility. Lastly, the Golf Course serves as a recreational and ecological asset, integrating sustainability with opportunities for community engagement and tourism. Together, these areas reflect Waukee’s commitment to thoughtful design, sustainability, and community well-being, forming the foundation for a vibrant future. DETAILED ENLARGEMENT AREAS FIGURE 2.13 / OVERALL FINAL CONCEPT - KEY AREAS SECTION 2ENLARGEMENT AREAS / PARK AREA FIGURE 2.14 / OVERALL FINAL CONCEPT - PARK AREA FIGURE 2.15 / PICKLE BALL COURTS FIGURE 2.16 / SKATE PARK 1. PARK AREA In the heart of Waukee, a new park space will be developed to create a vibrant hub for recreation, events, and community gatherings. This park will provide a multitude of amenities designed to cater to diverse interests and needs, making it a place for everyone to enjoy. The park will include facilities for Pickle Ball, a Skate Park, an Open Events Space, a Boathouse, Water access, and a Covered Pavilion that can host various indoor and outdoor events. Additionally, a network of trails will connect the park to the surrounding community, ensuring safe and convenient access for pedestrians. PICKLE BALL COURTS Pickle Ball, a rapidly growing sport that combines elements of tennis, badminton, and ping-pong, will have dedicated courts in the new park. These courts will provide a space for both casual play and competitive tournaments, encouraging physical activity and social interaction among players of all ages and skill levels. SKATE PARK The Skate Park will be a dynamic area designed for skateboarders and rollerbladers. With a variety of ramps, rails, and bowls, designed as a linear experience, the Skate Park will cater to beginners and experienced riders alike. This area will promote an active lifestyle and provide a safe environment for enthusiasts to practice and hone their skills. OPEN EVENTS SPACE A versatile Open Events Space will be a central feature of the park, offering a large, flexible area for hosting various community events. From outdoor concerts and movie nights to art exhibits and community fairs, this space will be a focal point for cultural and social activities, fostering a sense of community and engagement. PARK AREA CIVIC PLAZA NORTH WEST RESIDENTIAL AREA WEST / CENTER MIXED – USE AREA SOUTH WEST RES. + POOL RESERVE ATHLETICS / INDOOR SPORTS SOUTH RETAIL / COMMERCIAL SENIOR LIVING / TOWN HOMES GOLF COURSE 4746WAUKEE CIVIC MASTER PLAN ENLARGEMENT AREAS / PARK AREA BOATHOUSE AND WATER ACCESS The Boathouse will provide storage and rental facilities for kayaks, canoes, and paddle boards, giving park visitors easy access to water activities. With a launch area and docks, the Boathouse will be a hub for water-based recreation, promoting a healthy lifestyle and an appreciation for the natural environment. COVERED PAVILION The Covered Pavilion will be an architectural marvel, offering a versatile space for hosting a wide range of events. Whether it’s farmers’ markets, bazaars, hockey games, soccer matches, weddings, or music concerts, the Pavilion will be designed to accommodate both indoor and outdoor events. Its thoughtful design will include features such as climate control, sound equipment, and seating arrangements, ensuring comfort and convenience for all attendees. CONNECTIVITY AND ACCESSIBILITY A comprehensive network of trails will seamlessly connect the new park space to the surrounding community. Through the use of underpasses and bridges, pedestrians will be able to access the park safely without having to cross busy roads. This connectivity will encourage walking and biking, reducing traffic congestion and promoting a healthier, more sustainable lifestyle. The development of this new park space will bring numerous benefits to the community, enhancing the quality of life for residents and visitors alike. FIGURE 2.18 / BOATHOUSE AND WATER ACCESS FIGURE 2.17 / WATER ACCESS FIGURE 2.19 / COVERED PAVILION FIGURE 2.20 / COVERED PAVILION FIGURE 2.21 / WATER ACCESS ENLARGEMENT AREAS / PARK AREA SECTION 2 PROMOTING PHYSICAL ACTIVITY With facilities for sports and recreation, such as Pickle Ball courts and a Skate Park, the park will encourage physical activity and fitness. This will have positive impacts on public health, reducing the risk of chronic diseases and improving mental well-being. FOSTERING SOCIAL INTERACTION The park will serve as a gathering place for people of all ages and backgrounds, fostering social connections and a sense of community. Events and activities at the Open Events Space and Covered Pavilion will provide opportunities for cultural exchange and community engagement. ENHANCING ECONOMIC DEVELOPMENT By attracting visitors and hosting events, the park will stimulate local businesses and contribute to economic growth. The presence of the Boathouse and water-based activities will also boost tourism, bringing in revenue and supporting local enterprises. ENVIRONMENTAL SUSTAINABILITY The park’s design will incorporate sustainable practices, such as the use of native plants, water conservation measures, and green building materials. The emphasis on walking and biking will reduce carbon emissions, contributing to a cleaner and greener environment. FIGURE 2.24 / WATER ACCESS AND CONNECTIVITY FIGURE 2.22 / WATER ACCESS FIGURE 2.23 / WATER ACTIVITIES 4948WAUKEE CIVIC MASTER PLAN 2. CIVIC AREA Waukee Civic Campus will become a vibrant and active hub for the community. This ambitious project will include a new City Hall, a state-of-the- art Library, and a connected incubator space that will provide crucial support to small businesses. The campus aims to offer a lively and engaging environment for residents and visitors alike, active at most hours of the day. CITY HALL The new City Hall will be a cornerstone of the Civic campus, embodying the architectural character of stateliness and grandeur. It will serve as the administrative center of Waukee, housing essential city services and providing a central meeting place for civic engagement. The building will be designed to be both functional and aesthetically pleasing, reflecting the community’s values and aspirations. LIBRARY Adjacent to the City Hall, the new Library will be a beacon of knowledge and learning. It will offer a wide range of resources, including books, digital media, and community programs. The Library will be a modern and inviting space, equipped with the latest technology to meet the needs of all residents. It will also feature quiet reading areas, collaborative workspaces, and areas for children and teens, fostering a love of learning and exploration. INCUBATOR SPACE A key component of the Civic campus is the connected incubator space, designed to support small businesses and entrepreneurs. This space will provide affordable office facilities, mentorship programs, and networking opportunities, helping new businesses to thrive. By supplementing the City’s services, the incubator space will play a vital role in driving economic growth and innovation within the community. CENTRAL PLAZA AND GREEN SPACE At the heart of the Civic campus will be the Central Plaza, located on the water between the main buildings. This plaza will be a vibrant and active area, featuring green FIGURE 2.25 / OVERALL FINAL CONCEPT - CIVIC AREA FIGURE 2.26 / INDOOR SOCIAL SPACES FIGURE 2.27 / CIVIC BUILDING CORE ENLARGEMENT AREAS / CIVIC AREA SECTION 2 FIGURE 2.28 / OUTDOOR COFFEE SHOPS AND SEATING SPACES FIGURE 2.29 / CENTRAL PLAZA ENLARGEMENT AREAS / CIVIC AREA spaces, seating, and public art installations. The design will encourage social interaction and community events, making it a focal point for residents and visitors. The plaza will extend to 10th Street, seamlessly integrating with the surrounding urban landscape. ADJACENT RETAIL AND MIXED-USE BUILDINGS The Civic campus will also include adjacent retail and mixed- use buildings that will further activate the space. These buildings will offer a mix of shops, restaurants, and office spaces, creating a lively and dynamic environment. By providing convenient amenities and services, the adjacent buildings will enhance the overall experience of the Civic campus and contribute to its vibrancy. DESIGN AND ARCHITECTURAL CHARACTER The architectural character of the Civic campus will be stately and elegant, reflecting Waukee’s commitment to quality and excellence. The buildings will feature timeless design elements, with a focus on durability and sustainability. High-quality materials and craftsmanship will be used throughout the campus, ensuring that it remains a cherished landmark for generations to come. PUBLIC HEALTH AND WELLNESS The design of the Civic campus will promote public health and wellness by encouraging physical activity and outdoor recreation. The green spaces and walking paths will provide opportunities for exercise and relaxation, contributing to the overall well-being of the community. Additionally, the campus will host a variety of events and activities that will engage residents and promote a healthy lifestyle. ECONOMIC DEVELOPMENT The Civic campus will be a catalyst for economic development in Waukee. By attracting visitors and hosting events, it will stimulate local businesses and create new opportunities for growth. The incubator space will support the development of new enterprises, contributing to a diverse and resilient economy. The presence of retail and mixed-use buildings will further enhance the economic vitality of the area. SUSTAINABILITY AND ENVIRONMENTAL STEWARDSHIP Sustainability will be a core principle of the Civic campus design. The buildings will incorporate green building practices, such as energy-efficient systems, water conservation measures, and the use of sustainable materials. The landscaping will feature native plants and green spaces that support biodiversity and reduce environmental impact. By promoting walking and biking, the campus will also contribute to reducing carbon emissions and creating a cleaner environment. 5150WAUKEE CIVIC MASTER PLAN 3. NORTH WEST RESIDENTIAL AREA The proposed medium density residential area will offer a harmonious blend of urban living and natural beauty, creating a vibrant and cohesive community. This development is flexible and could feature a variety of residential options, including townhomes, modern apartments, and condos. Each housing unit should be crafted with a focus on high-quality architecture, ensuring a timeless and visually appealing aesthetic. QUALITY ARCHITECTURE AND DESIGN The architectural design of the residential area will reflect a commitment to excellence, incorporating durable materials and sustainable building practices. The buildings will showcase a blend of traditional and contemporary styles, with features such as large windows, open floor plans, and beautifully landscaped surroundings. Attention to detail in craftsmanship will ensure that each home is not only functional but also a joy to live in. CONNECTIVITY TO PARKS AND TRAILS One of the key highlights of this residential area is its seamless connection to a network of parks and trails. Residents will have easy access to green spaces, walking paths, and recreational areas, promoting an active and healthy lifestyle. The parks will offer a variety of amenities, including playgrounds, picnic areas, and sports facilities, making them ideal for families and individuals alike. The trails will provide scenic routes for walking, jogging, and biking, encouraging outdoor activity and fostering a sense of community. COMMUNITY AND LIFESTYLE The medium density of the residential area will create a lively and dynamic environment, fostering a sense of community among residents. The presence of townhomes, apartments, and condos will attract a diverse population, FIGURE 2.30 / OVERALL FINAL CONCEPT - NORTH WEST RESIDENTIAL AREA FIGURE 2.31 / RESIDENTIAL AREA FIGURE 2.32 / RESIDENTIAL AREA ENLARGEMENT AREAS / NW RESIDENTIAL AREA SECTION 2 FIGURE 2.35 / RESIDENTIAL AREA FIGURE 2.33 / RESIDENTIAL AREA FIGURE 2.36 / RESIDENTIAL AREA FIGURE 2.34 / RESIDENTIAL AREA ENLARGEMENT AREAS / NW RESIDENTIAL AREA enhancing the vibrancy of the neighborhood. Shared amenities such as community gardens, fitness centers, and social spaces will provide opportunities for residents to connect and engage with one another. In summary, the medium density residential area connected to parks and trails will offer a high standard of living with its quality architecture and thoughtful design. By integrating natural elements and providing access to outdoor recreational spaces, it will promote a balanced and fulfilling lifestyle for its residents. This development will not only enhance the urban fabric of the area but also contribute to the overall well-being of the community. 5352WAUKEE CIVIC MASTER PLAN 4. WEST & CENTER MIXED – USE AREA The envisioned mixed-use district at the key intersection of 10th Street and 6th Street is set to become a prominent landmark, connecting seamlessly to the Waukee Civic campus. This development aims to create a vibrant and dynamic environment that harmoniously integrates living, working, shopping, and leisure activities. The district will offer a unique blend of urban amenities and natural beauty, making it an ideal destination for residents and visitors alike. PRIME LOCATION AND CONNECTIVITY Strategically positioned at the major intersection of 10th Street and 6th Street, the mixed-use district will serve as a gateway to the Waukee Civic campus. The location ensures excellent accessibility, making it a central hub for the community. With the possibility of a hotel anchoring this intersection, the district will attract business travelers, tourists, and locals, enhancing its appeal and vibrancy. WALKABLE URBAN DESIGN The district will be characterized by its pedestrian-friendly design, encouraging walkability and outdoor activities. Wide sidewalks, tree-lined streets, and well-placed light poles will create an inviting atmosphere for strolling, shopping, and dining. Outdoor dining areas will be a key feature, allowing patrons to enjoy meals in a pleasant and lively environment. The integration of signage will provide clear navigation and enhance the district’s identity. RESIDENTIAL AND COMMERCIAL SPACES The mixed-use district will offer a variety of residential options, including modern apartments and townhomes, catering to diverse demographics. These residential units will be designed with a focus on quality architecture, incorporating both traditional and contemporary styles. On the commercial side, the district will boast a range of retail spaces, from boutique shops to smaller retail and restaurants. FIGURE 2.37 / OVERALL FINAL CONCEPT - WEST / CENTER MIXED – USE AREA FIGURE 2.38 / OUTDOOR WALKABLE URBAN SPACE FIGURE 2.39 / OUTDOOR WALKABLE URBAN SPACE ENLARGEMENT AREAS / MIXED–USE AREA SECTION 2 FIGURE 2.41 / OUTDOOR WALKABLE URBAN SPACE FIGURE 2.42 / OUTDOOR WALKABLE URBAN SPACE FIGURE 2.40 / OUTDOOR WALKABLE URBAN SPACE FIGURE 2.43 / OUTDOOR WALKABLE URBAN SPACE ENLARGEMENT AREAS / MIXED–USE AREA COMMUNITY AND LIFESTYLE The new district aims to foster a strong sense of community among its residents. Shared amenities such as community gardens, trails, and social spaces will provide opportunities for interaction and engagement. The blend of residential, commercial, and recreational spaces will create a lively and dynamic environment, promoting a balanced and fulfilling lifestyle. In summary, the new vibrant mixed-use district at the intersection of 10th Street and 6th Street will be a landmark development, connecting to the Waukee Civic campus and offering a high standard of urban living. With its walkable design, diverse residential and commercial spaces, and seamless integration of green areas, the district will promote a balanced and fulfilling lifestyle. This development will not only enhance the urban fabric of the area but also contribute to the overall well-being of the community, making it a place where people want to live, work, and play. 5554WAUKEE CIVIC MASTER PLAN 5. SOUTH WEST RES. & POOL RESERVE The new medium density residential area located near 10th Street offers high-quality apartment-style living, designed to cater to a variety of residents seeking a modern, urban lifestyle. This development emphasizes quality construction and thoughtful design, aimed at providing a comfortable and aesthetically pleasing living environment. RESIDENTIAL FEATURES The residential units in this area are characterized by their high standards of architecture and design. Modern apartments will be equipped with state-of-the-art amenities and finishes, ensuring a luxurious and convenient living experience. The architectural style should blend both traditional and contemporary elements, creating a visually appealing skyline while harmonizing with the surrounding urban fabric. INTEGRATION WITH GREEN SPACE A key highlight of this residential area is its seamless integration with green spaces. Residents will have direct access to well-maintained parks and gardens, promoting a healthy and active lifestyle. These green spaces will be perfect for leisurely strolls, picnics, and outdoor activities, fostering a strong sense of community and connection to nature. TEMPORARY PARK SPACE AND FUTURE DEVELOPMENTS The western half of the site is currently designated as an open park space, providing residents with additional recreational opportunities. This area is temporarily reserved but is planned for future development into an outdoor aquatic center. This forward-thinking approach ensures that the community will continually benefit from enhanced amenities and facilities. FIGURE 2.44 / OVERALL FINAL CONCEPT - RESIDENTIAL / WATER PARK SPACE FIGURE 2.45 / RESIDENTIAL AREA FIGURE 2.46 / RESIDENTIAL AREA ENLARGEMENT AREAS / SW RES. & POOL RESERVE SECTION 2 FIGURE 2.47 / FUTURE OUTDOOR AQUATIC CENTER FIGURE 2.49 / FUTURE OUTDOOR AQUATIC CENTER FIGURE 2.48 /FUTURE OUTDOOR AQUATIC CENTER ENLARGEMENT AREAS / SW RES. & POOL RESERVE FUTURE OUTDOOR AQUATIC CENTER The proposed outdoor aquatic center will be a significant addition to the community, offering a variety of water- based recreational activities. One of the key advantages of this development is its strategic planning for shared parking with the adjacent future athletic facility. Due to the opposite busy seasons of the aquatic center and athletic facility, shared parking will maximize the efficient use of available space, ensuring convenience for visitors and minimizing the need for additional infrastructure. 5756WAUKEE CIVIC MASTER PLAN 6. ATHLETICS & INDOOR SPORTS This large space will develop slowly, and the current scope of the athletic facility has not been fully defined. However, the anticipated project promises to offer a comprehensive and dynamic environment for various sporting events and activities, catering to the needs of the community and promoting an active lifestyle. FACILITY OVERVIEW The proposed facility is assumed to include three to four outdoor athletic fields, which will serve as versatile spaces for sports such as soccer, football, lacrosse, other outdoor activities. These fields will be complemented by indoor sports facilities capable of housing a wide array of events including hockey, soccer, basketball, volleyball, and pickleball. This multi-functional approach ensures that the facility can accommodate different types of sports, providing year-round opportunities for athletes and enthusiasts. INTEGRATED RETAIL SPACES In addition to the athletic facilities, the development plans incorporate several attached retail spaces facing 10th Street. These retail establishments are designed to cater to the traffic generated by the athletic activities, while also serving the daily needs of the community. Potential businesses could include nail salons and sandwich shops, offering convenience and variety to visitors and residents alike. PARKING AND ACCESSIBILITY To support the influx of visitors, the facility is anticipated to include parking accommodations for up to 1,500 cars. This extensive parking capacity ensures that visitors can easily access the athletic fields and retail spaces without FIGURE 2.50 / OVERALL FINAL CONCEPT - TREE CANOPY DIAGRAM FIGURE 2.51 / ATHLETIC FACILITY FIGURE 2.52 / ATHLETIC FACILITY ENLARGEMENT AREAS / ATHLETICS & INDOOR SPORTS SECTION 2 FIGURE 2.54 / ATHLETIC FACILITY FIGURE 2.53 / ATHLETIC FACILITY FIGURE 2.56 / ATHLETIC FACILITY FIGURE 2.55 / ATHLETIC FACILITY ENLARGEMENT AREAS / ATHLETICS & INDOOR SPORTS facing congestion or delays. The strategic planning of the parking area aims to maximize efficiency and convenience, enhancing the overall experience for users of the facility. DEVELOPMENT AND COMMUNITY IMPACT The development of this indoor-outdoor athletic facility represents a significant investment in the community’s infrastructure and recreational offerings. By providing modern, high-quality spaces for sports and social activities, the project aims to foster a stronger sense of community and promote a healthy, active lifestyle among residents. As the facility gradually takes shape, it will likely become a central hub of activity, contributing to the growth and prosperity of the surrounding area. In conclusion, while the final details of the proposed indoor-outdoor athletic facility are still being defined, the vision for the project is clear. It aims to deliver a state-of- the-art environment for sports and recreation, seamlessly integrating retail spaces and ensuring ample parking for visitors. This forward-thinking development is poised to become a cornerstone of the community, offering diverse opportunities for engagement and enjoyment. 5958WAUKEE CIVIC MASTER PLAN 7. SOUTH WEST RETAIL COMMERCIAL The envisioned mixed-use district at the key intersection of 10th Street and 6th Street is set to become a prominent landmark, connecting seamlessly to the Waukee Civic campus. This development aims to create a vibrant and dynamic environment that harmoniously integrates living, working, shopping, and leisure activities. The district will offer a unique blend of urban amenities and natural beauty, making it an ideal destination for residents and visitors alike. The proposed new retail district is strategically located at a key intersection and adjacent to the future athletic facility. This development is poised to become a bustling hub of activity, catering to both the everyday needs and leisure desires of the community. One of the central features of this district is a modern gas station, designed to provide efficient and convenient service for residents and visitors alike. Alongside the gas station, there could be a fast food. Additionally, a standalone restaurant could offer a sit-down dining experience with a more diverse menu. The retail district’s proximity to the athletic facility is a key advantage, FIGURE 2.57 / OVERALL FINAL CONCEPT - SOUTH WEST RETAIL FIGURE 2.58 / CONVENIENCE STORE FIGURE 2.59 / RETAIL AREA ENLARGEMENT AREAS / SW RETAIL COMMERCIAL SECTION 2 FIGURE 2.60 / RETAIL AREA FIGURE 2.61 / RETAIL AREA FIGURE 2.62 / RETAIL AREA FIGURE 2.63 / RETAIL AREA ENLARGEMENT AREAS / SW RETAIL COMMERCIAL fostering a seamless integration of services and amenities that support an active lifestyle. This thoughtful planning ensures that visitors to the athletic facility have easy access to fuel, food, and dining options, enhancing their overall experience. This intersection, will be known for its high traffic, will see improved connectivity and convenience, making the new retail district an essential part of the community’s growth and prosperity. 6160WAUKEE CIVIC MASTER PLAN 8. SENIOR LIVING & TOWNHOMES SENIOR LIVING The Senior Living area is strategically situated near the lake and the nearby golf course, providing a tranquil and scenic environment for its residents. This region will feature a large senior center that will bring vibrancy to the area during the day. The center will be well-connected by trails and underpasses, facilitating easy access to the park and Civic Campus across the street. Additionally, the design should accommodate golf cart parking, enhancing mobility and convenience for the senior residents. MIXED USE At the southeast corner of 10th and 6th Street, a mixed-use building will serve as a cornerstone for this prominent intersection. This structure will feature high-profile architecture on all four corners, making it a significant landmark within the district. The mixed-use building will blend residential, commercial, and possibly community spaces, creating a vibrant and dynamic environment that caters to a variety of needs and activities. Its strategic placement will bolster the overall development of the area, adding both aesthetic and functional value. TOWNHOMES The townhomes in this district will front 6th Street and are designed to be high-end, catering to those seeking luxurious living spaces. These townhomes will back onto the golf course, offering residents’ picturesque views and easy access to recreational amenities. Each unit will feature tuck-under parking, ensuring a seamless and attractive street presence. The walkable design of the townhomes will promote connectivity and encourage a pedestrian-friendly atmosphere, enhancing the overall appeal and livability of the neighborhood. FIGURE 2.64 / OVERALL FINALSENIOR LIVING / TOWNHOMES FIGURE 2.65 / TOWNHOMES FIGURE 2.66 / SENIOR LIVING ENLARGEMENT AREAS / SENIOR LIVING & TOWNHOMES SECTION 2 FIGURE 2.70 / MIXED USE FIGURE 2.68 / SENIOR LIVING FIGURE 2.71 / SENIOR LIVING FIGURE 2.67 / MULTI-FAMILY FIGURE 2.72 / SENIOR LIVINGFIGURE 2.69 / SENIOR LIVING ENLARGEMENT AREAS / SENIOR LIVING & TOWNHOMES 6362WAUKEE CIVIC MASTER PLAN 9. GOLF COURSE As the largest green space in the proposed City Center Master Plan, the new golf course and lake will be the environmental anchor for this center. The proposed 150-acre golf course will encompass the existing Sugar Creek Golf Course property while expanding to new land surrounding the existing course. Our vision for expanding the golf course from 9 holes to 18 holes was driven by the popularity of the game today. Golfers today want golf courses that are core courses, or one piece of property not separated with individual holes routed through homes. Golfers want courses that are challenging for all levels of golfers and are fun to play. They are not concerned about the total length of the course as much as they are about the condition. A shorter course that fits with the natural topography of the site is what Golfers are seeking to play. Our vision was to create a golf course master plan that encompassed some of the existing golf course holes while discovering new golf holes that highlight the beauty of the natural site. The reason many popular golf courses are continually enjoyed by golfers is because they were designed to accommodate a wide variety of shots. The key is to balance the difficulty and variety in shots which makes the course playable for all golfers. We have routed the golf course to have balanced distance for each nine that will play as a par 70 from 6,300 yards to 4,500 yards in total length. The easiest way to make the golf course playable is to have multiple tees and we are proposing a four-tee system for the proposed course distances. The main feature that impacts the course difficulty is the size and contouring of the putting surfaces. We envision greens that will average 6,000 square feet per hole which can accommodate a variety of pin locations while managing 40,000 rounds of golf per year. If the greens are too small, it will create agronomic problems which lead to poor turf conditions for the greens. Having quality greens is the most essential element to any golfer when it comes to determining which golf course to play. FIGURE 2.73 / OVERALL FINAL CONCEPT - GOLF COURSE AREA FIGURE 2.74 / GOLF COURSE AREA FIGURE 2.75 / GOLF COURSE AREA ENLARGEMENT AREAS / GOLF COURSE ENLARGEMENT AREAS / GOLF COURSE SECTION 2 FIGURE 2.76 / GOLF COURSE AREA Besides the tees and greens, the natural topography and water features will be a key feature of the new course. We have a natural creek in the northeast corner of the site which will bisect the course bringing the water into play on seven golf holes. In addition to the creek, we will have water hazards with the new lakes on the last three finishing holes of the golf course. This will make for a great finish for the golfers as they close out their round of golf. The natural elevation changes of over 50’ across the property and 10 golf holes that have the presence of water as a hazard leads us to a challenging course before we even factor in the design of sand bunkers. Every golf course architect will use sand bunkers as part of their design for the golf course. Sand bunkers are used to protect greens or define landing areas while directing golfers where to hit their next shot. Sand bunkers can also be overused on golf courses by golf course architects. Properly placed and designed sand bunkers will help to define the character of the course without being a maintenance burden to the operating budget. We envision minimal sand bunkers for the golf course since we have so many natural hazards with the creeks, lakes and natural topography. Another design element will be the establishment of natural areas throughout the golf course. These natural areas reduce the overall maintained turf areas while creating natural buffers to separate golf holes. Since the site has limited trees, these natural areas will create separation while adding color contrast to the course. These areas will also be natural habitats for wildlife that live on the golf course. All these natural features are what will make the golf course aesthetically beautiful for the golfers and people visiting the City Center to experience. Golfers today are concerned with golf course maintenance, as much or more so than at any other time in the past. Course conditioning is something that most golfers perceive and criticize without understanding the basic concepts of maintaining a golf course. Sustainability will be very important to the design of the golf course. 6564WAUKEE CIVIC MASTER PLAN DETAILED ENLARGEMENT AREAS SECTION 2 FIGURE 2.77 / GOLF COURSE AREA FIGURE 2.78 / GOLF COURSE AREA The biggest part of sustainability is water management which is both water applied and water removed for the turf areas to create the best turf conditions possible. We are proposing to use the new lake as our water supply for the irrigation system. As with any golf course, water is a valuable resource that needs to be used responsibly. The irrigation system will be designed to maximize control over the amount of water applied to the course. Proper course drainage and irrigation system will make all the difference in the course condition and the budget it takes to maintain the golf course. We only have one time to get both elements installed right with the design and construction of the new course. The challenge with implementing a new golf course project at an existing golf facility is trying to keep it open for play to avoid the downtime or course closure. We feel that we can limit this downtime by building a majority of these course improvements in multiple phases. Since we have open ground to the north and northeast of the existing golf course, these areas could be built while the existing course remains open. This work could be done in conjunction with the University Avenue improvements in order to balance the earthwork for the 4-5 golf holes, clubhouse, golf cart facility, parking lot and practice tee in this area. We have roughly 7-8 golf holes and a maintenance facility west of 6th street which could be built with the City Center lake and street improvements. DETAILED ENLARGEMENT AREAS SECTION 2 FIGURE 2.79 / GOLF COURSE AREA FIGURE 2.80 / GOLF COURSE AREA At the end of these two phases of improvements we would have the clubhouse, golf cart facility, parking lot, maintenance facility and approximately12-13 holes built before we would have to close the existing golf course. This would greatly reduce downtime and loss of revenue which comes with closing the existing golf course. The new 18-hole golf course for the will be a tremendous recreational asset for the residents of Waukee and the Des Moines area. We have purposefully not designed a championship level golf course due to the fact it would take more property to have a longer golf course which could potentially cost more to operate while being too difficult for the average golfer to enjoy. We envision a sustainable golf course that is a positive recreational asset for the City that will be fun to play for any level of golfer for many years. SECTION THREE / PHASING & IMPLEMENTATION 3-1 / PHASING SEQUENCE & DIAGRAMS 3-2 / ARCHITECTURAL THEMING 3-3 / ARCHITECTURAL BENCHMARKING 3-4 / SUSTAINABILITY THEMING 68 72 75 76 3 6968WAUKEE CIVIC MASTER PLAN PHASING SEQUENCE PHASING AND TIMELINE A phased timeline was developed to ensure structured and efficient implementation of the Master Plan. Phase 1 focuses on critical improvements, including municipal facilities and public infrastructure. Phase 2 emphasizes community-oriented projects, such as parks and cultural TABLE 3.1 / PHASING AND TIMELINE TABLE spaces. Subsequent phases are aimed at long-term development, ensuring flexibility for future adjustments. The phased approach ensures that priorities are addressed in alignment with available resources and evolving community needs. TIME FRAME PHASE ITEM 2025-26 1A 10TH STREET / UNIVERSTIY INTERSECTION 2025-26 1A DEVELOPMENT RFP FOR NW CORNER - LAND SALE 2025-26 1A PARK AREA SCHEMATIC DESIGN INCLUDING PAVILLION 2025-26 1A CITY HALL / CIVIC PLAZA DESIGN + LIBRARY AND FOOD HALL SCHEMATIC DESIGN 2025-26 1A PARTIAL PURCHASE OF SOUTH 40 ACRES - ROAD R.O.W + NEIGHBORING PARCELS NECESSARY 2026-27 1B 10TH STREET: UNIVERSITY SOUTH 2026-27 1B 10TH STREET: WESTOWN PKWY TO STREET B (BRIDGES, ABUTMENTS, TRAILS, ETC. INCLUDED) 2026-27 1B PARKS PLANNING FINALIZED (CD’S COMPLETED) BID SPRING OF 2027 (ALL SITE WORK. SKATE PARK, PICKLE BALL, SHELTERS, RESTROOMS, ETC.) 2027-28 1C COMPLETE CD’S FOR BOATHOUSE AND PAVILLION PROJECT 2027-28 1C DEVELOPMENT RFP FOR MIXED USE DISTRICT AND WEST MULTI-FAMILY (START WORK IN 2027) 2027-28 1C ALL GRADING COMPLETED ON SITE FOR ROADWAY PROJECTS 2027-28 1C UNIVERSITY AVENUE: PUBLIC WORKS TO 3RD STREET AND 6TH STREET CONNECTION TO 10TH STREET (INCLUDES BRIDGE CROSSING OF THE LAKE) 2028-29 1D CONSTRUCT PAVILLION AND BOATHOUSE / COMPLETE BY FALL 2028-29 1D PARKS PROJECTS AND PAVILLION - COMPLETED / OPENED 2028-29 1D DEVELOPMENT RFP FOR ROW HOMES FACING THE GOLF COURSE 2028-29 1D DEVELOPMENT RFP FOR SENIOR HOUSING AREA + 1 MIXED USE BUILDING 2028-29 1D UNIVERSITY AVENUE: 3RD STREET TO ST. BONIFACE CHURCH + STREAM RENOVATIONS TIME FRAME PHASE ITEM 2030-31 2A FINAL CD’S FOR CITY HALL COMPLETED 2030-31 2A BID CITY HALL / CIVIC PLAZA 2030-31 2A 6TH STREET BETWEEN 10TH & 11TH 2030-31 2A 11TH STREET FROM UNIVERSITY 2000’ SOUTH 2030-31 2A DEVELOPMENT RFP FOR MIXED USE AREA AROUND CITY HALL 2031-32 2B OPEN CITY HALL / CIVIC PLAZA 2031-32 2B COMPLETE CD’S FOR LIBRARY PROJECT 2031-32 2B CONSTRUCT LIBRARY 2031-32 2B SPORTS DISCUSSION / CITY OWNED LAND 2032-33 2C FINALIZE PURCHASE OF REMAINING SOUTH 40 ACRES 2032-33 2C COMPLETED LIBRARY PROJECT PHASING STATEMENT SECTION 3 Projects in Red are currently planned roadway projects in the CIP Future Public Construction Projects Projects in Blue would be revenue generating Items in Purple are acquisitions 2032-33 2C CONSTRUCT SOUTH STREET (NW OF 10TH & 310TH) 2032-33 2C PLANS FOR PARKS MAINTENANCE / GOLF COURSE MAINTENANCE AREA 2032-33 2C SOUTH RESIDENTIAL LOTS AVAILABLE 2033-34 2D DESIGN PARKS MAINTENANCE / GOLF COURSE MAINTENANCE AREA 2033-34 2D CONSTRUCT PARKS MAINTENANCE / GOLF COURSE MAINTENANCE AREA 2033-34 2D CONSTRUCT SKATE PARK / PICKELBALL / REMAINING NE PARK SHELTERS 2033-34 2D SOUTH COMMERCIAL AVAILABLE (NW OF 10TH & 310TH) 2033-34 2D COMPLETE CD’S FOR SUGAR CREEK GOLF COURSE TIME FRAME PHASE ITEM 2035-36 3A COMPLETE CD’S FOR FOOD HALL / INCUBATOR SPACE 2035-36 3A BUILD WEST 9 HOLES OF SUGAR CREEK GOLF COURSE 2035-36 3A BUILD FOOD HALL / INCUBATOR SPACE 2036-37 3B BUILD NEW CLUBHOUSE / DRIVING RANGE 2036-37 3B DESIGN OF WEST PARK 2036-37 3B DESIGN OF SW SPORTS 2036-37 3B FINALIZE PURCHASE OF REMAINING ROW FOR 310TH & 11TH 2036-37 3B SWITCH 9 HOLES TO WEST COURSE AND NEW CLUB HOUSE – CONSTRUCT EAST 9 HOLES 2037-38 3C CONSTRUCTION OF REMAINING 310TH & 11TH 2037-38 3C CONSTRUCTION OF SW PARK 2037-38 3C CONSTRUCTION OF SW SPORTS 2038-39 3D OPEN FULL 18 HOLE GOLF COURSE Table continues on the next page 7170WAUKEE CIVIC MASTER PLAN FIGURE 3.1 / ROADWAYS / PUBLIC IMPROVEMENTS PHASING GUIDE ROADWAYS / PUBLIC IMPROVEMENTS PROPOSED PHASING DIAGRAM FIGURE 3.2 / OVERALL PHASING DIAGRAM **TOTAL PROJECT COSTS AND CONSTRUCTION COSTS PROVIDED HEREIN ARE MADE ON THE BASIS OF ENGINEER'S EXPERIENCE AND QUALIFICATIONS AND REPRESENT THE ENGINEER'S BEST JUDGMENT. HOWEVER, THE ENGINEER CANNOT AND DOES NOT GUARANTEE THAT BIDS OR ACTUAL TOTAL PROJECT ORCONSTRUCTION COSTS WILL NOT VARY FROM THE ESTIMATE OF PROBABLE CONSTRUCTION COST. THIS ESTIMATE IS INTENDED TO ASSIST IN BUDGETARY ASSESSMENT AND DOES NOT GUARANTEE THAT ACTUAL PROJECT COSTS WILL NOT EXCEED OR BE LOWER THAN THE AMOUNTS STATED IN THIS ESTIMATE. University Ave: Public Works to 3rd St 6th Street: 10th St to Gray Ave Civic Campus Lake Construction: $32.0M Total: $39.1M 10th St: Westown Pkwy to 700' South of University Ave Construction: $17.0M Total: $22.4M 10th St: University Ave South Construction: $1.1M Total: $1.4M Intersection of University Ave/10th St 11th St/U Ave Asphalt Overlay 310th St Asphalt Overlay Construction: $15.2M Total: $17.0M University Ave: 3rd St to St. Boniface Church Stream Restoration Trails Construction: $12.1M Total: $14.5M Warrior Lane: University Ave to Park Rd Construction: $10.0M Total: $12.0M University Ave: S Warrior Ln to SE LA Grant Pkwy Construction: $6.9M Total: $8.5M Vineyard Property Parking Lot Construction: $3.0M Total: $3.5M LEGEND PHASE 1 (2025 - 2029) PHASE 2 (2030 - 2034) PHASE 3 (2035 - 2039) PRIVATE DEVELOPMENT 7372WAUKEE CIVIC MASTER PLAN On September 26, 2024, The design team met with City staff to focus on Architectural Style.   Several precedent images were presented for each civic building type.  These images showed a wide variety of exteriors, colors, and materials.  City staff provided guidance on which styles are preferred.  The images included on this page reflect a focused range of architectural appearances and styles that honor the preferences indicated by City staff. FIGURE 3.5 / VAUGHAN CITY HALL ARCHITECTURAL THEMING / CITY HALL FIGURE 3.6 / COLUMBUS LIBRARY FIGURE 3.7 / EASTON CITY HALL FIGURE 3.8 / WAUKEGAN CITY HALL FIGURE 3.3 / COLUMBUS METROPOLITAN LIBRARY FIGURE 3.4 / NEWARK CIVIC CENTER FIGURE 3.9 / WAUKEGAN CITY HALL FIGURE 3.12 / JOHNSON COUNTY LIBRARY ARCHITECTURAL THEMING / CITY LIBRARY FIGURE 3.13 / KENMORE LIBRARY FIGURE 3.14 / MORRISVILLE COMMUNITY LIBRARY FIGURE 3.10 / FAYETTEVILLE PUBLIC LIBRARY FIGURE 3.11 /OAK CREEK LIBRARY FIGURE 3.15 / JEAN KING LIBRARY SECTION 3 FIGURE 2.65 / TOWNHOMES 7574WAUKEE CIVIC MASTER PLAN 30 YEAR STAFF PROJECTIONS SVPA was provided population projections for 2060 at 68,000 residents. Office staff will need to grow in response to that increase in population. The City Hall is projected to include various departments including Administration, Economic and Community Development, HR, Finance, IT, and a portion of Parks and Recreation . The current population of staff in those departments requiring a designated location is around 54 housed in a variety of buildings. SVPA conducted a series of meetings with department leaders to strategize growth compared to population projections. Based on the data received it is anticipated the new City Hall could include 100 to 125 employees with designated office space. The intention would be to employ strategies to allow for growth and expansion within the initial building size of 25,000 to 30,000 s.f.. The city hall benchmark numbers also include community space such as council chambers, meeting rooms, lobby space and other required support spaces for both the public and staff uses. An alternate program was studied to include business incubator space which might add an additional 10,000 s.f. Community Spaces: Council Chambers, Meeting Rooms, etc. ��Expansion Potential: +10,000 sq. ft for Business Incubator �� Initial Space Plan: 25,000 sq. ft 🏗🏗 Projected Staff: 100-125 Growth Strategies �� City Hall Departments 🏛🏛 Current Staff: 54 �� Projected Population for 2060: 68,000 �� FIGURE 3.24 / 30 YEAR STAFF PROJECTIONS ARCHITECTURAL BENCHMARKING SECTION 3ARCHITECTURAL THEMING / PAVILION FIGURE 3.20 / MEADOWS PARK SHELTERS FIGURE 3.21 / MEADOWS PARK SHELTERSFIGURE 3.17 / COMMUNITY ICE CENTER FIGURE 3.16 / PAVILLON DU MICRORÉSEAU LAC-MÉGANTIC FIGURE 3.18 / FESTIVAL PARK FIGURE 3.23 / HOLLABAUGH PARK PAVILION FIGURE 3.19 / HOLLABAUGH PARK PAVILION 7776WAUKEE CIVIC MASTER PLAN SUSTAINABILITY BENCHMARKING FIGURE 3.27 / STREET TREES FIGURE 3.28 / NATIVE PLANTS IN STREET-SCAPES FIGURE 3.29 / LAKE S IN CITY LANDSCAPE FIGURE 3.26 / BIOSWALES IN STREET LANDSCAPING GREEN STREETS The campus will feature green streets throughout, incorporating various elements to manage stormwater runoff and enhance the urban environment. These streets could include: •Bioretention areas and rain gardens along sidewalks and in medians •Street trees in engineered soil volumes to ensure healthy growth •Permeable pavement for sidewalks and parking areas ENHANCED TREE COVER A robust urban forest will be established across the campus. Diverse native species will be planted to increase resilience •Trees will be strategically placed to provide shade, reduce the urban heat island effect, and improve air quality •Structural soils and silva cells could be used to support healthy root growth in paved areas SLOPE PROTECTION To prevent erosion and manage runoff on sloped areas: •Native vegetation will be planted on slopes •Terracing will be implemented where appropriate •Bioswales will be incorporated to slow and filter runoff PERMEABLE PAVING Permeable paving will be used extensively throughout the campus: •When appropriate parking lots will use permeable asphalt or concrete in key areas. (Entire lots should not be permeable) •Walkways can use recycled granular materials and plazas will feature permeable pavers as part of the design. •Portions of all paved surfaces should use materials that will allow stormwater to infiltrate, reducing runoff and recharging groundwater POND/LAKE FOREBAY The main lake shall have a forebay will be constructed to: •Capture and pre-treat stormwater before it enters the main retention pond •Remove sediment and pollutants, improving water quality •Enhance the aesthetic appeal of the campus MINIMIZING PIPE USAGE The campus design will prioritize natural drainage systems: •Bioswales and rain gardens will convey stormwater across the site •Underground infiltration galleries will be used where surface solutions are not feasible •This approach will reduce the need for traditional piped stormwater systems SECTION 3 GREEN INFRASTRUCTURE AND STORMWATER MANAGEMENT INTRODUCTION / SUMMARY The Waukee Civic Campus’s Green Infrastructure and Stormwater Management plan should emphasize sustainable design elements aimed at managing stormwater runoff while enhancing the urban environment. Green streets will incorporate bioretention areas, rain gardens, and permeable pavements, alongside strategically placed street trees in engineered soil to promote healthy growth. Enhanced tree cover will consist of diverse native species to increase resilience, improve air quality, and mitigate urban heat. Slope protection measures will include planting native vegetation, implementing terracing, and incorporating bioswales to manage erosion and filter runoff. The design will prioritize natural drainage systems, minimizing the reliance on traditional piped systems and incorporating a forebay in the main lake to pre-treat stormwater. In addition to stormwater management, the plan incorporates energy efficiency through the installation of solar panels on buildings and the consideration of green roofs for civic structures. These green roofs will provide insulation, absorb rainwater, and create habitats for pollinators. The implementation of this sustainability strategy will involve a phased plan, regular monitoring, and maintenance of green infrastructure elements, along with educational programs to engage the community. Performance metrics will track the effectiveness of stormwater runoff reduction, energy production, and air quality improvements, ensuring ongoing success and adaptation of the campus’s sustainable initiatives. Each of these initiatives are highlighted in the next few pages. FIGURE 3.25 / RAIN GARDENS INCORPORATED IN LANDSCAPE DESIGN SUSTAINABILITY BENCHMARKING SECTION 3 78 WAUKEE CIVIC MASTER PLAN This page is intentionally left blank. EXISTING SIDEWALK CONDITIONS A B C D SUSTAINABILITY BENCHMARKING ENERGY EFFICIENCY AND RENEWABLE ENERGY SOLAR FOR BUILDINGS Buildings within the civic campus will be equipped with rooftop solar panels when appropriate: •Solar arrays will be designed to maximize energy production •Battery storage systems will be integrated to provide resilience during power outages •When possible; excess energy will be fed back into the grid, potentially generating revenue for the city GREEN ROOFS FOR CIVIC BUILDINGS City of Waukee buildings shall consider green roofs as part of the design. •These will provide additional insulation, reducing heating and cooling costs •They will absorb rainwater, further reducing stormwater runoff •The green roofs will create habitat for pollinators and improve air quality FIGURE 3.31 / COMPLETE STREETS DESIGN FIGURE 3.30 / GREEN ROOFS INCORPORATED IN URBAN DESIGNIMPLEMENTATION AND MONITORING To ensure the success of this sustainability strategy: This approach includes phased implementation, regular maintenance, public education, and tracking of key metrics like water management, energy generation, and air quality improvements. Phased Sustainability A phased implementation plan will be developed, prioritizing key elements. Regular monitoring and maintenance schedules will be established for all green infrastructure elements. Educational signage and programs will be created to engage the public and explain the benefits of these sustainable features. Performance metrics will be tracked, including stormwater runoff reduction, energy production, and air quality By incorporating these elements, Waukee’s new Civic Campus will serve as a model for sustainable urban development, demonstrating the city’s commitment to environmental stewardship and resilience. SECTION FOUR / BENCHMARKING 4-1 / COMPREHENSIVE PLAN ANALYSIS 4-2 / FINANCIAL ANALYSIS 82 84 4 8382WAUKEE CIVIC MASTER PLAN In summary the Comprehensive Plan Future Land Use map provides a broad regional context, outlining various zoning categories such as residential, commercial, mixed-use, industrial, parks, and open spaces across a larger area. This broader framework translates into the Preferred Waukee Future Land Use Plan, which focuses on a specific area within the Waukee Civic Master Plan. The preferred plan refines the comprehensive vision by providing detailed COMPREHENSIVE PLAN ANALYSIS SECTION 4 FIGURE 4.2 / PREFERRED WAUKEE FUTURE LANDUSE PLAN FIGURE 4.3 / RELATIONSHIP BETWEEN WAUKEE CIVIC MASTER PLAN PROPOSED LANDUSE & COMPREHENSIVE PLAN allocations for mixed-use, residential, commercial, parks, open spaces, and a golf course. It emphasizes creating synergy between civic and recreational spaces while fostering community integration. The comprehensive plan serves as the foundation, while the preferred plan develops a more precise and focused vision tailored to the community’s needs and connectivity. COMPREHENSIVE PLAN ANALYSIS FIGURE 2.77 / GOLF COURSE AREA FIGURE 4.1 / WAUKEE FUTURE LANDUSE- 2040 COMREHENSIVE PLAN PLAN RELATIONSHIP TO COMPREHENSIVE PLAN The adopted comprehensive plan identifies the Waukee Civic Master Plan area as generally Institutional and Park related land uses. These land use designations include a variety of civic and governmental services along with public parks and recreational facilities. The proposed Master Plan expands upon these designations by including a variety of residential and commercial uses along with civic recreational use and open spaces. The addition of residential and commercial uses within the Master Plan area both takes advantage of the synergy that will be created by the planned civic and recreational uses and brings its own beneficial synergy to energize the City’s civic center. The Master Plan further respects the existing and proposed land uses within the surrounding neighborhood, edge-matching planned uses so not to conflict but instead accelerate the positive, continued development of this area of Waukee. 8584WAUKEE CIVIC MASTER PLAN RETAIL AND ENTERTAINMENT & SPORTS Based on CoStar data, the Retail and Entertainment & Sports market demonstrates a robust inventory of 1.7M SF, with under-construction space decreasing by 20.3% to 550,000 SF. Net absorption over the past 12 months has surged by 556.1% to 354,000 SF, while the vacancy rate remains low at 1.8%, reflecting a high occupancy rate of 98.2%. Market asking rents have risen by 1.3% to $19.93/SF, MULTI-FAMILY Based on CoStar data, the Multi-Family market in Waukee shows growth in inventory units, increasing by 24.3% to 5,301 units, with 84 units currently under construction, a decline of 92.5% from the prior period. The 12-month net absorption has surged by 738.5% to 760 units, while the vacancy rate has slightly risen to 19.3%. The market rent/ unit has decreased by 1.7% to $1,359, while the market FINANCIAL ANALYSIS FIGURE 4.5 / VACANCY RATE - WAUKEE RETAIL AND ENTERTAINMENT & SPORTS FIGURE 4.7 / VACANCY RATE - WAUKEE MULTI-FAMILY FIGURE 4.6 / MARKET ASKING RENT PER SF - WAUKEE RETAIL AND FIGURE 4.8 / MARKET ASKING RENT PER SF - WAUKEE RETAIL AND SECTION 4 Retail and Entertainment & Sports Multi-Family Retail and Entertainment & Sports Office Properties and the market sale price per square foot remains steady at $194. The market cap rate has improved by 10.2% to 7.5%. Over the past year, 12-month leased space totaled 306,000 SF, with an average asking price per SF of $370 and a sales volume of $27.7M. These figures highlight a thriving market with strong demand and a stable investment environment. sale price per unit has increased by 4.4% to $133,000. The market cap rate remains steady at 8.0%. Over the past year, total sales volume reached $23.4M, with an average asking price per unit of $174,000. These figures reflect a dynamic market with notable absorption but high vacancy, pointing to opportunities for stabilization. VACANCY RATES & BUILDING PERMIT TRENDS The City of Waukee has experienced rapid growth over the past decade. Currently, low vacancy rates for multi-family residential, commercial and office space prove there is unmet demand and as the Waukee population continues to grow, this demand will further increase. This positive trend is unlikely to change unless impacted by an external force such as an increase in lending interest rates or changes to property tax regulations that limit the ability of cities to grow. OFFICE BUILDINGS Based on CoStar data, the Waukee office market shows a stable inventory of 555,000 SF, with no new construction underway. Net absorption over the past 12 months is significantly down by 92.2%, totaling only 5,900 SF, while the vacancy rate remains low at 1.7%, reflecting high occupancy levels of 98.3%. Market asking rents have increased by 2% to $26.25/SF, and the market sale price FINANCIAL ANALYSIS TABLE 4.1 / WAUKEE BUILDING PERMIT TREND TABLE FIGURE 4.3 / VACANCY RATE - WAUKEE OFFICE BUILDINGS FIGURE 4.4 / MARKET ASKING RENT PER SF - WAUKEE OFFICE BUILDINGS FIGURE 4.1 / WAUKEE BUILDING PERMIT TREND TABLE FIGURE 4.2 / WAUKEE BUILDING PERMIT TREND TABLE SINGLE FAMILY TOWNHOME MULTI-FAMILY COMMERCIAL TOTAL PROPERTY YTD 411 173,447,849.26 $270 75209425.9 $630 82,240,229.52 $19 79794836.65$1897 439565838.82 $ 2024This Month 31 13,697,903.07 20 5,809,998.56 0 - 0 - 0 - 57 421,596.17 108 19,929,497.80 0 - YTD 411 173,447,849.26 270 75,209,425.97 0 - 11 82,240,229.52 19 79,794,836.65 1187 28,873,497.42 1897 439,565,838.82 6 75,803,326.00 FYTD 171 76,459,748.78 139 38,888,493.17 0 - 11 82,240,229.52 9 26,035,914.83 599 8,051,744.55 929 231,676,130.85 3 23,825,000.00 2023 This Month 46 18,527,540.98 13 3,781,627.98 - - - - - - 53 2,634,398.86 112 24,943,567.82 - - YTD 411 170,507,950.66 407 95,585,439.56 - - 7 53,588,276.54 28 76,027,843.57 949 20,330,225.06 1744 430,540,375.39 6 72,106,776.90 FYTD 231 96,903,513.87 231 58,461,442.10 - - - - 15 39,363,036.46 501 12,442,959.40 911 207,170,952.83 3 14,294,000.00 2022 This Month 7 4,097,030.35 24 5,891,892.24 0 -1 43,846,262.20 2 5,991,228.00 45 611,310.04 79 74,082,049.00 0 - YTD 380 135,274,502.55 146 50,314,876.00 0 -7 118,158,451.03 28 103,543,393.69 991 14,255,636.21 1552 421,546,859.48 11 40,715,120.00 FYTD 126 52,767,482.40 106 27,117,570.97 0 -7 118,158,451.03 11 48,117,582.57 460 6,557,702.04 710 252,718,789.01 2 194,000.00 2021 This Month 78 29,097,749.28 51 11,721,976.66 0 -0 -2 5,319,280.00 58 892,520.43 189 47,031,526.37 0 - YTD 672 219,222,272.05 153 36,663,969.45 0 -6 38,783,720.48 19 25,238,401.00 911 10,714,248.36 1761 330,622,611.34 16 52,725,111.00 FYTD 314 112,165,437.49 115 28,218,594.76 0 -4 25,522,750.88 10 11,227,025.00 417 3,101,202.12 860 180,235,010.25 9 52,725,111.00 2020 this month 39 11,462,994.45 35 7,490,730.29 0 -1 22,312,892.55 1 60,000.00 38 947,093.31 114 42,273,710.60 3 - YTD 411 116,646,505.48 226 46,661,128.79 0 -4 41,194,334.55 19 29,347,061.87 829 11,869,320.43 1489 245,718,351.12 21 54,548,175.77 FYTD 235 69,955,354.67 214 43,979,553.11 0 -1 22,312,892.55 11 22,064,961.65 257 8,079,646.93 718 166,392,408.91 11 19,986,000.00 2019 This Month 10 3,186,832.39 18 3,738,653.28 0 -0 -0 -48 967,202.02 76 7,892,687.69 2 56,000.00 YTD 190 56,683,733.02 443 79,259,481.12 0 -1 2,596,185.00 23 64,891,028.47 625 6,405,468.16 1282 209,835,895.77 6 2,341,627.72 FYTD*91 26,624,929.50 437 77,935,903.98 0 -1 2,596,185.00 11 17,301,008.33 319 3,187,785.92 859 127,645,812.73 3 56,000.00 2018 This Month 6 1,773,870.67 12 2,657,995.14 0 -0 -2 1,076,101.56 37 381,953.84 57 5,889,921.21 0 - YTD 203 59,519,674.16 59 14,831,605.49 0 -11 19,804,893.04 25 39,916,090.10 659 5,888,955.83 957 139,961,218.62 5 88,409,257.86 *FYTD 89 25,379,565.13 55 13,850,900.01 0 -8 15,970,067.00 15 14,263,715.89 310 2,611,670.18 477 72,075,918.21 4 87,834,657.86 2017 this month 14 3,921,401.72 0 -0 -0 -5 424,805.90 39 303,610.60 51 4,649,818.22 1 - YTD 237 71,746,262.51 129 24,126,435.04 0 -21 83,287,281.64 51 21,502,389.51 567 2,775,034.42 1005 203,437,403.12 2 139,120.00 *FYTD 97 30,181,238.50 51 9,529,426.95 0 -10 41,610,959.09 27 13,814,939.12 289 1,089,478.58 474 96,226,042.24 0 - 2016 This Month 15 4,271,459.01 0 -0 -4 403,990.80 3 343,745.00 35 279,807.79 57 5,299,002.60 0 - YTD 278 85,026,530.14 271 49,932,681.94 0 -14 41,470,718.01 39 28,434,455.12 522 4,298,013.48 1124 209,162,398.69 2 4,605,655.56 *FYTD 145 44,284,841.20 108 19,722,963.51 0 -10 17,713,958.19 24 21,833,786.86 265 2,236,912.00 522 105,792,461.76 0 - 2015 This month 31 9,757,070.21 18 2,954,951.05 0 -0 -0 -14 84,993.64 63 12,797,014.90 0 - YTD 372 113,259,506.90 89 17,361,294.68 0 -4 18,213,385.27 39 3,142,604.68 396 2,486,646.16 900 154,463,437.69 6 12,522,002.10 *FYTD 171 52,693,074.65 27 4,843,046.28 0 -2 10,214,995.98 22 2,758,069.48 191 1,287,860.47 413 71,797,046.86 1 68,000.00 Other Total Property Valuation Tax Exempt December 2024Building Permit Activity ReportBuilding Permits Issued Single Family Townhome Condominium Multi-Family Commercial 0 5 10 15 20 25 30 35 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 - 10,000,000.00 20,000,000.00 30,000,000.00 40,000,000.00 50,000,000.00 60,000,000.00 70,000,000.00 80,000,000.00 Total Valuation by Year 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 Single Family Residential Permits Issued: December 2024 Total Property Valuation: December 2024 Multi-Family Permits Issued 2024 Address Units Owner Name Date Issued 2190 SE Waco Pl 48 Bricktowne Kettlestone LC 7/17/2024 2380 SE Waco Pl 48 Bricktowne Kettlestone LC 7/17/2024 2240 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2260 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2350 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2330 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2295 SE Glacier Trl 60 Caliber Land Co 7/11/2024 1535 SE Glacier Trl 60 Kettlestone Apts, LLC 8/23/2024 1615 SE Glacier Trl 30 Kettlestone Apts, LLC 8/23/2024 2335 SE Glacier Trl 60 Caliber Land Company, LLC 8/06/2024 2375 SE Glacier Trl 60 Caliber Land Company, LLC 9/06/2024 Office Properties Office Properties 2024This Month 31 13,697,903.07 20 5,809,998.56 0 - 0 - 0 - 57 421,596.17 108 19,929,497.80 0 - YTD 411 173,447,849.26 270 75,209,425.97 0 - 11 82,240,229.52 19 79,794,836.65 1187 28,873,497.42 1897 439,565,838.82 6 75,803,326.00 FYTD 171 76,459,748.78 139 38,888,493.17 0 - 11 82,240,229.52 9 26,035,914.83 599 8,051,744.55 929 231,676,130.85 3 23,825,000.00 2023 This Month 46 18,527,540.98 13 3,781,627.98 - - - - - - 53 2,634,398.86 112 24,943,567.82 - - YTD 411 170,507,950.66 407 95,585,439.56 - - 7 53,588,276.54 28 76,027,843.57 949 20,330,225.06 1744 430,540,375.39 6 72,106,776.90 FYTD 231 96,903,513.87 231 58,461,442.10 - - - - 15 39,363,036.46 501 12,442,959.40 911 207,170,952.83 3 14,294,000.00 2022 This Month 7 4,097,030.35 24 5,891,892.24 0 -1 43,846,262.20 2 5,991,228.00 45 611,310.04 79 74,082,049.00 0 - YTD 380 135,274,502.55 146 50,314,876.00 0 -7 118,158,451.03 28 103,543,393.69 991 14,255,636.21 1552 421,546,859.48 11 40,715,120.00 FYTD 126 52,767,482.40 106 27,117,570.97 0 -7 118,158,451.03 11 48,117,582.57 460 6,557,702.04 710 252,718,789.01 2 194,000.00 2021 This Month 78 29,097,749.28 51 11,721,976.66 0 -0 -2 5,319,280.00 58 892,520.43 189 47,031,526.37 0 - YTD 672 219,222,272.05 153 36,663,969.45 0 -6 38,783,720.48 19 25,238,401.00 911 10,714,248.36 1761 330,622,611.34 16 52,725,111.00 FYTD 314 112,165,437.49 115 28,218,594.76 0 -4 25,522,750.88 10 11,227,025.00 417 3,101,202.12 860 180,235,010.25 9 52,725,111.00 2020 this month 39 11,462,994.45 35 7,490,730.29 0 -1 22,312,892.55 1 60,000.00 38 947,093.31 114 42,273,710.60 3 - YTD 411 116,646,505.48 226 46,661,128.79 0 -4 41,194,334.55 19 29,347,061.87 829 11,869,320.43 1489 245,718,351.12 21 54,548,175.77 FYTD 235 69,955,354.67 214 43,979,553.11 0 -1 22,312,892.55 11 22,064,961.65 257 8,079,646.93 718 166,392,408.91 11 19,986,000.00 2019 This Month 10 3,186,832.39 18 3,738,653.28 0 -0 -0 -48 967,202.02 76 7,892,687.69 2 56,000.00 YTD 190 56,683,733.02 443 79,259,481.12 0 -1 2,596,185.00 23 64,891,028.47 625 6,405,468.16 1282 209,835,895.77 6 2,341,627.72 FYTD*91 26,624,929.50 437 77,935,903.98 0 -1 2,596,185.00 11 17,301,008.33 319 3,187,785.92 859 127,645,812.73 3 56,000.00 2018 This Month 6 1,773,870.67 12 2,657,995.14 0 -0 -2 1,076,101.56 37 381,953.84 57 5,889,921.21 0 - YTD 203 59,519,674.16 59 14,831,605.49 0 -11 19,804,893.04 25 39,916,090.10 659 5,888,955.83 957 139,961,218.62 5 88,409,257.86 *FYTD 89 25,379,565.13 55 13,850,900.01 0 -8 15,970,067.00 15 14,263,715.89 310 2,611,670.18 477 72,075,918.21 4 87,834,657.86 2017 this month 14 3,921,401.72 0 -0 -0 -5 424,805.90 39 303,610.60 51 4,649,818.22 1 - YTD 237 71,746,262.51 129 24,126,435.04 0 -21 83,287,281.64 51 21,502,389.51 567 2,775,034.42 1005 203,437,403.12 2 139,120.00 *FYTD 97 30,181,238.50 51 9,529,426.95 0 -10 41,610,959.09 27 13,814,939.12 289 1,089,478.58 474 96,226,042.24 0 - 2016 This Month 15 4,271,459.01 0 -0 -4 403,990.80 3 343,745.00 35 279,807.79 57 5,299,002.60 0 - YTD 278 85,026,530.14 271 49,932,681.94 0 -14 41,470,718.01 39 28,434,455.12 522 4,298,013.48 1124 209,162,398.69 2 4,605,655.56 *FYTD 145 44,284,841.20 108 19,722,963.51 0 -10 17,713,958.19 24 21,833,786.86 265 2,236,912.00 522 105,792,461.76 0 - 2015 This month 31 9,757,070.21 18 2,954,951.05 0 -0 -0 -14 84,993.64 63 12,797,014.90 0 - YTD 372 113,259,506.90 89 17,361,294.68 0 -4 18,213,385.27 39 3,142,604.68 396 2,486,646.16 900 154,463,437.69 6 12,522,002.10 *FYTD 171 52,693,074.65 27 4,843,046.28 0 -2 10,214,995.98 22 2,758,069.48 191 1,287,860.47 413 71,797,046.86 1 68,000.00 Other Total Property Valuation Tax Exempt December 2024Building Permit Activity ReportBuilding Permits Issued Single Family Townhome Condominium Multi-Family Commercial 0 5 10 15 20 25 30 35 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 - 10,000,000.00 20,000,000.00 30,000,000.00 40,000,000.00 50,000,000.00 60,000,000.00 70,000,000.00 80,000,000.00 Total Valuation by Year 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 Single Family Residential Permits Issued: December 2024 Total Property Valuation: December 2024 Multi-Family Permits Issued 2024 Address Units Owner Name Date Issued 2190 SE Waco Pl 48 Bricktowne Kettlestone LC 7/17/2024 2380 SE Waco Pl 48 Bricktowne Kettlestone LC 7/17/2024 2240 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2260 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2350 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2330 SE Waco Pl 66 Bricktowne Kettlestone LC 7/17/2024 2295 SE Glacier Trl 60 Caliber Land Co 7/11/2024 1535 SE Glacier Trl 60 Kettlestone Apts, LLC 8/23/2024 1615 SE Glacier Trl 30 Kettlestone Apts, LLC 8/23/2024 2335 SE Glacier Trl 60 Caliber Land Company, LLC 8/06/2024 2375 SE Glacier Trl 60 Caliber Land Company, LLC 9/06/2024 per square foot has decreased by 5.1% to $127. Despite the dip in sales prices, the market cap rate has risen slightly to 11.9%. The 12-month leased SF totals 13,600, indicating steady demand, with an average asking price per SF of $422 in the past year. These figures highlight a well-leased market with minimal speculative construction activity. In consideration of the City’s current growth rate and the positive catalyst of the planned amenities within the Waukee Civic Master Plan, it can be anticipated that residential areas will develop quickly, building out in a few years following the extension of public infrastructure. As the population of the immediate area increases, the development of the mixed-use and commercial areas will follow, likely taking five or more years to be completely buildout. This buildout rate will be accelerated by the traffic and energy brought by the planned civic and recreational uses within the Master Plan. SECTION FIVE/ APPENDIX 5-1 / KANSAS CITY TRIP BOOKLET 5-2 / MINNEAPOLIS TRIP BOOKLET 5-3 / CHARETTE IMAGES 88 144 172 5 89 KANSAS CITY METRO TOUR | DAY 1 SECTION 5 KANSAS CITY METRO AREA / BUS TOUR FIELD GUIDE PREPARED FOR THE CITY OF WAUKEE 9190WAUKEE CIVIC MASTER PLAN APPENDIX SECTION 5 9:30AM 6:30PM BROOKRIDGE + CORPORATE WOODS (OPTIONAL) 6:30AM DEPART FROM WAUKEE CITY HALL OLATHE & JOHNSON COUNTY CIVIC CAMPUS KAUFFMAN LEGACY PARK 10:30PM MERRIAM COMMUNITY CENTER 11:30PM LUNCH AT MCCLAINS MARKET 1:00PM ITINERARY + ACCOMMODATIONS 2:30PM LENEXA CITY CENTER 5:00PM 6:15PM CHECK IN TO HOTEL - SHERATON OVERLAND PARK CONVENTION CENTER DEPART HOTEL 7:00PM DINNER AT Q-39 MEADOWBROOK PARK4:00PM 8:30PM SERV (OPTIONAL) KANSAS CITY METRO TOUR 7:30AM DEPART FROM HOTEL 8:00AM 9:00AM RAYMORE CITY HALL 9:45AM NEW LONGVIEW PRAIRIE VILLAGE CIVIC CAMPUS 9392WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5REFERENCE MAP CONFLUENCE MERRIAM COMMUNITY CENTER OLATHE & JOHNSON COUNTY CIVIC CAMPUS PRAIRIE VILLAGE CIVIC CAMPUS MEADOWBROOK PARKLENEXA CITY CENTER CORPORATE WOODS Q39 BROOKRIDGE KAUFFMAN LEGACY PARK SHERATON OVERLAND PARK HOTEL NEW LONGVIEW RAYMORE CITY HALL LEE’S SUMMIT MARKET PLAZA PARAGON CAPITOL FEDERAL SPORTS COMPLEX 9594WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5KAUFFMAN LEGACY PARK | KANSAS CITY, MO CIVIC CAMPUS SINGLE FAMILYRESIDENTIAL COMMERCIAL SINGLE &MULTI FAMILY RESIDENTIALMEDICAL INSTITUTE PRIVATEBUSINESSUNIVERISTY BUILDING NELSON ATKINSART MUSEUM MULTI FAMILYRESIDENTIALMULTI FAMILYRESIDENTIAL MULTI FAMILYRESIDENTIAL UNIVERSITY BUILDINGS COMMERCIAL UNIVERSITY BUILDING OVERVIEW Kauffman Legacy Park memorializes the Kauffman’s and their philanthropies through its welcoming design that brings a sense of peace. The civic area includes multiple parkers, Kauffman Memorial Gardens and Kaufman Conference Center, and the Anita Gorman Conservation Discovery Center. Surrounding the main civic area is single family housing and a creek that runs across the south portion of the area. The Discovery Center and Conference Center provide spaces for gatherings, meetings, and educational trips, while the parks are often used for recreation throughout the day. - https://www.kauffman.org/our-campus/legacy-park/ - https://mdc.mo.gov/discover-nature/places/anita-b-gorman-conservation- discovery-center - https://kcparks.org/places/theis-park/ BRUSH CREEK FRANK A. THEIS PARK VOLKER PARK ANITA GORMAN CONSERVATION DISCOVERY CENTER KAUFFMAN MEMORIAL GARDENS PARKINGPARKING PARKING BRUSH CREEK LEGACY PARK LEGACY PARK LEGACY LAKE SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL KAUFFMAN CONFERENCE CENTER Kansas City Room Lobby Troost Room Brush CreekRoom Paseo Room Town Square BrooksideRoom Nurs i n g Moth e r s Restrooms Loose ParkRoom Gillham ParkRoom Volker ParkRoom Office CoatCloset Vending Entrance To Parking Smoking Area(Outdoors only) N PlazaRoom 9796WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5KAUFFMAN LEGACY PARK | KANSAS CITY, MO 9998WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5MERRIAM COMMUNITY CENTER | MERRIAM, KS OVERVIEW Merriam is a suburb to the southwest of Kansas City, Kansas. Its foundation was laid with the construction of the City Hall and Fire Station, followed by the establishment of the police station in 2003. The landscape transformed in 2006 with the demolition of highway frontage housing to pave the way for progressive development. Over the years, the commercial sector has experienced steady growth, complemented by recent additions such as the Library and Community Center, enhancing the city’s amenities and fostering a vibrant atmosphere. - https://www.jocogov.org/best-times/march-april-2024/merriam-plaza-library- opens-march-20 - https://www.merriam.org/Government/Departments/Parks-Rec/Merriam- Community-Center DEVELOPMENT RESULTS - Opening of IKEA in 2015 spurred development in this area - New Community Center, parking garage and new pool built in 2021 - New Library completed in 2024 CIVIC CAMPUS COMMERCIALIKEA FAST FOOD SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL FAST FOOD COMMERCIAL SINGLE FAMILYRESIDENTIALMULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL BANK COMMERCIAL LIBRARY POOL CIVIC BUILDING MERRIAM POLICE DEPARTMENT MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL FIRE STATION COMMUNITY CENTER PARKS + REC SINGLE FAMILYRESIDENTIAL CITY HALL 101100WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5MERRIAM COMMUNITY CENTER | MERRIAM, KS 103102WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5LENEXA CITY CENTER | LENEXA, KS OVERVIEW Lenexa, situated in the southeast suburb of Kansas City, KS, boasts a vibrant civic campus sprawling across approximately 24 acres. Commencing its construction in 2014 and inaugurated in 2017, this campus seamlessly blends recreational and commercial elements, fostering community engagement and connectivity. Featuring a library, diverse dining options, and a range of housing choices within and around its premises, the civic campus serves as a focal point for fostering a closely-knit community within Lenexa. - https://www.copaken-brooks.com/our-properties/city-center-lenexa/ DEVELOPMENT RESULTS - Further development of the open parcels including “Restaurant Row” with an anticipated open in the fall of 2024 - Construction of a hospital and medical office is underway and set to finish completely in 2031 CITY CENTER GOLF COURSE SINGLE FAMILYRESIDENTIAL BASEBALL FIELDS SCHOOL RESTAURANTS MULTI FAMILY RESIDENTIAL COMMERCIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL CHURCH CHURCH MULTI FAMILY RESIDENTIAL SINGLE &MULTI FAMILY RESIDENTIAL MULTI FAMILY RESIDENTIAL SCHOOL FUTURE DEVELOPMENT MULTI FAMILY RESIDENTIAL LIBRARY REC CENTER FARMERS MARKET PARKING GARAGE GOLF COURSE COMMERCIAL RESTAURANTS OFFICES FUTURE DEVELOPMENT FITNESS MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL FUTURE DEVELOPMENT CITY HALLFOOD HALL FUTURE DEVELOPMENTAQUATIC CENTER FUTURE DEVELOPMENT MULTI FAMILY RESIDENTIAL COMMERCIAL FUTURE DEVELOPMENTMULTI FAMILY RESIDENTIAL MULTI FAMILY RESIDENTIAL 105104WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5LENEXA CITY CENTER | LENEXA, KS 107106WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5OLATHE & JOHNSON COUNTY CIVIC CAMPUS | OLATHE, KS OVERVIEW Olathe, situated southwest of Kansas City, Kansas, is a bustling center for government, professional services, unique small businesses, restaurants, historical neighborhoods, and cultural opportunities. The focus of civic life in their community and the recent investments made in the heart of their city demonstrate a strong commitment to nurturing their downtown core. - https://www.olatheks.gov/residents/community-resources/downtown-olathe - https://www.jocogov.org/department/county-managers-office/county- projects/facility-projects/johnson-county-square-project DEVELOPMENT RESULTS - Courthouse and plaza completed in 2021 - Current development of the Johnson County Square OLATHEPARKS + REC OLATHECITY HALLSTRATEGIC FINANCEPARKS + REC OLATHEHOUSING REHABILITATIONJOHNSON COUNTY DISTRICT COURTJOHNSON COUNTY SHERIFF COURTHOUSEJAIL JOHNSON COUNTY ADMINISTRATION BUILDING OLATHELIBRARY COMMERCIAL LIBRARY COMMERCIAL COMMERCIAL PARK & POOL CIVIC BUILDING CIVIC BUILDING CIVIC BUILDING CIVIC BUILDING SINGLE FAMILYRESIDENTIAL CIVIC BUILDING PARKING SINGLE FAMILYRESIDENTIAL MULTI FAMILY RESIDENTIAL SCULPTURE PARK USPS MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIALPLAZA SCHOOL FUTURE DEVELOPMENT 109108WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5OLATHE & JOHNSON COUNTY CIVIC CAMPUS | OLATHE, KS 111110WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5MEADOWBROOK PARK | PRAIRIE VILLAGE DEVELOPMENT RESULTS - Converted golf course - 52 single family homes, 70 twin villa homes, luxury apartments, a boutique hotel, and upscale senior living, working trails, lake amenity COMMERCIAL COMMERCIAL COMMERCIAL MULTI FAMILY RESIDENTIAL SCHOOL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL UTILITY SINGLE FAMILYRESIDENTIALSINGLE FAMILYRESIDENTIAL CHURCH CHURCH OVERVIEW Meadowbrook Park is a new development in Prairie Village, a suburb of Kansas City. This development includes single and multi family housing and a large park. Within the park is trails, pickleball courts, multiple playgrounds, and multiple shelters. This park then connects through a trail that wraps around a small lake that cuts through the housing. - https://meadowbrookpark.com/ - https://www.jcprd.com/Facilities/Facility/Details/Meadowbrook-Park-98 REDEVELOPMENTPROJECT AREA MULTI FAMILY RESIDENTIAL MEADOWBROOK PARK MEADOWBROOK PARK MEADOWBROOK PARK COUNTRY CLUB MULTI FAMILY RESIDENTIAL SENIORRESIDENTIAL RESTAURANTS COMMERCIAL COMMERCIAL TRAIL TRAIL TRAIL SINGLE &MULTI FAMILY RESIDENTIAL 113112WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5MEADOWBROOK PARK | PRAIRIE VILLAGE 115114WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5BROOKRIDGE REDEVELOPMENT| OVERLAND PARK, KS OVERVIEW Brookridge is a mixed-use density-driven development that is arranged to produce a walkable environment for most individuals. The master plan includes a walkable retail, office and residential center, potentially two to three executive hotels, and approximately 2,000 residential apartment units. the experience of the development will be a cohesive mixed-use neighborhood with attractive degrees of variation. Locally, the new urban quarter will provide high quality, high value services to the existing community. Vehicular access to I-435 heightens the economic and cultural impact of the project by making it readily available to the entire KC metropolitan region by motor vehicle. The civic program of public spaces taken with tightly knit neighborhoods in walking distance to Class A Office will develop a talent draw from local universities including Kansas State University and The University of Kansas and attract tourists from the entire state of Kansas and multi-state region. - https://www.curtinpropertycompany.com/project-facts - https://governor.kansas.gov/governor-kelly-breaks-ground-on-2b- redevelopment-in-overland-park/ DEVELOPMENT RESULTS - Converted golf course - 2,000 residential units, 16,000 anticipated jobs - 2028 completion date COMMERCIAL SINGLE FAMILYRESIDENTIAL GOLF COURSE MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL CORPORTATE WOODS MULTI FAMILY RESIDENTIAL COMMERCIAL MULTI FAMILY RESIDENTIAL COMMERCIAL COMMERCIAL COMMERCIAL MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIALSINGLE FAMILYRESIDENTIAL COMMERCIAL GOLF COURSE MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL COUNTRY CLUBPOOL STORAGE 117116WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5BROOKRIDGE REDEVELOPMENT| OVERLAND PARK, KS 119118WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5CORPORATE WOODS| OVERLAND PARK, KS DEVELOPMENT RESULTS - 2.1 million sqft of office realestate throughout 29 buildings - Accessible hiking/biking trails to Indian Creek - PGA regulation-sized putting green - Monhtly tenant events OVERVIEW Corporate Woods Office Park is located on College Blvd. between I-69 and Antioch Road. The 2.1 million square foot office park boasts beautiful wooded and green areas interspersed between buildings to offer a serene setting for tenants. COMMERCIAL CORPORTATE WOODS COMMERCIAL COMMERCIAL LANGUAGESERVICES CORPORATE OFFICE CORPORATE OFFICE PUBLIC PARK MIXED-USE BUILDING COMMERCIAL MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL CHAMBER OF COMMERCE CORPORATE OFFICES CORPORATE OFFICES CORPORATE OFFICE CORPORATE OFFICES CORPORATE OFFICES CORPORATE OFFICE PUBLIC PARK COMMERCIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL BROOKRIDGEREDEVELOPMENTSINGLE FAMILYRESIDENTIALCOMMERCIALSINGLE FAMILYRESIDENTIAL 121120WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 1 SECTION 5CORPORATE WOODS| OVERLAND PARK, KS 123122WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5PRAIRIE VILLAGE CIVIC CAMPUS | PRAIRIE VILLAGE, KS OVERVIEW Prairie Village, a suburb situated south of Kansas City, Kansas, offers a diverse array of amenities in its surroundings. Within its vicinity, you’ll find a pool complex, park, school, Fire Station, and YMCA. Civic infrastructure encompasses essential establishments like the City Hall and Police Station. Presently, the city is contemplating replacing the YMCA with a new Community Center and Library, potentially situated within the park. Additionally, plans for CIVIC CAMPUS SCHOOL CHURCHES YMCA SWIM SINGLE FAMILYRESIDENTIAL MULTI FAMILY RESIDENTIAL DEVELOPMENT RESULTS - The campus is older and has been landlocked by adjacent residential development - Plans to redevelop the civic buildings on site the renovation of their civic buildings are currently in the developmental stages. - https://www.pvkansas.com/departments/projects/municipal-complex- renovations-new-construction AQUATIC PARKPARKING MUNICIPAL BUILDINGS TENNIS COURTS SKATE PARK TRAIL ANDDISC GOLF CHURCHES 125124WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5RAYMORE CITY HALL | RAYMORE, MO CIVIC CAMPUS SINGLE FAMILYRESIDENTIAL SINGLE &MULTI FAMILY RESIDENTIAL COMMERCIAL COMMERCIALCOMMERCIAL CHURCHES MULTI FAMILY RESIDENTIAL OVERVIEW Raymore, situated south of Kansas City on the Missouri side, boasts a distinctive civic campus spanning approximately 28 acres, with ample adjacent space for development. Presently, the campus features a commercial strip, city hall, parks and recreation building, and a versatile multi-purpose event venue. Notably, the event space harmonizes with its surroundings, leveraging the adjacent environment to seamlessly integrate with the plaza in front DEVELOPMENT RESULTS - Municipal Circle Drive and City Hall built in 2003, Adjacent road infrastructure added 2004, Small office building developed 2005 - Development along 58 Highway has slowly infilled over time - Centerview Community Center added in 2017 - Multifamily duplex development added in 2022 and parcels are still available MULTI FAMILY RESIDENTIAL CITY HALL COMMERCIAL COMMERCIAL COMMERCIALCOMMERCIAL PARKS + REC EVENT SPACE FUTURE DEVELOPMENT FUTURE DEVELOPMENT CIVIC BUILDING SINGLE &MULTI FAMILY RESIDENTIAL SINGLE &MULTI FAMILY RESIDENTIAL 127126WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5RAYMORE CITY HALL | RAYMORE, MO 129128WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5NEW LONGVIEW | LEE’S SUMMIT, MO OVERVIEW Located at 3rd St. and View High Rd., New Longview combines classic Kansas City architecture with the magnificent beauty of the R.A. Long estate. Transforming significant historical structures into usable community centers and landmarks is the signature of the community. Choices are abundant, with over 1,100 residences, 600,000 square feet of office and retail space, park land and modern conveniences inspired by traditional neighborhood design. In 2019 the Lee’s Summit City Council approved a Community Improvement District for the area. While development is still in the works, plans include a one acre event space that will host special events and public concerts. The addition is expected to break ground in 2020. DEVELOPMENT RESULTS - Provided new housing options for the community college students - Room for growth - Close connection to the waterfront CIVIC CAMPUS MULTI FAMILY RESIDENTIAL LONGVIEW LAKE COLLEGE CAMPUS COMMUNITYCENTER GOLF COURSE PARKS +REC SHELTERS COMMERCIAL COLLEGESPORTS FIELDS SINGLE FAMILYRESIDENTIAL SINGLE &MULTI FAMILY RESIDENTIAL MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL PARKS +REC SHELTER OPEN SPACE PARKS +REC CAMPING SINGLE FAMILY RESIDENTIAL SINGLE FAMILY RESIDENTIAL COMMERCIAL HISTORIC STRUCTURES APARTMENTCLUBHOUSE OPEN SPACE STORMWATERMANAGEMENT COMMERCIAL MULTI FAMILY RESIDENTIAL SINGLE FAMILYRESIDENTIAL EVENT VENUE THEATER RETAIL FUTURE DEVELOPMENT 131130WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5NEW LONGVIEW | LEE’S SUMMIT, MO 133132WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5PARAGON STAR VILLAGE AND SPORTS COMPLEX | LEE’S SUMMIT, MO OVERVIEW Located near I-470 and View High Drive, Paragon Star will be a $250 million sports-complex anchored project. The sports complex will include 10 regulation soccer fields and is expected to be complete by Summer 2020. Plans for Paragon Star also include a commercial development, Paragon Star Village, which will include a 390-unit luxury multifamily complex, 100,000 square feet of Class A office space, two hotels, 90,000 square feet of retail and a 12,000 square foot entertainment venue. Upon completion, The Village entertainment district will include luxury apartments, hotel lodging and office space, as well as an entertainment district surrounding an inviting open-air plaza - all nestled into a lush, natural landscape intertwined with the Little Blue River and bordered by the Little Blue Trace and Rock Island Trails. DEVELOPMENT RESULTS - FIFA compliant turf fields, pickleball, sand volleyball, and multi-level ropes course - 35,000 sf of office space - 35,000 sf of retail space - 2024 completion date - Future luxury apartment development in southwest area SINGLE FAMILYRESIDENTIAL OPEN SPACE SINGLE FAMILYRESIDENTIAL COMMERCIAL CHURCH COMMERCIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL COMMERCIAL TRAIL LITTLE BLUERIVER KANSAS CITY METRO TOUR| DAY 2 SPORTS FIELDSPARKING PARKING FUTURE DEVELOPMENT FUTURE DEVELOPMENT FUTURE DEVELOPMENT FUTURE DEVELOPMENT OPEN SPACE OPEN SPACE LITTLE BLUERIVER TRAIL 135134WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5PARAGON STAR VILLAGE AND SPORTS COMPLEX | LEE’S SUMMIT, MO 137136WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5 OVERVIEW Lee’s Summit is a suburb to the south east of Kansas City, MO. They embarked on a transformative journey in 1989 with the establishment of a community-centric downtown initiative. Since then, the city has successfully preserved its historic architecture, lending its downtown area a distinctive charm. Spanning approximately 40 acres, Downtown Lee’s Summit stands as a testament to this preservation effort. Presently, the city is actively engaged in a forward-looking development project slated for completion in 2025, adjacent to its city hall. This endeavor aims to revitalize a previously unused block, fostering a more pedestrian-friendly environment, including the introduction of a pedestrian-only street, thereby enhancing the downtown experience. - https://downtownls.org/dlsms/ - https://cityofls.net/downtown-market-plaza DEVELOPMENT RESULTS - 109 new businesses since 2009 - Civic campus development - City Hall with an integrated streetscape pavilion, farmers market and event space, outdoor performance area, boutique hotel and retail, future multi-family housing - New pedestrian street FUTURE DEVELOPMENT PARAGON STAR VILLAGE AND SPORTS COMPLEX | LEE’S SUMMIT, MO COMMERCIAL COMMERCIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL SINGLE FAMILYRESIDENTIAL COMMERCIAL SCHOOL COMMERCIAL SINGLE FAMILYRESIDENTIAL DOWNTOWNLEE’S SUMMIT DOWNTOWNLEE’S SUMMIT DOWNTOWNLEE’S SUMMIT SEE INSETOPPOSITE PAGE 139138WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5PARAGON STAR VILLAGE AND SPORTS COMPLEX | LEE’S SUMMIT, MO 141140WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5CAPITOL FEDERAL SPORT COMPLEX OF LIBERTY | LIBERTY, MO OVERVIEW Opened in June 2002 as Fountain Bluff Sports Complex, this multi-million dollar facility offers various sporting events on the 146-acre site. In addition to the recently turfed baseball/softball fields, the complex also includes six grass, regulation sized soccer fields, eight stocked ponds that are used to irrigate the fields; more than two miles of walking/ jogging trails; playgrounds; and concession stands. OPEN SPACE OPEN SPACE DEVELOPMENT RESULTS - Over 2 miles of paved walking/biking trails - Over 200,000 visitors every year - Extended playing seasons - 8 fishing ponds SPORTS FIELDS SPORTS FIELDS PARKING PARKING PLAYGROUND POND POND POND POND POND POND POND POND CAPITOL FEDERAL SPORT COMPLEX OF LIBERTY | LIBERTY, MO Capitol Federal® Sports Complex of Liberty MINSKY'S PIZZA FIELD 143142WAUKEE CIVIC MASTER PLAN APPENDIX KANSAS CITY METRO TOUR | DAY 2 SECTION 5CAPITOL FEDERAL SPORT COMPLEX OF LIBERTY | LIBERTY, MO MINNEAPOLIS METRO AREA / BUS TOUR FIELD GUIDE PREPARED FOR THE CITY OF WAUKEE This page is intentionally left blank. • 147146WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 OVERVIEW Cobblestone Lake is an enclave of neighborhoods drawn together by streetscapes of architectural harmony, a centerpiece lake with miles of shoreline surrounded by a unique park & trail system including recreational facilities and a variety of neighborly amenities. Located 20 miles south of both Minneapolis and St. Paul, the “Master-Planned” community consists of 323 acres accommodating 2000 to 2500 single-family and multi-family homes plus a neighborhood commercial area anchored by a the new Super Target, providing opportunity for charming neighborhood shops and businesses giving the development a sense of community. The “Traditional” architecture of Cobblestone Lake accentuates classic styles emphasizing streetscapes and front porch amenities etc. The area is highlighted by a centerpiece 36-acre lake, miles of recreation trails and sidewalks, as well as public and private parkland, and open green-space for every ones enjoyment. COBBLESTONE LAKE - APPLE VALLEY DEVELOPMENT RESULTS - Variety of Housing Types - Senior Living, Apartments, Single Family variety - Extensive Public realm w/Interconnected double trail Pedestrian Environment - Adjacent connected suburban retail concept 149148WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 COMMERCIAL / RETAIL COMMERCIAL / RETAIL RESIDENTIAL SENIORLIVING RESIDENTIAL COBBLESTONE LAKE - APPLE VALLEY COBBLESTONELAKE RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL 151150WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 OVERVIEW As one of Thirty Two teams that play in the National Football League, the Minnesota Vikings wanted to create a world class facility that would put their organization under one roof, attract and retain top talent, accommodate their fan base in a new way, and ultimately provide an asset to the community. The result was Viking Lakes and the Twin Cities Orthopedics Performance Center, in Eagan, Minnesota, a 200-acre master planned community. The Landscape Architect’s role was critical in helping the client see a grander vision than the initial scope of a corporate headquarters and training facility – leading site master planning, creating development guidelines, introducing sustainability and ecological restoration, and emphasizing the importance of the public realm through design, pedestrian circulation, programming and branding. DEVELOPMENT RESULTS - Variety of Housing Types - High Amenity Apartment Living - Elite training / rehab facility for college / highschool athletes - Extensive Public realm w/Interconnected Pedestrian Environment - Future Event / destination focused amenities - World Class Facility and Hotel BEFORE VIKINGS PKWY VIKING LAKES - EAGAN MAIN STREETCONCEPT VIKINGS HQ RESIDENTIAL FUTURERESIDENTIAL FUTURERESIDENTIAL HOTEL TODAY MOBCOMMERCIAL /RETAIL COMMERCIAL VIKINGS PKWY FUTUREEVENT CENTER LAKEAMENITY FUTUREDEVELOPMENT FUTURECOMMERCIAL FUTUREEVENT VENUE 153152WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5VIKING LAKES - EAGAN HOTEL LAKEAMENITY LAKEAMENITY 155154WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 OVERVIEW A 122-acre former brownfield site know as Highland Bridge in Saint Paul Minnesota, traditional home to the Dakota people and most recently a decommissioned Ford Assembly Plant, this site aims to promote economic, environmental and social sustainability. The public realm at Highland Bridge serves as the catalyst to promote and encourage adjacent development as the remainder of the site continues to be built out. DEVELOPMENT RESULTS - Variety of Housing Types - Senior Living, Apartments, Single Family, and Brownstones - Blend of Public and Privately owned Public realm w/Interconnected Pedestrian Environment featuring Park amenities - Continued development and demand (Higher ROIs than anticipated) - Stormwater treatment as a focal element of the development HIGHLAND BRIDGE - ST. PAUL HIGHLAND PARKWAY CR E T I N A V E MT C U R V E B L V D MONTREA L A V E CENTRAL WATER FEATURE UŊČI MAKHÀ PARK ASSEMBLYUNIONPARK CENTRALPLAZA GATEWAYPARK MOB RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL MIXED USEDEVELOPMENT 157156WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 Sustainable Stormwater Management for Highland Bridge Improving water as it flows through Highland Bridge into Hidden Falls and the Mississippi River Water Flow Direction Legend Open Water Rain Gardens Underground Stormwater Treatment Water Diversion Structure Highland Bridge Project Boundary Note: Building footprints are based on 2020 conceptual plans, constructed building design may vary from what is shown Hidden Falls Drains to the Mississippi River Ford Parkway Bohland Ave Montreal A v e Cr e t i n A v e Mississ i p p i R i v e r B o ulevard Cl e v e l a n d A v e S Mount Curve Blvd Feet 0 200 400 N HIGHLAND BRIDGE - ST. PAUL 159158WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 BIG BOX RETAIL OVERVIEW Maple Grove is a northwestern suburb of the Twin Cities. Within the City of Maple Grove there is an area defined as the Maple Grove Gravel Mining Area (GMA). This area encompassed approximately 2,100 acres and has been actively mined for construction aggregates since the 1920s. The vision of the landowners and the Gravel Mining Area Planning Task Force was to create a distinctive environment that blended the desirable elements of typical suburban life with the character and pedestrian scale of more traditional urban neighborhoods. Multiple phases of what became regionally recognized as Arbor Lakes have been implemented and the vision is being achieved with spectacular results serving as a destination attraction in the Twin Cities metro. DEVELOPMENT RESULTS - Variety of housing types - medium to high density, senior living, - Civic campus - Government Center, community center with an ice arena, an aquatic center and a fitness center for the Maple Grove community, county library - Over 2,000,000 SF of new retail and office space including the Shoppes of Arbor Lakes and the Fountains of Arbor Lakes. - Town Green civic commons and 40 acre Central Park. ARBOR LAKES TOWN GREEN - MAPLE GROVE CENTRALPARK TOWNGREEN COMMUNITYCENTER +LIBRARY ARBORLAKES FOUNTAIN AT ARBORLAKES MAIN STREETCONCEPT RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL GOVCENTER 161160WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5ARBOR LAKES TOWN GREEN - MAPLE GROVE 163162WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 BIG BOX RETAIL BIG BOX RETAIL OVERVIEW Built in 2002, Excelsior & Grand is a premier redevelopment project located on the 15-acre Park Commons redevelopment site along Excelsior Boulevard between Monterey Drive and Quentin Avenue. Centered along a 600 ft. town green that connects Excelsior Boulevard to the neighboring 30-acre Wolfe Park, the $160 million project aimed to revitalize Excelsior Boulevard and create a community focal point or downtown environment for St. Louis Park. DEVELOPMENT RESULTS - Variety of Housing Types - Apartment / Condiminiums - Mixed Use Development with integrated parking and retail - Extensive Public realm w/Interconnected Pedestrian Environment between private and civic uses - Community Center, Wolfe Park, and Aquatics Facility - Covered Multi-use Plaza for various events COMMERCIAL /RETAIL COMMERCIAL /RETAIL EXCELSIOR & GRAND / WOLFE PARK - ST. LOUIS PARK COMMUNITYCENTER +AQUATICS MAIN STREETCONCEPT WOLFE PARK RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL MIXED USEDEVELOPMENT MIXED USEDEVELOPMENT COMMERCIAL /OFFICE COMMERCIAL /RETAIL COMMERCIAL /OFFICE 165164WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5EXCELSIOR & GRAND / WOLFE PARK - ST. LOUIS PARK 167166WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5 OVERVIEW Centennial Lakes is retail, commercial, and residential gem within Edina. The backbone of this development is a city park and greenspace. The park features more than 1.5 miles of paved pathways meandering around a 10-acre lake interspersed with beautifully landscaped grounds, formal and informal seating areas, swinging benches and fountains. Centennial Lakes is also linked to the Edina Promenade which weaves it’s way to to the north connecting additional residents and businesses to this feature. Confluence is actively involved in development projects around Centennial Lakes and Promenade. This amenity is cherished and creates a desirability and continues to attract development proposals as adjacent buildings have begun to reach their lifespan. - DEVELOPMENT RESULTS - Variety of housing types - medium to high density, senior living, rowhomes - Extensive Public realm w/Interconnected Pedestrian Environment with a variety of amenities - paddleboats, fishing, remote control sailboats, lawn games, bent grass putting course, weekly farmers market, labrynth, performance amphitheatre. - Commercial Office park and Retail activity CENTENNIAL LAKES - EDINA 169168WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5CENTENNIAL LAKES - EDINA PROMENADE CENTENNIALLAKES FUTURE MUDEVELOPMENTFUTURE MUDEVELOPMENT COMMERCIAL / RETAIL COMMERCIAL / RETAIL COMMERCIAL / RETAIL OFFICE / COMMERCIAL OFFICE / COMMERCIAL OFFICE / COMMERCIAL OFFICE / COMMERCIAL OFFICE / COMMERCIAL OFFICE / COMMERCIAL OFFICE / COMMERCIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL 171170WAUKEE CIVIC MASTER PLAN APPENDIX MINNEAPOLIS CITY METRO TOUR SECTION 5DEVELOPMENT SCALE COMPARISON COBBLESTONE LAKEWAUKEE SITE VIKING LAKES EXCELSIOR & GRAND MAPLE GROVE CENTENNIAL LAKES / PROMENADE HIGHLAND BRIDGE WAUKEE CIVIC MASTER PLAN CHARRETE 23 MARCH 2024 PREPARED AT HOTEL FORT DES MONIES- DES MONIES, IA This page is intentionally left blank. 175 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 174 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 1 CHARRETTE / GROUP 1 FIGURE 5.1 / GROUP 1 PROPOSED PLAN FIGURE 5.2 / GROUP 1 PROPOSED SKETCHES 177 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 176 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 2 CHARRETTE / GROUP 2 FIGURE 5.3 / GROUP 2 PROPOSED PLAN FIGURE 5.4 / GROUP 2 PROPOSED SKETCHES 179 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 178 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 3 CHARRETTE / GROUP 3 FIGURE 5.5 / GROUP 3 PROPOSED PLAN FIGURE 5.6 / GROUP 3 PROPOSED SKETCHES 181 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 180 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 4 CHARRETTE / GROUP 4 FIGURE 5.7 / GROUP 4 PROPOSED PLAN FIGURE 5.8 / GROUP 4 PROPOSED SKETCHES 183 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 182 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 5 CHARRETTE / GROUP 5 FIGURE 5.9 / GROUP 5 PROPOSED PLAN FIGURE 5.10 / GROUP 5 PROPOSED SKETCHES 185 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 184 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 6 CHARRETTE / GROUP 6 FIGURE 5.11 / GROUP 6 PROPOSED PLAN FIGURE 5.12 / GROUP 6 PROPOSED SKETCHES 187 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 186 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 7 CHARRETTE / GROUP 7 FIGURE 5.13 / GROUP 7 PROPOSED PLAN FIGURE 5.14 / GROUP 7 PROPOSED SKETCHES 189 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 188 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 8 CHARRETTE / GROUP 8 FIGURE 5.15 / GROUP 7 PROPOSED PLAN FIGURE 5.16 / GROUP 7 PROPOSED SKETCHES 191 DESIGN CHARRETTE- MARCH 23, 2024 SECTION 5 190 WAUKEE CIVIC MASTER PLAN APPENDIX GROUP 9 CHARRETTE / GROUP 9 FIGURE 5.17 / GROUP 9 PROPOSED PLAN GROUP 10 FIGURE 5.18 / GROUP 10 PROPOSED SKETCHES