Loading...
HomeMy WebLinkAbout2025-04-07 I05A 10th St Crack and Seat_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 7, 2025 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 2 to Grimes Asphalt and Paving Corporation, increasing the contract in the amount of $239,985.96. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: The change order includes the zero-out change order to adjust final quantities to the measured as-built amounts. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract in the amount of $239,985.96. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I5A 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 March 31, 2025 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #2 & Pay Request #2 10th Street Crack and Seat – NW Douglas Parkway to 260th Street Dear Mrs. Kappos: Attached please find a detailed Pay Request and Change Order for City Council approval on April 7, 2025. Submitted Quantity Item No. Description Division Unit Quantity 2.1 TOPSOIL, OFF-SITE 1 CY 420.00 2.3 CLASS 13 EXCAVATION 1 CY 47.10 2.3 CLASS 13 EXCAVATION 2 CY 16.90 7.3 GRANULAR SURFACING 1 TON 400.4 7.3 GRANULAR SURFACING 2 TON 318.30 7.4 ASPHALT PAVEMENT SAMPLES AND TESTING 1 LS 0.50 7.4 ASPHALT PAVEMENT SAMPLES AND TESTING 2 LS 0.50 7.5 HMA PAVEMENT, HIGH TRAFFIC, SURFACE COURSE, PG 58-28H, 1/2" MIX 1 TON 192.26 7.5 HMA PAVEMENT, HIGH TRAFFIC, SURFACE COURSE, PG 58-28H, 1/2" MIX 2 TON 192.26 7.6 HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, PG 58-28S, 1/2" MIX 1 TON 10.00 7.6 HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, PG 58-28S, 1/2" MIX 2 TON 10.00 7.15 JOINT CONTROL FABRIC 1 LF 500.00 7.15 JOINT CONTROL FABRIC 2 LF 500.00 7.16 HMA PAVEMENT, 1/2" INTERMEDIATE AND SURFACE MIX, 6 IN. 1 TON 385.10 7.16 HMA PAVEMENT, 1/2" INTERMEDIATE AND SURFACE MIX, 6 IN. 2 TON 109.16 . We have reviewed the submitted quantities, and they appear to be in order with what has been constructed in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay Grimes Asphalt of Des Moines, Iowa the amount of $136,568.40 for the work completed to date. C:\pw_workdir\pw_ie\fvd_amw2\d0822601\Ltr_2025-0210_Waukee 10th Crack and Seat - Recommend CO2 and PR2.docx Change Description: This change order includes the zero-out change order to adjust final quantities to the measured as-built amounts. We recommend the City of Waukee Increase the contract price in the amount of $239,985.96 to complete the additional work associated with Change Order #2. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Final Pay Request #2 & Change Order #2 dated 03/31/2025 CHANGE ORDER 02 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:Grimes Asphalt and Paving Corporation 5550 NE 22nd Street Des Moines, Iowa 50313 $1,254,457.62 May 6, 2024 2.3 1 Special CY $64.00 -29.54 ($1,890.56) 2.3 2 Special CY $64.00 -10.46 ($669.44) 7.3 1 7010-J-1004 TON $36.50 1203.67 $43,933.96 7.3 2 7010-J-1004 TON $36.50 1280.13 $46,724.75 7.5 1 7020-A-1000 TON $93.00 214.26 $19,926.18 7.5 2 7020-A-1000 TON $93.00 214.26 $19,926.18 7.6 1 7020-A-1010 TON $86.00 518.50 $44,591.00 7.6 2 7020-A-1010 TON $86.00 612.00 $52,632.00 7.7 1 7020-A-1021 TON $121.00 160.90 $19,468.90 7.7 2 7020-A-1021 TON $121.00 199.40 $24,127.40 7.8 1 7030-H-3000 TON $36.50 -18.00 ($657.00) 7.8 2 7030-H-3000 TON $36.50 -31.00 ($1,131.50) 7.9 1 7040-A-1008 SY $45.00 -215.00 ($9,675.00) 7.9 2 7040-A-1008 SY $45.00 -266.00 ($11,970.00) 7.10 1 7040-B-1006 TON $56.00 -68.00 ($3,808.00) 7.10 2 7040-B-1006 TON $56.00 -84.00 ($4,704.00) 7.14 1 7092-C-1000 LF $3.50 242.00 $847.00 7.14 2 7092-C-1000 LF $3.50 242.00 $847.00 7.15 1 7092-H-1000 LF $2.50 192.00 $480.00 7.15 2 7092-H-1000 LF $2.50 192.00 $480.00 7.16 1 Special TON $105.00 79.26 $8,322.30 8.1 1 8020-C-1000 STA $90.00 -14.94 ($1,344.60) 8.1 2 8020-C-1000 STA $90.00 -5.26 ($473.40) 8.2 1 8020-M-1000 STA $36.00 -14.94 ($537.84) 8.2 2 8020-M-1000 STA $36.00 -5.26 ($189.36) 8.4 1 8040-A-1000 EA $500.00 -2.00 ($1,000.00) THE CONTRACT IS CHANGED AS FOLLOWS: This is the final zero-out change order to match as-built quantities from the field measurements. NW 10th Street Crack and Seat NW Douglas Parkway to 260th Street 2 23W034.00 Waukee Project File Number March 31, 2025 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 Value AdjustmentQuantity AdjustmentUnit PriceDescriptionUnit PAINTED PAVEMENT MARKINGS, DURABLE Division Item Code Class 13 Excavation HMA PAVEMENT, 1/2" INTERMEDIATE AND SURFACE MIX, 6 IN. GROOVES CUT FOR PAVEMENT MARKINGS FULL DEPTH SAW CUT JOINT CONTROL FABRIC JOINT CONTROL FABRIC GRANULAR SURFACING GRANULAR SURFACING HMA PAVEMENT, HIGH TRAFFIC, SURFACE COURSE, PG 58-28H, 1/2" MIX HMA PAVEMENT, HIGH TRAFFIC, SURFACE COURSE, PG 58-28H, 1/2" MIX FULL DEPTH PATCHES, HMA, 8 IN. SUBBASE OVER-EXCAVATION HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, PG 58-28S, 1/2" MIX HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, PG 58-28S, 1/2" MIX HMA OVERLAY, INTERLAYER BASE COURSE, PG 58-34E, 3/8" MIX HMA OVERLAY, INTERLAYER BASE COURSE, PG 58-34E, 3/8" MIX DRIVEWAY, GRANULAR, CLASS-A CRUSHED STONE, DRIVEWAY OR ROADWAY, 4 IN. DRIVEWAY, GRANULAR, CLASS-A CRUSHED STONE, DRIVEWAY OR ROADWAY, 4 IN. FULL DEPTH PATCHES, HMA, 8 IN. SUBBASE OVER-EXCAVATION FULL DEPTH SAW CUT TRAFFIC SIGNS, R6-1R, 54" x 18" Class 13 Excavation PAINTED PAVEMENT MARKINGS, DURABLE GROOVES CUT FOR PAVEMENT MARKINGS CO2_2025_0210-Waukee 10th Crack and Seat.xlsx Change Order 1 Page 1 of 2 8.5 1 8040-I-1000 EA $400.00 -1.00 ($400.00) 8.6 1 8040-J-1000 EA $200.00 -3.00 ($600.00) 9.1 1 9010-A-1100 AC $14,500.00 -0.06 ($870.00) 9.2 1 9040-T-1000 EA $175.00 -12.00 ($2,100.00) 9.3 1 9040-T-2000 EA $25.00 -12.00 ($300.00) $239,985.96 $1,254,457.62 $52,751.00 $1,307,208.62 $239,985.96 $1,547,194.58 0 Days Recommended By: Grimes Asphalt and Paving Corporation Signature: Name: Matt Younker Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ Date: Name: Brad Deets Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER The Original Contract Sum was Title: Lead Civil Engineer Title: City Administrator Name: Rob Kline, P.E. The new Contract Sum including this Change Order will be Signature: City of Waukee Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was INLET PROTECTION DEVICE, MAINTENANCE REMOVE AND REINSTALL TRAFFIC SIGNS REMOVE AND SALVAGE TRAFFIC SIGN ASSEMBLY HYDRAULIC SEEDING, FERTILIZING & MULCHING, TYPE 6 (SALT-RESISTANT MIXTURE) INLET PROTECTION DEVICE, DROP-IN TYPE CO2_2025_0210-Waukee 10th Crack and Seat.xlsx Change Order 1 Page 2 of 2