Loading...
HomeMy WebLinkAbout2025-04-07 I06 Kettlestone Central Gym_Revised Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 7, 2025 AGENDA ITEM: Consideration of approval of resolution approving a revised site plan for Kettlestone Central - Gymnasium FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a revised site plan for a commercial building, located north of SE University Avenue and east of SE Alice’s Road. The revised site plan includes revising the originally approved building elevations. The original building elevations included mostly brick, EIFS and storefront glazing. The revised building elevations include more brick, no EIFS, and the addition of fabric awnings over the storefronts. The revised site plan also shows the removal of the bump out on the southwest corner of the building. No other changes are proposed. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the revised site plan request at their meeting on March 25, 2025, and recommended approval: Approval of a Revised Site Plan for Kettlestone Central - Gymnasium (2045 Glacier Trail) Melissa DeBoer, Planning Coordinator, introduced the request for approval of a proposed revised site plan and restroom building elevations for Kettlestone Central – Gymnasium, as requested by Jensen Group. Jensen Group submitted for site plan approval for Kettlestone Central - Gymnasium and was granted approval by City Council on September 18, 2023, for the two buildings that are currently being constructed on site. Each building is 55,380 square feet in area and each building will include six basketball courts. The original site plan also included one outdoor basketball court. The developer has since reached out to City staff about revising the outdoor area between the two buildings. The proposed revised site plan includes revising the outdoor court area to include two basketball courts instead of the original one planned. The revised site plan also includes the addition of an outdoor restroom building that is approximately 605 square feet in area and just under 13 feet in height. The restroom building is proposed along the east side of the site, just to the east of the proposed outdoor courts. The building elevations of the proposed outdoor restroom building will be constructed mostly of brick to match the two large buildings that are currently being constructed on site. Other minor changes are proposed to the site including adding a decorative retaining wall for an entrance feature to the outdoor courts and adjusting sidewalk alignment to accommodate the revised changes to the outdoor courts area. At this time, staff would recommend approval of the revised site plan for Kettlestone Central – Gymnasium. Discussion as follows: I6 • General discussion with Erin Ollendike of Civil Design Advantage of the location, size and function of the retaining wall; confirmation its function is to direct foot traffic in the area • Confirmation that the design change does not impact parking; space that already exists in the design is being utilized for an extra court and a restroom • Discussion of spectator seating and confirmation from Erin Ollendike of Civil Design Advantage that there is no permanent seating, but space exists for spectators to bring their own chairs Motion by Commissioner Broderick for approval of a Revised Site Plan for Kettlestone Central – Gymnasium (2045 SE Glacier Trail), seconded by Commissioner Streight. Ayes: Nays: Broderick, Streit, Bankole, Beenken, Lohse, and Tuel. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the revised site plan for Kettlestone Central - Gymnasium subject to remaining staff comments. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Memo III. Site Plan IV. Building Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE REVISED SITE PLAN FOR KETTLESTONE CENTRAL - GYMNASIUM IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Revised Site Plan for Kettlestone Central - Gymnasium, subject to remaining staff comments on March 25, 2025; AND, WHEREAS, the Revised Site Plan for Kettlestone Central - Gymnasium is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Revised Site Plan for Kettlestone Central - Gymnasium is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 7th day of April, 2025, that the Revised Site Plan for Kettlestone Central - Gymnasium is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair M emo Waukee City Hall 230 Highway 6 Waukee IA 50263 Office: (515) 987-4522 Cell: (515) 250-7986 Facsimile: (515) 987-1845 To: Planning and Zoning Commissioners From: Melissa DeBoer, AICP – Planning Coordinator Date: March 21, 2025 Re: Kettlestone Central - Gymnasium – Revised Site Plan Attach: Proposed Revised Site Plan and Proposed Restroom Building Elevations BACKGROUND Jensen Group submitted for site plan approval for Kettlestone Central - Gymnasium and was granted approval by City Council on September 18, 2023, for the two buildings that are currently being constructed on site. Each building is 55,380 square feet in area and each building will include six basketball courts. The original site plan also included one outdoor basketball court. The developer has since reached out to City staff about revising the outdoor area between the two buildings. PROPOSED PLAN The proposed revised site plan includes revising the outdoor court area to include two basketball courts instead of the original one planned. The revised site plan also includes the addition of an outdoor restroom building that is approximately 605 square feet in area and just under 13 feet in height. The restroom building is proposed along the east side of the site, just to the east of the proposed outdoor courts. The building elevations of the proposed outdoor restroom building will be constructed mostly of brick to match the two large buildings that are currently being constructed on site. Other minor changes are proposed to the site including adding a decorative retaining wall for an entrance feature to the outdoor courts and adjusting sidewalk alignment to accommodate the revised changes to the outdoor courts area. STAFF RECOMMENDATION At this time, staff would recommend approval of the revised site plan for Kettlestone Central - Gymnasium. KETTLESTONE CENTRAL - GYMNASIUM 4121 NW URBANDALE DRIVE, URBANDALE, IOWA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE UTILITY WARNING CONSTRUCTION SCHEDULE DEVELOPMENT SUMMARY SUBMITTAL DATES SURVEYOR OWNER INDEX OF SHEETSVICINITY MAP GENERAL LEGEND ENGINEER APPLICANT NOTES DATE OF SURVEY BENCHMARKS KETTLESTONE CENTRAL - GYMNASIUM SITE PLAN FOR: WAUKEE, IOWA l l l l l l www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call WAUKEE, IOWA C1.0 LEGAL DESCRIPTION IMPERVIOUS SURFACE AREA PARKING SE W A C O P L A C E / 98 T H S T R E E T GR A N D P R A I R I E P K W Y UNIVERSITY AVENUE I-80 92 N D S T R E E T SE P A R K V I E W C R O S S I N G D R I V E ASHWORTH ROA D WESTOWN PKWY PROJECT SITE ADDRESS ZONING PROJECT WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DE T A I L S C2.012" SUBGRADE PREPARATION SW-203 SANITARY CLEANOUT DOWNSPOUT CONNECTION WITH TEE HYDRANT ASSEMBLY DETAIL ° SANITARY SEWER SERVICE RISERDETECTABLE WARNING DETAIL CURB RAMP FOR CLASS B OR C SIDEWALK CLASS 'A' INTEGRAL CURB AND SIDEWALKINTEGRAL 6" STANDARD CURB RCP APRON FOOTING DETAIL BOLLARD SIGN ON POSTSIGN ON BOLLARD 4' X 4' SW-513 INTAKE WITH PERMANENT STAND PIPE (ST-32) LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 FUTURE DEVELOPMENT LOT 14 SE G L A C I E R T R A I L S E W E S T O W N P A R K W A Y SE W A C O P L A C E / 9 8 T H S T R E E T WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DI M E N S I O N P L A N C3.0 TRAFFIC CONTROL NOTES PAVEMENT THICKNESS GENERAL NOTES LOT 4 LOT 5 LOT 14 SE G L A C I E R T R A I L TRAINER 390 SF STORAGE 516 SF GYMNASIUM AREA 55,380 SF LOBBY AREA 8,850 SF CONC. 305 SF STORAGE 1,180 GSF LOUNGE 500 GSF DI M E N S I O N P L A N C3.1 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 LOT 6 LOT 7 LOT 14 SE G L A C I E R T R A I L TRAINER 390 SF STORAGE 516 SF GYMNASIUM AREA 55,380 SF LOBBY AREA 8,850 SF CONC. 305 SF STORAGE 1,180 GSF LOUNGE 500 GSF S E W E S T O W N P A R K W A Y DI M E N S I O N P L A N C3.2 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DETAIL 'A' (1"=30' FULL-SIZE) LOT 1 LOT 2 LOT 3LOT 4LOT 5LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 FUTURE DEVELOPMENT (REFER TO KETTLESTONE CENTRAL - APARTMENTS FOR DETAILS) LOT 14 SE GLACIER TRAIL SE P L E A S A N T V I E W D R I V E SE W E S T O W N P A R K W A Y SE WACO PLACE / 98TH STREET SE WACO PLACE / 98TH STREET WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.0 GRADING NOTES SE P L E A S A N T D R I V E WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.1 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.2 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.3 SE G L A C I E R T R A I L GR A D I N G P L A N C4.4 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.5 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.6 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.7 S E W E S T O W N P A R K W A Y GR A D I N G P L A N C4.8 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.9 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.10 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.11 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 GR A D I N G P L A N C4.12 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DETAIL 'A' SE W A C O P L A C E / 9 8 T H S T R E E T DETAIL 'B' GR A D I N G P L A N C4.13 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DETAIL 'C' DETAIL 'D' DETAIL 'E' GR A D I N G P L A N C4.14 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 DETAIL 'G' DETAIL 'F' l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l ll l l ll l l ll l l ll ll l l l l l l ll l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l TSB #1 SE P L E A S A N T V I E W D R I V E SE G L A C I E R T R A I L S E W A C O P L A C E DA #1 12.05 AC WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 EROSION AND SEDIMENT CONTROL PLAN R TSB # l l l l SWPPP LEGEND KETTLESTONE CENTRAL - GYMNASIUM VICINITY MAP KETTLESTONE CENTRAL - GYMNASIUM DISCHARGE POINT SUMMARYSTABILIZATION QUANTITIES NOTES: WAUKEE, IOWA SE W A C O P L A C E / 98 T H S T R E E T GR A N D P R A I R I E P K W Y UNIVERSITY AVENUE I-80 92 N D S T R E E T SE P A R K V I E W C R O S S I N G D R I V E ASHWORTH ROA D WESTOWN PKWY PROJECT ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.0 R l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l ll l l ll l l ll l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l SE G L A C I E R T R A I L DA #2 28.12 AC DA #1 12.05 AC l l l l l l l l l l l l WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.1 l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l ll l l l l l l l l l l l l l l l l l ll ll ll l l l l l llllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l S E W E S T O W N P A R K W A Y DA #2 22.69 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.2 l l l l l l l l l l l l l llllllllllllllllll llllllllllllllllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll ll ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l TSB #2 S E W E S T O W N P A R K W A Y SE W A C O P L A C E / 9 8 T H S T R E E T DA #2 22.69 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C5.3SEDIMENT BASIN OUTLET STRUCTURE (ST-34) SE G L A C I E R T R A I L S E W E S T O W N P A R K W A Y SE W A C O P L A C E / 9 8 T H S T R E E T LOT 1LOT 2LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 FUTURE DEVELOPMENT (REFER TO KETTLESTONE CENTRAL - APARTMENTS FOR DETAILS) LOT 14 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N C6.0 UTILITY NOTES S E W E S T O W N P A R K W A Y SE W A C O P L A C E / 9 8 T H S T R E E T LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N C6.1 LOT 1 LOT 2LOT 3 LOT 4 LOT 14 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N C6.2 LOT 14 LOT 5 LOT 6 UT I L I T Y P L A N C6.3 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 LOT 6 LOT 7 LOT 14 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N C6.4 LOT 8 LOT 7 LOT 9 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N C6.5 S E W E S T O W N P A R K W A Y SE W A C O P L A C E / 9 8 T H S T R E E T LOT 9 LOT 8 LOT 7 LOT 14 LOT 10 LOT 13 LOT 11 LOT 12 FUTURE DEVELOPMENT (REFER TO KETTLESTONE CENTRAL - APARTMENTS FOR DETAILS) C6.6 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 UT I L I T Y P L A N SE G L A C I E R T R A I L LOT 5 LOT 6 LOT 8 SE P L E A S A N T V I E W D R I V E LOT 3 LOT 2 LOT 1 UT I L I T Y P L A N C6.7 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 SHEET INDEX SHEET INDEX SHEET INDEX LOT 7 FUTURE DEVELOPMENT (REFER TO KETTLESTONE CENTRAL - APARTMENTS FOR DETAILS) FUTURE DEVELOPMENT (REFER TO KETTLESTONE CENTRAL - APARTMENTS FOR DETAILS) UT I L I T Y P L A N C6.8 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 SHEET INDEX SHEET INDEX UT I L I T Y P L A N C6.9 WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 SHEET INDEX SHEET INDEX SHEET INDEX SE WACO PLACE SE W A C O P L A C E S E W A C O P L A C E PROPOSED LANDSCAPE QUANTITIES WA U K E E , I O W A RE V I S I O N S EN G I N E E R : J W M T E C H : M S T EN G I N E E R : E K O CI V I L D E S I G N A D V A N T A G E DA T E KE T T L E S T O N E C E N T R A L - G Y M N A S I U M PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2302.086 SHEET NUMBER: TH I R D S U B M I T T A L 08 / 0 8 / 2 0 2 3 FO U R T H S U B M I T T A L 08 / 2 9 / 2 0 2 3 FI F T H S U B M I T T A L 09 / 1 9 / 2 0 2 3 SI X T H S U B M I T T A L 09 / 2 6 / 2 0 2 3 FI N A L S U B M I T T A L 10 / 1 7 / 2 0 2 3 RE V I S E D S U B M I T T A L 03 / 0 4 / 2 0 2 5 LANDSCAPE NOTES LANDSCAPE REQUIREMENTS MINIMUM PLANTING REQUIREMENTS OFF-STREET PARKING AREAS OPEN SPACE 25' BUFFER REQUIREMENTS (EAST) PLANTING PIT DETAIL 1 2 3 1 3 Finished Grade 3" Deep Mulch Depth of Root Ball or Container Root System 1 1/2 to 2 Times Root Ball Diameter Place root ball on undisturbed soil. PLANTING PIT (Balled and Burlapped Plants) Scarify sides of pit. 3" Deep Mulch 1 Finished Grade PLANTING PIT (On Slopes) Original Grade 2 Place root ball on undisturbed soil. Form 3'' deep saucer. Scarify sides of pit. Form 3" deep saucer. 3 Depth of Root Ball or Container Root System 1 1/2 to 2 Times Root Ball Diameter Install with root collar at or slightly above grade. Do not place mulch within 2 inches of trunk. Begin transition at edge of root ball. Cut and remove all twine, burlap, and wire baskets from top of root ball prior to placing backfill material. LA N D S C A P E P L A N L1.0 X WALL TYPE, SEE SHEET A.501 X DOOR TAG X WINDOW TAG X KEYNOTE SECTION ELEVATION DETAIL CALLOUT X X.X X X.X X X.X Project Number: Revision Schedule 3/ 2 1 / 2 0 2 5 1 2 : 1 1 : 5 9 P M A1 KE T T L E S T O N E C E N T R A L G Y M N A S I U M TITLE SHEET 03/20/25 ADDENDUM SET 21010 20 4 5 / 2 0 5 5 S E G L A C I E R T R A I L W A U K E E , I O W A 5 0 2 6 3 OUTDOOR COURT RESTROOMS PROJECT TEAM OWNER: SHEET INDEX ABBREVIATIONS @ AT AFF ABOVE FINISHED FLOOR ALLOW ALLOWABLE ALUM ALUMINUM B.O.BOTTOM OF CJ CEILING JOINT CLG CEILING CONC CONCRETE CPT CARPET CS CONCRETE, SEALED CT CERAMIC TILE DN DOWN DS DOWNSPOUT EQ EQUAL EQUIP EQUIPMENT EXST EXISTING FD FLOOR DRAIN FDN FOUNDATION F.O.FACE OF FTG FOOTING GB GRAB BAR GL GLASS GWB GYPSUM WALL BOARD HDWR HARDWARE HM HOLLOW METAL INSUL INSULATION MFR MANUFACTURER MATL MATERIAL MECH MECHANICAL MIN MINIMUM MR MIRROR MTL METAL NA NOT APPLICABLE NOM NOMINAL O.C.ON CENTER OP HND OPPOSITE HAND OPT OPTIONAL OVHD OVERHEAD DOOR PL PROPERTY LINE PT PRESSURE TREATED PTD PAINTED R RADIUS RMV REMOVE RCP REFLECTED CEILING PLAN REQD REQUIRED REF REFERENCE SCH SCHEDULE SGWB SUSPENDED GWB SND SANITARY NAPKIN DISPOSAL STR STRUCTURAL T TEMPERED T&G TONGUE AND GROOVE T.O.TOP OF TTD TOILET TISSUE DISPENSER TYP TYPICAL VCT VINYL COMPOSITE TILE W WIDE W/WITH WD WOOD KETTLESTONE CENTRAL - WAUKEE, IOWA 50263 ADDENDUM SET I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly registered architect under the laws of the state of Iowa. KIEL K. UHL, AIA Iowa License # 07435 Jensen Group Pages or sheets covered by this seal: Date Issued: Signature 4611 MORTENSEN ROAD -AMES, IOWA 50010 CONTACT: DICKSON JENSEN -(515) 233-2752 IOWA YOUTH ATHLETIC FOUNDATION CONSTRUCTION MANAGER: 4611 MORTENSEN ROAD -AMES, IOWA 50010 CONTACT: TODD PETERSEN -(515) 233-2752 JENSEN GROUP ARCHITECT: 4611 MORTENSEN ROAD -AMES, IOWA 50010 CONTACT: KIEL UHL, AIA -(515) 233-2752 JENSEN GROUP CIVIL ENGINEER: 3405 SE CROSSROADS DRIVE, SUITE G -GRIMES, IOWA 50111 CONTACT: ERIN OLLENDIKE, P.E. -(515) 369-4429 CIVIL DESIGN ADVANTAGE DRAWING SYMBOLS GENERAL NOTES 1.REFER TO CIVIL, MECHANICAL, ELECTRICAL AND PLUMBING NOTES FOR ADDITIONAL INFORMATION OR REQUIREMENTS 2.VERIFY EXISTING CONDITIONS BEFORE FABRICATION OR PRIOR TO PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF SIGNIFICANT DISCREPANCIES. CONTRACTORS SHALL BE RESPONSIBLE FOR CHECKING EXISTING CONDITIONS AT THE JOB SITE BEFORE SUBMITTING A PROPOSAL. SUBMISSION OF A PROPOSAL SHALL BE TAKEN AS EVIDENCE THAT SUCH INSPECTION HAS BEEN MADE. CLAIMS FOR EXTRA COMPENSATION FOR WORK THAT COULD HAVE BEEN FORESEEN BY SUCH INSPECTION WHETHER SHOWN ON CONTRACT DOCUMENTS OR NOT, SHALL NOT BE ACCEPTED OR PAID. 3.DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE AND BE FIELD VERIFIED AND COORDINATED WITH WORK OF ALL TRADES. IF NO DIMENSIONS ARE GIVEN OR DISCREPANCIES FOUND, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR CLARICATION BEFORE COMMENCING THE WORK. 4.THE PURPOSE OF THE CONSTRUCTION DOCUMENTS IS NOT TO OUTLINE EVERY EXACT CONDITION. INSTEAD, THE PURPOSE IS TO THOROUGHLY OUTLINE THE INTENT OF THE CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTORS TO PROVIDE COMPLETE SYSTEMS PER MANUFACTURER'S REQUIREMENTS TO INSURE A COMPLETE SYSTEM AND THE MANUFACTURER APPROVAL OF WARRANTIES. 5.THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PROVIDE FOR A PLUMB, LEVEL, AND SQUARE STRUCTURE UNLESS NOTED OTHERWISE. ANY DEVIATION FROM THIS GENERAL INTENT SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. 6.THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PROVIDE FOR A WATERTIGHT AND WEATHERTIGHT BUILDING. CONTRACTORS SHALL REVIEW ALL DETAILS RELATING TO THIS INTENT AND BY ENTERING INTO THEIR RESPECTIVE CONSTRUCTION CONTRACT WARRANTS FOR ONE FULL YEAR THE ADEQUACY OF THESE DETILS. SHOULD CONTRACTORS TAKE EXCEPTION TO THESE DETAILS, HE OR SHE SHALL NOTIFY THE ARCHITECT PRIOR TO COMMENCING WORK. ANY DEVIATION FROM THIS GENERAL INTENT SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. 7.THE BUILDING SHALL BE CONSTRUCTED IN FULL COMPLIANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATIONS AS WELL AS THE DRAWINGS AND SPECIFICATIONS. ANY CODE DEFICIENCIES IN THE DRAWINGS RECOGNIZED BY CONTRACTORS SHOULD BE BROUHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION. 8.ALL DIMENSIONS ARE SHOWN TO FACE OF STUDS, FACE OF BLOCK, OR GRID LINES UNLESS NOTED OTHERWISE. 9.ROOF TRUSS SHOP DRAWINGS ARE TO BE SUBMITTED FOR REVIEW BY STRUCTURAL ENGINEER AND ARCHITECT. 10.ROOF TRUSS/JOIST MANUFACTURER TO COORDINATE TRUSS WEB LAYOUT W/ ARCHITECT AND STRUCTURAL ENGINEER TO ALLOW FOR HVAC DUCT RETURNS. 11.ROOF TRUSS/JOIST MANUFACTURER TO COORDINATE TRUSS LAYOUT W/ DRAFTSTOPPING REQUIREMENTS. 12.SPRINKLER AND ELECTRIAL CONTRACTORS TO COORDINATE LOCATION OF SPRINKLER MAIN AND HOUSE PANEL WITH ARCHITECT/CONSTRUCTION MANAGER. 13.PLUMBING AND MECHANICAL CONTRACTORS TO COORDINATE LOCATIONS OF EQUIPMENT, METERS, AND FLOOR DRAINS WITH ARCHITECT/CONSTRUCTION MANAGER. 14.SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION AND CONSTRUCTION REGARDING ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING: -CONCRETE MIX DESIGNS (5 DAYS BEFORE POUR, MIN.) -CONCRETE REINFORCEMENT -EMBEDDED STEEL ITEMS -STRUCTURAL STEEL -STEEL JOISTS -STEEL DECK -LT. GA. METAL STUDS -STEEL LINTELS 15.CONSTRUCTION MANAGER TO SCHEDULE AND CONDUCT MEETINGS ON SITE TO REVIEW FIRST INSTALLATIONS OF ALL MASONRY SILL, HEAD, AND JAMB DETAILS. ARCHITECT TO REVIEW AND APPROVE FIRST INSTALLATIONS PRIOR TO CONTINUATION OF WORK. 16.SITE SAFETY PROCEDURES AND PROTOCOL FOR EVERYONE WORKING ON THE JOB SITE IS THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER. 17.THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR SAFETY RECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONSTRUCTION MANAGER. 18.CONTRACTORS SHALL KEEP THE PREMISES AND SURROUNDING AREA FREE OF ACCUMULATION OF WASTE MATERIAL OR RUBBISH CAUSED BY OPERATIONS UNDER THE CONTRACT. AT COMPLETION OF WORK, CONTRACTORS SHALL REMOVE FROM AND ABOUT THE PROJECT WASTE MATERIALS, RUBBISH, THE CONTRACTOR'S TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIALS. 19.CONTRACTORS TO VERIFY ALL DRYWALL AND MASONRY CONTROL JOINTS WITH ARCHITECT. SPECIAL INSPECTIONS 1. SPECIAL INSPECTIONS FOR ENERGY CODE COMPLIANCE SHALL BE PERFORMED ACCORDING TO CITY OF WAUKEE AMENDMENT TO THE 2012 INTERNATIONAL ENERGY CONSERVATION CODE, SECTION 222.19. SUCH INSPECTIONS SHALL BE COMPLETED BY A THIRD PARTY CERTIFIED TO DO SUCH INSPECTIONS WITH A REPORT SUBMITTED TO THE ADMINISTRATIVE OFFICIAL SHOWING COMPLIANCE WITH THE STATE ADOPTED ENERGY CODE. 2. SPECIAL INSPECTIONS FOR THROUGH PENETRATIONS, MEMBRANE PENETRATION FIRESTOPS, FIRE-RESISTANT JOINT SYSTEM AND PERIMETER FIRE BARRIER SYSTEMS SHALL BE PERFORMED IN ACCORDANCE WITH IBC 1705.17.1 AND 1705.17.2. 3. COMMISSIONING AGENTS AND INSPECTORS SHALL BE IN NO WAY AFFILIATED WITH THE PROJECT'S DESIGN, INSTALLATION OR SALE OF PRODUCTS, TO AVOID ANY CONFLICT OF INTEREST. THE COMMISSIONING AGENT SHALL BE ACCREDITED BY AN INDUSTRY-RECOGNIZED CERTIFICATION PROGRAM, TO BE DETERMINED BY THE AHJ. 4. SPECIAL INSPECTION REPORTS SHALL BE FURNISHED TO BUILDING OFFICIAL, OWNER, ARCHITECT, AND CONTRACTOR VICINITY MAP SITE LOCATION A1 TITLE SHEET 10/10/24 A2 PLANS + ELEVATIONS 10/10/24 A3 SECTIONS + ASSEMBLIES 10/10/24 A4 DETAILS 10/10/24 A1-A4 03/20/25 ARCHITECTURAL STRUCTURAL S1 STRUCTURAL PLAN AND DETAILS 10/10/24 No. Description Date 2' - 8"40' - 4"2' - 8" 2' - 8"4' - 8"1' - 4"5' - 0"0' - 6"0' - 2"11' - 8"0' - 2"0' - 6" 3' - 2"1' - 10" 1' - 4" 4' - 8"2' - 8" 15 ' - 8 " 7' - 8 " 8' - 0 " 7' - 8 " 8' - 0 " 15 ' - 8 " D1D2D2 D2 D1D1 CL R . 6' - 4 " 6' - 4" CLR. CLR. 3' - 0" CLR. 3' - 0" 2' - 8" 1' - 4" 9' - 0"4' - 0" 0' - 5 1/8" 2' - 0 7/8" 8' - 8 7/8" 0' - 5 1/8" 4' - 0"9' - 0" 1' - 4" 2' - 8" A.D. 1. 3. B.C. CL R . 6' - 4 " CL R . 6' - 4 " 6' - 4" CLR.6' - 4" CLR. 2. 45' - 8" 5' - 4 " 2' - 4 " 3' - 8 " 3' - 0 " 1' - 4 " 5' - 4 " 2' - 4 " 3' - 8 " 3' - 8 " 1A1B1A1B1A 1B 1A 1B 1A 1A 1B 1A 1A 1A 1A 1A 1A 1B 1A 1A 1B 1A 2A 2A 2B 2B 2B 2B 2B 2' - 8 " P6 P2 P2 P3 P3 P4 P2 P7P7P7 P1 P1 P1 09 A3 11 A3 10 A3 2B2B A.D. 1. 3. B.C. 2. P8P8 P12 P12P12 P12 P9 P10 P10 P10 P11P11 A.D.B.C. E4 E3 E1 E1E3 E3 E8 E4 E4 0' - 0" 11' - 0" T.O. SLAB T.O. PARAPET 8' - 0" T.O. OPENINGE9E9 E2 E2 1.3.2. E4 E8 E5 E4 E1 E1 E3 0' - 0" 11' - 0" T.O. PARAPET T.O. SLAB 8' - 0" T.O. OPENING 1.3.2. E3 E4 E8 E1 E5 E4 E1 0' - 0" 11' - 0" T.O. PARAPET T.O. SLAB E4 8' - 0" T.O. OPENING A.D.B.C. E3 E3 E1 E1 E7 E7E7 E7 E4E4E4E2E2 E2E2 E5 E4 E6 0' - 0" 8' - 0" 12' - 8" T.O. BUILDING T.O. OPENING T.O. SLAB A.D. 1. 3. B.C. 2. R V VVV R R R RR RR RR W WWW RRF F 6" RECESSED CAN LIGHT FIXTURE, F2R CEILING MOUNTED PENDANT FIXTURE, F4 WALL MOUNTED EGRESS LIGHT, F5 SEMI-RECESSED FIRE EXTINGUISHER CABINET CONTROL JOINT WALL MOUNTED EXIT SIGNAGE, F7 LINEAR LED LIGHT FIXTURE, F6 8' CEILING FAN, F8 4" RECESSED CAN LIGHT FIXTURE, F1R2 5' CEILING FAN, F9 P2 CEILING MOUNTED PENDANT FIXTURE, F3P A.D. 1. 3. B.C. 2. FD FD FD *WATER HEATERS FOR THESE (2) LAVATORIES TO BE ELECTRIC POINT-OF-USE UNDER/NEAR THE LAVATORIES *PROVIDE 2" COLD SUPPLY TO SERVE REMOTE RESTROOMS. VERIFY ROUTING WITH CIVIL *THESE DRAWINGS ARE SCHEMATIC FOR PERMIT AND THERE IS NO SPECIFICATION. CONTRACTORS SHALL BE RESPONSIBLE FOR COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES AS WELL AS WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY AND GOOD PRACTICE *REFER TO CIVIL DWGS FOR CONTINUATION OF SANITARY. VERIFY ELEVATION, SIZE, LOCATION, AND DIRECTION PRIOR TO ANY WORK VTR VTR VTR 2"Ø DOMESTIC WATER CO 6"Ø SANITARY Project Number: Revision Schedule 3/ 2 1 / 2 0 2 5 1 2 : 1 2 : 0 0 P M A2 KE T T L E S T O N E C E N T R A L G Y M N A S I U M PLANS + ELEVATIONS 03/20/25 ADDENDUM SET 21010 20 4 5 / 2 0 5 5 S E G L A C I E R T R A I L W A U K E E , I O W A 5 0 2 6 3 1/4" = 1'-0"05 RESTROOM FLOOR PLAN 1/4" = 1'-0"07 RESTROOM ROOF PLAN 1/4" = 1'-0"06 RESTROOM - EAST ELEVATION 1/4" = 1'-0"04 RESTROOM - NORTH ELEVATION 1/4" = 1'-0"03 RESTROOM - SOUTH ELEVATION 1/4" = 1'-0"02 RESTROOM - WEST ELEVATION PLAN KEYNOTES P1 SEALED CONCRETE FLOOR P2 FLOOR DRAIN P3 WALL MOUNTED TROUGH SINK P4 WALL MOUNTED ADA DRINKING FOUNTAINS P5 ELECTRIC WATER HEATER P6 ELECTRIC FURNACE (OPTIONAL) P7 WALL HUNG STAINLESS STEEL FLUSH VALVE TOILET W/ADA GRAB BARS P8 FULLY ADHERED EPDM ROOFING, 60 MIL. MIN. OVER RIGID INSULATION P9 CAST STONE COPING P10 PRE-FINISHED METAL COPING P11 THRU-WALL SCUPPER AND DOWNSPOUT P12 TAPERED INSULATION ELEVATION KEYNOTES E1 BRICK VENEER E2 BRICK EXPANSION JOINT E3 INSET BRICK E4 SOLDIER COURSE HEADER, TYP. E5 CAST STONE COPING E6 WALL MOUNTED DRINKING FOUNTAIN E7 EXTERIOR LIGHT FIXTURE, F1 E8 PRE-FINISHED METAL COPING E9 THRU-WALL SCUPPER AND DOWNSPOUT1/4" = 1'-0"08 RESTROOM REFLECTED CEILING PLAN CEILING PLAN LEGEND 0' 3'12'6' 0' 3' 12'6' 0' 3' 12'6'0' 3' 12'6' 0' 3' 12'6' 0' 3' 12'6'0' 3' 12'6' 0' 3' 12'6' No. Description Date 1 ADDENDUM 1 03/20 1/4" = 1'-0"01 RESTROOM PLUMBING PLAN 1 INTERIOR WALL: FIRE RATING - 4 HOUR UL DESIGN NO. U902 CMU WALL W/ BRICK VENEER1B - 8" BURNISHED BLOCK, FULLY GROUTED CELLS - FLUID APPLIED WEATHER BARRIER - OPTIONAL: 2" RIGID INSULATION -TYPE 1A: 2" +/- AIR SPACE -TYPE 1B: 1 1/2" +/- AIR SPACE - BRICK VENEER PER ELEVATION 7 5 / 8 " VA R I E S EXTERIOR INTERIOR INTERIOR WALL: FIRE RATING - 1 HOUR UL DESIGN NO. N/A CORRIDOR/BATHROOM WALL -TYPE 2A:8" BURNISHED BLOCK -TYPE 2B:4" BURNISHED BLOCK - FULLY GROUTED CELLS 7 5 / 8 " INTERIOR INTERIOR VA R I E S 1A 2B2A FLOOR ASSEMBLY: FIRE RATING - N/A - CONCRETE SLAB. SEE STRUCTURAL - VAPOR BARRIER - COMPACTED GRANULAR FILL. SEE STRUCTURAL -SUBGRADE SLAB ON GRADEB SE E S T R U C T U R A L INTERIOR ROOF ASSEMBLY: FIRE RATING - N/A - FULLY ADHERED EPDM ROOF MEMBRANE - 1/2" PERLITE BASED COVER BOARD - 2" RIGID INSULATION - 5/8" OSB SHEATHING - 2X10 WOOD ROOF JOIST - R38 BATT INSULATION - 6 MIL. VAPOR BARRIER - 5/8" GWB, TYPE C WOOD JOIST W/EPDM MEMBRANEA 5/ 8 " 9 1 / 4 " 5/ 8 " ~ 2 " 1/ 2 " VA R I E S EXTERIOR INTERIOR 3. 0' - 0" -4' - 2" 8' - 0" 11' - 11 5/8" T.O. WALL JOIST BEARING T.O. SLAB T.O. FOUNDATION B.O. FOUNDATION 3.2. 0' - 0" -4' - 2" 8' - 0" 11' - 11 5/8" T.O. WALL JOIST BEARING/ B.O. LINTEL T.O. SLAB T.O. FOUNDATION B.O. FOUNDATION 1. -4' - 2" 0' - 0" 8' - 0" 10' - 11 5/8" T.O. WALL JOIST BEARING T.O. SLAB T.O. FOUNDATION B.O. FOUNDATION 3' - 0" 6' - 8 " A 3' - 0" 1' - 0 " 4' - 8 " B 0' - 2"VARIES 0' - 2" 0' - 2 " 6' - 8 " RIGID FRAME 1 0' - 2"VARIES 0' - 2" 0' - 2 " 6' - 8 " RIGID FRAME 2 15 " M I N . 48 " M I N . 15 " M I N . 48 " M I N . CLEAR OPENING 32" MINIMUM 60 " 54" 36" 48" 48 " APPROACH FROM FRONT APPROACH FROM FRONT CLEAR OPENING 32" MINIMUM 54 " 60" 42" 48 " APPROACH FROM LATCH SIDE 60"x54" 48 " x 4 8 " IF BO T H CL O S E R A N D L A T C H 48"x36" 48 " 54"x60" IF CLOSER IS PROVIDED 42 " 42"x60" APPROACH FROM LATCH SIDE 48"x60" IF CLOSER IS PROVIDED 48"x60" 30" MIN. 48 " M I N . 24 " 2' - 0 " M A X . 2' - 0" MIN.CL CENTER CLEAR SPACE ON LAVATORY CABINETRY MUST BE REMOVABLE WITHOUT REPLACEMENT OF THE COUNTER, THE FLOOR FINISH MUST EXTEND UNDER CABINETRY, AND WALLS BEHIND AND SURROUNDING THE CABINETRY MUST BE FINISHED 11"2' - 3 " M I N . MIN. 8" MI N . 9" KNEE CLEARANCE 2' - 1 0 " M A X . TOE CLEARANCE MI N . 9" 17" - 25" 2' - 6 " M I N . 2' - 1" MAX. 2' - 6 " M I N . 25" MAX. R 30" 60" 24 " 36 " 12"36"12" 60" CL 16"-18" MIN. 18" 5' - 6 " M I N . W H E N L A V A T O R Y O V E R L A P S 59 " M I N . MIN. 60" 35" MIN. 17 " - 1 9 " 33 " - 3 6 " 36" MIN.6" CL MIN. 24" MIN. 12" MAX. 12" MIN. 42" 40" MIN. 54" MIN. 24" MIN. 42" MIN. 1 1 / 2 " M I N . 13 1 / 2 " 18 " M I N . PROTRUDING DISPENSER LOCATION 18 " 40 " 33 " - 3 6 " Project Number: Revision Schedule 3/ 2 1 / 2 0 2 5 1 2 : 1 2 : 0 1 P M A3 KE T T L E S T O N E C E N T R A L G Y M N A S I U M SECTIONS + ASSEMBLIES 03/20/25 ADDENDUM SET 21010 20 4 5 / 2 0 5 5 S E G L A C I E R T R A I L W A U K E E , I O W A 5 0 2 6 3 1 : 708VERTICAL ASSEMBLIES 1 : 712HORIZONTAL ASSEMBLIES 3/4" = 1'-0"09 WALL SECTION A 3/4" = 1'-0"10 WALL SECTION B 3/4" = 1'-0"11 WALL SECTION C DOOR SCHEDULE MARK TYPE W HT QTY. FINISH MATL. THICKNESS FRAME MATL. FRAME TYPE HARD WARE COMMENTS D1 A 3' - 0" 6' - 8" 2 INSULATED METAL 0' - 2" HOLLOW METAL 1 2 36" x 80" ENTRY DOOR D2 B 3' - 0" 4' - 8" 3 INSULATED METAL 0' - 2" HOLLOW METAL 1 3 36" x 56" STALL DOOR D3 A 3' - 0" 6' - 8" 1 INSULATED METAL 0' - 2" HOLLOW METAL 1 1 36" x 80" STORAGE DOOR HARDWARE GROUP 2: RESTROOM ENTRY KEYED CYLINDER PULL HANDLE PUSH PLATE CLOSER BUMPER HINGES GASKET STRIKE PLATE AND INSERT HARDWARE GROUP 1: STORAGE/UTILITY KEYED CYLINDER PULL HANDLE PUSH PLATE BUMPER HINGES GASKET STRIKE PLATE AND INSERT 1/4" = 1'-0"14 DOOR TYPES 1/4" = 1'-0"13 FRAME TYPES HARDWARE GROUP 3: RESTROOM STALL PRIVACY LOCKSET BUMPER HINGES 1/2" = 1'-0"07 TYPE A + B REACH 1/2" = 1'-0"04 TYPE A DOOR CLEARANCES 1/2" = 1'-0"01 LAVATORY ADA PLAN CLEARANCES 1/2" = 1'-0"02 LAVATORY ADA CLEARANCES 1/2" = 1'-0"03 TYPE A TURNING CLEARANCES 1/2" = 1'-0"06 ADA WATER CLOSET CLEARANCES 1/2" = 1'-0"05 ADA WATER CLOSET GRAB BARS 0' 1' 4'2'0' 1' 4'2'0' 1' 4'2' No. Description Date CONTINUOUS METAL CLEAT CONTINUOUS TERMINATION BAR MODIFIED BITUMEN CAP SHEET INTERPLY SHEET 3 PLY EPDM ROOFING 2 C BOND BEAM. SEE STRUCTURAL CONTINUOUS 2X LEDGER. SEE STRUCTURAL 2" RIGID INSULATION FLUID APPLIED WEATHER BARRIER MEMBRANE 0' - 0 1/2" PRE-FINISHED METAL COPING CAP 2 MODIFIED BITUMEN CAP SHEET INTERPLY SHEET 3 PLY EPDM ROOFING C WELDED SCUPPER SET IN FLASHING CEMENT BOND BEAM. SEE STRUCTURAL CONTINUOUS 2X LEDGER. SEE STRUCTURAL 2" RIGID INSULATION FLUID APPLIED WEATHER BARRIER MEMBRANE CONTINUOUS METAL CLEAT CONTINUOUS TERMINATION BAR PRE-FINISHED METAL COPING CAP METAL COUNTER FLASHING CONTINUOUS TERMINATION BAR MODIFIED BITUMEN CAP SHEET INTERPLY SHEET 3 PLY EPDM ROOFING 2 C BOND BEAM. SEE STRUCTURAL CONTINUOUS 2X LEDGER. SEE STRUCTURAL 2" RIGID INSULATION FLUID APPLIED WEATHER BARRIER MEMBRANE THRU WALL FLASHING W/ INTEGRAL DRIP EDGE CAST STONE COPING #4 REBAR ANCHOR PINS. MINIMUM THREE PER CAST STONE SECTION 0' - 0 1/2" PREFINISHED TRIM. COLOR TO MATCH WINDOW FRAME. SOLDIER AND ROWLOCK COURSE HEADER. REFER TO 03/A.501 CELLULAR WEEP VENTS @ 24" O.C. MAX. COLOR TO MATCH MORTAR TWO PIECE METAL HEAD FLASHING W/ 1/2" HEMMED DRIP EDGE AND END DAMS BEYOND FLUID APPLIED WEATHER BARRIER MEMBRANE. APPLY CONTINOUS INTO OPENING BACKER ROD AND SEALANT. STEEL ANGLE LINTEL. SEE STRUCTURAL. STEEL HEADER. SEE STRUCTURAL 2" CONTINUOUS RIGID INSULATION 2 SHEET METAL CAVITY CLOSURE INSULATED METAL DOOR SHIM AS REQUIRED EXPANDED FOAM FILLER. INSTALL CONTINUOUS AT WINDOW INTERIOR FLUID APPLIED WEATHER BARRIER MEMBRANE. APPLY CONTINUOUS INTO OPENING BACKER ROD AND SEALANT 2" CONTINUOUS RIGID INSULATION SHEET METAL CAVITY CLOSURE. INSTALL SEALANT BETWEEN FLASHING AND BRICK AT EXTERIOR 2 BRICK TIE SHIM AS REQUIRED INSULATED METAL DOOR PREFINISHED TRIM. COLOR TO MATCH WINDOW FRAME. EXPANDED FOAM FILLER. INSTALL CONTINUOUS AT WINDOW INTERIOR CONTINUOUS SEALANT OVER EXPANSION BOARD INSULATED METAL DOOR BRICK VENEER, BEYOND CONCRETE PATIO SLAB. SEE STRUCTURAL DOOR THRESHOLD. SET IN CONT. BED OF SEALANT CMU, BEYOND SHEET METAL CAVITY CLOSURE, BEYOND FLEXIBLE FLASHING. LAP OVER AND ADHERE TO BASE FLASHING. 2" CONTINUOUS RIGID INSULATION 2 BRICK TIE SHEET METAL BASE FLASHING W/ 1/2" HEMMED DRIP EDGE CELLULAR WEEP VENTS @ 24" O.C. MAX. COLOR TO MATCH MORTAR CONTINUOUS MORTAR COLLECTION MESH TERMINATION BAR W/CONTINUOUS BEAD OF SEALANT @ TOP GROUT CAVITY SOLID BELOW TOP OF SLAB OR GRADE CONTINUOUS SEALANT OVER EXPANSION BOARD FLUID APPLIED WEATHER BARRIER MEMBRANE. APPLY CONTINUOUS INTO OPENING Project Number: Revision Schedule 3/ 2 1 / 2 0 2 5 1 2 : 1 2 : 0 1 P M A4 KE T T L E S T O N E C E N T R A L G Y M N A S I U M DETAILS 03/20/25 ADDENDUM SET 21010 20 4 5 / 2 0 5 5 S E G L A C I E R T R A I L W A U K E E , I O W A 5 0 2 6 3 3" = 1'-0"04 PARAPET DETAIL A 3" = 1'-0"05 PARAPET DETAIL C 3" = 1'-0"03 PARAPET DETAIL B 3" = 1'-0"08 DOOR HEAD DETAIL @ CMU 3" = 1'-0"07 DOOR JAMB DETAIL @ CMU 3" = 1'-0"06 DOOR THRESHOLD DETAIL @ CMU 3" = 1'-0"01 BASE OF WALL FOUNDATION DETAIL No. Description Date