HomeMy WebLinkAbout2025-05-05 I01F_01 Spring Crest Park_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 5, 2025 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 1 to Elder Corporation, for Spring Crest Park Project increasing the contract in the amount of $1,500.00. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 to Elder Corporation is for construction staking of the shade structure and play equipment footings. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 1 PREPARED BY: Laurie Baker REVIEWED BY: Matt Jermier PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F1 gēnus [ landscape architects ] 520 42ND STREET SUITE 400 DES MOINES, IA 50312 T 515 284 1010 WWW.GENUS-LA.COM April 25, 2025 Mr. Matt Jermier Parks and Recreation Director, Waukee 805 University Avenue Waukee, IA 50263 RE: SPRING CREST PARK – CHANGE ORDER #1 Genus Project No. 24008 Dear Mr. Jermier: Please find Change Order #1 attached in the amount of $1,500 for the above-referenced project. This work is associated with: 1) Construction staking of the shade structure and play equipment footings. Genus recommends that the City of Waukee approve Change Order #1 to Elder Corporation. Don’t hesitate to reach out if you have questions or need additional information. Sincerely, Scot Schuckert, ASLA Field Operations Coordinator CC: Nick Yeast, Elder Corporation Tito Roth, City of Waukee Brett Douglas, Genus 10:43 am Wednesday, April 23, 2025 Spring Crest Park CO#01 Waukee, IA City of Waukee Project: Location: Owner: Plans Dated: Phone 515-266-3111 Fax 515-265-4565 5088 E. University Ave. Des Moines, Iowa 50327 24-1217NY-3 1 visits to stake the playground equipment Addenda: Project Notes Nick Yeast 515-402-5427 Estimator: Phone: shade structure with other staking needed DESCRIPTION AMOUNTUNIT PRICEUNITQUANTITYITEM $1,500.00LS 1.005000 $1,500.00Stake Shade Structure & Playground Equipment NOTES: 1. EXCLUSIONS: A.We exclude in our scope of work: bonds, permits and AGC dues, liquidated damages, Pollution Liability Insurance Coverage, cost of inspection, layout staking/surveying, compaction tests, soil testing, utility cut-offs, saw cuts, damage to utilities or conduits embedded in concrete, dewatering, abandoning or removal of intakes or manholes, temporary access roads, sheeting or shoring, handling of contaminated soils, unacceptable soil removal or replacement, frost excavation, frost removal, work when temps are 10 degrees or below, over excavation or recompaction, soil stabilization, foundation or footing excavation, backfill of foundation walls, removal of foundation spoil, excavation or backfill of retaining walls, handling of other contractor's soil, import or export of soil, import or export of granular materials, import of topsoil or black dirt, well abandonment, under cutting fill areas, fine grading, hand excavation, grading for sidewalks, repair to any work damaged by others, traffic control, hand tamping, silt fences, erosion control, mowing, seeding or sodding, connection fees, pavement removal or replacement for utilities unless stated above, boxout paving around intakes or steel plates to cover intakes and adjustment of fixtures, System Development Fee, As-Built Drawing . 2. SPECIAL CONSIDERATIONS: A.All service lines stop 5' away from building. Utility items tied to Earthwork items. All utilities backfilled with trench spoils - Compaction to be with existing soil to 95% Standard Proctor. B. Insurance limits include the following... GL $1,000,000 (Ea Occurrence) GL $2,000,000 (Aggregate) XL $10,000,000 (Aggregate) Additional Fees apply for requirements exceeding the above limits . C. This Proposal may be withdrawn by us if not accepted within 14 days . Payment to be made in monthly draws. Nothing shall obligate Elder Corporation outside the scope listed herein. B. We are not responsible for locating or notifying private utilities . C. Contractor shall accept pad or parking grades prior to work done by other trades. Grading tolerances to be within plus or minus two tenths of a foot. 3.The Agreement may be withdrawn by Elder Corporation without notice at any time prior to receipt by Elder Corporation at its home office of a fully executed copy of same . 4.The laws of the State of Iowa shall apply to all claims and disputes arising out of or related to this Agreement and/or the Project. ACCEPTANCE OF PROPOSAL We have carefully read and reviewed and hereby accept the foregoing Proposal for Construction Agreement from Elder Corporation. By: _________________________________________________ Date: _____________________ Title: ____________________________ This Agreement is not binding on Elder Corporation unless and until signed by an officer of Elder Corporation in the space indicated below and delivered to the Owner. By:__________________________________________________ Date:______________________ Title:_____________________________