Loading...
HomeMy WebLinkAbout2025-05-05 I06A-C Alder Point Retail_Preliminary Plat, Final Plat, Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 5, 2025 AGENDA ITEM: Consideration of approval of resolutions approving a preliminary plat and site plan for Alder Point Retail and a final plat for Alder Point Plat 2. FORMAT: Resolutions SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a preliminary plat, final plat, and site plan for a commercial development, located in the southwest corner where NW Douglas Parkway and NW 10th Street intersect, containing 4.37-acres. The proposed project includes a preliminary and final plat to divide the parcel into 2 lots for commercial development and one outlot for a detention pond (Outlot ‘Z’). The preliminary plat shows an extension of a private street into the site as one of the access points and utility extension. The project includes the construction of one single-story building on each lot (Lot 1 and Lot 2), and construction of a detention pond in Outlot ‘Z’. Lot 1 will have a coffee shop and Lot 2 will have a building with retail and restaurant spaces. The final plat identifies Lot 1, Lot 2, Outlot ‘Z” for stormwater detention, and the extension of the private street running west-east south of Lot 1 for access into the site. Two accesses will be provided into the overall site. One access is off the private road that extends from NW Peterson Drive, and the other is from the public street south of Lot 2 (NW Yorktown Drive). A total of 25 parking spaces and 3 queuing spaces are required for the building on Lot 1, and 114 parking spaces are required for the building on Lot 2. The proposed parking for both lots is being met with 32 parking spaces and 15 queuing spaces for Lot 1 and 114 parking spaces and 5 accessible spaces for Lot 2. All units will be serviced with private utilities. Storm water detention will be provided with a pond in the northwest corner of the site in Outlot ‘Z’. The pond will be privately owned and maintained by a homeowner’s association. A minimum of 20% of the site is required to be open space, they are providing 41%. The required amount of plantings are being provided, throughout the site in compliance with the Landscape and Open Space Ordinance. The elevations of the buildings will be constructed of black brick and fiber cement siding as well as storefront glazing. The trash enclosures will be constructed of similar materials to match the buildings. I6A-C FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat, final plat, and site plan request at their meeting on April 22, 2025, and recommended approval: Approval of a Preliminary Plat and Site Plan for Alder Point Retail and a Final Plat for Alder Point Plat 2. Elizabeth Cramblet, City Planner, introduced the request for approval of a preliminary plat, final plat and site plan for a commercial development, as requested by Alder Partners, LLC, represented by Kris Bower of Civil Design Advantage. The property is located where NW Douglas Parkway and NW 10th Street intersect, containing approximately 4.37 acres. The preliminary plat identifies two lots for commercial development and one outlot for a detention pond. The preliminary plat also shows an extension of a private street into the site as one of the access points and utility extensions. The proposed project includes a preliminary and final plat to divide the parcel into two lots and one outlot. The applicant proposes to construct one building on each lot (Lot 1 and Lot 2) and construct a detention pond in Outlot ‘Z’. On Lot 1, the applicant is proposing a single story building approximately 2,500 square feet in area and 29 feet in height. The building will consist of black brick, fiber cement and storefront glazing. The building is situated in the center of the lot with parking on the north and east side of the building. There is a drive-through lane and window for the coffee shop that will circle the building in a counterclockwise direction. The site plan shows a private drive (NW Peterson Drive) south of the outlot providing access to Lot 1 and Lot 2, with a proposed 26-foot ingress/egress easement. The building on Lot 1 will include an outdoor patio space along the east side of the building. A trash enclosure is proposed in the northwest corner of Lot 1 and will consist of materials to match the main building. A monument sign for Lot 1 is proposed at the northeast corner of the site by the intersection of NW Douglas Parkway and NW 10th Street. On Lot 2 the applicant is proposing a single story building approximately 12,120 square feet and 24 feet in height. The restaurant space will be 5,928 square feet and the retail space will have 6,192 square feet in area. The building will consist of black brick, fiber cement and glass with glazing. Parking will be available along the east and south side of the building. The building on Lot 2 will include outdoor patio spaces along both the north and south sides of the building. The site plan shows the potential for a future drive-through lane for the restaurant on Lot 2. As indicated on the site plan, this proposal will require separate site plan approval from the Community Development Department. A trash enclosure is located behind the building on the west side with materials to match the primary building. Access to this building may also come from the private drive to the north of the building. A monument sign is proposed at the southeast corner of NW 10th Street and NW Yorktown Drive. The site plan shows a detention basin on Outlot ‘Z’ located west of Lot 1 in the northwest corner of the overall site. Two accesses will be provided onto the overall site at this time. One access is from the private road that extends from NW Peterson Drive, located on the west side of the site from NW Sproul Drive. The second access is from the public road that runs along the south side of the site (NW Yorktown Drive). A total of 25 parking spaces are required for Lot 1 plus three queuing spaces for the drive-through lane, with a total of 28 spaces. The site plan shows 32 parking spaces, 15 queuing spaces for the drive- through lane, and two accessible spaces for a total of 49 spaces. A total of 89 parking spaces are required for the restaurant space on Lot 2 and 25 spaces are required for the retail space for a total of 114 parking spaces required for Lot 2. The site plan shows the 114 required spaces being provided, including five accessible spaces. Pedestrian access will be provided onto the overall site from the existing and proposed sidewalks. A five-foot wide sidewalk will be extended along NW Douglas Parkway along the north side of Lot 1 and continue along the west side of NW 10th Street along the east side of the site to the corner of NW 10th Street and NW Yorktown Drive where it will continue along the south side of the site. An additional five-foot wide sidewalk extends east along the south side of NW Peterson Drive until it ends at the patio on the north side of the building on Lot 2. Public utilities are provided to the site. The sanitary sewer will run from a public main that lies south of the site and will be privately owned and maintained. Water will run from a public main that lies north and south of the site and will be privately owned and maintained. Storm water detention will be provided in a pond located at the northwest corner of the site. The pond will be privately owned and maintained. A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 41%. Plantings are being provided throughout the site in compliance with the Landscape & Open Space Ordinance. The elevations of the buildings are proposed to be constructed of black brick and fiber cement siding as well as storefront glazing. The trash enclosures are proposed to be constructed of black brick to match the buildings. A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan Ordinance. A sign package has not been evaluated at this time and will be reviewed as a separate application. A photometric plan will be required with the sign package. All proposed easements have been indicated on the site plan, preliminary plat, and final plat. Private utility easements are provided across the site. Public ingress/egress easements are provided for access to the site at two locations. Discussion as follows: • Discussion of hours of operation and potential noise from a commercial development close to residential areas; Andy confirmed the zoning ordinance does not stipulate or limit hours of operation and the city is not required to send notices to surrounding residents in those residential areas • Confirmation that a landscape buffer is designed to help with noise • General discussion of traffic flow in the area is designed; Keith Weggen of Civil Design Advantage confirmed the width of the 25-foot drive-through lane and potential for an additional drive-through and how that traffic flow would be routed Motion by Commissioner Lohse for approval of a Preliminary Plat for Alder Point Retail, seconded by Commissioner Tuel. Ayes: Bankole, Beenken, Lohse, and Tuel. Nays: None. Motion carried. Motion by Commissioner Bankole for approval of a Final Plat for Alder Point Plat 2, seconded by Commissioner Lohse. Ayes: Bankole, Beenken, Lohse, and Tuel. Nays: None. Motion carried. Motion by Commissioner Tuel for approval of a Site Plan for Alder Point Retail, seconded by Commissioner Bankole. Ayes: Bankole, Beenken, Lohse, and Tuel. Nays: None. Motion carried. RECOMMENDATION: Approve the resolutions. ATTACHMENTS: I. Proposed Resolutions II. Staff Report III. Preliminary Plat IV. Site Plan V. Final Plat VI. Building Elevations PREPARED BY: Elizabeth Cramblet, Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE PRELIMINARY PLAT FOR ALDER POINT RETAIL IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval of a Preliminary Plat for Alder Point Retail on April 22, 2025; AND, WHEREAS, the Preliminary Plat for Alder Point Retail is in general conformance with section §176 - Subdivision Regulations of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 5th day of May, 2025, that the Preliminary Plat for Alder Point Retail be approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE SITE PLAN FOR ALDER POINT RETAIL IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Alder Point Retail, subject to remaining staff comments on April 22, 2025; AND, WHEREAS, the Site Plan for Alder Point Retail is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Alder Point Retail is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 5th day of May, 2025, that the Site Plan for Alder Point Retail is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE FINAL PLAT FOR ALDER POINT PLAT 2 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, BOYSEN PROPERTIES, LLC has requested final plat approval of Alder Point Plat 2 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on April 22, 2025, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Alder Point Plat 2 and the documents relating thereto will comply with section §176 – Subdivision Regulations of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 5th day of May, 2025, that the Final Plat for Alder Point Plat 2 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1. Public Storm Water Detention Easement; 2. Public Ingress/Egress Easement; 3. Public Storm Sewer Easement 4. Public Overland Flowage Easement 5. Private Sanitary Sewer Easement 6. Cross-Easement, Maintenance, and Cost Sharing Agreement ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Alder Point Retail - Site Plan, Preliminary Plat, and Final Plat PREPARED BY: Elizabeth Cramblet – Planner REPORT DATE: April 16, 2025 MEETING DATE: April 22, 2025 GENERAL INFORMATION Owner: Boysen Properties, LLC Applicant: Alder Partners LLC Owner’s Representative: Kris Bower, Civil Design Advantage Request: The applicant is requesting approval of a site plan for a commercial development Location and Size: Property is located in the southwest corner where NW Douglas Parkway and NW 10th Street intersect containing approximately 4.37 acres. AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. April 29, 2025 2 of 6 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Single-Family Residential, Medium Density Residential, Open Space C-1A (Neighborhood Commercial District), R-4 (Row Dwelling & Townhome Dwelling District), (Planned Development District) North Vacant – Restaurant under construction Single-Family Residential, Open Space A-1 (Agricultural District) South Multi-tenant retail building Medium Density Residential, Open Space C-1A (Neighborhood Commercial District), R-4 (Row Dwelling & Townhome Dwelling District), (Planned Development District) East Vacant – Undeveloped Institutional, Open Space A-1 (Agricultural District) West Large Retail building Single-Family Residential, Medium Density Residential, Open Space R-2 (One and Two-Family Residential District), (Planned Development District) BACKGROUND The subject property is located on the southwest corner where NW Douglas Parkway and NW 10th Street intersect, containing approximately 4.37 acres. PROJECT DESCRIPTION The preliminary plat identifies two lots for commercial development and one outlot for a detention pond. The preliminary plat also shows an extension of a private street into the site as one of the access points and utility extensions. The proposed project includes a preliminary and final plat to divide the parcel into 2 lots and one outlot. The applicant proposes to construct one building on each lot (Lot 1 and Lot2) and construct a detention pond in Outlot ‘Z’. On Lot 1, the applicant is proposing a single story building approximately 2,500 square feet in area and 29 feet in height. The building will consist of black brick, fiber cement and storefront glazing. The building is situated in the center of the lot with parking on the north and east side of the building. There is a drive-thru lane and window for the coffee shop that will circle the building in a counter-clockwise direction. The site plan shows a private drive (NW Peterson Drive) south of the outlot providing access to Lot 1 and Lot 2, with a proposed 26-foot ingress/egress easement. The building on Lot 1 will include an outdoor patio space along the east side of the building. A trash enclosure is proposed in the northwest corner of Lot 1 and will consist of materials to match the main building. A monument sign for Lot 1 is proposed at the northeast corner of the site by the intersection of NW Douglas Parkway and NW 10th Street. On Lot 2 the applicant is proposing a single story building approximately 12,120 square feet and 24 feet in height. The restaurant space will have 5,928 square feet and the retail space will have 6,192 square feet in area. The building will consist of black brick, fiber cement and glass with glazing. Parking will be available along the east and south side of the building. The building on Lot 2 will include outdoor patio spaces along both the north and south sides of the building. The site plan shows the potential for a future drive-thru lane for the restaurant on Lot 2. As indicated on the site plan, this proposal will require separate site plan approval from April 29, 2025 3 of 6 the Community Development Department. A trash enclosure is located behind the building on the west side with materials to match the primary building. Access to this building may also come from the private drive to the north of the building. A monument sign is proposed at the southeast corner of NW 10th Street and NW Yorktown Drive. The site plan shows a detention basin on Outlot ‘Z’ located west of Lot 1 in the northwest corner of the overall site. ACCESS AND PARKING Two accesses will be provided into the overall site at this time. One access is off the private road that extends from NW Peterson Drive, located at the west side of the site off of NW Sproul Drive. The second access is off the public road that runs along the south side of the site (NW Yorktown Drive). A total of 25 parking spaces are required for Lot 1 plus 3 queuing spaces for the drive-thru lane with a total of 28 spaces. The site plan shows 32 parking spaces, 15 queuing spaces for the drive-thru lane, and 2 accessible spaces for a total of 49 spaces. A total of 89 parking spaces are required for the restaurant space on Lot 2 and 25 spaces are required for the retail space for a total of 114 parking spaces required for Lot 2. The site plan shows the 114 required spaces being provided, including 5 accessible spaces. SIDEWALKS Pedestrian access will be provided into the overall site from the existing and proposed sidewalks. A five-foot- wide sidewalk will be extended along NW Douglas Parkway along the north side of Lot 1 and continue along the west side of NW 10th Street along the east side of the site to the corner of NW 10th Street and NW Yorktown Drive where it will continue along the south side of the site. An additional five-foot wide sidewalk extends east along the south side of NW Peterson Drive until it ends at the patio on the north side of the building on Lot 2. UTILITIES Public utilities are provided to the site. The sanitary sewer will run from a public main that lies south of the site and will be privately owned and maintained. Water will run from a public main that lies north and south of the site and will be privately owned and maintained. Storm water detention will be provided in a pond located at the northwest corner of the site. The pond will be privately owned and maintained. April 29, 2025 4 of 6 LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 41%. Plantings are being provided throughout the site in compliance with the Landscape & Open Space Ordinance. April 29, 2025 5 of 6 ELEVATIONS The elevations of the single-story buildings are proposed to be constructed of black brick and fiber cement siding as well as storefront glazing. The trash enclosures are proposed to be constructed of black brick to match the buildings. Elevations of the proposed buildings have been provided for review. Lot 1 Lot 2 LIGHTING PLAN A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan April 29, 2025 6 of 6 Ordinance. A sign package has not been evaluated at this time and will be reviewed as a separate application. A photometric plan will be required with the sign package. EASEMENTS All proposed easements have been indicated on the site plan, preliminary plat, and final plat. Private utility easements are provided across the site. Public ingress/egress easements are provided for access to the site at two locations. PARKLAND DEDICATION There are no parkland dedication requirements associated with this phase of the development as there is no residential proposed at this site. COMPREHENSIVE PLAN The land uses shown within the Comprehensive Plan for the subject property are Single-Family Residential, Medium Density Residential, and Open Space. The comprehensive plan allows for flexibility of land uses. The proposed land uses are allowed per the zoning of the property. The proposed uses will provide goods and services for the residents in this area. STAFF RECOMMENDATION The proposed preliminary plat, final plat and site plan are in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval subject to any remaining staff comments and review of legal documents. PROJECT TEAM: DEVELOPER/APPLICANT: ENGINEER: LANDSCAPE ARCHITECT: GEOTECHNICAL ENGINEER: SURVEYOR: WATER: SANITARY SEWER: ELECTRIC: STORM SEWER: TELEPHONE: BUILDING DEPARTMENT: HEALTH DEPARTMENT: GAS: HWY 6 / HICKMAN ROAD NW 1 0 T H S T R E E T SITE LOCATION NW DOUGLAS PKWY Alder Point Retail 4121 NW URBANDALE DRIVE, URBANDALE, IA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE UTILITY WARNING LAND USE DEVELOPMENT SUMMARY SUBMITTAL DATES ZONING INDEX OF SHEETSVICINITY MAP GENERAL LEGENDPROPERTY DESCRIPTION Alder Point Retail PRELIMINARY PLAT FOR: WAUKEE, IOWA l l l l l l WAUKEE, IOWA PRELIMI N A R Y NOT FOR C O N S T R U C T I O N SITE AREA LOT 1 LOT 2 OUTLOT 'Z' OWNER: GENERAL NOTES VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y NW S P R O U L D R I V E NW YORKTOWN DRIVE NW DOUGLAS PKWY N. 1 0 T H S T ( H W Y R 2 2 ) GM OUTLOT 'Z' LOT 2 NW PETER S E N DRIVE LOT 1 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: PR E L I M I N A R Y P L A T C1.1 PROJECT TEAM: WATER: SANITARY SEWER: ELECTRIC: STORM SEWER: TELEPHONE: BUILDING DEPARTMENT: HEALTH DEPARTMENT: GAS: HWY 6 / HICKMAN ROAD NW 1 0 T H S T R E E T SITE LOCATION NW DOUGLAS PKWY Alder Point Retail 4121 NW URBANDALE DRIVE, URBANDALE, IA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE UTILITY WARNING LAND USE DEVELOPMENT SUMMARY SUBMITTAL DATES ZONING INDEX OF SHEETSVICINITY MAP GENERAL LEGENDPROPERTY DESCRIPTION Alder Point Retail SITE PLAN FOR: WAUKEE, IOWA l l l l l l www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call WAUKEE, IOWA PRELIMI N A R Y NOT FOR C O N S T R U C T I O N SITE AREA LOT 1 LOT 2 OUTLOT 'Z' IMPERVIOUS AREA DEVELOPER/APPLICANT: ENGINEER: LANDSCAPE ARCHITECT: GEOTECHNICAL ENGINEER: SURVEYOR: OWNER: 1 19 20 NW S P R O U L D R I V E NW YORKTOWN DRIVE NW DOUGLAS PKWY N. 1 0 T H S T ( H W Y R 2 2 ) NW PETER S E N DRIVE CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: TO P O G R A P H I C S U R V E Y / C1.1www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA Know what's before you dig. below.Call DE M O L I T I O N P L A N DEMOLITION NOTES VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y 1 19 20 NW S P R O U L D R I V E NW YORKTOWN DRIVE NW DOUGLAS PKWY N. 1 0 T H S T ( H W Y R 2 2 ) NW PETER S E N DRIVE OUTLOT 'Z' LOT 2 Δ=20°02'46" L=10.50' R=30.00' CH=10.44' CHB=N80°31'32"E S89°27'05"E 182.26' S00°01'35"E 282.99' Δ=90°00'00" L=47.12' R=30.00' CH=42.43' CHB=S44°58'25"W S89°58'25"W 264.99' N00°00'32"W 146.93' S89°58'33"W 65.05' N00°01'35"W 125.35' S89°58'25"W 72.57' S79°03'57"W 69.49' Δ=11°16'23" L=74.77' R=380.00' CH=74.64' CHB=N09°23'24"W N15°01'35"W 29.17' Δ=3°37'05" L=20.21' R=320.00' CH=20.20' CHB=N13°13'02"W Δ=11°22'55" L=63.57' R=320.00' CH=63.46' CHB=N05°43'02"W N00°01'35"W 5.19' Δ=70°31'44" L=36.93' R=30.00' CH=34.64' CHB=N35°14'17"E GM LOT 1 N0 0 ° 0 0 ' 3 2 " W 1 5 6 . 8 0 ' S89°27'05"E 12.87' S83°48'20"E 15 0 . 8 7 ' N89°59'28"E 103.00' S45°01'08"E 74.96' S00°01'35"E 94.63' CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: SI T E R E F E R E N C E P L A N C2.1www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA Know what's before you dig. below.Call GENERAL NOTES TRAFFIC CONTROL NOTES PAVEMENT THICKNESS VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y NW DOUGLAS PKWY NW PETER S E N NW S P R O U L D R I V E N. 1 0 T H S T ( H W Y R 2 2 ) NW S P R O U L D R I V E RESTAURANT 3,552 SF RESTAURANT 2,376 SF RETAIL 1,548 SF RETAIL 1,548 SF RETAIL 1,548 SF RETAIL 1,548 SF COFFEE SHOP 2,425 SF 22 ' 22 ' 22 ' 22 ' 49 . 3 3 ' 33 ' 72' 72' PATIO PATIO OUTLOT 'Z' LOT 2 GM 31 . 5 ' 75.5' LOT 1 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: DI M E N S I O N P L A N C2.2 PAVEMENT THICKNESS T NW YORKTOWN DRIVE N. 1 0 T H S T ( H W Y R 2 2 ) NW S P R O U L D R I V E RESTAURANT 3,552 SF RETAIL 1,548 SF RETAIL 1,548 SF22 ' 22 ' 49 . 3 3 ' 72' PATIO GM CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: DI M E N S I O N P L A N C2.3 PAVEMENT THICKNESSGENERAL NOTESSIGN LEGEND VAN ACCESSIBLE VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y GM CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: GR A D I N G P L A N C3.1 VA N T NW YORKTOWN DRIVE N. 1 0 T H S T ( H W Y R 2 2 ) NW S P R O U L D R I V E GM CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: GR A D I N G P L A N C3.2 REFERENCE NOTES GRADING NOTES RETAINING WALL SPOT ELEVATION REFERENCE VAN LOT 1 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: GR A D I N G P L A N C3.3 GRADING DETAIL #1 GRADING DETAIL #2 GRADING DETAIL #4 1 2 4 GRADING DETAIL #55 GRADING DETAIL #33 GRADING DETAIL #66 VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y GM R l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l llllllll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l DA #1 5.13 AC l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l NW DOUGLAS PKWY NW PETER S E N DRIVE NW S P R O U L D R I V E NW YORKTOWN DRIVE CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: ER O S I O N & S E D I M E N T C4.1 CO N T R O L P L A N NOTES: R TSB # l l l l TST # SWPPP LEGEND DISCHARGE POINT SUMMARY STABILIZATION QUANTITIES 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y 15 0 ' H Y D R A N T R A D I U S NW DOUGLAS PKWY NW PETER S E N NW S P R O U L D R I V E N. 1 0 T H S T ( H W Y R 2 2 ) NW S P R O U L D R I V E 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S GM CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: UT I L I T Y P L A N C5.1 FLEXSTORM INLET FILTER MAINTENANCE REQUIREMENTS STRUCTURE (ST-1) MAINTENANCE REQUIREMENTS POND MAINTENANCE REQUIREMENTS 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S VA N T 15 0 ' H Y D R A N T R A D I U S 15 0 ' H Y D R A N T R A D I U S NW YORKTOWN DRIVE N. 1 0 T H S T ( H W Y R 2 2 ) NW S P R O U L D R I V E 15 0 ' H Y D R A N T R A D I U S GM CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: UT I L I T Y P L A N C5.2 UTILITY NOTESUTILITY NOTES FLEXSTORM INLET FILTER MAINTENANCE REQUIREMENTS STRUCTURE (ST-1) MAINTENANCE REQUIREMENTS POND MAINTENANCE REQUIREMENTS CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: DE T A I L S C6.1 DOWNSPOUT CONNECTION WITH TEE 1 SIGN ON POST2 SIGN ON BOLLARD3 BOLLARD DETAIL4 12" SUBGRADE PREPARATION5 INTEGRAL 6" STANDARD CURB6 CURB RAMP FOR CLASS B OR C SIDEWALK 7 P.C.C. WHEELSTOP8 CLASS 'A' INTEGRAL CURB AND SIDEWALK 9 ST-1 STRUCTURE W/ WEIR WALL DETAIL11 ST-8 WITH ORIFICE PLATE10 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: DE T A I L S C6.2STARBUCKS - ARROW SIGN FOOTING DETAILS1STARBUCKS - EXIT SIGN FOOTING DETAILS2 FRONT ELEVATION 1 1 / 2 " GR E A T E R O F 4 ' - 0 " O R LO C A L F R O S T D E P T H 3" CLR. (12) 1/2" DIA. GALVANIZED ANCHOR RODS WITH 6" MIN. EMBEDMENT; 3" PROJECTION ABOVE FOOTING (TYP. AT EACH PLATE) (5) #5 LONG LENGTH, (10) #5 SHORT 6' - 0"LENGTH TOP AND BOTTOM .6" MIN. CONDUIT 10 ' - 3 7 / 8 " 4' - 6" 1/2" HOT DIPPED GALVANIZED LEVELING NUTS (12) REQUIRED STEEL BASE PLATE WELDED TO STEEL POSTS BY MFR. NATURAL GRADE OR ENGINEERED FILL NON-STRUCTURAL BASE COVER DOS AND SPEAKER CANOPY ABOVE 2' - 0" 3" C L R . 3" CLR. 2" C L R . 1' - 5"6' - 7 7/8" 9' - 1 0 " SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER SIDE ELEVATION 10 ' - 3 7 / 8 " 8" 8" 8" 4" 4" 2' - 0 " 7"8"1' - 1"8"1' - 9"8"7" 6' - 0" 2' - 5"2"2"2"3' - 1" ALL ANCHORS TO BE PROVIDED BY G.C. ANCHOR BOLT (TYP.): (4) AT EACH CANOPY BASE PLATE (4) AT DOS BASE PLATE BASE COVER OUTLINE OUTLINE OF CANOPY BASE PLATE (TYP. 1 OF 2)) ALL CONDUIT STUB-UPS TO BE 3" ABOVE FOOTING EDGE OF CONCRETE FOOTING ROUTE CONDUIT PER ELECTRICAL SITE PLAN OUTLINE OF DOS POST BASE PLATE DOS STUB-UPS DR I V E T H R U P O S S T U B - U P DR I V E T H R U P O S S T U B - U P EL E C T R I C A L S T U B - U P DE T E C T O R L O O P S T U B - U P 1' - 0 " 1' - 0 " DR I V E T H R U C U R B 2' - 3 " T O F A C E O F CANOPY LIGHTING 4"4" STUB-UP 4" 2"8"2" 4" 8" 2" 1' - 0" 1' - 2 " 4" X 4" X 0.25" STEEL TUBE POST WELDED TO STEEL BASE PLATE FRONT EDGE FACING DRIVE THRU LANE THRU HOLE FOR MOUNTING (TYP.) ANCHOR BOLT (TYP 1 OF 4) CUT-OUT 1 3/8" BASE PLATE 2 5 / 8 " 1 3 / 8 " 4"4" SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER TACK NUT TO ROD 1/2" HEAVY HEX NUT WITH WASHER (4) 1/2" DIA. A36 THREADED HOT DIPPED GALVANIZED ANCHOR RODS WITH GALVANIZED HARDWARE (3) 1/2" HEAVY HEX NUTS & WASHER -GALVANIZED SEE GROUND FOOTING DETAIL FOR ROD LENGTH SEE SEPARATE DETAIL FOR ANCHOR ROD PATTERN IN FOUNDATION ALTERNATE ADHESIVE POST-INSTALLED ANCHORS: HILTI 1/2" DIA. HVU ADHESIVE CAPSULES AT 9" EMBEDMENT WITH A36 HOT-DIPPED GALVANIZED THREADED STEEL RODS AND HARDWARE. (12) REQUIRED DTE DOS CANOPY -DID 22543 DTE DOS CANOPY GROUND FOOTING DTE DOS CANOPY BOLT PATTERN (TOP VIEW)DTE DOS CANOPY BASE PLATE DTE DOS CANOPY ANCHOR ROD DTE DIRECTIONAL SIGNAGE - ARROW AND LOGO -DID 14104DTE DIRECTIONAL SIGNAGE - EXIT -DID 14091 STARBUCKS - CANOPY FOOTING DETAILS3 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: DE T A I L S C6.3 STARBUCKS - CLEARANCE BAR FOOTING DETAILS5 8 3/4" SIDE ELEVATION SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER G.C. RESPONSIBLE FOR FOUNDATIONS AND FOOTINGS ON ALL MENU BOARD AND DRIVE THRU ELEMENTS. SIGNAGE VENDOR TO SUPPLY TEMPLATES AND INSTALL MENU BOARDS ONLY. FRONT ELEVATION DIA. 2' - 0" 2' - 5 1/8" DIA. 2' - 0" NON-STRUCTURAL BASE COVER HOT DIPPED GALVANIZED LEVELING NUTS (4) REQUIRED STEEL MOUNTING BASE WELDED TO POST NATURAL GRADE OR ENGINEERED FILL (4) 1/2" DIA. X 9" LONG GALVANIZED ANCHOR BOLTS; 3 1/4" PROJECTION ABOVE FOOTING (3) #3 TIES WITHIN FIRST 5" THEN #3 TIES AT 12" O.C. (6) #5 VERTICAL BAR SPACED EVENLY AROUND PERIMETER 6" MIN. CONDUIT . 1 1 / 2 " GR E A T E R O F 3 ' - 9 " O R LO C A L F R O S T D E P T H 3" MIN. 3" M I N . 1' - 7 1 / 2 " 3' - 5 3 / 8 " SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER 2' - 0" DIA. 8"8"8" 4"4" 8" 8" 8" ALL ANCHORS TO BE PROVIDED BY G.C. CONDUIT STUB-UP 3" ABOVE FOOTING ANCHOR BOLT (TYP. 1 OF 4) BASE OUTLINE DRIVE LANE FACE THIS SIDE ROUTE CONDUIT PER ELECTRICAL SITE PLAN 4" 4" 4 1/2"4"4"4 1/2" 1' - 5" 2" 4" 4" 2" 1' - 0 " FRONT EDGE FACING DRIVE THRU LANE 3/4" STEEL BASE PLATE THRU HOLE FOR MOUNTING (TYP.) 2 1/2" SQUARE X 1/4" PLATE WASHER (TYP. 1 OF 4) 6 1/2"4"6 1/2" ANCHOR BOLT (TYP 1 OF 4) 6" X 3" X 0.1875" STEEL POST WELDED TO BASE PLATE CENTER ANCHOR ROD PATTERN IN FOUNDATION ALTERNATIVE -POST INSTALLED ADHESIVE ANCHORS A36 HOT-DIPPED GALVANIZED THREADED STEEL RODS AND HARDWARE MINIMUM 20" EMBEDMENT TACK NUT TO ROD 3/4" HEAVY HEX NUT WITH WASHER (4) 3/4" X 24" LENGTH A36 THREADED HOT DIPPED GALVANIZED THREADED ANCHOR RODS WITH GALVANIZED HARDWARE (3) 3/4" HEAVY HEX NUTS & WASHER -GALVANIZED ROD LENGTH = 24" SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER DTE PRE-MENU BOARD -DID 22542 DTE PRE-MENU GROUND FOOTING DTE PRE-MENU BOLT PATTERN (TOP VIEW) DTE PRE-MENU BASE PLATE DTE PRE-MENU ANCHOR ROD SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER G.C. RESPONSIBLE FOR FOUNDATIONS AND FOOTINGS ON ALL MENU BOARD AND DRIVE THRU ELEMENTS. SIGNAGE VENDOR TO SUPPLY TEMPLATES AND INSTALL MENU BOARDS ONLY. FRONT ELEVATION NON-STRUCTURAL BASE COVER HOT DIPPED GALVANIZED LEVELING NUTS (4) REQUIRED STEEL MOUNTING BASE PLATE WELDED TO STEEL POST SIDE ELEVATION NATURAL GRADE OR ENGINEERED FILL (4) 1/2" DIA. X 14" LONG GALVANIZED ANCHOR BOLTS; 4" PROJECTION ABOVE FOOTING (3) #3 TIES WITHIN FIRST 5" THEN #3 TIES AT 12" O.C. (8) #6 VERTICAL BAR SPACED EVENLY AROUND PERIMETER DIA. 2' - 6" DIA. 2' - 6" GR E A T E R O F 5 ' - 0 " O R LO C A L F R O S T D E P T H 1 1 / 2 " 3" MIN. 3" M I N . 8" MIN.. CONDUIT 1' - 6 3 / 4 " 3' - 6 3 / 4 " 7' - 10 1/2"1' - 1 1/2" SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER ALL ANCHORS TO BE PROVIDED BY G.C. CONDUIT STUB-UP 3" ABOVE FOOTING (4) ANCHOR BOLTS BASE PLATE OUTLINE FRONT EDGE OF DRIVE LANE SIDE ROUTE CONDUIT PER ELECTRICAL SITE PLAN 11"8"11" 4" 4" 11 " 8" 11 " 1' - 3"1' - 3" 2' - 6" DIA. 8" X 4" X 0.1875" STEEL TUBE POST WELDED TO BASE PLATE 3" 8" 3" 1' - 6" 7"4"7" 7" 7" 1' - 2 " THRU HOLE FOR MOUNTING (TYP.) 2 1/2" SQUARE X 1/4" PLATE WASHER (TYP. 1 OF 4)) 3/4" STEEL BASE PLATE FRONT EDGE FACING DRIVE THRU LANE 5"2"2"2"2"5" 5"2"4"2"5" ANCHOR BOLT (TYP 1 OF 4) TACK NUT TO ROD 3/4" HEAVY HEX NUT WITH WASHER (4) 3/4" X 24" LENGTH A36 THREADED HOT DIPPED GALVANIZED THREADED ANCHOR RODS WITH GALVANIZED HARDWARE ALTERNATIVE -POST INSTALLED ADHESIVE ANCHORS HILTI 1" DIA. HVU ADHESIVE CAPUSLES AT 12 3/8" EMBEDMENT WITH A36 HOT-DIPPED GALVANIZED STEEL THREADED RODS AND HARDWARE P = 14.665k# X 0.76 EDGE ADJ = 11.15k# > 8.74# -OKA (3) 3/4" HEAVY HEX NUTS & WASHER -GALVANIZED ROD LENGTH = 24"SEE DETAIL 1 ON SHEET 3 FOR ANCHOR ROD PATTERN IN FOUNDATION MINIMUM 18" EMBEDMENT SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER DTE 5 PANEL MENU BOARD -DID 22540 DT 5-PANEL MENU BOARD GROUND FOOTING DTE 5-PANEL MENU BOARD BOLT PATTERN (TOP VIEW) DTE 5-PANEL MENU BOARD BASE PLATE DTE 5-PANEL MENU BOARD ANCHOR ROD SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER TACK NUT TO ROD 1/2" HEAVY HEX NUT WITH WASHER (4) 1/2" DIA. A36 THREADED HOT DIPPED GALVANIZED THREADED ANCHOR RODS WITH GALVANIZED HARDWARE (3) 1/2" HEAVY HEX NUTS & WASHER - GALVANIZED SEE GROUND FTG. DETAIL FOR ROD LENGTH CENTER ANCHOR ROD PATTERN IN FOUNDATION SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER ALL ANCHORS TO BE PROVIDED BY G.C. (4) ANCHOR BOLTS BASE OUTLINE 8" 8" 8" 8"8"8" 2' - 0" 2' - 0 " ELEVATION VIEW 3 1 / 2 " 1" ANCHOR BOLT (TYP. 1 OF 4) HIGH STRENGTH NON-SHRINKING GROUT PLAN VIEW 2"8"2" 1' - 0 " 1' - 0" 12" X 12" X 3/4" STEEL BASE PLATE 4" X 4" X 0.25" SQUARE STEEL TUBE POST WELDED TO BASE THRU HOLE FOR MOUNTING (TYP.) 2" 8" 2" 4" 4" 4"4" SITE-SPECIFIC FOOTING ENGINEERING REQUIRED BY LICENSED ENGINEER G.C. RESPONSIBLE FOR FOUNDATIONS AND FOOTINGS ON ALL MENU BOARD AND DRIVE THRU ELEMENTS. SIGNAGE VENDOR TO SUPPLY TEMPLATES AND INSTALL MENU BOARDS ONLY. (4) 1/2" DIA. GALVANIZED ANCHOR BOLTS MIN. 1' - 9" 6" AVG. ROAD BED CURB AND GRADE MAY VARY PER LOCATION 4 x 4 x .25w SQUARE STEEL TUBE NATURAL FINISH OR ENGINEERED FILL BASE PLATE NON-STR U C T U R A L BASE COVER (4) #4 VERTICAL BARS SPACED EVENLY AROUND PERIMETER GR E A T E R O F 4 ' - 3 " O R LO C A L F R O S T D E P T H DIA. 1 1 / 2 " (3) #3 TIES WITHIN FIRST 5" THEN #3 TIES AT 9" O.C. .3" CLR. 25 " M I N . 3" CLR. POST-INSTALLED ANCHORS NOT PERMITTED DUE TO CLOSE SPACING OF ANCHOR BOLTS 2' - 0" 8' - 6 " ( M U S T B E M A I N T A I N E D ) 4" 7' - 11 3/4" . 8' - 2 1/2" (BTM. OF BASE PLATE TO TOP OF STEEL TUBE) DTE CLEARANCE BAR SIGNAGE - DID 23111 DTE CLEARANCE BAR ANCHOR ROD DTE CLEARANCE BAR BOLT PATTERN (TOP VIEW) DTE CLEARANCE BAR BASE PLATE DTE CLEARANCE BAR GROUND FOOTING STARBUCKS - PRE-MENU FOOTING DETAILS46STARBUCKS - MENU BOARD FOOTING DETAILS VAN VA N 12345678 9 10 11 12 13 14 15 T T DO N O T EN T E R DO N O T EN T E R DR I V E T H R U EN T R Y DR I V E T H R U EN T R Y NW S P R O U L D R I V E NW YORKTOWN DRIVE NW DOUGLAS PKWY N. 1 0 T H S T ( H W Y R 2 2 ) GM OUTLOT 'Z' LOT 1 LOT 2 ® PLANT SCHEDULE 30' BUFFER ® PLANT SCHEDULE OPEN SPACE - LOT 1 ® PLANT SCHEDULE OPEN SPACE - LOT 2 CI V I L D E S I G N A D V A N T A G E AL D E R P O I N T R E T A I L EN G I N E E R : DR A F T E D : RE V I S I O N S DA T E WA U K E E , I O W A PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2304.285 04/30/2025 DATE: SHEET NUMBER: LA N D S C A P E P L A N L1.1 LANDSCAPE NOTES LEGEND MINIMUM PLANTING REQUIREMENTS OFF-STREET PARKING AREAS 30' BUFFER REQUIREMENTS LOT 1 LANDSCAPE REQUIREMENTS LOT 2 LANDSCAPE REQUIREMENTS SETBACK AREA PARKING LOT LOT 2 S45°01'08"E 74.96' N89°59'28"E 103.00' S83°48'20"E 15 0 . 8 7 ' S89°27'05"E 195.13' Δ=90°34'30" L=47.42' R=30.00' CH=42.64' CHB=N45°15'40"E N00°01'35"W 5.19' Δ=15°00'00" L=83.78' R=320.00' CH=83.54' CHB=N07°31'35"W N15°01'35"W 29.17' Δ=11°16'23" L=74.77' R=380.00' CH=74.64' CHB=N09°23'24"W S79°03'57 " W 69.49' S89°58'25"W 72.57' N0 0 ° 0 1 ' 3 5 " W 1 2 5 . 3 5 ' S89°58'33"W 65.05' N0 0 ° 0 0 ' 3 2 " W 1 4 6 . 9 3 ' S89°58'25"W 264.99' Δ=90°00'00" L=47.12' R=30.00' CH=42.43' CHB=S44°58'25"W S0 0 ° 0 1 ' 3 5 " E 3 7 7 . 6 2 ' LOT 1 OUTLOT 'Z' ALDER POINT PLAT 2 FINAL PLAT ENGINEER / SURVEYOR CI V I L D E S I G N A D V A N T A G E 2304.285 AL D E R P O I N T P L A T 2 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 1 PR E P A R E D 11 / 1 5 / 2 4 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : RE V I S E D 02 / 2 1 / 2 5 RE V I S E D 04 / 3 0 / 2 5 1 FI N A L P L A T LEGENDOWNER / DEVELOPER ZONING BULK REGULATIONS DATE OF SURVEY PLAT DESCRIPTION CURVE DATA NOTES INDEX LEGEND PRELIMIN A R Y NOT FOR C O N S T R U C T I O N NW 1 0 T H S T R E E T NW DOUGLAS PARKWAY N W S P R O U L D R I V E NW YORKTOWN DRIVE N f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 VICINITY MAP RENDERING PROJECT DATA PROJECT TEAM DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 1 3 A M COVER SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 CONTACT LIST, SHEET INDEX, & ARTWORK SHELL BUILDING - ALDER POINT CGR GOVERNING CODES: PROJECT DESIGN INFORMATION: BUILDING CONSTRUCTION: CITY OF WAUKEE NEW TYPE VBTYPE OF CONSTRUCTION: BUILDING SUMMARY: SQUARE FOOTAGES: OTHER IMAGES OR PROJECT DATA NAME OF BUSINESS ADDRESS LINE 1 ADDRESS LINE 2 PHONE: EMAIL: CONTACT: OWNER: SPRINKLED: BUSINESS GROUP B (SINGLE OCCUPANCY)OCCUPANCY CLASSIFICATION: N ZONING: SEE CODE ANALYSIS SHEET G-102 ** I M A G E D I S C L A I M E R * * AR T I S T I C R E N D E R I N G O N L Y ! AC T U A L S I T E C O N D I T I O N S / P L A N T I N G & P A V I N G M A Y D I F F E R . RE F E R T O C I V I L D R A W I N G S F O R T H O S E C O N D I T I O N S . AREA FOR: ARCHITECTURAL SEAL WHEN APPLICABLE NAME OF BUSINESS: KCL ADDRESS: 300 4TH ST, WEST DES MOINES, IA 50265 PHONE: (515) 724-7938 EMAIL: njohnson@kclengineering.com CONTACT: NICK JOHNSON MECHANICAL CONSULTANT: DOES NOT APPLY TO THIS DRAWING SET or T.B.D. PLANS ARE UNDER SEPERATE REVIEW DOES NOT APPLY TO THIS DRAWING SET or T.B.D. PLANS ARE UNDER SEPERATE REVIEW SHEET INDEX GENERAL SHEET NO.SHEET NAME COVER CONTACT LIST, SHEET INDEX, & ARTWORK SHEET SUB-TOTAL: 1 INTERIOR DESIGN SHEET NO.SHEET NAME ARCHITECTURAL SHEET NO.SHEET NAME A-101 MAIN LEVEL PLAN A-150 ROOF PLAN A-200 EXTERIOR ELEVATIONS A-201 EXTERIOR ELEVATIONS A-202 COLOR EXTERIOR ELEVATIONS A-300 BUILDING SECTIONS A-400 TYPICAL WALL SECTIONS A-900 3D IMAGES SHEET SUB-TOTAL: 8 TRASH ENCLOSURE SHEET NO.SHEET NAME T-100 TRASH ENCLOSURE PLANS & ELEVATIONS T-101 TRASH ENCLOSURE SECTIONS T-500 TRASH ENCLOSURE GATE DETAILS SHEET SUB-TOTAL: 3 NAME OF BUSINESS: KCL ADDRESS: 300 4TH ST, WEST DES MOINES, IA 50265 PHONE: (515) 724-7938 EMAIL: njohnson@kclengineering.com CONTACT: NICK JOHNSON PLUMBING CONSULTANT: NAME OF BUSINESS: CDA ADDRESS: 4121 NW URBANDALE DR, URBANDALE, IA 50322 PHONE: (515) 369-4400 EMAIL: keithw@cda-eng.com CONTACT: KEITH WEGGEN CIVIL CONSULTANT: NAME OF BUSINESS: KCL ADDRESS: 300 4TH ST, WEST DES MOINES, IA 50265 PHONE: (515) 724-7938 EMAIL: njohnson@kclengineering.com CONTACT: NICK JOHNSON ELECTRICAL CONSULTANT: NAME OF BUSINESS ADDRESS LINE 1 ADDRESS LINE 2 PHONE: EMAIL: CONTACT: OTHER/ SPECIALTY CONSULTANT: DOWNING CONSTRUCTION INC. 509 EAST SCENIC VALLEY AVENUE INDIANOLA, IOWA 50125 PHONE: 515.961.5386 EMAIL: RYANP@DOWNINGCONSTRUCT.COM CONTACT: RYAN PLOCK GENERAL CONTRACTOR: SPECIFICATIONS SHEET NO.SHEET NAME DOWNING STUDIO PHONE: EMAIL: CONTACT: INTERIORS CONSULTANT: NAME OF BUSINESS: STURUCTREFY ADDRESS: 5550 WILD ROSE LN #400, WEST DES MOINES, IA 50266 PHONE: (515) 991-4176 EMAIL: bjb@structurefy.com CONTACT: BRANT BRISTOW STRUCTURAL CONSULTANT: DOWNING CONSTRUCTION INC. 509 EAST SCENIC VALLEY AVENUE INDIANOLA, IOWA 50125 PHONE: 515.961.5386 EMAIL: CARTERR@DOWNINGCONSTRUCT.COM CONTACT: CARTER REINIER ARCHITECTURAL CONSULTANT: YES A-200 A-200 A-2011 A-201 1 3 2 A-202 1 A-202 3 A-202 2 A-2024 81' - 1 1/2" 1 1 2 2 4 4 3 3 AA BB CC 6' - 8 " 28 ' - 1 0 1 / 4 " 54' - 5 1/2"12' - 9 1/2"13' - 10 1/2" 15' - 5"2' - 2"19' - 3"5"1' - 7"6' - 0"1' - 7"5"22' - 5"11' - 10 1/2" 35 ' - 6 1 / 4 " 8" 4" 3' - 4 " 2' - 8 " 3' - 4 " 1' - 4 " 17 ' - 2 1 / 4 " 2' - 8 " 1' - 1 1/4" 1 A-300 2 A-300 4' - 6 " 4' - 6" FACP LOCATION 12 ' - 2 1 / 4 " 4" 3' - 8 " 1' - 0 " 11 ' - 8 " STOOP 5' - 0" ST O O P 5' - 0 " 10' - 0" 11 ' - 0 " 35 ' - 6 1 / 4 " 81' - 1 1/2" X6i X6i X6i X6i X6i X6i D.S.D.S. D.S. D.S.D.S. D.S. 6 1/8" 11' - 9 1/4" 6 1/8" RISER ROOM 101 T.I. AREA 100 101 100C 100B 10 0 A STOOP 5' - 0" D.S. f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 1 4 A M A-101 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 MAIN LEVEL PLAN CGR SCALE: 1/4" = 1'-0"1 MAIN LEVEL PLAN Overall Building Area Name Area Area 2,426 SF 2,426 SF N A-200 A-200 A-201 1 3 2 A-202 1 A-202 3 A-202 2 1 1 2 2 4 4 3 3 AA BB CC 1/ 4 " / 1 2 " 1/ 4 " / 1 2 " 1" / 1 2 " 1 / 2 " / 1 2 " 1/2 " / 1 2 " 1 / 2 " / 1 2 " 1/ 2 " / 1 2 " 6' - 8 " 15 ' - 7 1 / 4 " 13 ' - 3 " 3 5 / 8 " 17' - 9 1/2"63' - 4"4' - 2 5/8" 35 ' - 6 1 / 4 " 81' - 1 1/2" 1 A-300 2 A-300 17' - 7 1/2"34' - 7"2' - 3"12' - 9 1/2"2' - 3"11' - 7 1/2" 4' - 2 5 / 8 " 21 ' - 5 " 7' - 5 1 / 4 " PE R S T A R B U C K S 4' - 1 1 " MAX 3' - 11" 28 ' - 1 0 1 / 4 " 81' - 1 1/2" 28 ' - 1 0 1 / 4 " VALLEYVALLEY VALLEY RI D G E PRE-ENGINEERED AWNING, TYPICAL AWNING HANGERS PER SUPPLIER, TYPICAL TURN TPO UP PARAPET WALL AND UNDER METAL COPING CAP, TYPICAL PRE-FINISHED METAL PARAPET COPING CAP 1" / 1 2 " 1" / 1 2 " 1 " / 1 2 " VALLEY VALLEY RI D G E VALLE Y VA L L E Y VALLEY 8"x8" THROUGH WALL SCUPPER, TYPICAL f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 1 5 A M A-150 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 ROOF PLAN CGR SCALE: 1/4" = 1'-0"1 ROOF PLAN N MAIN LEVEL0" B.O. CANOPY 11' - 0" T.O. SCREEN 24' - 0" T.O. FOOTING-8" B.O. FOUNDATION-4' - 2" T.O. GLAZING 10' - 0" 1243 T.O. PARAPET WALL19' - 0" 2 A-300 PLATE LEVEL15' - 0" DOWNSPOUT DOWNSPOUT PRE-ENGINEERED AWNING B-2 B-1 B-2 14 ' - 4 " 11 1/4" 4' - 2 " 15 ' - 0 " 4' - 0 " 5' - 0 " CONCRETE FOUNDATION PER STRUCTURAL PRE-FINISHED METAL COPING CAP RTU SCREEN WC-1 MAIN LEVEL 0" B.O. CANOPY 11' - 0" T.O. SCREEN24' - 0" T.O. FOOTING-8" B.O. FOUNDATION -4' - 2" T.O. GLAZING10' - 0" 1 243 T.O. PARAPET WALL19' - 0" 2 A-300 PLATE LEVEL 15' - 0" SCUPPER AND DOWNSPOUTSCUPPER AND DOWNSPOUT PRE-ENGINEERED AWNING B-2 B-2 B-1 B-1 B-1 PRE-ENGINEERED AWNING 14 ' - 4 " 5' - 0 " 4' - 0 " 15 ' - 0 " 4' - 2 " CONCRETE FOUNDATION PER STRUCTURAL PRE-FINISHED METAL COPING CAP RTU SCREEN WC-1 f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 1 6 A M A-200 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 EXTERIOR ELEVATIONS CGR Emergency Egress One sash of this group must comply with governing fire and building codes.*SCALE: 1/4" = 1'-0"1 ELEVATION - SOUTH SCALE: 1/4" = 1'-0"3 ELEVATION - NORTH MATERIAL LEGEND MARK MATERIAL DESCRIPTION B-1 EXTERIOR BRICK (OFF WHITE) B-2 EXTERIOR BRICK (CHARCOAL) MTL-1 PRE-FINISHED METAL COPING CAP (BLACK) MTL-2 VETIS PRE-FABRICATE METAL AWNING (BLACK) MTL-3 PRE-FABRICATED METAL SCUPPER AND DOWNSPOUT (BLACK) MTL-4 STOREFRONT SYSTEM (BLACK) MTL-5 PRE-FABRICATED METAL LADDER (BLACK) WC-1 EXTERIOR WOOD COMPOSITE TONGUE & GROOVE US09 SIDING (5-9/16 ”x1/2”). MFR/PRODUCT: NEW TECH WOOD, INDIAN EBONY (EB) NOTE: ALL SIGNAGE TO BE EVALUATED IN A SEPERATE PERMIT - NOT A PART OF THIS APPLICATION MAIN LEVEL 0" B.O. CANOPY 11' - 0" T.O. SCREEN24' - 0" T.O. FOOTING -8" B.O. FOUNDATION-4' - 2" T.O. GLAZING10' - 0" ABC T.O. PARAPET WALL19' - 0" 1 A-300 PLATE LEVEL 15' - 0" PRE-ENGINEERED AWNING DOWNSPOUT B-1 B-1 B-2 B-1 5' - 0 " 4' - 0 " 15 ' - 0 " 4' - 2 " CONCRETE FOUNDATION PER STRUCTURAL PRE-FINISHED METAL COPING CAP RTU SCREEN B-2 WC-1 MAIN LEVEL0" B.O. CANOPY11' - 0" T.O. SCREEN 24' - 0" T.O. FOOTING -8" B.O. FOUNDATION-4' - 2" T.O. GLAZING 10' - 0" A B C T.O. PARAPET WALL19' - 0" 1 A-300 PLATE LEVEL15' - 0" 16' - 9" DOWNSPOUT SCUPPER AND DOWNSPOUT RTU SCREEN PRE-ENGINEERED AWNING ROOF LADDER W/ LOCKABLE COVER B-2 B-1 B-1 B-1 B-2 SPACE FOR UTILITIES 5' - 0 " 4' - 0 " 15 ' - 0 " 4' - 2 " CONCRETE FOUNDATION PER STRUCTURAL PRE-FINISHED METAL COPING CAP WC-1 SCALE: 1/4" = 1'-0"2 ELEVATION - WEST SCALE: 1/4" = 1'-0"1 ELEVATION - EAST f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 1 8 A M A-201 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 EXTERIOR ELEVATIONS CGR MATERIAL LEGEND MARK MATERIAL DESCRIPTION B-1 EXTERIOR BRICK (OFF WHITE) B-2 EXTERIOR BRICK (CHARCOAL) MTL-1 PRE-FINISHED METAL COPING CAP (BLACK) MTL-2 VETIS PRE-FABRICATE METAL AWNING (BLACK) MTL-3 PRE-FABRICATED METAL SCUPPER AND DOWNSPOUT (BLACK) MTL-4 STOREFRONT SYSTEM (BLACK) MTL-5 PRE-FABRICATED METAL LADDER (BLACK) WC-1 EXTERIOR WOOD COMPOSITE TONGUE & GROOVE US09 SIDING (5-9/16 ”x1/2”). MFR/PRODUCT: NEW TECH WOOD, INDIAN EBONY (EB) NOTE: ALL SIGNAGE TO BE EVALUATED IN A SEPERATE PERMIT - NOT A PART OF THIS APPLICATION MTL-1 MTL-2 MTL-3 MTL-3 MTL-4 MTL-1 MTL-2 B-2 B-1 B-1 B-1 MTL-4 WC-1 MTL-2 MTL-2 MTL-4 MTL-2 MTL-4 MTL-1 MTL-2 MTL-3 MTL-2 MTL-2 B-2 B-1 B-2 WC-1 MTL-2 MTL-1 MTL-2 MTL-1 MTL-3 MTL-5 MTL-2 MTL-5 B-2 B-1 B-1 B-1 B-2 WC-1 MTL-2 MTL-2 MTL-1 MTL-3 MTL-4 MTL-2 B-1 B-2 B-1 B-2 B-1 WC-1 f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 2 0 A M A-202 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 COLOR EXTERIOR ELEVATIONS CGR SCALE: 3/16" = 1'-0"1 COLOR - SOUTH SCALE: 3/16" = 1'-0"2 COLOR - NORTH SCALE: 3/16" = 1'-0"3 COLOR - WEST SCALE: 3/16" = 1'-0"4 COLOR - EAST MATERIAL LEGEND MARK MATERIAL DESCRIPTION B-1 EXTERIOR BRICK (OFF WHITE) B-2 EXTERIOR BRICK (CHARCOAL) MTL-1 PRE-FINISHED METAL COPING CAP (BLACK) MTL-2 VETIS PRE-FABRICATE METAL AWNING (BLACK) MTL-3 PRE-FABRICATED METAL SCUPPER AND DOWNSPOUT (BLACK) MTL-4 STOREFRONT SYSTEM (BLACK) MTL-5 PRE-FABRICATED METAL LADDER (BLACK) WC-1 EXTERIOR WOOD COMPOSITE TONGUE & GROOVE US09 SIDING (5-9/16 ”x1/2”). MFR/PRODUCT: NEW TECH WOOD, INDIAN EBONY (EB) VENEER CALCULATIONS: NORTH (REAR) MATERIAL CLASS CLASS-1 CLASS-1 CLASS-1 CLASS-OTHER MATERIAL DESCRIPTION BRICK VENEER: C1 BRICK VENEER: C2 CLEAR GLAZING H.M. DOOR OPENINGS AREA (S.F.) 450 170 25 42 687 S.F. % TOTALS: PRIMARY SOUTH (FRONT) PRIMARY WEST (DRIVE-THRU) EAST % 66 24 4 6 100% MATERIAL CLASS CLASS-1 CLASS-1 CLASS-1 CLASS-OTHER MATERIAL DESCRIPTION BRICK VENEER: C1 BRICK VENEER: C2 CLEAR GLAZING H.M. DOOR OPENINGS AREA (S.F.) 380 127 180 0 687 S.F. % TOTALS: % 55 18 27 0 100% MATERIAL CLASS CLASS-1 CLASS-1 CLASS-1 CLASS-OTHER MATERIAL DESCRIPTION BRICK VENEER: C1 BRICK VENEER: C2 CLEAR GLAZING H.M. DOOR OPENINGS AREA (S.F.) 1008 464 82 0 1,554 S.F. % TOTALS: % 65 30 5 0 100% MATERIAL CLASS CLASS-1 CLASS-1 CLASS-1 CLASS-OTHER MATERIAL DESCRIPTION BRICK VENEER: C1 BRICK VENEER: C2 CLEAR GLAZING H.M. DOOR OPENINGS AREA (S.F.) 654 673 227 0 1,554 S.F.TOTALS: % 42 43 15 0 100% NOTE: ALL SIGNAGE TO BE EVALUATED IN A SEPERATE PERMIT - NOT A PART OF THIS APPLICATION MAIN LEVEL0" B.O. CANOPY11' - 0" T.O. SCREEN 24' - 0" T.O. FOOTING-8" T.O. GLAZING 10' - 0" 1 2 T.O. PARAPET WALL19' - 0" 2 A-300 PLATE LEVEL15' - 0" 81' - 1 1/2" TPO ROOFING SYSTEM PER SPECS FUTURE 4" CONCRETE SLAB PER STRUCTURAL ON VAPOR BARRIER PER SPECS. OVER 4" MIN GRANULAR FILL ROOF TRUSSES PER STRUCTURAL PRE-FINISHED METAL COPING CAP 100A 3' - 11" MAIN LEVEL 0" B.O. CANOPY11' - 0" T.O. SCREEN24' - 0" T.O. FOOTING -8" T.O. GLAZING10' - 0" A B T.O. PARAPET WALL19' - 0" 1 A-300 PLATE LEVEL 15' - 0" FUTURE 4" CONCRETE SLAB PER STRUCTURAL ON VAPOR BARRIER PER SPECS. OVER 4" MIN GRANULAR FILL 28' - 10 1/4" 28' - 10 1/4" ROOF TRUSSES PER STRUCTURAL TPO ROOFING SYSTEM PER SPECS PRE-FINISHED METAL COPING CAP f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 2 1 A M A-300 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 BUILDING SECTIONS CGR SCALE: 1/4" = 1'-0"1 BUILDING SECTION - B SCALE: 1/4" = 1'-0"2 BUILDING SECTION - A FLOOR LINE COMMERCIAL BUILDING WRAP OVER 5/8" OSB SHEATHING 5/8" GYPSUM WALL BOARD OVER VAPOR BARRIER (X6i) 2x6 STUDS @ 16" o.c. w/ R-21 BIBBS INSULATION or R-21 BATT INSULATION SLOPE GRADE AWAY FROM STRUCTURE 2x6 "TREATED" SILL PLATE ON SILL SEALER SLAB ON GRADE T.O. FOUNDATION GRID/ FRAMING LINE NOTE: SHEATHING IS SET "OUTSIDE" OF GRIDLINE T.O. WALL PLATE SPRAY FOAM INSULATION 2x4 FRAMING B/N TRUSSES HEEL T.O. PARAPET ROOF TRUSSES @ 2' - 0" o.c.5/8" OSB ROOF SHEATHING w/ SUPPORT CLIPS B/N TRUSSES TPO ROOFING SYSTEM SEE DETAIL ON A-500 TURN TPO UP PARAPET WALL & UNDER METAL CAP 5/8" OSB SHEATHING ON BOTH SIDES OF PARAPET WALL w/ COMMERCIAL BUILDING WRAP OVER SHEATHING PARAPET END WALL: FIELD FRAMED 2x4 STUDS @ 1' - 4" o.c. PARAPET CAP SYSTEM SEE DETAIL ON A-500 2x4 LATERAL SUPPORT FRAMING AS REQUIRED BY TRUSS MFR. EL E V A T I O N S SE E E X T E R I O R PE R S T R U C T . VA R I E S 15 ' - 0 " SE E S T R U C T . SL A B E D G E BRICK VENEER PER EXTERIOR ELEVATIONS EXTEND GYP. TO ROOF DECK ABOVE THRU WALL METAL FLASHING 8" CONCRETE CURB PER STRUCTURAL FUTURE 4" CONCRETE SLAB PER STRUCTURAL VAPOR BARRIER PER SPECS 4" MIN GRANULAR FILL INSULATED PARAPET WALL f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 2 1 A M A-400 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 TYPICAL WALL SECTIONS CGR SPRAY FOAM NOTE WHEN SPRAY FOAM IS EXPOSED, PROVIDE INTUMESCENT PAINT TO MEET IBC & IFC REQUIREMENTS. OR IF A "WILD-RETURN" HVAC SYSTEM IS INSTALLED. SCALE: 1/2" = 1'-0"1 TYPICAL WALL SECTION f: 515.961.0468 PROP E R T Y O F D O W N I N G S T U D I O THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 DE S I G N D E V E L O P M E N T P L A N ( S ) - N O T F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE S: \ 0 1 D e s i g n \ 0 1 A s s e m b l y - R e s t a u r a n t \ 9 0 - 2 0 8 - S t a r b u c k s A l d e r P o i n t\ 0 1 D e s i g n \ 0 5 R e v i t \ 9 0 - X X X - S t a r b u c k s A l d e r P o i n t . r v t 4/ 2 8 / 2 0 2 5 8 : 2 9 : 3 6 A M A-900 SH E L L B U I L D I N G - A L D E R P O I N T NW 1 0 T H S T R E E T & N W D O U G L A S P A R K W A Y WA U K E E , I o w a 5 0 2 6 3 90-208 04/28/2025 3D IMAGES CGR SCALE:1 3D ARIEL VIEW - S.W. CORNER SCALE:2 3D ARIEL VIEW - N.E. CORNER FINISHED FLOOR 0" TRUSS BEARING 16' - 0" T.O. PARAPET 1 24' - 0" T.O. GLAZING 12' - 0" T.O. PARAPET 2 27' - 0" BRK-2 VIS BRK-1 BRK-1 BRK-2 VIS T.O. PARAPET 3 29' - 0" FCP-1 FCP-1 BRK-2 COP-1 VIS VISVISVIS BRK-1 FCP-1 FAS-1 CAN-1 BRK-1 GALVANIZED & PAINTED BLACK PIPE RAILING VIS VIS FAS-1 CAN-1 FCP-1 BRK-2 BRK-2 BRK-2BRK-2BRK-1 CAN-1CAN-1 BRK-1FCP-1 FINISHED FLOOR 0" TRUSS BEARING 16' - 0" T.O. PARAPET 1 24' - 0" T.O. GLAZING 12' - 0" T.O. PARAPET 3 29' - 0" FCP-1 BRK-1 BRK-2 COP-1 FAS-1 BRK-1 BRK-2 BRK-2BRK-2 VISVIS BRK-1 FINISHED FLOOR 0" TRUSS BEARING 16' - 0" T.O. PARAPET 1 24' - 0" T.O. GLAZING 12' - 0" T.O. PARAPET 2 27' - 0" BRK-1 COP-1 BRK-2BRK-2 BRK-2 BRK-2 FAS-1 FCP-1 BRK-1 VIS VISVIS CAN-1 FINISHED FLOOR 0" TRUSS BEARING 16' - 0" T.O. PARAPET 1 24' - 0" T.O. GLAZING 12' - 0" BRK-1 PROPOSED METER BANK LOCATION BRK-2 BRK-2 BRK-1 BRK-1 BRK-2 COP-1 COP-1 COP-1 CAN-1 BRK-1 GALVANIZED & PAINTED BLACK PIPE RAILING TYPICAL U.O.N. • EXPOSED CONCRETE: GRIND SMOOTH & RUB/COAT WITH CEMENT SLURRY. • EXPOSED LINTELS: GALVANIZED & PAINTED TO MATCH ADJACENT MATERIAL ABOVE. • METAL RAILINGS: GALVANIZED & PAINTED BLACK. • FASCIA: METAL PREFINISHED BLACK. • SOFFIT: METAL PREFINISHED TO MATCH ADJACENT ROOF COLOR. • SCUPPERS, GUTTERS & DOWNSPOUTS: METAL PREFINISHED TO MATCH ADJ. MATERIAL. • CAULKS & SEALANTS: COLOR MATCHED TO ADJACENT MATERIAL. • HOLLOW METAL MAN DOORS & FRAMES: PAINTED BLACK. • LIGHT FIXTURES: METAL PRE-FINISHED HOUSINGS TO MATCH ADJ. OPENING FRAMING. MISC EXTERIOR MATERIAL FINISHES SAA JOB #: This drawing has been prepared by the Architect, or under the Architect's direct supervision. This drawing is provided as an instrument of service by the Designer / Architect and is intended for use on this project only. Any reproduction, use, or disclosure of information contained herein without the prior written consent of the Architect is strictly prohibited. (C) Copyright 2024 by Simonson & Associates Architects, L.L.C. 24"x36" SHEET (FULL SIZE) -SCALE IS AS NOTED. 12"x18" SHEET (HALF SIZE) -SCALE IS ONE-HALF OF WHAT IS NOTED OTHER SHEET SIZES NOT TO SCALE 23002A ALDER POINT RETAIL ALDER POINT LOT #2 WAUKEE, IA 12/17/2024 SCALE:1/8" = 1'-0"1 EAST ELEVATION (FRONT) SCALE:1/8" = 1'-0"2 SOUTH ELEVATION SCALE:1/8" = 1'-0"3 NORTH ELEVATION SCALE:1/8" = 1'-0"4 WEST ELEVATION (BACK) EXTERIOR MATERIAL LEGEND MAT. LABEL MATERIAL DESCRIPTION BRK-1 4" FACE BRICK; MODULAR SIZE; GLEN GERY BLACK PEARL (OR APPROVED EQUIV.) W/ DARK GROUT; WIRECUT BRK-2 4" FACE BRICK; MODULAR SIZE; GLEN GERY OYSTER WHITE WITH SPECK GLAZED (OR APPROVED EQUIV.) W/ LIGHT GROUT CAN-1 PREFINISHED ALUMINUM CANOPY; BLACK COP-1 PREFINISHED METAL COPING; COLOR: BLACK FAS-1 PREFINISHED METAL FASCIA; COLOR: BLACK FCP-1 FIBER CEMENT PANEL W/ CONCEALED FASTENERS; NICHIHA VINTAGEWOOD; COLOR: SPRUCE VIS 1” INSULATED VISION GLASS: CLEAR W/ LOW E COATING SET IN THERMALLY BROKEN ALUMINUM STOREFRONT FRAMING; COLOR: BLACK NORTH ELEVATION 1,777.28 SF TOTAL GLASS = 288.00 SF 16.0% PRIMARY MATERIAL BRICK = 1,432.67 SF 80.0% PRIMARY MATERIAL FIBER CEMENT = 56.61 SF 04.0% SECONDARY MATERIAL Secondary Materials not to exceed 25% on street facing facades. MATERIAL CALCULATIONS (CITY OF WAUKEE) (C1A ZONING) SOUTH ELEVATION 1,858.59 SF TOTAL GLASS = 288.00 SF 15.0% PRIMARY MATERIAL BRICK = 1,438.85 SF 56.0% PRIMARY MATERIAL FIBER CEMENT = 131.74 SF 07.0% SECONDARY MATERIAL Secondary Materials not to exceed 25% on street facing facades. EAST ELEVATION (FRONT)4,302.68 SF TOTAL GLASS = 1,484.00 SF 34.0% PRIMARY MATERIAL BRICK = 2,387.86 SF 56.0% PRIMARY MATERIAL FIBER CEMENT = 430.86 SF 10.0% SECONDARY MATERIAL Secondary Materials not to exceed 25% on street facing facades. WEST ELEVATION (BACK)4,087.95 SF TOTAL GLASS = 0.00 SF 00.0% PRIMARY MATERIAL BRICK = 3,877.73 SF 53.0% PRIMARY MATERIAL FIBER CEMENT = 0.00 SF 00.0% SECONDARY MATERIAL OTHER (DOORS) = 210.22 SF 05.0% SECONDARY MATERIAL Secondary Materials not to exceed 25% on street facing facades.