Loading...
HomeMy WebLinkAbout2025-05-19 I01H_04 Sugar Creek Golf Course Parking Lot_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 19, 2025 AGENDA ITEM:Consideration of approval of Change Order No. 2 to InRoads Asphalt Paving & Materials, for the Sugar Creek Golf Course Parking Lot Project increasing the contract in the amount of $1,399.11. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 to InRoads Asphalt, Paving & Materials is for quantity adjustments for curb and gutter, sidewalk PCC, off- site topsoil, and placement of 65.37 tons of granular subbase with core-out excavation. Eliminate bid quantity for on-site topsoil, hydraulic seeding, fertilizing and mulching, 6”erosion stone, modular block retaining wall, excavation class 10 waste. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 2 PREPARED BY: Laurie Baker REVIEWED BY: Matt Jermier PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H4 P:\24\2405601\CONSTRUCTION\CHANGE ORDERS\CO 2\SUGARCREEKGOLFCOURSEPARKINGLOT_CO2.DOCX 4390 114th Street  Urbandale, IA 50322  (515) 270-0848  FAX (515) 270-1067 CHANGE ORDER NO. 2 PROJECT: Sugar Creek Golf Course Parking Lot DATE: 5/8/2025 OWNER: Waukee Parks and Recreation Department ENGINEER: Kirkham Michael CONTRACTOR: In Roads LLC KM PROJECT NO: 2405601 CONTRACT FOR: Entire Work CONTRACT DATE: Description of the changes in the Contract Documents: Add 5.5 LF of CURB AND GUTTER, 2', 6" and 9.5 SY of SIDEWALK, PCC, 4 IN., CLASS A, 13 CY of TOPSOIL, OFF-SITE, 65.37 TON of GRANULAR SUBBASE WITH CORE-OUT EXCAVATION. Delete 27 CY of TOPSOIL, ON- SITE, 0.07 AC of HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 1, 0.7 TON of RIP-RAP, 6" EROSION STONE, 50 SF of MODULAR BLOCK RETAINING WALL, 25 CY of EXCAVATION, CLASS 10, WASTE. Attachments: Change Order No. 2 Summary.xlsx CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: $342,051.15 Original Contract Time: $- Net Change by Previous Change Orders: $8,090.88 Net Change from Previous Change Orders: $- Contract Price prior to this Change Order: $350,142.03 Contract Time prior to this Change Order: $- Net increase of this Change Order: $1,399.11 Net (in/de)crease of this Change Order: $- Contract Price with approved Change Orders: $351,541.14 Contract Time with approved Change Orders: $- RECOMMENDED: APPROVED: ACCEPTED: Armin Vlahovljak Engineer Owner Contractor Date: 5/8/2025 Date: Date: Change Order No. 2 Breakdown Waukee Parks and Recreation Sugar Creek Golf Course Parking Lot 5/8/2025 Item Description Add/Delete Qty Unit Unit Price Total Comments Work Completed? 1 CURB AND GUTTER, 2', 6"add 5.5 LF 29.50$ 162.25$ Over-run yes 2 SIDEWALK, PCC, 4 IN., CLASS A add 9.5 SY 87.00$ 826.50$ Over-run yes 3 TOPSOIL, OFF-SITE add 13 CY 38.00$ 494.00$ Add yes 4 TOPSOIL, ON-SITE delete -27 cy 11.00$ (297.00)$ Under-run yes 5 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 1 delete -0.07 ac 7,000.00$ (490.00)$ Under-run yes 6 RIP-RAP, 6" EROSION STONE delete -0.7 ton 350.00$ (245.00)$ Under-run yes 7 MODULAR BLOCK RETAINING WALL delete -50 sf 75.00$ (3,750.00)$ Under-run yes 8 EXCAVATION, CLASS 10, WASTE delete -25 CY 15.00$ (375.00)$ Under-run, Alternate 2 yes 9 GRANULAR SUBBASE WITH CORE-OUT EXCAVATION add 65.37 TON 77.61$ 5,073.36$ Over-run yes Total Change Order:1,399.11$ Original Contract :342,051.15$ Change Order 1: 8,090.88$ 1,399.11$ New Contract Total:351,541.14$ Change Order 2: