HomeMy WebLinkAbout2025-05-19 I01H_07 Traffic Signal Enhancements, School & Trail Crossings_Pmt Est 3AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: May 19, 2025
AGENDA ITEM:Consideration of approval of Payment Estimate No. 3 to Iowa Signal,
Inc. for the Traffic Signal Enhancements project in the amount of
$294,507.32.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Iowa Signal, Inc. requested Payment Estimate No. 3
for the work completed on the Traffic Signal Enhancements, Waukee School & Trail Crossing
Improvements project in the amount of $294,507.32. Snyder & Associates has reviewed the
payment estimate and recommends payment.
The partial payment is for the pay period January 31, 2025 to May 12, 2025. This pay estimate is
for construction/installation of all remaining contract and change order items except one
pedestrian pushbutton including: traffic signal heads, signal cabinet modifications, signal cabinet
replacements, battery backup systems, APS pushbuttons, and signal cables.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $294,507.32
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Payment Estimate No. 3
ATTACHMENTS: I. Letter of Recommendation
II. Payment Estimate No. 3
PREPARED BY:Sara Kappos
REVIEWED BY:Sara Kappos SKK
I1H7
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM
v:\projects\2022\122.0627.01\construction\ltr_2025-05-14_payapp03_signalenhancement(tap).docx
May 14, 2025
Rudy Koester, P.E.
Public Works Director
City of Waukee
805 University Ave
Waukee, IA 50263
RE: PARTIAL PAYMENT APPLICATION NO. 3
TRAFFIC SIGNAL ENHANCEMENT
S&A PROJECT NO.: 122.0627.01
IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25
Dear Mr. Koester:
Partial payment application #3 is for construction/installation of all remaining contract and change
order items except one pedestrian pushbutton including: traffic signal heads, signal cabinet
modifications, signal cabinet replacements, battery backup systems, APS pushbuttons, and signal
cables.
Attached is partial payment application #3 for the project. The project utilizes 3% retainage, per
the Iowa DOT’s maximum. We recommend the payment of $294,507.32 to the contractor, Iowa
Signal, Inc. This represents about 100% of the total project cost, less withheld retainage. After the
final pushbutton is installed following clearance for the work from the Union Pacific Railroad,
another pay application will be issued recommending the release of the retainage for full project
completion.
Please contact me should you have any questions regarding this partial payment application.
Sincerely,
SNYDER & ASSOCIATES, INC.
Andrew Houchin, P.E.
Project Engineer
Enclosure
PROJECT: Traffic Signal Enhancement SNYDER & ASSOCIATES PROJECT NO.: 122.0627.01
IOWA DOT PROJECT NO.: TAP-T-8177(601)--8V-25
OWNER: Waukee
CONTRACTOR: Iowa Signal, Inc.
ADDRESS: 3711 SE Capitol Circle, Grimes, IA 50111
DATE: 5/13/2025 PAYMENT PERIOD: 1/31/2025
to 5/12/2025
1. CONTRACT SUMMARY:
Original Contract Amount:917,492.00$ CONTRACT PERIOD: COMPLETION DATE
Contract Completion Date: December 31, 2024
Net Change by Change Order:61,945.50$
Contract Amount to Date:979,437.50$
2. WORK SUMMARY:Extension by Change Order: April 30, 2025
Total Work Performed to Date:979,437.50$
Retainage: 3%$29,383.13
Total Earned Less Retainage:950,054.37$
Less Previous Applications for Payment: 655,547.05$
AMOUNT DUE THIS APPLICATION:294,507.32$
3. CONTRACTOR'S CERTIFICATION:
The undersigned CONTRACTOR certifies that:
(1) all previous progress payments received from OWNER on account of Work done under the contract referred to above have been
applied to discharge in full all obligations of CONTRACTOR incurred in connection with the Work covered by prior Applications for
Payment; and
(2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by the application for Payment are free
and clear of all liens, claims, security interests, and encumbrances
Iowa Signal, Inc.
CONTRACTOR
By DATE:
4. ENGINEER'S APPROVAL:
Payment of the above AMOUNT DUE THIS APPLICATION is recommended:
Snyder & Associates, Inc.
ENGINEER
By DATE:
5. OWNER'S APPROVAL
OWNER
By DATE:
APPLICATION FOR PARTIAL PAYMENT NO. 3
V:\Projects\2022\122.0627.01\Construction\PayApp03_2025-05-13_SignalEnhancement(TAP)
5/14/25
6. DETAILED ESTIMATE OF WORK COMPLETED:
APPLICATION FOR PARTIAL PAYMENT NO. 3
ITEM TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0010 0.5 0.5 1.0 LS 2,700.00$ 1,350.00$ 1,350.00$ -$ -$ 2,700.00$ 0 -$ 0.5 0.5 1 2,700.00$ 100.00%
0020 0.5 0.5 1.0 LS 27,800.00$ 13,900.00$ 13,900.00$ -$ -$ 27,800.00$ 0.05 0.05 0.1 2,780.00$ 0.45 0.45 0.9 25,020.00$ 100.00%
0030 1 1 LS 2,145.00$ -$ -$ -$ 2,145.00$ 2,145.00$ 0 -$ 1 1 2,145.00$ 100.00%
0040 24 24 EA 1,634.00$ -$ 39,216.00$ -$ -$ 39,216.00$ $28,695.60 N/A 28,695.60$ $10,520.40 N/A 10,520.40$ 100.00%
0050 8 8 EA 6,783.00$ -$ 54,264.00$ -$ -$ 54,264.00$ 8 8 54,264.00$ 0 -$ 100.00%
0060 2 5 7 EA 4,412.00$ 8,824.00$ 22,060.00$ -$ -$ 30,884.00$ $2,459.06 $6,147.64 N/A 8,606.70$ $6,364.94 $15,912.36 N/A 22,277.30$ 100.00%
0070 4 7 11 EA 50,405.00$ -$ 201,620.00$ 352,835.00$ -$ 554,455.00$ $0.00 $146,448.00 $256,284.00 $0.00 N/A 402,732.00$ $55,172.00 $96,551.00 N/A 151,723.00$ 100.00%
0080 2 8 4 14 EA 370.00$ 740.00$ 2,960.00$ 1,480.00$ -$ 5,180.00$ $270.00 $1,080.00 $540.00 N/A 1,890.00$ $470.00 $1,880.00 $940.00 N/A 3,290.00$ 100.00%
0090 11 24 35 EA 370.00$ -$ -$ 4,070.00$ 8,880.00$ 12,950.00$ $1,485.00 $3,240.00 N/A 4,725.00$ $2,585.00 $5,640.00 N/A 8,225.00$ 100.00%
0100 4 6 10 EA 402.00$ 1,608.00$ 2,412.00$ -$ -$ 4,020.00$ $529.20 $793.80 N/A 1,323.00$ $1,078.80 $1,618.20 N/A 2,697.00$ 100.00%
0110 2 2 EA 850.00$ 1,700.00$ -$ -$ -$ 1,700.00$ $1,135.80 N/A 1,135.80$ $564.20 N/A 564.20$ 100.00%
0120 2 2 EA 550.00$ 1,100.00$ -$ -$ -$ 1,100.00$ 2 2 1,100.00$ 0 -$ 100.00%
0130 18 18 EA 437.00$ -$ 7,866.00$ -$ -$ 7,866.00$ $5,751.00 N/A 5,751.00$ $2,115.00 N/A 2,115.00$ 100.00%
0140 7 22 13 42 EA 776.00$ -$ 5,432.00$ 17,072.00$ 10,088.00$ 32,592.00$ $3,975.30 $12,493.80 $7,382.70 N/A 23,851.80$ $1,456.70 $4,578.20 $2,705.30 N/A 8,740.20$ 100.00%
0150 10 5 15 EA 523.00$ 5,230.00$ 2,615.00$ -$ -$ 7,845.00$ $3,834.00 $1,917.00 N/A 5,751.00$ $1,396.00 $698.00 N/A 2,094.00$ 100.00%
0160 8 17 25 EA 751.00$ 6,008.00$ 12,767.00$ -$ -$ 18,775.00$ $4,399.20 $9,348.30 N/A 13,747.50$ $1,608.80 $3,418.70 N/A 5,027.50$ 100.00%
0170 10 10 EA 10,800.00$ -$ -$ -$ 108,000.00$ 108,000.00$ $79,200.00 N/A 79,200.00$ $28,800.00 N/A 28,800.00$ 100.00%
0180 300 2,700 3000 LF 2.00$ 600.00$ 5,400.00$ -$ -$ 6,000.00$ 0 -$ 300 2700 3000 6,000.00$ 100.00%
Highlighted = Payment for stored materials Highlighted = Remaining amount less stored materials
TAP+USTEP TAP Only USTEP Only City OVERALL PERCENT COMPLETE = 100.00%
ORIGINAL CONTRACT = 41,060.00$ 371,862.00$ 375,457.00$ 129,113.00$ 917,492.00$
PREVIOUS PAY APPS = 15,117.26$ 259,810.64$ 270,802.80$ 89,822.70$ 635,553.40$
CURRENT PAY APP = 25,942.74$ 112,051.36$ 104,654.20$ 39,290.30$ 281,938.60$
Traffic Signal, Replacement/Modification, 12" <R,<Y,<FY,<G
(All LED) w/ Backplate, Mast-Arm Mounted
Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G>
(All LED), Side of Pole Mounted
Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G>
(All LED) w/ Backplate, Mast-Arm Mounted
Uninterruptible Power Supply
Signal Cable, 5c
DIV 1 DIV 2 TOTAL
Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted
Traffic Sign - R3-5, 30" x 36", Mast-Arm Mounted
Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate,
Mast-Arm Mounted
Traffic Signal, Relocate, Existing, 12" R,Y,G w/ Backplate,
Mast-Arm Mounted
Traffic Signal, Replacement, 16" Pedestrian Head,
Hand/Person, Countdown
Accessible Pedestrian Signal Push Button and Sign
Rectangular Rapid Flashing Beacon Assembly, per Post
Signal Cabinet Modification
Signal Cabinet Replacement
Traffic Sign - R10-12 MOD, 30" x 30", Mast-Arm Mounted
DESCRIPTION
Traffic Control
Mobilization
Railroad Protective Liability Insurance for Union Pacific
Railroad Co.
CURRENT PAY APP
Div 1 Div 2 Div 1 Div 2 Div 1 Div 2 Div 1 Div 2
PREVIOUS PAY APPS
UNIT UNIT COST
CONTRACT ITEMS
V:\Projects\2022\122.0627.01\Construction\PayApp03_2025-05-13_SignalEnhancement(TAP)
CHANGE ORDER SUMMARY:
ITEM CO TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL TAP+ TAP USTEP City TOTAL PREV TAP+ TAP USTEP City TOTAL CURRENT PERCENT
NO. DESCRIPTION # USTEP Only Only QTY. USTEP Only Only COST USTEP Only Only QTY. COST USTEP Only Only QTY. COST COMPL.
0060 Signal Cabinet Modification 1 -1 -1 EA 4,412.00$ -$ (4,412.00)$ -$ -$ (4,412.00)$ -1 -1 (4,412.00)$ 0 -$ 100.00%
0070 Signal Cabinet Replacement 1 1 1 EA 50,405.00$ -$ 50,405.00$ -$ -$ 50,405.00$ $35,829.00 N/A 35,829.00$ $14,576.00 N/A 14,576.00$ 100.00%
0140
Traffic Signal, Replacement/Modifcation, 12"
<R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm
Mounted
1 4 4 EA 776.00$ -$ -$ -$ 3,104.00$ 3,104.00$ $2,271.60 N/A 2,271.60$ $832.40 N/A 832.40$ 100.00%
0180 Signal Cable 5c 2 205 205 EA 2.00$ -$ -$ -$ 410.00$ 410.00$ 0 -$ 205 205 410.00$ 100.00%
8001 Signal Cable 7c 2 875 875 EA 2.50$ -$ -$ -$ 2,187.50$ 2,187.50$ 0 -$ 875 875 2,187.50$ 100.00%
8002 Traffic Signal, New, 12" R,Y,G (All LED) w/ Backplate,
Mast-Arm Mounted 2 3 3 EA 650.00$ -$ -$ -$ 1,950.00$ 1,950.00$ $1,436.40 N/A 1,436.40$ $513.60 N/A 513.60$ 100.00%
8003 Traffic Signal, New, 12" R,Y,G (All LED), Side of Pole
Mounted 2 2 2 EA 475.00$ -$ -$ -$ 950.00$ 950.00$ $655.20 N/A 655.20$ $294.80 N/A 294.80$ 100.00%
8004 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 776.00$ -$ -$ -$ 2,328.00$ 2,328.00$ $1,692.90 N/A 1,692.90$ $635.10 N/A 635.10$ 100.00%
8005 Traffic Signal, New, 12" R,Y>,FY>,G> (All LED), Side of
Pole Mounted 2 1 1 EA 523.00$ -$ -$ -$ 523.00$ 523.00$ $404.10 N/A 404.10$ $118.90 N/A 118.90$ 100.00%
8006 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED) w/
Backplate, Mast-Arm Mounted 2 3 3 EA 850.00$ -$ -$ -$ 2,550.00$ 2,550.00$ $2,006.10 N/A 2,006.10$ $543.90 N/A 543.90$ 100.00%
8007 Traffic Signal, New, 12" R,Y,G,Y>,G> (All LED), Side of
Pole Mounted 2 2 2 EA 650.00$ -$ -$ -$ 1,300.00$ 1,300.00$ $990.00 N/A 990.00$ $310.00 N/A 310.00$ 100.00%
8008 Traffic Signal, Replacement, 12" R,Y,G,Y>,G> (All
LED), Side of Pole Mounted 2 1 1 EA 650.00$ -$ -$ -$ 650.00$ 650.00$ $495.00 N/A 495.00$ $155.00 N/A 155.00$ 100.00%
Highlighted = Payment for stored materials Highlighted = Remaining amount less stored materials
TAP+USTEP TAP Only USTEP Only City
TOTAL CHANGE ORDERS = -$ 45,993.00$ -$ 15,952.50$ 61,945.50$
PREVIOUS PAY APPS = -$ 31,417.00$ -$ 9,951.30$ 41,368.30$
CURRENT PAY APP = -$ 14,576.00$ -$ 6,001.20$ 20,577.20$
TAP+USTEP TAP Only USTEP Only City
TOTAL CONTRACT & CHANGE ORDERS 41,060.00$ 417,855.00$ 375,457.00$ 145,065.50$ 979,437.50$
PREVIOUS PAY APPS TOTAL CONTRACT & CHANGE ORDERS 15,117.26$ 291,227.64$ 270,802.80$ 99,774.00$ 676,921.70$
CURRENT PAY APP TOTAL CONTRACT & CHANGE ORDERS 25,942.74$ 126,627.36$ 104,654.20$ 45,291.50$ 302,515.80$
(Current less 3% retainage for Claim Forms) 25,164.46$ 122,828.54$ 101,514.57$ 43,932.76$ 293,440.33$
DIV 1 DIV 2 TOTAL
Div 1 Div 2
DIV 1 DIV 2 TOTAL
Div 1 Div 2
CURRENT PAY APPPREVIOUS PAY APPS
Div 1 Div 2 Div 1 Div 2
UNIT UNIT COST
V:\Projects\2022\122.0627.01\Construction\PayApp03_2025-05-13_SignalEnhancement(TAP)