HomeMy WebLinkAbout2025-05-19 I01H_08 University Ave Area Improvements Phase 1_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 19, 2025 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 2 to Elder Corporation for the University Avenue Area Improvements Phase 1 Project, increasing the contract in the amount of $7,847.85. FORMAT:Consent SYNOPSIS INCLUDING PRO & CON: Change Order No.2 is for temporary traffic control for flaggers, rock check dam, tile line repair, water main valve box repair/backfill, and 8” water main fittings. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $7,847.85. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Change Order No. 2 ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1H8 S-H Project No.: 4203290 May 9, 2025 Rudy Koester, Public Works Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #2 – Review and Recommendation to Approve University Avenue Area Improvements - Phase 1 Dear Mr. Koester: Please find attached Change Order #2 for the University Avenue Area Improvements - Phase 1 project. The change order includes the following items: • Temporary Traffic Control for Flaggers • Rock Check Dam • Tile Line Repair • Water Main Valve Box Repair and Backfill • Water Main Fittings – 8” 45° Bends Temporary traffic control signage is added for flaggers on 6th Street/Ute Avenue to facilitate a lane closure during paving of the 310th Street asphalt connection to 6th Street/Ute Avenue. Rock check dams are added to the project to be used for erosion and sediment control in channel/ditch locations. While attempting to shut down the existing 18" water main for connections to the newly-installed water main, an existing water valve was found to be inoperable. Excavation, repair, and backfill of the existing valve box is added so the existing valve could be operated to shut down the main and allow for completion of the connections during the scheduled outage window. During excavation for this repair, an existing drainage tile line was encountered and damaged, requiring repair. 8" 45-degree water main bends are added to accommodate the elevation difference between the new 18" water main and the existing 8" water main connection at the west side of the Waukee Public Works building. We have reviewed the change order items and unit prices, and both are in line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $7,847.85 to the construction contract for the University Avenue Area Improvements - Phase 1 with Elder Corporation of Des Moines, IA. Sincerely, SHIVE-HATTERY, INC. Blake T. Peterson, PE Civil Engineer Enc. Change Order #2 CITY OF WAUKEE 230 W HICKMAN ROAD WAUKEE, IOWA 50263 Contractor: 5088 E. University Avenue Des Moines, IA 50327 $10,068,807.00 1/20/2025 CO-2.1 LS $ 577.50 1.00 $ 577.50 CO-2.2 TON $ 75.65 30.54 $ 2,310.35 CO-2.3 LS $ 2,300.00 1.00 $ 2,300.00 CO-2.4 LS $ 1,400.00 1.00 $ 1,400.00 CO-2.5 EA $ 630.00 2.00 $ 1,260.00 $ 7,847.85 $10,068,807.00 $3,450.20 $10,072,257.20 $7,847.85 $10,080,105.05 0.11% 0 Days 0 Days November 21, 2025 May 31, 2026 CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Landscaping/Site Restoration/Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 2 TOTAL The Original Contract Sum was Unit May 9, 2025 TEMPORARY TRAFFIC CONTROL FOR FLAGGERS Contractor: Elder Corporation Elder Corporation Signature: Name: The Landscaping/Site Restoration/Final Completion Contract Time will be changed by ROCK CHECK DAM WATER MAIN VALVE BOX, REPAIR AND BACKFILL TILE LINE REPAIR The Grading/Structure/Utility/Paving Contract Time will be changed by The date of Grading/Structure/Utility/Paving Completion as of the date of this Change Order therefore is Title: Date: University Avenue Area Improvements - Phase 1 4203290 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description WATER MAIN FITTING, 45 DEGREE BEND, 8 IN. THE CONTRACT IS CHANGED AS FOLLOWS: Item CO-2.1: Temporary traffic control signage is added for flaggers on 6th Street/Ute Avenue to facilitate a lane closure during paving of the 310th Street asphalt connection to 6th Street/Ute Avenue.Item CO-2.2: Rock check dams are added to the project to be used for erosion and sediment control in channel/ditch locations.Items CO-2.3 and CO-2.4: While attempting to shut down the existing 18" water main for connections to the newly-installed water main, an existing water valve was found to be inoperable. Excavation, repair, and backfill of the existing valve box is added so the existing valve could be operated to shut down the main and allow for completion of the connections during the scheduled outage window. During excavation for this repair, an existing drainage tile line was encountered and damaged, requiring repair.Item CO-2.5: 8" 45-degree water main bends are added to accommodate the elevation difference between the new 18" water main and the existing 8" water main connection at the west side of the Waukee Public Works building. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Inc. Signature: Name: Title: P:\Projects\DM\4203290\Construction\_University Avenue Phase 1\CASupport\Change Orders\02\ChangeOrder02_UniversityAvenuePhase1.xlsx 1 of 1 Nick Tometich Project Manager Blake Peterson, PE Project Engineer Brad Deets City Administrator Date: 2025.05.13 13:56:50-05'00' 05/13/2025