Loading...
HomeMy WebLinkAbout2025-05-19 I01H_10 11th and 17th St Culverts_Pmt Est 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 19, 2025 AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to Nagel Construction, LLC, for the 11th and 17th Street Culverts project in the amount of $126,346.94. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Nagel Construction, LLC, requested Payment Estimate No. 1 for the work completed on the 11th and 17th Street Culverts project in the amount of $126,346.94. WHKS & Co. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending May 8, 2025. This pay estimate is for mobilization, construction survey, excavation, granular material, structural concrete and reinforcing steel. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $126,346.94 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 1 ATTACHMENTS: I. Letter of Recommendation II.Payment Estimate No. 1 PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1H10 3737 Woodland Avenue, Suite 111 West Des Moines, IA 50266 Phone: 515.226.8859 Email: desmoines@whks.com Website: www.whks.com May 8, 2025 Mr. Rudy Koester, P.E. Director of Public Works / City Engineer City of Waukee 805 University Avenue Waukee, IA 50263 RE: City of Waukee 11th and 17th Street Culverts Pay Estimate No. 1 Dear Mr. Koester: Enclosed is Pay Estimate No. 1 for the above reference project. We have coordinated with the Contractor and City staff performing field observation regarding the actual work completed to date and recommend the City make payment in the amount of $126,346.94 to: Nagel Construction, LLC 2601 140th St. Allerton, IA 50008 5% retainage in the amount of $6,649.84 should be held by the City until 30 days after project acceptance and completion of any punch list items are completed to the satisfaction of the City. Please contact us if you have any questions. Sincerely, WHKS & CO. Casey V. Faber, P.E. Project Manager cc (w/ enclosures): Sara Kappos, City of Waukee Andy Nichols, City of Waukee Andy Nagel, Nagel Construction, LLC 3737 Woodland, Suite 111 West Des Moines, IA 50266 564,004.00$ Project:Reinforced Box Culverts Total Contract Plus Change Orders:564,004.00$ Project No.:9975 Date:5/8/2025 Location:11th and 17th Streets Estimate No.:1 Contractor:Nagel Construction, LLC % Complete:23.6% 11th Street Items 1 EMBANKMENT-IN-PLACE CY $10.00 182.7 $1,827.00 0.0 0%-$ 2 EXCAVATION, CLASS 10, CHANNEL CY $10.00 325.1 $3,251.00 0.0 0%-$ 3 FLOODED BACKFILL CY $55.00 125.0 $6,875.00 0.0 0%-$ 4 EXCAVATION, CLASS 20 CY $15.00 753 $11,295.00 753 753 100%11,295.00$ 5 GRANULAR MATERIAL FOR BLANKET CY $50.00 110.2 $5,510.00 168.3 168.3 153%8,415.00$ 6 STRUCTURAL CONCRETE (RCB CULVERT) CY $585.00 209.8 $122,733.00 104.9 104.9 50%61,366.50$ 7 REINFORCING STEEL LB $1.35 30,993 $41,840.55 15,497 15,496.5 50%20,920.28$ 8 ORNAMENTAL METAL RAILING LF $300.00 103.0 $30,900.00 0.0 0%-$ 9 TEMPORARY STREAM DIVERSION EACH $3,000.00 1 $3,000.00 1 1 100%3,000.00$ 10 ENGINEERING FABRIC SY $3.00 335.5 $1,006.50 0.0 0%-$ 11 REVETMENT, CLASS E TON $68.00 240.1 $16,326.80 0.0 0%-$ 12 CONSTRUCTION SURVEY LS $3,000.00 1.00 $3,000.00 1.00 1.00 100%3,000.00$ 13 MOBILIZATION LS $25,000.00 1.00 $25,000.00 1.00 1.00 100%25,000.00$ 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF $40.00 50.0 $2,000.00 0.0 0%-$ 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF $3.50 355.0 $1,242.50 0.0 0%-$ 17th Street Items 16 EMBANKMENT-IN-PLACE CY $10.00 363.7 $3,637.00 0.0 0%-$ 17 EXCAVATION, CLASS 10, CHANNEL CY $10.00 260.0 $2,600.00 0.0 0%-$ 18 REMOVAL OF EXISTING STRUCTURES LS $9,000.00 1.00 $9,000.00 0.00 0%-$ 19 FLOODED BACKFILL CY $55.00 119.1 $6,550.50 0.0 0%-$ 20 EXCAVATION, CLASS 20 CY $15.00 943 $14,145.00 0 0%-$ 21 GRANULAR MATERIAL FOR BLANKET CY $50.00 117.4 $5,870.00 0.0 0%-$ 22 STRUCTURAL CONCRETE (RCB CULVERT) CY $585.00 223.6 $130,806.00 0.0 0%-$ 23 REINFORCING STEEL LB $1.35 32,887 $44,397.45 0 0%-$ 24 ORNAMENTAL METAL RAILING LF $300.00 132.4 $39,720.00 0.0 0%-$ 25 TEMPORARY STREAM DIVERSION EACH $3,000.00 1 $3,000.00 0 0%-$ 26 ENGINEERING FABRIC SY $3.00 338.3 $1,014.90 0.0 0%-$ 27 REVETMENT, CLASS E TON $68.00 235.6 $16,020.80 0.0 0%-$ 28 CONSTRUCTION SURVEY LS $3,000.00 1.00 $3,000.00 0.00 0%-$ 29 MOBILIZATION LS $5,000.00 1.00 $5,000.00 0.00 0%-$ 30 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF $40.00 50.0 $2,000.00 0.0 0%-$ 31 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF $3.50 410.0 $1,435.00 0.0 0%-$ 132,996.78$ PARTIAL PAYMENT ESTIMATE FOR CONSTRUCTION WORK COMPLETED Contract Cost Quantity Completed This Estimate Contract Quantity Total Quantity Completed to Date Total Dollars To Date Quantity Completed Previous Estimate Contract Bid Price: Percent CompleteUnitDescriptionLine No. Unit Price