Loading...
HomeMy WebLinkAbout2025-06-16 J01H_02 Centennial Park Parking and Road Paving_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 16, 2025 AGENDA ITEM:Consideration of approval of Change Order No. 1 to InRoads Asphalt Paving & Materials, for the Centennial Park Parking & Road Paving project increasing the contract in the amount of $15,928.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 to InRoads Asphalt Paving & Materials is for CMP Pipe Replacement to repair damaged CMP, and pavement removal 4” chip seal. Credit to the project for the under-run items; hydraulic seeding/fertilizing/mulching, excavation class 10, drop in inlet protection device. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 1 PREPARED BY: Laurie Baker REVIEWED BY: Matt Jermier PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1H2 P:\24\2405600\CONSTRUCTION\CO\CENTENNIALPARK_CO1.DOCX 4390 114th Street  Urbandale, IA 50322  (515) 270-0848  FAX (515) 270-1067 CHANGE ORDER NO. 1 PROJECT: Centennial Park -Parking and Road Paving DATE: 6/11/2025 OWNER: Waukee Parks and Recreation Department ENGINEER: Kirkham Michael CONTRACTOR: In Roads LLC KM PROJECT NO: 2405600 CONTRACT FOR: Entire Work CONTRACT DATE: Description of the changes in the Contract Documents: Addition of CMP Pipe Replacement work required on Base Bid, HMA quantity over-run on Base Bid, PCC Sidewalk over-run on base bid, Seeding & Mulching under-run on Base Bid, Excavation, Class 10 under-run on Alternate 1, Pavement Removal, 4 IN. Chip Seal over-run on Alternate 1 and Filter Sock placement and removal over-run on Alternate 1. Attachments: InRoads LLC Quote for EWO 1 for Centennial Park Waukee 06.10.2024.pdf, Change Order No. 1 Summary.pdf CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: $337,893.75 Original Contract Time: $- Net Change by Previous Change Orders: $0 Net Change from Previous Change Orders: $- Contract Price prior to this Change Order: $337,893.75 Contract Time prior to this Change Order: $- Net increase of this Change Order: $15,928.00 Net (in/de)crease of this Change Order: $- Contract Price with approved Change Orders: $353,821.75 Contract Time with approved Change Orders: $- RECOMMENDED: APPROVED: ACCEPTED: Armin Vlahovljak Engineer Owner Contractor Date: 6/11/2025 Date: Date: Change Order No. 1 Breakdown Waukee Parks and Recreation Centennial Park -Parking and Road Paving 6/11/2025 Item Description Add/Delete Qty Unit Unit Price Total Comments 1 CMP Pipe Replacement add 20 LF 125.40$ 2,508.00$ Repair damaged CMP 2 PAVEMENT, ASPHALT, ST, 2 IN., BASE, 3/4 IN., PG 58-28S add 15 SY 14.00$ 210.00$ Over-run 3 PAVEMENT, ASPHALT, ST, 2 IN., INTERMEDIATE, 1/2 IN., PG 58-28S add 15 SY 14.00$ 210.00$ Over-run 4 PAVEMENT, ASPHALT, ST, 2 IN., SURFACE, 1/2 IN., PG 58-28S add 15 SY 14.00$ 210.00$ Over-run 5 SIDEWALK, PCC, 4 IN.add 0.9 SY 300.00$ 270.00$ Over-run 6 HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING, TYPE 1 delete -0.13 AC 6,000.00$ (780.00)$ Under-run 7 EXCAVATION, CLASS 10 delete -225 CY 10.00$ (2,250.00)$ Under-run 8 PAVEMENT REMOVAL, 4 IN. CHIP SEAL add 2028 SY 7.50$ 15,210.00$ Over-run 9 FILTER SOCK, 12"add 85 LF 3.50$ 297.50$ Over-run 10 FILTER SOCK REMOVAL add 85 LF 0.50$ 42.50$ Over-run Total Change Order:15,928.00$ Original Contract :337,893.75$ New Contract Total:353,821.75$