Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025-09-02 I01F_02 Waukee Public Safety_Change Order 16
\AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 2, 2025 AGENDA ITEM:Consideration of approval of Change Order No. 16 (Combined) for the Waukee Public Safety Building Project, increasing the contract in the amount of $45,668.92 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Substantial completion of the Waukee Public Safety Building has been completed. As the project has begun to wrap up there are several small change orders that are necessary. These changes include miscellaneous electrical work, additional irrigation and sodding as well as additional wall repairs that were required due to polishing the concrete floors among several other small items. This project is close to wrapping up and staff does not anticipate any significant change orders moving forward. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:The net result of this Change Order increases the contract price in the amount of $45,668.92. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the Change Order. ATTACHMENTS: I. Change Order 16 PREPARED BY: Brad Deets, City Administrator REVIEWED BY: I1F2 Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com August 26, 2025 Brad Deets, City Administrator City of Waukee 230 W. Hickman Road Waukee, IA 50263 Re: Waukee Public Safety Building: Change Order No. 16: Multiple Pricing Request Approvals Dear Brad: Change Order No.16 for the Waukee Public Safety Building includes the following revisions: • CR 117 RFI-156 Mirror and Training Film Deduct $-468.64 • CR 127 RFI-164 Fitness Storage Plumbing Add $1,492.95 • CR 129 Apparatus Power Cord Reels Add $8,640.27 • CR 134 SCBA Requirements Add $1,927.02 • CR 137 Additional Cleaning Add $4,975.01 • CR 140 City Stockpile Agreement Deduct $-9432.00 • CR 142 Paint Touch Up Add $1,511.23 • CR 146 Bollards and Curb Repair Add $2,492.50 • CR 148 Polished Concrete Repairs Add $8,963.57 • CR 153 Fitness TV Add $704.00 • CR 155 Relocate Markerboards Add $883.92 • CR 156 Magnets Add $389.40 • CR 159 Fitness Sod & Irrigation Add $8,280.00 • CR 160 Misc Electrical Add $15,309.69 Ryan Companies recommends approval of the Prime Contractors for Change Order No.16 at a combined value of $45,668.92. Please see attached Change Order No.16 individual change orders and associated back up for each individual change request (CR) for additional information. If you have any questions or comments regarding this information, please contact me at your convenience. Thank you. Sincerely, RYAN COMPANIES US, INC. Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com Jill Boetger Project Manager Enclosed: WPS Prime CO No. 16 CC: Matt Van Loon, Ryan Companies Ryan Pigneri, Ryan Companies Angie Pfannkuch, Sidekick Development Danielle Hermann, OPN Architects Aaron Twedt, OPN Architects Alex Streyffeler, OPN Architects AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #16 SWPPP Change Order Number: WPS CO 16 (Absolute No. 4) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 09.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Absolute Concrete Construction, Inc. dba Absolute Group P.O. Box 430 Granger, IA 50109 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 137 Additional Cleaning Deduct of $-341.00 The original Contract Sum was $ 155,000.00 Net change by previously authorized Change Orders $ -103,525.00 The Contract Sum prior to this Change Order was $ 51,475.00 The Contract Sum will be decreased by this Change Order in the amount of $ 341.00 The new Contract Sum including this Change Order will be $ 51,134.00 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Absolute Concrete Construction, Inc. dba Absolute Group City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #15 Earthwork & Utilities Change Order Number: WPS CO 16 (Wenthold No. 4) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.02.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Wenthold Excavating, LLC 4008 NE 126th Ave Elkhart, IA 50073 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 137 Additional Cleaning Deduct of $-341.00 The original Contract Sum was $ 803,330.50 Net change by previously authorized Change Orders $ 720.00 The Contract Sum prior to this Change Order was $ 804,050.50 The Contract Sum will be decreased by this Change Order in the amount of $ 341.00 The new Contract Sum including this Change Order will be $ 803,709.50 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Wenthold Excavating, LLC City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets City Administrator DATE: DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #18 Landscape & Irrigation Change Order Number: WPS CO 16 (Alpha No. 5) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 09.02.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Alpha Landscapes LLC 31273 510th Ave Slater, IA 50244 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR137 Additional Cleaning Deduct $-341.00 WPS CR140 City Stockpile Agreement Deduct $9432.00 WPS CR159 Fitness Sod & Irrigation ADD $8280.00 The original Contract Sum was $ 653,784.00 Net change by previously authorized Change Orders $ -3,177.00 The Contract Sum prior to this Change Order was $ 650,607.00 The Contract Sum will be decreased by this Change Order in the amount of $ 1,493.00 The new Contract Sum including this Change Order will be $ 649,114.00 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Alpha Landscapes LLC City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #14 Audio-Visual Change Order Number: WPS CO 16 (TriCity No. 5) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 09.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Tri-City Electric Company of Iowa 6225 N. Brady Street Davenport, IA 52806 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 137 Additional Cleaning Deduct of $-1943.00 WPS CR 153 Fitness TV Add of $704.00 The original Contract Sum was $ 602,832.00 Net change by previously authorized Change Orders $ -3,112.00 The Contract Sum prior to this Change Order was $ 599,720.00 The Contract Sum will be decreased by this Change Order in the amount of $ 1,239.00 The new Contract Sum including this Change Order will be $ 598,481.00 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Tri-City Electric Company of Iowa City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #17 Site Concrete Change Order Number: WPS CO 16 (Jordison No. 6) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Jordison Construction, Inc. 12014 Ridgemont Drive Urbandale, IA 50323 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 137 Additional Cleaning Deduct $-341.00 WPS CR 146 Bollards and Curb Repair ADD $2,492.50 The original Contract Sum was $ 1,110,000.00 Net change by previously authorized Change Orders $ 22,784.50 The Contract Sum prior to this Change Order was $ 1,132,784.50 The Contract Sum will be increased by this Change Order in the amount of $ 2,151.50 The new Contract Sum including this Change Order will be $ 1,134,936.00 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Jordison Construction, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #8 Glass & Glazing Change Order Number: WPS CO 16 (Ford Metro No. 8) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Ford Metro, Inc. 3121 40th Avenue NW Rochester, MN 55901 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR137 Additional Cleaning Deduct $-1184.00 The original Contract Sum was $ 1,069,100.00 Net change by previously authorized Change Orders $ 3,924.33 The Contract Sum prior to this Change Order was $ 1,073,024.33 The Contract Sum will be decreased by this Change Order in the amount of $ 1,184.00 The new Contract Sum including this Change Order will be $ 1,071,840.33 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Ford Metro, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: DR A F T AIA® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 DRAFT PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #1 General Construction Change Order Number: WPS CO 13 (DDVI No. 13) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) DDVI Inc PO Box 743 Indianola, IA 50125 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed u pon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 117 Deduct $-468.64 WPS CR 137ADD $11,409.01 WPS CR 142 ADD $1,721.23 WPS CR 148 ADD $8,963.57 WPS CR 155 ADD $883.92 WPS CR 156 ADD $389.40 WPS CR 160 ADD $15,309.69 The original Contract Sum was $ 2,905,000.00 Net change by previously authorized Change Orders $ 113,992.39 The Contract Sum prior to this Change Order was $ 3,018,992.39 The Contract Sum will be increased by this Change Order in the amount of $ 38,208.18 The new Contract Sum including this Change Order will be $ 3,057,200.57 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) DR A F T AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: DDVI Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: AIA® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS)Contract For: Bid Package #13 Electrical & Communications Change Order Number: WPS CO 16 (Van Maanen No. 15) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.2.2025 OWNER: (name and address)ARCHITECT: (name and address)CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Van Maanen Electric, Inc. 500 Iowa Speedway Dr. Newton, IA 50208 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR129 Apparatus Power Cord Reels ADD $8,640.27 WPS CR134 SCBA Requirements ADD $1,927.02 WPS CR137 Additional Cleaning Deduct $-1,943.00 WPS CR142 Paint Touch-up Deduct $-210.00 The original Contract Sum was $4,711,425.00 Net change by previously authorized Change Orders $190,159.65 The Contract Sum prior to this Change Order was $4,901,584.65 The Contract Sum will be increased by this Change Order in the amount of $8,414.29 The new Contract Sum including this Change Order will be $4,909,998.94 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name)CONSTRUCTION MANAGER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE:DATE: Van Maanen Electric, Inc. City of Waukee Iowa CONTRACTOR (Firm name)OWNER (Firm name) SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE:DATE: AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #10 Framing, Drywall, & Ceilings Change Order Number: WPS CO 16 (HSI No. 11) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 9.2.2025 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Hilsabeck Schacht, Inc. 617 S. 19th Street West Des Moines, IA 50265 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR127 RFI-164 Fitness Storage Plumbing Add $1,492.95 The original Contract Sum was $ 2,562,500.00 Net change by previously authorized Change Orders $ 40,131.33 The Contract Sum prior to this Change Order was $ 2,602,631.33 The Contract Sum will be increased by this Change Order in the amount of $ 1,492.95 The new Contract Sum including this Change Order will be $ 2,604,124.28 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Hilsabeck Schacht, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: Waukee Public Safety - Change Request Summary 7/30/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 117.0 DDVI Credit for mirror film.-$468.64 117.1 Jordison Construction No response $0.00 117.2 Enterprise Precast No response $0.00 117.3 TSF Structures No response $0.00 117.4 Northwest Steel No response $0.00 117.5 Forman Ford No response $0.00 117.6 Academy Roofing No response $0.00 117.7 Ford Metro No response $0.00 117.8 Skold Door No response $0.00 117.9 Hilsabeck Schacht No response $0.00 117.10 Elite Fire Sprinkler No response $0.00 117.11 Kruck Plumbing and Heating No response $0.00 117.12 Van Maanen No response $0.00 117.13 TriCity Electric No response $0.00 117.14 Wenthold No response $0.00 117.15 Absolute No response $0.00 117.16 Jordison Construction No response $0.00 117.17 Alpha Landscapes No response $0.00 -$468.64 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)-$15.23 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 -$483.87 Change Request 117 Summary: Credit for removing mirror film per RFI-156. Change Request 117 Subtotal Change Request 117 Cost Change Total Waukee Public Safety - Change Request Summary 8/13/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 127.0 DDVI No cost impact $0.00 127.1 Jordison Construction No response $0.00 127.2 Enterprise Precast No response $0.00 127.3 TSF Structures No response $0.00 127.4 Northwest Steel No response $0.00 127.5 Forman Ford No response $0.00 127.6 Academy Roofing No response $0.00 127.7 Ford Metro No response $0.00 127.8 Skold Door No response $0.00 127.9 Hilsabeck Schacht Box out plumbing pipes and modify ceiling $1,492.95 127.10 Elite Fire Sprinkler No response $0.00 127.11 Kruck Plumbing and Heating No response $0.00 127.12 Van Maanen No response $0.00 127.13 TriCity Electric No response $0.00 127.14 Wenthold No response $0.00 127.15 Absolute No response $0.00 127.16 Jordison Construction No response $0.00 127.17 Alpha Landscapes No response $0.00 $1,492.95 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$48.52 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $1,541.47 Change Request 127 Summary: Box out plumbing pipes in fitness storage room per RFI-164 Change Request 127 Subtotal Change Request 127 Cost Change Total $85.00 $75.00 $85.00 $125.00 $510.00 $450.00 $85.00 $250.00 $26.52 $8.84 $53.82 $3.25 $28.60 $19.37 $12.79 $38.37 $19.37 $28.60 $3.25 $8.97 $8.84 $26.52 $2.05 $4.10 $4.11 $8.22 $6.86 $6.86 $1295.00 $197.95 $1492.95 6/23/25 Waukee Public Safety - Change Request Summary 8/19/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 129.0 DDVI No cost impact.$0.00 129.1 Van Maanen Added power cord reels per FD request.$8,301.27 129.2 Van Maanen Changed out breaker size to work with fire department vehicles.$339.00 $8,640.27 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$280.81 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $8,921.08 Change Request 129 Summary: Added power cord reels and breaker size change at FD request. Change Request 129 Subtotal Change Request 129 Cost Change Total Waukee Public Safety - Change Request Summary 8/13/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 134.0 DDVI No cost impact.$0.00 134.1 Jordison Construction No response $0.00 134.2 Enterprise Precast No response $0.00 134.3 TSF Structures No response $0.00 134.4 Northwest Steel No response $0.00 134.5 Forman Ford No response $0.00 134.6 Academy Roofing No response $0.00 134.7 Ford Metro No response $0.00 134.8 Skold Door No response $0.00 134.9 Hilsabeck Schacht No response $0.00 134.10 Elite Fire Sprinkler No response $0.00 134.11 Kruck Plumbing and Heating No response $0.00 134.12 Van Maanen Remove installed items, install Owner provided 3-button switch.$1,927.02 134.13 TriCity Electric No response $0.00 134.14 Wenthold No response $0.00 134.15 Absolute No response $0.00 134.16 Jordison Construction No response $0.00 134.17 Alpha Landscapes No response $0.00 $1,927.02 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$62.63 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $1,989.65 Change Request 134 Summary: MAKO required 3-button switch rather than what Van Maanen provided per original RFI response. They also required 3-sides for access which required wire mesh gate relocation. Change Request 134 Subtotal Change Request 134 Cost Change Total 1 Ryan Pigneri From:Clint Robinson <crobinson@waukee.org> Sent:Thursday, May 29, 2025 3:03 PM To:Randall Miller Jr.; Angie Pfannkuch Cc:Ryan Pigneri; Alex Streyffeler Subject:RE: SCBA EXTERNAL EMAIL: If unknown sender, DO NOT click links/attachments. NEVER give out your user ID or password. Approved from an owner standpoint. Clint Robinson | Fire Chief Waukee Fire Department 1300 SE L.A. Grant Parkway, Waukee, IA 50263 Office: 515-978-7998 crobinson@waukee.org | Waukee.org/Fire CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential, proprietary, and/or privileged information protected by law. If you are not the intended recipient, you may not use, copy, or distribute this e-mail message or its attachments. If you believe you have received this e-mail message in error, please contact the sender by reply e-mail and telephone immediately and destroy all copies of the original message. From: Randall Miller Jr. <Randall.MillerJr@RyanCompanies.com> Sent: Thursday, May 29, 2025 09:08 To: Angie Pfannkuch <angie@sidekickdevelopment.com>; Clint Robinson <crobinson@waukee.org> Cc: Ryan Pigneri <Ryan.Pigneri@RyanCompanies.com>; Alex Streyffeler <astreyffeler@opnarchitects.com> Subject: SCBA Just following up our conversations yesterday. The Mako sta was on site yesterday and had a few changes. They need and switch on the 1st floor that matches the three button one emergency stop switch that is on the compressor upstairs. They will provide that switch with 40’ of wire for Van Mannen to install on the first floor. The gate layout restricts the access to the compressor for maintenance. They would like at a minimum three sides exposed. Please see proposed solution. Keep in mind this would keep it from being two di erent rooms. Please let me know if we are good to move forward. 2 Randall Miller Jr Senior Superintendent Randall.millerjr@ryancompanies.com (p) 515-309-8513 (c) 515-321-3054 Ryan Companies US, Inc. 111 East Grand, Suite 200, Des Moines, IA 50309 ryancompanies.com Waukee Public Safety - Change Request Summary 8/19/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 137.0 DDVI Additional cleaning per PCO#37, 41, 42 $11,409.01 137.1 Jordison Construction No cost impact $0.00 137.2 Enterprise Precast No cost impact $0.00 137.3 TSF Structures No cost impact $0.00 137.4 Northwest Steel No cost impact $0.00 137.5 Forman Ford No cost impact $0.00 137.6 Academy Roofing No cost impact $0.00 137.7 Ford Metro Rework final cleaning -$1,184.00 137.8 Skold Door Rework final cleaning $0.00 137.9 Hilsabeck Schacht Rework final cleaning $0.00 137.10 Elite Fire Sprinkler Rework final cleaning $0.00 137.11 Kruck Plumbing and Heating Rework final cleaning $0.00 137.12 Van Maanen Rework final cleaning -$1,943.00 137.13 TriCity Electric Rework final cleaning -$1,943.00 137.14 Wenthold Rework final cleaning -$341.00 137.15 Absolute Rework final cleaning -$341.00 137.16 Jordison Construction Rework final cleaning -$341.00 137.17 Alpha Landscapes Rework final cleaning -$341.00 $4,975.01 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$161.69 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $5,136.70 Change Request 137 Summary: Additional cleaning for project turnover. Change Request 137 Subtotal Change Request 137 Cost Change Total Waukee Public Safety - Change Request Summary 7/30/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 140.0 DDVI No response $0.00 140.1 Jordison Construction No response $0.00 140.2 Enterprise Precast No response $0.00 140.3 TSF Structures No response $0.00 140.4 Northwest Steel No response $0.00 140.5 Forman Ford No response $0.00 140.6 Academy Roofing No response $0.00 140.7 Ford Metro No response $0.00 140.8 Skold Door No response $0.00 140.9 Hilsabeck Schacht No response $0.00 140.10 Elite Fire Sprinkler No response $0.00 140.11 Kruck Plumbing and Heating No response $0.00 140.12 Van Maanen No response $0.00 140.13 TriCity Electric No response $0.00 140.14 Wenthold No response $0.00 140.15 Absolute No response $0.00 140.16 Jordison Construction No response $0.00 140.17 Alpha Landscapes Credit for seeding of stockpile and 25-ft haul road pathway -$9,432.00 -$9,432.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)-$306.54 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 -$9,738.54 Change Request 140 Summary: City stockpile agreement resulted in less seeding activities. Change Request 140 Subtotal Change Request 140 Cost Change Total ALPHA Landscapes, LLC Project Name:Waukee Public Safety Seed Credit (515) 984-2651 Date of Proposal:7/16/2025 Bids@AlphaLandscapesIA.com Date of Plans:N/A 5145 NW Beaver Dr Addendum #:N/A Johnston, IA 50131 Tax Included:Y Prevailing Wage:N Quantity Description Unit Unit Price Extended Price -78600 Tallgrass Prairie Seed SF $0.05 -$3,930.00 -78600 Hydromulch SF $0.07 -$5,502.00 CO Total:-$9,432.00 General Notes: Pricing is good for 30 days from transmittal All line items are tied unless otherwise noted No bond/dues costs included. Add 1.8% to contract value if needed to cover bonding Clerical errors are subject to correction Site limits assumed by provided takeoff. Additional areas disturbed by others may be subject to additional charges Private utility locates will not be the responsibility of ALPHA Landscapes Additional mobilizations may result in additional charges Grading: All grades for seeded/sodded areas shall be left to +/- 0.1' of final elevations by others, ALPHA is not responsible for modifying grades more than 0.1' All grades for rock/mulch beds shall be left a minimum of 2" below adjacent concrete Site to receive suitable soils by others for landscape/seeding, no topsoil/soil amendments included unless otherwise noted in this proposal Includes removal of up to 1 skid loader bucket of weeds/rocks/debris over 1" per acre All grades shall be approved by ALPHA prior to work beginning. Any grades not meeting the above specification may result in extra charges Planting: 95% of project plant material being in-ground shall be considered substantial completion of planting and mark beginning date of the 1-year warranty One single warranty inspection and replacement mobilization shall be completed, one replacement shall constitue fulfillment of warranty If a variety of plant cannot be installed due to planting window restrictions it shall not effect substantial completion status of remaining plantings If warranty replacements are requested less than 1 year after installation the remainder of the warranty after replacements are completed will be vacated On phased projects each phase will have a seperate 1-year warranty beginning at the substantial completion of each phase When planting is requested outside specified/recommended SUDAS planting dates planting warranty may be voided Assumes specified species are zone/moisture level tolerant and will thrive in the specified locations, warranty may be void if design error is demonstrable Neglect, disease, animal/insect damage, vandalism, or any factor not related Alpha's responsibilities may void warranty ALPHA will not be held responsible for tampering, damage, or deactivation to irrigation systems or resulting plant/sod damage Seeding: When seeding is requested outside specified/recommended seeding dates the success of the seeding is not the responsibility of ALPHA Landscapes No continual maintenance (such as mowing or watering) or warranty is included unless specifically noted otherwise in this proposal Retaining Walls: Includes light excavation of wall area, site expected to be cut to back of wall backfill zone (typically 3'+ from face of wall) Includes engineering for walls over 4' in above-ground height. Assumes on site soils meet parameters of retained backfill Any items related to the fence or handrail are not included, unless noted otherwise in this proposal Geotechnical Testing of any type (M&D, Bearing, and/or Proctor), or Global Stability Engineering is not included Irrigation: City utilities will be called in prior to installation; however, we're not responsible for locating private utilities, or other underground objects that can be impacted during the irrigation installation. We WILL NOT be held liable for any damages incurred for these being unmarked. Proposal assumes project will be completed in one mobilization. Additional mobilization charges will apply if the project is phased out, or the site is not ready when scheduled. Proposal excludes damages or tampering with system components caused by other trades. This cause voids warranty. Any repairs will be billed on a time & material basis. 72 hours notice required for sleeving installation ALPHA Landscapes, LLC (Subcontractor)Contractor: _____________________ By: ___________________________By: ___________________________ Title: President Title: ___________________________ Date: _________________________Date: __________________________ Waukee Public Safety - Change Request Summary 8/20/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 142.0 DDVI Paint repairs tracked on T&M tickets, less 2-hrs Walsh (DDVI Contractor). $1,721.23 142.1 Jordison Construction No response $0.00 142.2 Enterprise Precast No response $0.00 142.3 TSF Structures No response $0.00 142.4 Northwest Steel No response $0.00 142.5 Forman Ford No response $0.00 142.6 Academy Roofing No response $0.00 142.7 Ford Metro No response $0.00 142.8 Skold Door No response $0.00 142.9 Hilsabeck Schacht 24 hours of repair per DDVI PCO 38. Working direct with DDVI.$0.00 142.10 Elite Fire Sprinkler No response $0.00 142.11 Kruck Plumbing and Heating No response $0.00 142.12 Van Maanen 3 hours of repair per DDVI PCO 38.-$210.00 142.13 TriCity Electric No response $0.00 142.14 Wenthold No response $0.00 142.15 Absolute No response $0.00 142.16 Jordison Construction No response $0.00 142.17 Alpha Landscapes No response $0.00 $1,511.23 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$49.11 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $1,560.34 Change Request 142 Summary: Additional drywall and paint touch-up for damage caused by Primes. Change Request 142 Subtotal Change Request 142 Cost Change Total Waukee Public Safety - Change Request Summary 8/20/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 146.0 Jordison Construction (Site) 6/27: Curb repair $507.50 146.1 Jordison Construction (Site) 7/25: Furnish, install, and fill EV charging bollards.$1,985.00 $2,492.50 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$81.01 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $2,573.51 Change Request 146 Summary: Concrete repairs due to damage by unknown parties and added requests per FD. Change Request 146 Subtotal Change Request 146 Cost Change Total Waukee Public Safety - Change Request Summary 8/4/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 148.0 DDVI Repaint corridors where damage was present following polished concrete operations. $8,963.57 148.1 Jordison Construction No response $0.00 148.2 Enterprise Precast No response $0.00 148.3 TSF Structures No response $0.00 148.4 Northwest Steel No response $0.00 148.5 Forman Ford No response $0.00 148.6 Academy Roofing No response $0.00 148.7 Ford Metro No response $0.00 148.8 Skold Door No response $0.00 148.9 Hilsabeck Schacht No response $0.00 148.10 Elite Fire Sprinkler No response $0.00 148.11 Kruck Plumbing and Heating No response $0.00 148.12 Van Maanen No response $0.00 148.13 TriCity Electric No response $0.00 148.14 Wenthold No response $0.00 148.15 Absolute No response $0.00 148.16 Jordison Construction No response $0.00 148.17 Alpha Landscapes No response $0.00 $8,963.57 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$291.32 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $9,254.89 Change Request 148 Summary: Repair finishes where added polished concrete scope went through. Change Request 148 Subtotal Change Request 148 Cost Change Total Waukee Public Safety - Change Request Summary 8/4/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 153.0 DDVI No response $0.00 153.1 Jordison Construction No response $0.00 153.2 Enterprise Precast No response $0.00 153.3 TSF Structures No response $0.00 153.4 Northwest Steel No response $0.00 153.5 Forman Ford No response $0.00 153.6 Academy Roofing No response $0.00 153.7 Ford Metro No response $0.00 153.8 Skold Door No response $0.00 153.9 Hilsabeck Schacht No response $0.00 153.10 Elite Fire Sprinkler No response $0.00 153.11 Kruck Plumbing and Heating No response $0.00 153.12 Van Maanen No response $0.00 153.13 TriCity Electric Furnish and install new TV.$704.00 153.14 Wenthold No response $0.00 153.15 Absolute No response $0.00 153.16 Jordison Construction No response $0.00 153.17 Alpha Landscapes No response $0.00 $704.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$22.88 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $726.88 Change Request 153 Summary: Cracked fitness TV following puchlist creation, damage by unknown parties. Change Request 153 Subtotal Change Request 153 Cost Change Total August 4, 2025 City of Waukee Waukee, IA 50263 RE: Public Safety Facility – Display Replacement Tri-City Electric Co. is pleased to provide the following scope of work: Scope of work to include: The following quote is a bid for the City of Waukee Public Safety Facility – This is to replace a Display that got broken FITNESS ROOM 121 INCLUDES • Parts only (1) Display EXCLUDES • Wall/Ceiling Boxes • Conduit • AC Power • Back Board • AV Rack • Data Cabling • Grommet hole in Lectern Bid – $704.00 This quote does not include any applicable taxes. Thank you for the opportunity to quote this project. Please feel free to call with any questions concerning this quote. Sincerely, Rod Christofferson Estimator/Audio/Visual Designer Audio/Visual Division 515.650.4519 rchristofferson@tricityelectric.com Notes Bid price is valid for 30 days. Bid is subject to the terms of a mutually acceptable contract. Bid is based on the daily market rate for goods and commodities reflected by the submitted date of this proposal. Tri -City Electric reserves the right to increase said bid accordingly to reflect the market rates on the day of receipt of the Purchase Order. Changes will be shown in documentation through commercial quotes, invoices, and/or receipts for such goods and commodities if applicable. Work is to be performed during a standard 8-hour workday between 7:00 AM and 3:30 PM, Monday through Friday. Payments are due every 30 days as the work progresses. A 1.5% service charge will be applied to all outstanding account balances over 30 days past due. Excavation Notes Proposal is based on normal soil conditions for trenching, auguring and excavation. If TCE encounters rock, debris, old foundations, high water, loose or unstable soil conditions additional charges will be added, respectively. All excavation spoils are to remain on site. If included in bid for removal is based on CLEAN, Non -Contaminated soil removal and does not included remediation or special hauling fees, treatment charges and special permits relating to contaminated soils. Owner/General Contractor is responsible for all excavated areas if not specified and included in the scope of work. Non-Solicitation of Employees By acceptance of this proposal, customer agrees not to directly or indirectly recruit, solicit, hire, or induce any employee of Tri City Electric Company or any affiliate thereof, to terminate his or her employment with Tri City Electric Company. This restriction does not apply to solicitation of any employee of Tri City Electric Company or any affiliate thereof, who Tri City Electric Company has terminated due to job elimination or reduction in work force. Contractor agrees that it must obtain written consent of Tri City Electric Company prior to hiring any such Tri City Electric Company employee. The duties, objections and restrictions set forth in this paragraph shall expire upon the first anniversary of the conclusion date of the engagement contemplated in this proposal. Force Majeure If the Subcontractor is delayed at any time in the commencement or progress of the Work by diseases, epidemics, pandemics, including but not limited to labor or material shortages, unusual delay in deliveries, restrictions on access or travel, unavoidable casualties or other causes beyond the Subcontractor’s control, then the contract times shall be extended. Waukee Public Safety - Change Request Summary 8/4/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 155.0 DDVI Relocate markerboards at request of City.$883.92 155.1 Jordison Construction No response $0.00 155.2 Enterprise Precast No response $0.00 155.3 TSF Structures No response $0.00 155.4 Northwest Steel No response $0.00 155.5 Forman Ford No response $0.00 155.6 Academy Roofing No response $0.00 155.7 Ford Metro No response $0.00 155.8 Skold Door No response $0.00 155.9 Hilsabeck Schacht No response $0.00 155.10 Elite Fire Sprinkler No response $0.00 155.11 Kruck Plumbing and Heating No response $0.00 155.12 Van Maanen No response $0.00 155.13 TriCity Electric No response $0.00 155.14 Wenthold No response $0.00 155.15 Absolute No response $0.00 155.16 Jordison Construction No response $0.00 155.17 Alpha Landscapes No response $0.00 $883.92 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$28.73 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $912.65 Change Request 155 Summary: Relocate markerboards at City request. Change Request 155 Subtotal Change Request 155 Cost Change Total Waukee Public Safety - Change Request Summary 8/4/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 156.0 DDVI Furnish and install gate magnets at trash and generator enclosures.$389.40 156.1 Jordison Construction No response $0.00 156.2 Enterprise Precast No response $0.00 156.3 TSF Structures No response $0.00 156.4 Northwest Steel No response $0.00 156.5 Forman Ford No response $0.00 156.6 Academy Roofing No response $0.00 156.7 Ford Metro No response $0.00 156.8 Skold Door No response $0.00 156.9 Hilsabeck Schacht No response $0.00 156.10 Elite Fire Sprinkler No response $0.00 156.11 Kruck Plumbing and Heating No response $0.00 156.12 Van Maanen No response $0.00 156.13 TriCity Electric No response $0.00 156.14 Wenthold No response $0.00 156.15 Absolute No response $0.00 156.16 Jordison Construction No response $0.00 156.17 Alpha Landscapes No response $0.00 $389.40 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$12.66 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $402.06 Change Request 156 Summary: Exterior gates at trash and generator enclosures call for magnet, but no product specified. Change Request 156 Subtotal Change Request 156 Cost Change Total Waukee Public Safety - Change Request Summary 8/11/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 159.0 DDVI No response $0.00 159.1 Jordison Construction No response $0.00 159.2 Enterprise Precast No response $0.00 159.3 TSF Structures No response $0.00 159.4 Northwest Steel No response $0.00 159.5 Forman Ford No response $0.00 159.6 Academy Roofing No response $0.00 159.7 Ford Metro No response $0.00 159.8 Skold Door No response $0.00 159.9 Hilsabeck Schacht No response $0.00 159.10 Elite Fire Sprinkler No response $0.00 159.11 Kruck Plumbing and Heating No response $0.00 159.12 Van Maanen No response $0.00 159.13 TriCity Electric No response $0.00 159.14 Wenthold No response $0.00 159.15 Absolute No response $0.00 159.16 Jordison Construction No response $0.00 159.17 Alpha Landscapes Replace seed with sod and extend irrigation at fitness patio square. Rezone controller $8,280.00 $8,280.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$269.10 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $8,549.10 Change Request 159 Summary: Sod the portion of fitness square that had prairie seed and extend irrigation zone to fully cover. Change Request 159 Subtotal Change Request 159 Cost Change Total ALPHA Landscapes, LLC Project Name:Waukee Public Safety Fitness Area Changes (515) 984-2651 Date of Proposal:7/31/2025 Bids@AlphaLandscapesIA.com Date of Plans:N/A 5145 NW Beaver Dr Addendum #:N/A Johnston, IA 50131 Tax Included:Y Prevailing Wage:N Quantity Description Unit Unit Price Extended Price 1 Grub Weeds/Natives And Haul Spoils LS $750.00 $750.00 1 Irrigation Add LS $2,975.00 $2,975.00 Add 4 Heads to Zone 1, Add 1 Zone with 6 Rotors 6000 Sod SF $0.68 $4,080.00 CO Total:$7,805.00 5 Rezone Controller Hr $95.00 $475.00 If Not Accepted, Added Zone will be Zone 23 in Controller - No Additional Charge General Notes: Pricing is good for 30 days from transmittal All line items are tied unless otherwise noted No bond/dues costs included. Add 1.8% to contract value if needed to cover bonding Clerical errors are subject to correction Site limits assumed by provided takeoff. Additional areas disturbed by others may be subject to additional charges Private utility locates will not be the responsibility of ALPHA Landscapes Additional mobilizations may result in additional charges Grading: All grades for seeded/sodded areas shall be left to +/- 0.1' of final elevations by others, ALPHA is not responsible for modifying grades more than 0.1' All grades for rock/mulch beds shall be left a minimum of 2" below adjacent concrete Site to receive suitable soils by others for landscape/seeding, no topsoil/soil amendments included unless otherwise noted in this proposal Includes removal of up to 1 skid loader bucket of weeds/rocks/debris over 1" per acre All grades shall be approved by ALPHA prior to work beginning. Any grades not meeting the above specification may result in extra charges Planting: 95% of project plant material being in-ground shall be considered substantial completion of planting and mark beginning date of the 1-year warranty One single warranty inspection and replacement mobilization shall be completed, one replacement shall constitue fulfillment of warranty If a variety of plant cannot be installed due to planting window restrictions it shall not effect substantial completion status of remaining plantings If warranty replacements are requested less than 1 year after installation the remainder of the warranty after replacements are completed will be vacated On phased projects each phase will have a seperate 1-year warranty beginning at the substantial completion of each phase When planting is requested outside specified/recommended SUDAS planting dates planting warranty may be voided Assumes specified species are zone/moisture level tolerant and will thrive in the specified locations, warranty may be void if design error is demonstrable Neglect, disease, animal/insect damage, vandalism, or any factor not related Alpha's responsibilities may void warranty ALPHA will not be held responsible for tampering, damage, or deactivation to irrigation systems or resulting plant/sod damage Seeding: When seeding is requested outside specified/recommended seeding dates the success of the seeding is not the responsibility of ALPHA Landscapes No continual maintenance (such as mowing or watering) or warranty is included unless specifically noted otherwise in this proposal Retaining Walls: Includes light excavation of wall area, site expected to be cut to back of wall backfill zone (typically 3'+ from face of wall) Includes engineering for walls over 4' in above-ground height. Assumes on site soils meet parameters of retained backfill Any items related to the fence or handrail are not included, unless noted otherwise in this proposal Geotechnical Testing of any type (M&D, Bearing, and/or Proctor), or Global Stability Engineering is not included Irrigation: City utilities will be called in prior to installation; however, we're not responsible for locating private utilities, or other underground objects that can be impacted during the irrigation installation. We WILL NOT be held liable for any damages incurred for these being unmarked. Proposal assumes project will be completed in one mobilization. Additional mobilization charges will apply if the project is phased out, or the site is not ready when scheduled. Proposal excludes damages or tampering with system components caused by other trades. This cause voids warranty. Any repairs will be billed on a time & material basis. 72 hours notice required for sleeving installation ALPHA Landscapes, LLC (Subcontractor)Contractor: _____________________ By: ___________________________By: ___________________________ Title: President Title: ___________________________ Date: _________________________Date: __________________________ Waukee Public Safety - Change Request Summary 8/19/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 160.0 Van Maanen Bunk room lighting control changes at FD request.$697.31 160.1 Van Maanen Nitrogren purge control wiring scope gap.$1,654.73 160.2 Van Maanen Sauna breaker and wire upsize per RFI-182.$2,358.07 160.3 Van Maanen Furnish and install blank covers at unused openings.$608.76 160.4 Van Maanen Temporary device removal and reinstall for storm shelter acoustical ceiling panel install. $741.41 160.5 Van Maanen Bifold control relocations.$9,249.41 $15,309.69 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$497.56 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $15,807.25 Change Request 160 Summary: Miscellaneous electrical changes as described below. Change Request 160 Subtotal Change Request 160 Cost Change Total