HomeMy WebLinkAbout2025-09-15 I01F_03 Waukee Public Safety Building_Pmt Est 21AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 18, 2025 AGENDA ITEM:Consideration of approval of Payment Estimate No. 21 (Combined) for the Waukee Public Safety Building Project in the amount of $69,020.61. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: The new Public Safety Building (Station 92) is substantially completed and the building is now fully occupied by both the Police and Fire Departments. Pay Estimate 21 for the Waukee Public Safety Building project mainly covers audio/visual work within the building as well as several minor items. The building is considered 99.72% complete and approximately $80,000 remains to be paid out on the project. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: Payment Estimate No. 21 is in the amount of $69,020.61. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Pay Estimate No. 21 ATTACHMENTS: I. Pay Estimate No. 21 PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F3 Document G736™ – 2009 Project Application and Project Certificate for Payment, Construction Manager as Adviser Edition AIA Document G736 – 2009 (formerly G722™CMa – 1992). Copyright © 1981, 1992 and 2009. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:18:59 ET on 09/05/2025 under Order No.4104251064 which expires on 10/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA56) 1 APPLICATION NO:21 Distribution to:TO OWNER:City of Waukee 230 W. Hickman Road Waukee, IA 50263>>>>> PROJECT: Waukee Public Safety Building 815 NW 20th Street Waukee, IA 50263>>>>> PERIOD TO: August 31, 2025 ATTENTION: Brad Deets VIA CONSTRUCTION MANAGER:Ryan Companies US, Inc.PROJECT NOS:6173-000 / 21841001 OWNER: CONSTRUCTION MANAGER: ARCHITECT: OTHER : PROJECT APPLICATION FOR PAYMENT PROJECT CERTIFICATE FOR PAYMENT Application is made for Payment, as shown below, in connection with the Project. AIA Document G737™–2009, Summary of Contractors' Applications for Payment, is attached. 1. TOTAL CONTRACT SUMS (Item A Totals)28,868,514.50 2. TOTAL NET CHANGES BY CHANGE ORDERS (Item B Totals)329,899.74 3. TOTAL CONTRACT SUM TO DATE (Item C Totals)29,198,414.24 In accordance with the Contract Documents, based on evaluation of the Work and the data comprising this Application, the Construction Manager certifies to the Owner that to the best of its knowledge, information and belief the Work has progressed as indicated; the quality of the Work is in accordance with the Contract Documents; and the Construction Manager recommends to the Owner and Architect that the Contractors be paid the AMOUNTS set forth in the attached Summary of Contractors' Applications for Payment. 4. TOTAL COMPLETED & STORED TO DATE (Item F Totals)29,117,879.92 5. RETAINAGE (Item H Totals)1,012,219.65 6. LESS PREVIOUS TOTAL PAYMENTS (Item I Totals)28,036,639.66 TOTAL OF AMOUNTS CERTIFIED ...........................................................69,020.61 7. CURRENT PAYMENT DUE (Item J Totals)69,020.61 CONSTRUCTION MANAGER: By:Date:The undersigned Construction Manager certifies that to the best of its knowledge, information and belief this Project Application for Payment is an accurate compilation of the Contractors' Applications for Payment, attached hereto. CONSTRUCTION MANAGER: By:Date: State of: In accordance with the Contract Documents, based on evaluation of the Work, the data comprising this Application, and the Construction Manager's recommendation, the Architect certifies to the Owner that to the best of its knowledge, information and belief the Work has progressed as indicated; the quality of the Work is in accordance with the Contract Documents; and the Contractors are entitled to payments of the AMOUNTS set forth in the attached Summary of Contractors' Applications for Payment. County of: ARCHITECT: Subscribed and sworn to before me this day of By:Date: Notary Public: My Commission expires: Document G737™ – 2009 Summary of Contractors' Applications for Payment, Construction Manager as Adviser Edition AIA Document G737 – 2009(formerly G723™CMa – 1992). Copyright © 1992 and 2009. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:19:02 ET on 09/05/2025 under Order No.4104251064 which expires on 10/22/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADAA9) 1 APPLICATION NO.:21 APPLICATION DATE:August 26, 2025 AIA Document G732, Application and Certificate for Payment, has been completed by each Contractor. The content of those G732 forms is summarized below.PERIOD FROM:July 01, 2025 PERIOD TO:August 31, 2025 In tabulations below, amounts are in US dollars.PROJECT NOS.:Ryan Co.: 6173-000 /OPN: 21841001 0 A B C D E F G H I J K L DESCRIPTION OF WORK CONTRACTOR'S NAME ORIGINAL CONTRACT SUM NET CHANGES IN THE WORK CONTRACT SUM TO DATE WORK IN PLACE TO DATE STORED MATERIALS (Not in D or I) TOTAL COMPLETED AND STORED TO DATE (D + E) RETAIN- AGE % RETAINAGE AMOUNT PREVIOUS PAYMENTS CURRENT PAYMENT (F – H – I) BALANCE TO FINISH (C – F) % COMPL. (F ÷ C) General Const DDVI 2,905,000.00 113,992.39 3,018,992.39 3,005,543.70 0.00 3,005,543.70 5.00%150,277.19 2,855,266.52 0.00 13,448.69 99.55% Building Concrete Jordison Const 1,271,000.00 -1,563.00 1,269,437.00 1,271,000.00 0.00 1,271,000.00 5.00%63,550.01 1,207,449.99 0.00 -1,563.00 100.12% Precast Material Enterprise Precast 1,833,316.00 -2,822.13 1,830,493.87 1,833,316.00 0.00 1,833,316.00 5.00%91,665.80 1,741,650.20 0.00 -2,822.13 100.15% Steel Material TSF Structures 1,932,100.00 6,640.00 1,938,740.00 1,938,740.00 0.00 1,938,740.00 0.00%0.00 1,938,740.00 0.00 0.00 100.00% Erection Northwest Steel 1,064,188.00 13,560.00 1,077,748.00 1,077,748.01 0.00 1,077,748.01 5.00%53,887.40 1,023,860.61 0.00 -0.01 100.00% Metal Panels Forman Ford 575,239.00 0.00 575,239.00 575,239.00 0.00 575,239.00 0.00%0.00 575,239.00 0.00 0.00 100.00% Roofing Academy Roofing 998,000.00 3,030.75 1,001,030.75 999,080.75 0.00 999,080.75 5.00%49,954.04 949,126.71 0.00 1,950.00 99.81% Glass & Glazing Ford Metro 1,069,100.00 3,924.33 1,073,024.33 1,073,024.33 0.00 1,073,024.33 5.00%53,651.22 1,019,373.11 0.00 0.00 100.00% Overhead Doors Skold Door 310,000.00 1,346.00 311,346.00 311,346.00 0.00 311,346.00 5.00%15,567.30 295,778.70 0.00 0.00 100.00% Frame & Drywall Hilsabeck Schacht 2,562,500.00 40,131.33 2,602,631.33 2,600,788.33 0.00 2,600,788.33 5.00%130,039.42 2,470,748.91 0.00 1,843.00 99.93% Fire Protection Elite Fire Sprinkler 364,700.00 0.00 364,700.00 364,700.00 0.00 364,700.00 0.00%0.00 364,700.00 0.00 0.00 100.00% Mech & Plumbing Kruck Plumbing 5,947,000.00 47,809.92 5,994,809.92 5,994,809.92 0.00 5,994,809.92 0.00%0.00 5,994,307.23 502.69 0.00 100.00% Elec & Comm Van Maanen 4,711,425.00 190,159.65 4,901,584.65 4,890,311.25 0.00 4,890,311.25 5.00%244,515.56 4,645,795.69 0.00 11,273.40 99.77% Audio-Visual TriCity Electric 602,832.00 -3,112.00 599,720.00 599,719.73 0.00 599,719.73 5.00%29,985.99 504,771.18 64,962.56 0.27 100.00% Earthwork Wenthold 803,330.50 720.00 804,050.50 804,050.10 0.00 804,050.10 5.00%40,202.51 763,847.60 0.00 0.40 100.00% SWPPP Absolute 155,000.00 -103,525.00 51,475.00 44,775.00 0.00 44,775.00 5.00%2,238.75 41,348.75 1,187.50 6,700.00 86.98% Site Concrete Jordison Const 1,110,000.00 22,784.50 1,132,784.50 1,135,277.00 0.00 1,135,277.00 5.00%56,763.93 1,076,145.20 2,367.87 -2,492.50 100.22% Landscape & Irrig Alpha Landscapes 653,784.00 -3,177.00 650,607.00 598,410.80 0.00 598,410.80 5.00%29,920.54 568,490.26 0.00 52,196.20 91.98% 0.00 0.00 0.00 0.00 0.00 0.00 0.00%0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00%0.00 0.00 0.00 0.00 0.00% TOTALS $28,868,514.50 $329,899.74 $29,198,414.24 $29,117,879.92 $0.00 $29,117,879.92 3.48%$1,012,219.65 $28,036,639.66 $69,020.62 $80,534.32 99.72% Waukee Public Safety Building: Pay Application No. 21 Pay Apps Due to Ryan Co: 08/23/2025 Pay Apps Due to OPN: 9/5/2025 Council Packet Info to Waukee: 9/10/2025 by midnight Council Approval: 9/15/2025 Payment Due to Prime C ontractors no later than: 9/15/2025 Prime Contractors Current (less retainage) Bid Package #1: General C onstruction (DDVI) Bid Package #2: Building C oncrete (Jordison Construction) Bid Package #3: Precast Material (Enterprise Precast) Bid Package #4: Steel Material & Misc. Metals (TSF Structures) Bid Package #5: Precast & Steel Erection (Northwest Steel) Bid Package #6: Metal Panels (Forman Ford) Bid Package #7: Roofing (Academy Roofing) Bid Package #8: Glass & Glazing (Ford Metro) Bid Package #9: Overhead Doors (Skold Door) Bid Package #10: Framing, Drywall & Ceilings (Hilsabeck Schacht) Bid Package #11: Fire Protection (Elite Fire Sprinkler) Bid Package #12: Mechanical & Plumbing (Kruck Plumbing & Heating)502.69 Bid Package #13: Electrical & Communications (Van Maanen Electric) Bid Package #14: Audio-Visual (Tri-C ity Electric)64,962.56 Bid Package #15: Earthwork & Utilities (Wenthold Excavating) Bid Package #16: SWPPP (Absolute Group)1,187.50 Bid Package #17: Site Concrete (Jordison Construction)2,367.87 Bid Package #18: Landscaping & Irrigation (Alpha Landscapes) Pay Application Subtotal 69,020.62 Invoice #: 338588nvoice #: 338588APPLICATION AND CERTIFICATE FOR PAYMENTAPPLICATION AND CERTIFICATE FOR PAYMENTAPPLICATION AND CERTIFICATE FOR PAYMENTAPPLICATION AND CERTIFICATE FOR PAYMENTAPPLICATION AND CERTIFICATE FOR PAYMENT 1Page Contractor Architect Owner Distribution to : Distribution to : 8787A176370 City of Waukee Public Safety A176370 City of Waukee Public Safety A176370 City of Waukee Public Safety Contract Date: Project Nos: Contract For: Via Architect: Tri City Electric Co of Iowa CorpTri City Electric Co of Iowa CorpFrom Contractor: Ryan Companies Project:ToTo Owner: 6 PePeriod To: Application No. : 111 E Grand Ave, Suite 200111 E Grand Ave, Suite 200 6225 N Brady St6225 N Brady St Davenport, IA 52806 Des Moines, IA 50309es Moines, IA 50309 Application Date :8/19/2025 Due Date :9/18/2025 -$3,112.00 $29,985.98 Subscribed and sworn to before me this scribed and sworn to before me this County of:State of: 4. Total Completed and Stored To Date . . . . . . . . . . . . . . . 4. Total Completed and Stored To Date . . . . . . . . . . . . . . . 4. Total Completed and Stored To Date . . . . . . . . . . . . . . . 4. Total Completed and Stored To Date . . . . . . . . . . . . . . . Notary Public: $0.00 0.00%of Stored Materialof Stored Materialb. Application is made for payment, as shown below, in connection with the Contract.Application is made for payment, as shown below, in connection with the Contract.Application is made for payment, as shown below, in connection with the Contract.Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet is attached.tinuation Sheet is attached. a. 5. Retainage : $29,985.98 ARCHITECT'S CERTIFICATE FOR PAYMENTATE FOR PAYMENT My Commission expires:My Commission expires: $64,962.56 5.00% By:____________________________________Date____________________________________Date____________________________________Date____________________________________Date:____________________________$599,719.73 $599,720.00 Tri City Electric Co of Iowa CorpTri City Electric Co of Iowa CorpCONTRACTOR: $602,832.00 The undersigned Contractor certifies that to the best of the Contractor's knowledge,The undersigned Contractor certifies that to the best of the Contractor's knowledge,The undersigned Contractor certifies that to the best of the Contractor's knowledge,The undersigned Contractor certifies that to the best of the Contractor's knowledge,The undersigned Contractor certifies that to the best of the Contractor's knowledge, information, and belief, the work covered by this Application for Payment has been completed nformation, and belief, the work covered by this Application for Payment has been completed nformation, and belief, the work covered by this Application for Payment has been completed nformation, and belief, the work covered by this Application for Payment has been completed nformation, and belief, the work covered by this Application for Payment has been completed nformation, and belief, the work covered by this Application for Payment has been completed in accordance with the Contract Documents. That all amounts have been paid by the Contractor n accordance with the Contract Documents. That all amounts have been paid by the Contractor n accordance with the Contract Documents. That all amounts have been paid by the Contractor n accordance with the Contract Documents. That all amounts have been paid by the Contractor n accordance with the Contract Documents. That all amounts have been paid by the Contractor n accordance with the Contract Documents. That all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from for Work for which previous Certificates for Payment were issued and payments received from for Work for which previous Certificates for Payment were issued and payments received from for Work for which previous Certificates for Payment were issued and payments received from for Work for which previous Certificates for Payment were issued and payments received from for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due.he Owner, and that current payment shown herein is now due.he Owner, and that current payment shown herein is now due.he Owner, and that current payment shown herein is now due. $504,771.19 $569,733.75 In accordance with the Contract Documents, based on on-site observations and the dataIn accordance with the Contract Documents, based on on-site observations and the dataIn accordance with the Contract Documents, based on on-site observations and the dataIn accordance with the Contract Documents, based on on-site observations and the dataIn accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner that to the best of thecomprising the above application, the Architect certifies to the Owner that to the best of thecomprising the above application, the Architect certifies to the Owner that to the best of thecomprising the above application, the Architect certifies to the Owner that to the best of thecomprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information, and belief, the Work has progressed as indicated,s knowledge, information, and belief, the Work has progressed as indicated,s knowledge, information, and belief, the Work has progressed as indicated,s knowledge, information, and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractorthe quality of the Work is in accordance with the Contract Documents, and the Contractorthe quality of the Work is in accordance with the Contract Documents, and the Contractorthe quality of the Work is in accordance with the Contract Documents, and the Contractorthe quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.is entitled to payment of the AMOUNT CERTIFIED.is entitled to payment of the AMOUNT CERTIFIED. 1. Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . .1. Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . .1. Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . .1. Original Contract Sum . . . . . . . . . . . . . . . . . . . . . . . . . . 8. Current Payment Due . . . . . . . . . . . . . . . . . . . . . . . . . . . 8. Current Payment Due . . . . . . . . . . . . . . . . . . . . . . . . . . . 8. Current Payment Due . . . . . . . . . . . . . . . . . . . . . . . . . . . 8. Current Payment Due . . . . . . . . . . . . . . . . . . . . . . . . . . . 7. Less Previous Certificates For Payments . . . . . . . . . . . . 7. Less Previous Certificates For Payments . . . . . . . . . . . . 7. Less Previous Certificates For Payments . . . . . . . . . . . . 7. Less Previous Certificates For Payments . . . . . . . . . . . . 6. Total Earned Less Retainage . . . . . . . . . . . . . . . . . . . . . .6. Total Earned Less Retainage . . . . . . . . . . . . . . . . . . . . . .6. Total Earned Less Retainage . . . . . . . . . . . . . . . . . . . . . .6. Total Earned Less Retainage . . . . . . . . . . . . . . . . . . . . . . Total Retainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Total Retainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Total Retainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . of Completed Workof Completed Work 3. Contract Sum To Date . . . . . . . . . . . . . . . . . . . . . . . . . .3. Contract Sum To Date . . . . . . . . . . . . . . . . . . . . . . . . . .3. Contract Sum To Date . . . . . . . . . . . . . . . . . . . . . . . . . .3. Contract Sum To Date . . . . . . . . . . . . . . . . . . . . . . . . . . 2. Net Change By Change Order . . . . . . . . . . . . . . . . . . . .2. Net Change By Change Order . . . . . . . . . . . . . . . . . . . .2. Net Change By Change Order . . . . . . . . . . . . . . . . . . . .2. Net Change By Change Order . . . . . . . . . . . . . . . . . . . . CONTRACTORONTRACTOR'S APPLICATION FOR PAYMENT APPLICATION FOR PAYMENT APPLICATION FOR PAYMENT CHCHANGE ORDER SUMMARYANGE ORDER SUMMARY Additions Deductions Total changes approvedTotal changes approved $4,690.81 $7,802.81 Total Approved this MonthTotal Approved this Month TOTALS $7,802.81$4,690.81 Net Changes By Change Orderet Changes By Change Order -$3,112.00 9. Balance To Finish, Plus Retainage . . . . . . . . . . . . . . . . .9. Balance To Finish, Plus Retainage . . . . . . . . . . . . . . . . .9. Balance To Finish, Plus Retainage . . . . . . . . . . . . . . . . .9. Balance To Finish, Plus Retainage . . . . . . . . . . . . . . . . .$29,986.25 AMOUNT CERTIFIED AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Attach explanation if amount certified differs from the amount applied. Initial all figures on this Application and on the Continuation Sheet that are changed to conform with the amount certified.)tinuation Sheet that are changed to conform with the amount certified.)tinuation Sheet that are changed to conform with the amount certified.)tinuation Sheet that are changed to conform with the amount certified.) ARCHITECT: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to theThis Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to theThis Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to theThis Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to theThis Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment, and acceptance of payment are withoutontractor named herein. Issuance, payment, and acceptance of payment are withoutontractor named herein. Issuance, payment, and acceptance of payment are withoutontractor named herein. Issuance, payment, and acceptance of payment are withoutontractor named herein. Issuance, payment, and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract.prejudice to any rights of the Owner or Contractor under this Contract.prejudice to any rights of the Owner or Contractor under this Contract.prejudice to any rights of the Owner or Contractor under this Contract. in previous months by Ownerin previous months by Owner By:____________________________________Date____________________________________Date____________________________________Date____________________________________Date:____________________________ $64,962.56 $0.00 $0.00 8/22/25 Iowa Scott 22nd August 202522nd August 2025 CONTINUATION SHEET Page 2 of 2 (Not in D or E)(D+E+F) To Date(D+E) Application In Place Stored and Stored No.Value From Previous This Period Presently Completed (G / C)To Finish (C-G) Item Total Description of Work Scheduled Materials %Balance RetainageWork Completed A B C D E F G H I Contract : 87A176370 City of Waukee Public Safety338588Invoice # : Architect's Project No.: To: 8/19/2025Application Date : 6Application No. :Application and Certification for Payment, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply.Due Date :9/18/2025 0.000.00 0.00%0.000.000.000.00 0.001City of Waukee Public Safety 300.006,000.00 100.00%6,000.000.000.006,000.00 0.002Submittals 1,435.3528,707.06 100.00%28,707.060.000.0028,707.33 0.273AV Rough-in Material 925.0018,500.00 100.00%18,500.000.000.0018,500.00 0.004AV Cabling 23,500.00423,631.28 100.00%470,000.000.0046,368.72470,000.00 0.005AV Material 3,406.2354,499.74 100.00%68,124.670.0013,624.9368,124.67 0.006AV Installation 450.000.00 100.00%9,000.000.009,000.009,000.00 0.007AV Testing 125.000.00 100.00%2,500.000.002,500.002,500.00 0.008Training 13.000.00 100.00%260.000.00260.00260.00 0.00901Change Order #1 - Add Audinate USB Option -279.400.00 100.00%-5,588.000.00-5,588.00-5,588.00 0.00902Change Order #2 - Material Credit for Rooms 211, 102, & 332 110.800.00 100.00%2,216.000.002,216.002,216.00 0.00903Change Order #3 - Ceiling Mount Brackets for Mics 531,338.08 68,381.65 0.00 599,719.73 100.00%0.27 29,985.98Grand Totals 599,720.00 Chicago, Illinois 60606 Chicago, Illinois 60606 Chicago, Illinois 60606 24 t h Ju n e 20 2 5 KR U C K Pl u m b i n g & H e a t i n g C o m p a n y I n c . Me c h a n i c a l C o n t r a c t o r s S i n c e 1 9 4 1 __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ OF F I C E . 6 1 5 S t o r y S t r e e t T E L E P H O N E : 5 1 5 - 4 3 2 - 2 2 1 0 61 5 S t o r y S t r e e t SH E E T M E T A L D E P T . – 1 8 1 0 2 1 7 th R o a d BO O N E , I O W A 5 0 0 3 6 W A R E H O U S E – 1 8 1 0 2 1 7 th R o a d Ju l y 7 th , 2 0 2 5 Da n i e l l e H e r m a n n OP N A r c h i t e c t s 10 0 C o u r t A v e S u i t e 1 0 0 De s M o i n e s , I A 5 0 3 0 9 Ci t y o f W a u k e e - W a u k e e P u b l i c S a f e t y B u i l d i n g De a r D a n i e l l e , Th e p u r p o s e o f t h i s l e t t e r i s t o r e q u e s t r e l e a s e o f r e t a i n e d f u n d s o n t h e a b o v e l i s t e d p r o j e c t a n d t o p r o v i d e t h e sw o r n s t a t e m e n t b e l o w . “T e n c a l e n d a r d a y s p r i o r t o f i l l i n g t h i s r e q u e s t , n o t i c e w a s g i v e n a s r e q u i r e d b y p a r a g r a p h s “ f ” a n d “ g ” o f se c t i o n 2 6 . 1 3 o f t h e I o w a C o d e t o a l l k n o w n s u b c o n t r a c t o r s , s u b - su b c o n t r a c t o r s a n d s u p p l i e r s ” . If y o u h a v e a n y q u e s t i o n s , p l e a s e c a l l m y c e l l p h o n e a t 5 1 5 - 2 3 6 - 0 1 1 1 . Si n c e r e l y , Kr u c k P l u m b i n g & H e a t i n g Ch a d H o u s t o n Pr e s i d e n t CO M M E R C I A L – I N D U S T R I A L – R E S I D E N T A I L – P L U M B I N G – H E A T I N G – S H E E T M E T A L – A I R C O N D I T I O N I N G - V E N T I L A T I O N Ch a d H o u s t o n Ce r t i f i c a t e O f C o m p l e t i o n En v e l o p e I d : 0 7 5 E B 8 0 F - B 3 4 7 - 4 D B 9 - A 9 5 2 - A E 7 3 6 C E 1 7 4 B A St a t u s : C o m p l e t e d Su b j e c t : C o m p l e t e w i t h D o c u s i g n : W P S P a y A p p 2 1 _ P r o j e c t M a n u a l . p d f So u r c e E n v e l o p e : Do c u m e n t P a g e s : 2 1 Si g n a t u r e s : 2 En v e l o p e O r i g i n a t o r : Ce r t i f i c a t e P a g e s : 5 In i t i a l s : 0 Be t h B e r t l s h o f e r Au t o N a v : E n a b l e d En v e l o p e I d S t a m p i n g : E n a b l e d Ti m e Z o n e : ( U T C - 0 6 : 0 0 ) C e n t r a l T i m e ( U S & C a n a d a ) 53 3 S o u t h T h i r d S t r e e t , S u i t e 1 0 0 Mi n n e a p o l i s , M N 5 5 4 1 5 Be t h . B e r t l s h o f e r @ R y a n C o m p a n i e s . c o m IP A d d r e s s : 4 . 4 3 . 1 3 4 . 7 4 Re c o r d T r a c k i n g St a t u s : O r i g i n a l 9 / 5 / 2 0 2 5 1 : 1 8 : 5 5 P M Ho l d e r : B e t h B e r t l s h o f e r B e t h . B e r t l s h o f e r @ R y a n C o m p a n i e s . c o m Lo c a t i o n : D o c u S i g n Si g n e r E v e n t s Si g n a t u r e Ti m e s t a m p Ry a n P i g n e r i Ry a n . P i g n e r i @ R y a n C o m p a n i e s . c o m Pr o j e c t m a n a g e r Ry a n C o m p a n i e s U S , I n c . Se c u r i t y L e v e l : E m a i l , A c c o u n t A u t h e n t i c a t i o n (N o n e ) Si g n a t u r e A d o p t i o n : P r e - s e l e c t e d S t y l e Us i n g I P A d d r e s s : 1 4 9 . 1 5 4 . 1 . 9 9 Si g n e d u s i n g m o b i l e Se n t : 9 / 5 / 2 0 2 5 1 : 2 0 : 2 9 P M Vi e w e d : 9 / 5 / 2 0 2 5 1 : 2 3 : 5 7 P M Si g n e d : 9 / 5 / 2 0 2 5 1 : 2 4 : 1 1 P M El e c t r o n i c R e c o r d a n d S i g n a t u r e D i s c l o s u r e : N o t O f f e r e d v i a D o c u s i g n Aa r o n T w e d t at w e d t @ o p n a r c h i t e c t s . c o m Se c u r i t y L e v e l : E m a i l , A c c o u n t A u t h e n t i c a t i o n (N o n e ) Si g n a t u r e A d o p t i o n : P r e - s e l e c t e d S t y l e Us i n g I P A d d r e s s : 1 4 0 . 8 2 . 1 8 8 . 2 Se n t : 9 / 5 / 2 0 2 5 1 : 2 4 : 1 2 P M Vi e w e d : 9 / 5 / 2 0 2 5 2 : 5 5 : 4 6 P M Si g n e d : 9 / 5 / 2 0 2 5 2 : 5 5 : 5 2 P M El e c t r o n i c R e c o r d a n d S i g n a t u r e D i s c l o s u r e : A c c e p t e d : 9 / 5 / 2 0 2 5 2 : 5 5 : 4 6 P M I D : 7 b e f d b 5 c - 0 c b f - 4 a b 2 - 8 a f e - a c b 3 8 0 c 8 d f f 3 In P e r s o n S i g n e r E v e n t s Si g n a t u r e Ti m e s t a m p Ed i t o r D e l i v e r y E v e n t s St a t u s Ti m e s t a m p Ag e n t D e l i v e r y E v e n t s St a t u s Ti m e s t a m p In t e r m e d i a r y D e l i v e r y E v e n t s St a t u s Ti m e s t a m p Ce r t i f i e d D e l i v e r y E v e n t s St a t u s Ti m e s t a m p Ca r b o n C o p y E v e n t s St a t u s Ti m e s t a m p Wi t n e s s E v e n t s Si g n a t u r e Ti m e s t a m p No t a r y E v e n t s Si g n a t u r e Ti m e s t a m p En v e l o p e S u m m a r y E v e n t s St a t u s Ti m e s t a m p s En v e l o p e S e n t Ha s h e d / E n c r y p t e d 9/ 5 / 2 0 2 5 1 : 2 0 : 2 9 P M Ce r t i f i e d D e l i v e r e d Se c u r i t y C h e c k e d 9/ 5 / 2 0 2 5 2 : 5 5 : 4 6 P M Si g n i n g C o m p l e t e Se c u r i t y C h e c k e d 9/ 5 / 2 0 2 5 2 : 5 5 : 5 2 P M En v e l o p e S u m m a r y E v e n t s St a t u s Ti m e s t a m p s Co m p l e t e d Se c u r i t y C h e c k e d 9/ 5 / 2 0 2 5 2 : 5 5 : 5 2 P M Pa y m e n t E v e n t s St a t u s Ti m e s t a m p s El e c t r o n i c R e c o r d a n d S i g n a t u r e D i s c l o s u r e EL E C T R O N I C R E C O R D A N D S I G N A T U R E D I S C L O S U R E Fr o m t i m e t o t i m e , R y a n C o m p a n i e s U S , I n c . ( w e , u s o r C o m p a n y ) m a y b e r e q u i r e d b y l a w t o pr o v i d e t o y o u c e r t a i n w r i t t e n n o t i c e s o r d i s c l o s u r e s . D e s c r i b e d b e l o w a r e t h e t e r m s a n d co n d i t i o n s f o r p r o v i d i n g t o y o u s u c h n o t i c e s a n d d i s c l o s u r e s e l e c t r o n i c a l l y t h r o u g h t h e D o c u S i g n sy s t e m . P l e a s e r e a d t h e i n f o r m a t i o n b e l o w c a r e f u l l y a n d t h o r o u g h l y , a n d i f y o u c a n a c c e s s t h i s in f o r m a t i o n e l e c t r o n i c a l l y t o y o u r s a t i s f a c t i o n a n d a g r e e t o t h i s E l e c t r o n i c R e c o r d a n d S i g n a t u r e Di s c l o s u r e ( E R S D ) , p l e a s e c o n f i r m y o u r a g r e e m e n t b y s e l e c t i n g t h e c h e c k - bo x n e x t t o ‘ I a g r e e t o us e e l e c t r o n i c r e c o r d s a n d s i g n a t u r e s ’ b e f o r e c l i c k i n g ‘ C O N T I N U E ’ w i t h i n t h e D o c u S i g n sy s t e m . Ge t t i n g p a p e r c o p i e s At a n y t i m e , y o u m a y r e q u e s t f r o m u s a p a p e r c o p y o f a n y r e c o r d p r o v i d e d o r m a d e a v a i l a b l e el e c t r o n i c a l l y t o y o u b y u s . Y o u w i l l h a v e t h e a b i l i t y t o d o w n l o a d a n d p r i n t d o c u m e n t s w e s e n d to y o u t h r o u g h t h e D o c u S i g n s y s t e m d u r i n g a n d i m m e d i a t e l y a f t e r t h e s i g n i n g s e s s i o n a n d , i f y o u el e c t t o c r e a t e a D o c u S i g n a c c o u n t , y o u m a y a c c e s s t h e d o c u m e n t s f o r a l i m i t e d p e r i o d o f t i m e (u s u a l l y 3 0 d a y s ) a f t e r s u c h d o c u m e n t s a r e f i r s t s e n t t o y o u . A f t e r s u c h t i m e , i f y o u w i s h f o r u s t o se n d y o u p a p e r c o p i e s o f a n y s u c h d o c u m e n t s f r o m o u r o f f i c e t o y o u , y o u w i l l b e c h a r g e d a $0 . 0 0 p e r - p a g e f e e . Y o u m a y r e q u e s t d e l i v e r y o f s u c h p a p e r c o p i e s f r o m u s b y f o l l o w i n g t h e pr o c e d u r e d e s c r i b e d b e l o w . Wi t h d r a w i n g y o u r c o n s e n t If y o u d e c i d e t o r e c e i v e n o t i c e s a n d d i s c l o s u r e s f r o m u s e l e c t r o n i c a l l y , y o u m a y a t a n y t i m e ch a n g e y o u r m i n d a n d t e l l u s t h a t t h e r e a f t e r y o u w a n t t o r e c e i v e r e q u i r e d n o t i c e s a n d d i s c l o s u r e s on l y i n p a p e r f o r m a t . H o w y o u m u s t i n f o r m u s o f y o u r d e c i s i o n t o r e c e i v e f u t u r e n o t i c e s a n d di s c l o s u r e i n p a p e r f o r m a t a n d w i t h d r a w y o u r c o n s e n t t o r e c e i v e n o t i c e s a n d d i s c l o s u r e s el e c t r o n i c a l l y i s d e s c r i b e d b e l o w . Co n s e q u e n c e s o f c h a n g i n g y o u r m i n d If y o u e l e c t t o r e c e i v e r e q u i r e d n o t i c e s a n d d i s c l o s u r e s o n l y i n p a p e r f o r m a t , i t w i l l s l o w t h e sp e e d a t w h i c h w e c a n c o m p l e t e c e r t a i n s t e p s i n t r a n s a c t i o n s w i t h y o u a n d d e l i v e r i n g s e r v i c e s t o yo u b e c a u s e w e w i l l n e e d f i r s t t o s e n d t h e r e q u i r e d n o t i c e s o r d i s c l o s u r e s t o y o u i n p a p e r f o r m a t , an d t h e n w a i t u n t i l w e r e c e i v e b a c k f r o m y o u y o u r a c k n o w l e d g m e n t o f y o u r r e c e i p t o f s u c h pa p e r n o t i c e s o r d i s c l o s u r e s . F u r t h e r , y o u w i l l n o l o n g e r b e a b l e t o u s e t h e D o c u S i g n s y s t e m t o re c e i v e r e q u i r e d n o t i c e s a n d c o n s e n t s e l e c t r o n i c a l l y f r o m u s o r t o s i g n e l e c t r o n i c a l l y d o c u m e n t s fr o m u s . Al l n o t i c e s a n d d i s c l o s u r e s w i l l b e s e n t t o y o u e l e c t r o n i c a l l y Un l e s s y o u t e l l u s o t h e r w i s e i n a c c o r d a n c e w i t h t h e p r o c e d u r e s d e s c r i b e d h e r e i n , w e w i l l p r o v i d e el e c t r o n i c a l l y t o y o u t h r o u g h t h e D o c u S i g n s y s t e m a l l r e q u i r e d n o t i c e s , d i s c l o s u r e s , au t h o r i z a t i o n s , a c k n o w l e d g e m e n t s , a n d o t h e r d o c u m e n t s t h a t a r e r e q u i r e d t o b e p r o v i d e d o r m a d e av a i l a b l e t o y o u d u r i n g t h e c o u r s e o f o u r r e l a t i o n s h i p w i t h y o u . T o r e d u c e t h e c h a n c e o f y o u in a d v e r t e n t l y n o t r e c e i v i n g a n y n o t i c e o r d i s c l o s u r e , w e p r e f e r t o p r o v i d e a l l o f t h e r e q u i r e d no t i c e s a n d d i s c l o s u r e s t o y o u b y t h e s a m e m e t h o d a n d t o t h e s a m e a d d r e s s t h a t y o u h a v e g i v e n us . T h u s , y o u c a n r e c e i v e a l l t h e d i s c l o s u r e s a n d n o t i c e s e l e c t r o n i c a l l y o r i n p a p e r f o r m a t t h r o u g h th e p a p e r m a i l d e l i v e r y s y s t e m . I f y o u d o n o t a g r e e w i t h t h i s p r o c e s s , p l e a s e l e t u s k n o w a s de s c r i b e d b e l o w . P l e a s e a l s o s e e t h e p a r a g r a p h i m m e d i a t e l y a b o v e t h a t d e s c r i b e s t h e co n s e q u e n c e s o f y o u r e l e c t i n g n o t t o r e c e i v e d e l i v e r y o f t h e n o t i c e s a n d d i s c l o s u r e s el e c t r o n i c a l l y f r o m u s . Ho w t o c o n t a c t R y a n C o m p a n i e s U S , I n c . : Yo u m a y c o n t a c t u s t o l e t u s k n o w o f y o u r c h a n g e s a s t o h o w w e m a y c o n t a c t y o u e l e c t r o n i c a l l y , to r e q u e s t p a p e r c o p i e s o f c e r t a i n i n f o r m a t i o n f r o m u s , a n d t o w i t h d r a w y o u r p r i o r c o n s e n t t o re c e i v e n o t i c e s a n d d i s c l o s u r e s e l e c t r o n i c a l l y a s f o l l o w s : To c o n t a c t u s b y e m a i l s e n d m e s s a g e s t o : g r a h a m . b e l m o n t @ r y a n c o m p a n i e s . c o m To a d v i s e R y a n C o m p a n i e s U S , I n c . o f y o u r n e w e m a i l a d d r e s s To l e t u s k n o w o f a c h a n g e i n y o u r e m a i l a d d r e s s w h e r e w e s h o u l d s e n d n o t i c e s a n d d i s c l o s u r e s el e c t r o n i c a l l y t o y o u , y o u m u s t s e n d a n e m a i l m e s s a g e t o u s at g r a h a m . b e l m o n t @ r y a n c o m p a n i e s . c o m a n d i n t h e b o d y o f s u c h r e q u e s t y o u m u s t s t a t e : y o u r pr e v i o u s e m a i l a d d r e s s , y o u r n e w e m a i l a d d r e s s . W e d o n o t r e q u i r e a n y o t h e r i n f o r m a t i o n f r o m yo u t o c h a n g e y o u r e m a i l a d d r e s s . If y o u c r e a t e d a D o c u S i g n a c c o u n t , y o u m a y u p d a t e i t w i t h y o u r n e w e m a i l a d d r e s s t h r o u g h y o u r ac c o u n t p r e f e r e n c e s . To r e q u e s t p a p e r c o p i e s f r o m R y a n C o m p a n i e s U S , I n c . To r e q u e s t d e l i v e r y f r o m u s o f p a p e r c o p i e s o f t h e n o t i c e s a n d d i s c l o s u r e s p r e v i o u s l y p r o v i d e d by u s t o y o u e l e c t r o n i c a l l y , y o u m u s t s e n d u s a n e m a i l to g r a h a m . b e l m o n t @ r y a n c o m p a n i e s . c o m a n d i n t h e b o d y o f s u c h r e q u e s t y o u m u s t s t a t e y o u r em a i l a d d r e s s , f u l l n a m e , m a i l i n g a d d r e s s , a n d t e l e p h o n e n u m b e r . W e w i l l b i l l y o u f o r a n y f e e s a t th a t t i m e , i f a n y . To w i t h d r a w y o u r c o n s e n t w i t h R y a n C o m p a n i e s U S , I n c . To i n f o r m u s t h a t y o u n o l o n g e r w i s h t o r e c e i v e f u t u r e n o t i c e s a n d d i s c l o s u r e s i n e l e c t r o n i c fo r m a t y o u m a y : i. d e c l i n e t o s i g n a d o c u m e n t f r o m w i t h i n y o u r s i g n i n g s e s s i o n , a n d o n t h e s u b s e q u e n t p a g e , se l e c t t h e c h e c k - b o x i n d i c a t i n g y o u w i s h t o w i t h d r a w y o u r c o n s e n t , o r y o u m a y ; ii . s e n d u s a n e m a i l t o g r a h a m . b e l m o n t @ r y a n c o m p a n i e s . c o m a n d i n t h e b o d y o f s u c h r e q u e s t y o u mu s t s t a t e y o u r e m a i l , f u l l n a m e , m a i l i n g a d d r e s s , a n d t e l e p h o n e n u m b e r . W e d o n o t n e e d a n y ot h e r i n f o r m a t i o n f r o m y o u t o w i t h d r a w c o n s e n t . . T h e c o n s e q u e n c e s o f y o u r w i t h d r a w i n g co n s e n t f o r o n l i n e d o c u m e n t s w i l l b e t h a t t r a n s a c t i o n s m a y t a k e a l o n g e r t i m e t o p r o c e s s . . Re q u i r e d h a r d w a r e a n d s o f t w a r e Th e m i n i m u m s y s t e m r e q u i r e m e n t s f o r u s i n g t h e D o c u S i g n s y s t e m m a y c h a n g e o v e r t i m e . T h e cu r r e n t s y s t e m r e q u i r e m e n t s a r e f o u n d h e r e : ht t p s : / / s u p p o r t . d o c u s i g n . c o m / g u i d e s / s i g n e r - g u i d e - si g n i n g - s y s t e m - r e q u i r e m e n t s . Ac k n o w l e d g i n g y o u r a c c e s s a n d c o n s e n t t o r e c e i v e a n d s i g n d o c u m e n t s e l e c t r o n i c a l l y To c o n f i r m t o u s t h a t y o u c a n a c c e s s t h i s i n f o r m a t i o n e l e c t r o n i c a l l y , w h i c h w i l l b e s i m i l a r t o ot h e r e l e c t r o n i c n o t i c e s a n d d i s c l o s u r e s t h a t w e w i l l p r o v i d e t o y o u , p l e a s e c o n f i r m t h a t y o u h a v e re a d t h i s E R S D , a n d ( i ) t h a t y o u a r e a b l e t o p r i n t o n p a p e r o r e l e c t r o n i c a l l y s a v e t h i s E R S D f o r yo u r f u t u r e r e f e r e n c e a n d a c c e s s ; o r ( i i ) t h a t y o u a r e a b l e t o e m a i l t h i s E R S D t o a n e m a i l a d d r e s s wh e r e y o u w i l l b e a b l e t o p r i n t o n p a p e r o r s a v e i t f o r y o u r f u t u r e r e f e r e n c e a n d a c c e s s . F u r t h e r , if y o u c o n s e n t t o r e c e i v i n g n o t i c e s a n d d i s c l o s u r e s e x c l u s i v e l y i n e l e c t r o n i c f o r m a t a s d e s c r i b e d he r e i n , t h e n s e l e c t t h e c h e c k - bo x n e x t t o ‘ I a g r e e t o u s e e l e c t r o n i c r e c o r d s a n d s i g n a t u r e s ’ b e f o r e cl i c k i n g ‘ C O N T I N U E ’ w i t h i n t h e D o c u S i g n s y s t e m . By s e l e c t i n g t h e c h e c k - b o x n e x t t o ‘I a g r e e t o u s e e l e c t r o n i c r e c o r d s a n d s i g n a t u r e s ’ , y o u c o n f i r m th a t : ™ Yo u c a n a c c e s s a n d r e a d t h i s E l e c t r o n i c R e c o r d a n d S i g n a t u r e D i s c l o s u r e ; a n d ™ Yo u c a n p r i n t o n p a p e r t h i s E l e c t r o n i c R e c o r d a n d S i g n a t u r e D i s c l o s u r e , o r s a v e o r s e n d th i s E l e c t r o n i c R e c o r d a n d D i s c l o s u r e t o a l o c a t i o n w h e r e y o u c a n p r i n t i t , f o r f u t u r e re f e r e n c e a n d a c c e s s ; a n d ™ Un t i l o r u n l e s s y o u n o t i f y R y a n C o m p a n i e s U S , I n c . a s d e s c r i b e d a b o v e , y o u c o n s e n t t o re c e i v e e x c l u s i v e l y t h r o u g h e l e c t r o n i c m e a n s a l l n o t i c e s , d i s c l o s u r e s , a u t h o r i z a t i o n s , ac k n o w l e d g e m e n t s , a n d o t h e r d o c u m e n t s t h a t a r e r e q u i r e d t o b e p r o v i d e d o r m a d e av a i l a b l e t o y o u b y R y a n C o m p a n i e s U S , I n c . d u r i n g t h e c o u r s e o f y o u r r e l a t i o n s h i p w i t h Ry a n C o m p a n i e s U S , I n c . .