HomeMy WebLinkAbout2025-09-15 I01F_07 11th & 17th St Culverts_Pmt Est 5AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 15, 2025 AGENDA ITEM:Consideration of approval of Payment Estimate No. 5 to Nagel Construction, LLC., for the 11th & 17th Street Culvert project in the amount of $41,630.17. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Nagel Construction, LLC, requested Payment Estimate No. 5 for the work completed on the 11th & 17th Street Culvert project in the amount of $41,630.17. WHKS & Co. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending August 31, 2025. This pay estimate is for embankment in place, class 10 excavation, flooded backfill, revetment stone, and stabilized construction entrance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $41,630.17 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 5 ATTACHMENTS: I. Letter of Recommendation II.Payment Estimate No. 5 PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1F7 3737 Woodland Avenue, Suite 111 West Des Moines, IA 50266 Phone: 515.226.8859 Email: desmoines@whks.com Website: www.whks.com September 8, 2025 Mr. Rudy Koester, P.E. Director of Public Works / City Engineer City of Waukee 805 University Avenue Waukee, IA 50263 RE: City of Waukee 11th and 17th Street Culverts Pay Estimate No. 5 Dear Mr. Koester: Enclosed is Pay Estimate No. 5 for the above reference project. We have coordinated with the Contractor and City staff performing field observation regarding the actual work completed to date and recommend the City make payment in the amount of $41,630.17 to: Nagel Construction, LLC 2601 140th St. Allerton, IA 50008 3% retainage in the amount of $1,287.53 (for this pay application, $14,297.99 total) should be held by the City until 30 days after project acceptance and completion of any punch list items are completed to the satisfaction of the City. Please contact us if you have any questions. Sincerely, WHKS & CO. Casey V. Faber, P.E. Project Manager cc (w/ enclosures): Lisa Bauman, City of Waukee Sara Kappos, City of Waukee Tracy Lovetinsky, City of Waukee Andy Nichols, City of Waukee Becky Schuett, City of Waukee Andy Nagel, Nagel Construction, LLC 3737 Woodland, Suite 111 West Des Moines, IA 50266 564,004.00$ Project:Reinforced Box Culverts Total Contract Plus Change Orders:564,004.00$ Project No.:9975 Date:9/8/2025 Location:11th and 17th Streets Estimate No.:5 Contractor:Nagel Construction, LLC % Complete:84.5% 11th Street Items 1 EMBANKMENT-IN-PLACE CY $10.00 182.7 $1,827.00 0.0 182.7 182.7 100%1,827.00$ 2 EXCAVATION, CLASS 10, CHANNEL CY $10.00 325.1 $3,251.00 0.0 325.1 325.1 100%3,251.00$ 3 FLOODED BACKFILL CY $55.00 125.0 $6,875.00 0.0 125.0 125.0 100%6,875.00$ 4 EXCAVATION, CLASS 20 CY $15.00 753 $11,295.00 753 0 753 100%11,295.00$ 5 GRANULAR MATERIAL FOR BLANKET CY $50.00 110.2 $5,510.00 168.3 0.0 168.3 153%8,415.00$ 6 STRUCTURAL CONCRETE (RCB CULVERT) CY $585.00 209.8 $122,733.00 209.8 0.0 209.8 100%122,733.00$ 7 REINFORCING STEEL LB $1.35 30,993 $41,840.55 30,993 0 30,993 100%41,840.55$ 8 ORNAMENTAL METAL RAILING LF $300.00 103.0 $30,900.00 0.0 0.0 0%-$ 9 TEMPORARY STREAM DIVERSION EACH $3,000.00 1 $3,000.00 1 0 1 100%3,000.00$ 10 ENGINEERING FABRIC SY $3.00 335.5 $1,006.50 0.0 0.0 0%-$ 11 REVETMENT, CLASS E TON $68.00 240.1 $16,326.80 0.0 120.1 120.1 50%8,166.80$ 12 CONSTRUCTION SURVEY LS $3,000.00 1.00 $3,000.00 1.00 0.00 1.00 100%3,000.00$ 13 MOBILIZATION LS $25,000.00 1.00 $25,000.00 1.00 0.00 1.00 100%25,000.00$ 14 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF $40.00 50.0 $2,000.00 0.0 50.0 50.0 100%2,000.00$ 15 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF $3.50 355.0 $1,242.50 0.0 0.0 0%-$ 17th Street Items 16 EMBANKMENT-IN-PLACE CY $10.00 363.7 $3,637.00 0.0 363.7 363.7 100%3,637.00$ 17 EXCAVATION, CLASS 10, CHANNEL CY $10.00 260.0 $2,600.00 0.0 260.0 260.0 100%2,600.00$ 18 REMOVAL OF EXISTING STRUCTURES LS $9,000.00 1.00 $9,000.00 1.00 0.00 1.00 100%9,000.00$ 19 FLOODED BACKFILL CY $55.00 119.1 $6,550.50 0.0 119.1 119.1 100%6,550.50$ 20 EXCAVATION, CLASS 20 CY $15.00 943 $14,145.00 1,018 0 1,018 108%15,270.00$ 21 GRANULAR MATERIAL FOR BLANKET CY $50.00 117.4 $5,870.00 118.5 0.0 118.5 101%5,925.00$ 22 STRUCTURAL CONCRETE (RCB CULVERT) CY $585.00 223.6 $130,806.00 223.6 0.0 223.6 100%130,806.00$ 23 REINFORCING STEEL LB $1.35 32,887 $44,397.45 32,887 0 32,887 100%44,397.45$ 24 ORNAMENTAL METAL RAILING LF $300.00 132.4 $39,720.00 0.0 0.0 0%-$ 25 TEMPORARY STREAM DIVERSION EACH $3,000.00 1 $3,000.00 1 0 1 100%3,000.00$ 26 ENGINEERING FABRIC SY $3.00 338.3 $1,014.90 0.0 0.0 0%-$ 27 REVETMENT, CLASS E TON $68.00 235.6 $16,020.80 0.0 117.8 117.8 50%8,010.40$ 28 CONSTRUCTION SURVEY LS $3,000.00 1.00 $3,000.00 1.00 0.00 1.00 100%3,000.00$ 29 MOBILIZATION LS $5,000.00 1.00 $5,000.00 1.00 0.00 1.00 100%5,000.00$ 30 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF $40.00 50.0 $2,000.00 50.0 0.0 50.0 100%2,000.00$ 31 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF $3.50 410.0 $1,435.00 0.0 0.0 0%-$ 476,599.70$ PARTIAL PAYMENT ESTIMATE FOR CONSTRUCTION WORK COMPLETED Contract Bid Price: Line No. Description Unit Unit Price Contract Quantity Contract Cost Quantity Completed Previous Estimate Quantity Completed This Estimate Total Quantity Completed to Date Percent Complete Total Dollars To Date