HomeMy WebLinkAbout2025-09-15 I01F_08 U Pl Culvert_Pmt Est 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 15, 2025 AGENDA ITEM:Consideration of approval of Payment Estimate No. 2 to Nagel Construction, LLC., for the U Place Culvert project in the amount of $111,791.63. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Nagel Construction, LLC, requested Payment Estimate No. 2 for the work completed on the U Place Culvert project in the amount of $111,791.63. WHKS & Co. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending August 31, 2025. This pay estimate is for granular material for culvert floor blanket, structural concrete, reinforcing steel, temporary stream diversion, class 20 excavation, and stabilized construction entrance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $111,791.63 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 2 ATTACHMENTS: I. Letter of Recommendation II.Payment Estimate No. 2 PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1F8 3737 Woodland Avenue, Suite 111 West Des Moines, IA 50266 Phone: 515.226.8859 Email: desmoines@whks.com Website: www.whks.com September 8, 2025 Mr. Rudy Koester, P.E. Director of Public Works / City Engineer City of Waukee 805 University Avenue Waukee, IA 50263 RE: City of Waukee U Place Culvert Pay Estimate No. 2 Dear Mr. Koester: Enclosed is Pay Estimate No. 2 for the above reference project. We have coordinated with the Contractor and City staff performing field observation regarding the actual work completed to date and recommend the City make payment in the amount of $111,791.63 to: Nagel Construction, LLC 2601 140th St. Allerton, IA 50008 3% retainage in the amount of $3,457.47 (for this pay application, $4,381.47 total) should be held by the City until 30 days after project acceptance and completion of any punch list items are completed to the satisfaction of the City. Please contact us if you have any questions. Sincerely, WHKS & CO. Casey V. Faber, P.E. Project Manager cc (w/ enclosures): Lisa Bauman, City of Waukee Sara Kappos, City of Waukee Tracy Lovetinsky, City of Waukee Andy Nichols, City of Waukee Becky Schuett, City of Waukee Andy Nagel, Nagel Construction, LLC 3737 Woodland, Suite 111 West Des Moines, IA 50266 346,032.30$ Project:Reinforced Box Culvert Replacement Total Contract Plus Change Orders:346,032.30$ Project No.:9977 Date:9/8/2025 Location:U Place Estimate No.:2 Contractor:Nagel Construction, LLC % Complete:42.2% 1 REMOVAL OF EXISTING STRUCTURES LS $7,000.00 1.00 $7,000.00 0.00 0.00 0%-$ 2 GRANULAR MATERIAL FOR BLANKET CY $50.00 81.0 $4,050.00 0.0 81.0 81.0 100%4,050.00$ 3 STRUCTURAL CONCRETE (RCB CULVERT) CY $585.00 174.4 $102,024.00 0.0 87.2 87.2 50%51,012.00$ 4 REINFORCING STEEL LB $1.30 32,194 $41,852.20 0 16,097 16,097 50%20,926.10$ 5 ORNAMENTAL METAL RAILING LF $275.00 96.0 $26,400.00 0.0 0.0 0%-$ 6 TEMPORARY STREAM DIVERSION EACH $3,000.00 1 $3,000.00 0 1 1 100%3,000.00$ 7 CONSTRUCTION SURVEY LS $2,800.00 1.00 $2,800.00 1.00 0.00 1.00 100%2,800.00$ 8 MOBILIZATION LS $28,000.00 1.00 $28,000.00 1.00 0.00 1.00 100%28,000.00$ 9 CONNECTING TILE TO CULVERT LS $3,000.00 1.00 $3,000.00 0.00 0.00 0%-$ 10 CLEARING AND GRUBBING UNIT $30.00 50.0 $1,500.00 0.0 0.0 0%-$ 11 EMBANKMENT-IN-PLACE CY $8.00 1,670.9 $13,367.20 0.0 0.0 0%-$ 12 EXCAVATION, CLASS 10, CHANNEL CY $8.00 537.5 $4,300.00 0.0 0.0 0%-$ 13 COMPACTING BACKFILL ADJACENT TO BRIDGES, CULVERTS OR STRUCTURES CY $10.00 37.4 $374.00 0.0 0.0 0%-$ 14 COMPACTION WITH MOISTURE CONTROL CY $4.00 1,759.4 $7,037.60 0.0 0.0 0%-$ 15 MACADAM STONE BASE TON $56.00 42.1 $2,357.60 0.0 0.0 0%-$ 16 GRANULAR SURFACING ON ROAD, CLASS C GRAVEL TON $42.00 45.3 $1,902.60 0.0 0.0 0%-$ 17 FLOODED BACKFILL CY $52.00 106.8 $5,553.60 0.0 0.0 0%-$ 18 EXCAVATION, CL 20 CY $15.00 2,337.4 $35,061.00 0.0 2,337.4 2,337.4 100%35,061.00$ 19 APRONS, METAL, 24 IN. DIA. EA $500.00 2.0 $1,000.00 0.0 0.0 0%-$ 20 APRONS CONCRETE FOOTING EA $1,200.00 2.0 $2,400.00 0.0 0.0 0%-$ 21 CULVERT, UNCLASSIFIED ENTRANCE PIPE, 24 IN. DIA. LF $125.00 65.0 $8,125.00 0.0 0.0 0%-$ 22 REMOVE STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. LF $15.00 53.0 $795.00 0.0 0.0 0%-$ 23 ENGINEERING FABRIC SY $2.50 618.7 $1,546.75 0.0 0.0 0%-$ 24 REVETMENT, CLASS B TON $68.00 464.0 $31,552.00 0.0 0.0 0%-$ 25 REVETMENT, REMOVE AND REPLACE CY $30.00 34.0 $1,020.00 0.0 0.0 0%-$ 26 GATE, FIELD FENCE, 22 FT. EA $700.00 1.0 $700.00 0.0 0.0 0%-$ 27 REMOVAL OF FENCE, BARBED WIRE LF $4.00 100.0 $400.00 0.0 0.0 0%-$ 28 REMOVE AND REINSTALL SIGN AS PER PLAN EA $400.00 1.0 $400.00 0.0 0.0 0%-$ 29 SAFETY CLOSURE EA $400.00 2.0 $800.00 0.0 0.0 0%-$ 30 FIRE HYDRANT ADJUSTMENT EA $3,500.00 1.0 $3,500.00 0.0 0.0 0%-$ 31 MULCHING, MECHANICALLY-BONDED FIBER MATRIX ACRE $4,000.00 0.1 $400.00 0.0 0.0 0%-$ 32 SILT FENCE LF $1.75 225.0 $393.75 0.0 0.0 0%-$ PARTIAL PAYMENT ESTIMATE FOR CONSTRUCTION WORK COMPLETED Contract Bid Price: Line No. Description Unit Unit Price Contract Quantity Contract Cost Quantity Completed Previous Estimate Quantity Completed This Estimate Total Quantity Completed to Date Percent Complete Total Dollars To Date 1 of 2