HomeMy WebLinkAbout2025-09-15 I10A-B Kettlestone Community Choice Credit Union_Final Plat, Site Plan AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: September 15, 2025
AGENDA ITEM: Consideration of approval of resolutions approving a final plat for The Shops
at Kettlestone North Plat 9 and a site plan for Kettlestone Community Choice
Credit Union (2870 Grand Prairie Parkway)
FORMAT: Resolutions
SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a final plat and site
plan for commercial development, located west of Grand Prairie Parkway and
north of SE Esker Ridge Drive, containing 2.09-acres.
The project includes the construction of a two-story building that includes
space for Community Choice Credit Union, a restaurant space, and flex space.
The building is 12,023 square feet in area and 28-feet in height. Main
entrances into the building are provided along the west side of the building.
The restaurant space is located within the north portion of the building, and
the credit union is located within the south portion of the building. The flex
space is 2,359 square feet in area and is located on the second floor of the
building.
The site also includes an outdoor patio space located on the north side of the
building for the restaurant space. A trash enclosure is proposed at the north
side of the parking lot. A drive-thru for the credit union is located at the
southwest corner of the site. A monument sign is proposed at the southeast
corner of the site. Wayfinding signage will be provided within the parking lot
in order to guide vehicles to the proposed drive-thru for the credit union.
The final plat includes one lot. The lot is 2.09 acres in area. An ingress-egress
easement is included with the final plat to provide shared access for the
proposed lot and the adjacent lot to the west.
Two accesses are provided to the site. One at the north side of the site from
the private street and one at the south side of the site off of SE Esker Ridge
Drive.
A ten-foot-wide trail will be constructed along the south side of the site,
adjacent to SE Esker Ridge Drive. An existing five-foot-wide sidewalk is
located along the north side of the site. An existing ten-foot-wide trail is
located along the east side of the site, adjacent to Grand Prairie Parkway. A
pedestrian connection will be provided into the site from the proposed trail
along SE Esker Ridge Drive.
A total of 105 parking spaces are required for the proposed site plan. The total
amount of parking proposed is 131 spaces including 5 accessible stalls.
Bicycle parking is also being provided in accordance with the Kettlestone
Design Guidelines.
I10A-B
This site will be serviced with public utilities. Storm water detention is
provided with an underground detention facility, located within the west side
of the parking lot.
A minimum of 20% of the project area is required to be open space. The total
amount of open space proposed is 31%. The landscape plan meets the
requirements of the Landscape and Open Space Ordinance and the Kettlestone
Design Guidelines.
The elevations of the building are proposed to be constructed mostly of brick,
Nichiha fiber cement panels, and storefront system. The trash enclosure will
be constructed of brick to match the building and includes metal gates.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission
reviewed the final plat and site plan request at their meeting on
September 9, 2025, and recommended approval:
Approval of a Final Plat for The Shops at Kettlestone North Plat 9, and Approval of a Site Plan
for Kettlestone Community Choice Credit Union (2870 Grand Prairie Parkway)
Melissa DeBoer, Planning Coordinator, introduced the request for approval of a final plat and site plan
for commercial development, as requested by Community Choice Credit Union, represented by Eric
Cannon of Snyder & Associates.
The property is located west of Grand Prairie Parkway and north of SE Esker Ridge Drive, containing
approximately 2.09 acres. The subject property was previously rezoned from K-OF (Kettlestone
Office District) to K-RC (Kettlestone Retail Community District) in the spring of 2024.
The site plan includes the construction of a two-story building that includes space for Community
Choice Credit Union, a restaurant space, and flex space. The building is 12,023 square feet in area and
28-feet in height. Main entrances into the building are provided along the west side of the building.
The restaurant space is located within the north portion of the building, and the credit union is located
within the south portion of the building. The flex space is 2,359 square feet in area and is located on
the second floor of the building.
The site also includes an outdoor patio space located on the north side of the building for the restaurant
space. A trash enclosure is proposed on the north side of the parking lot. A drive-through for the credit
union is located at the southwest corner of the site. A monument sign is proposed at the southeast
corner of the site. Wayfinding signage will be provided within the parking lot to guide vehicles to the
proposed drive-through for the credit union.
The final plat includes one lot. An ingress-egress easement is included with the final plat to provide
shared access for the proposed lot and the adjacent lot to the west. Two accesses are provided to the
site, one at the north side of the site from the private street and one at the south side of the site from SE
Esker Ridge Drive.
A ten-foot-wide trail will be constructed along the south side of the site, adjacent to SE Esker Ridge
Drive. An existing five-foot-wide sidewalk is located along the north side of the site. An existing ten-
foot-wide trail is located along the east side of the site, adjacent to Grand Prairie Parkway. A
pedestrian connection will be provided into the site from the proposed trail along SE Esker Ridge
Drive. A total of 105 parking spaces is required for the proposed site plan, with 131 parking spaces
proposed, including five accessible stalls. Bicycle parking is also being provided in accordance with
the Kettlestone Design Guidelines
This site will be serviced with public utilities. Storm water detention is provided with an underground
detention facility, located within the west side of the parking lot. A minimum of 20% of the project
area is required to be open space. The total amount of open space proposed is 31%. The landscape plan
meets the requirements of the Landscape and Open Space Ordinance and the Kettlestone Design
Guidelines.
The elevations of the building are proposed to be constructed mostly of brick, Nichiha fiber cement
panels, and storefront system. The trash enclosure will be constructed of brick to match the building
and includes metal gates. A photometric plan for the site lighting has been submitted and complies
with the requirements of the Site Plan Ordinance.
The subject property is located within the Kettlestone Corridor and was includes within the 2015
master plan for the corridor. The land use shown with the Kettlestone Master Plan for the subject
property is Office. The Kettlestone Master Plan is intended to act as a guide for land use while at the
same time allowing for flexibility of land uses. The intent is that the land use designations can move
based upon market demands and the type of development. The proposed site plan still includes office
use in addition it will allow for restaurant use.
The site plan is in general conformance with the Site Plan Ordinance and Kettlestone Design
Guidelines. Staff recommends approval of the final plat and site plan subject to remaining staff
comments and review of legal documents.
Discussion as follows: (None)
Motion by Commissioner Tuel for approval of a Final Plat for The Shops at Kettlestone North Plat 9,
seconded by Commissioner Lohse. Ayes: Broderick, Beenken, Lohse, Tuel, and Bannister. Nays:
None. Motion carried.
Motion by Commissioner Lohse for Approval of a Site Plan for Kettlestone Community Choice Credit
Union (2870 Grand Prairie Parkway, seconded by Commissioner Bannister. Ayes: Broderick,
Beenken, Lohse, Tuel, and Bannister. Nays: None. Motion carried.
RECOMMENDATION: Approve the resolutions.
ATTACHMENTS: I. Proposed Resolutions
II. Staff Report
III. Site Plan
IV. Final Plat
V. Building Elevations
PREPARED BY: Melissa DeBoer, Planning Coordinator
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2025-
APPROVING THE FINAL PLAT FOR THE SHOPS AT KETTLESTONE NORTH PLAT 9
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, COMMUNITY CHOICE CREDIT UNION has requested final plat approval of The
Shops at Kettlestone North Plat 9 (the “Plat”); AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat
on September 9, 2025, subject to remaining staff comments and review of the legal documents; AND,
WHEREAS, the Final Plat for The Shops at Kettlestone North Plat 9 and the documents relating
thereto will comply with section §176 – Subdivision Regulations of the Waukee Municipal Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this
15th day of September, 2025, that the Final Plat for The Shops at Kettlestone North Plat 9 be and the
same is hereby accepted and approved by the City Council of the City of Waukee.
BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements
and documents to be filed with the Plat:
1. Public Ingress/Egress Easement; and
2. Reciprocal Access Easement Agreement
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
R. Charles Bottenberg
Chris Crone
Rob Grove
Anna Bergman Pierce
Ben Sinclair
THE CITY OF WAUKEE, IOWA
RESOLUTION 2025-
APPROVING THE SITE PLAN FOR KETTLESTONE COMMUNITY CHOICE CREDIT
UNION (2870 GRAND PRAIRIE PARKWAY)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for Kettlestone Community Choice Credit Union, subject to remaining staff
comments on September 9, 2025; AND,
WHEREAS, the Site Plan for Kettlestone Community Choice Credit Union is in general
conformance with §160 – Site and Building Development Standards Ordinance of the Waukee
Municipal Code; AND,
WHEREAS, the Site Plan for Kettlestone Community Choice Credit Union is in general
conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal
Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 15th day of September, 2025, that the Site Plan for Kettlestone Community Choice Credit
Union is approved subject to remaining staff comments.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
R. Charles Bottenberg
Chris Crone
Rob Grove
Anna Bergman Pierce
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Kettlestone Community Choice
Credit Union – Site Plan / The Shops at
Kettlestone North Plat 9 – Final Plat
PREPARED BY: Melissa DeBoer, AICP – Planning
Coordinator
REPORT DATE: September 4, 2025
MEETING DATE: September 9, 2025
GENERAL INFORMATION
Owner/Applicant: Community Choice Credit Union
Owner’s Representative: Eric Cannon, P.E. with Snyder & Associates
Request: The applicant is requesting approval of a final plat
and site plan for commercial development.
Location and Size: Property is located west of Grand Prairie Parkway
and north of SE Esker Ridge Drive, containing
approximately 2.09 acres.
Property Address:
2780 Grand Prairie Parkway
AREA MAP
ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area.
September 4, 2025
2 of 3
LAND USES AND ZONING
Location Existing Land Use Kettlestone Master Plan Current Zoning
Property in
Question
Vacant – Undeveloped Office K-RC (Kettlestone Retail
Community District)
North Multi-Family Residential –
Apartments
Office K-MF-HIGH (Kettlestone Multi-
Family Stacked High District)with
a Planned Development
Overlay
South Commercial (McDonald’s)
Retail Community
K-RR (Kettlestone Retail Regional
District) with a Planned
Development Overlay
East Office (Holmes Murphy) Office K-OF (Kettlestone Office District)
West Vacant – Undeveloped Office K-MU (Kettlestone Mixed Use
District) with a Planned
Development Overlay
BACKGROUND
The subject property was previously rezoned from K-OF (Kettlestone Office District) to K-RC (Kettlestone
Retail Community District) in the spring of 2024.
PROJECT DESCRIPTION
The site plan includes the construction of a two-story building that includes space for Community Choice
Credit Union, a restaurant space, and flex space. The building is 12,023 square feet in area and 28-feet in
height. Main entrances into the building are provided along the west side of the building. The restaurant space
is located within the north portion of the building, and the credit union is located within the south portion of
the building. The flex space is 2,359 square feet in area and is located on the second floor of the building.
The site also includes an outdoor patio space located on the north side of the building for the restaurant
space. A trash enclosure is proposed at the north side of the parking lot. A drive-thru for the credit union is
located at the southwest corner of the site. A monument sign is proposed at the southeast corner of the site.
Wayfinding signage will be provided within the parking lot in order to guide vehicles to the proposed drive-
thru for the credit union.
The final plat includes one lot. The lot is 2.09 acres in area. An ingress-egress easement is included with the
final plat to provide shared access for the proposed lot and the adjacent lot to the west.
ACCESS AND PARKING
Two accesses are provided to the site. One at the north side of the site from the private street and one at the
south side of the site off of SE Esker Ridge Drive.
A ten-foot-wide trail will be constructed along the south side of the site, adjacent to SE Esker Ridge Drive. An
existing five-foot-wide sidewalk is located along the north side of the site. An existing ten-foot-wide trail is
located along the east side of the site, adjacent to Grand Prairie Parkway. A pedestrian connection will be
provided into the site from the proposed trail along SE Esker Ridge Drive.
September 4, 2025
3 of 3
A total of 105 parking spaces are required for the proposed site plan. The total amount of parking proposed is
131 spaces including 5 accessible stalls. Bicycle parking is also being provided in accordance with the
Kettlestone Design Guidelines.
UTILITIES
This site will be serviced with public utilities. Storm water detention is provided with an underground
detention facility, located within the west side of the parking lot.
LANDSCAPING & OPEN SPACE
A minimum of 20% of the project area is required to be open space. The total amount of open space
proposed is 31%. The landscape plan meets the requirements of the Landscape and Open Space Ordinance
and the Kettlestone Design Guidelines.
ELEVATIONS
The elevations of the building are proposed to be constructed mostly of brick, Nichiha fiber cement panels,
and storefront system. The trash enclosure will be constructed of brick to match the building and includes
metal gates.
PHOTOMETRIC PLAN
A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan
Ordinance.
COMPREHENSIVE PLAN
The subject property is located within the Kettlestone Corridor and was includes within the 2015 master plan
for the corridor. The land use shown with the Kettlestone Master Plan for the subject property is Office. The
Kettlestone Master Plan is intended to act as a guide for land use while at the same time allowing for flexi bility
of land uses. The intent is that the land use designations can move based upon market demands and the type
of development. The proposed site plan still includes office use in addition it will allow for restaurant use.
STAFF RECOMMENDATION
The site plan is in general conformance with the Site Plan Ordinance and Kettlestone Design Guidelines. Staff
recommends approval of the final plat and site plan subject to remaining staff comments and review of the
legal documents.
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
0
'
12
4
.
0
1
1
5
.
0
1
C1
0
0
124.0115.01
C100
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
TI
T
L
E
S
H
E
E
T
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
T
S
H
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
TI
T
L
E
S
H
E
E
T
,
20
2
5
/
0
9
/
0
2
,
9:
3
2
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 200
SITE PLAN
FOR
KETTLESTONE COMMUNITY
CHOICE CREDIT UNION
2780 GRAND PRAIRIE PARKWAY
CITY OF WAUKEE, DALLAS COUNTY, IOWA
OWNER
COMMUNITY CHOICE CREDIT UNION
6163 NW 86TH ST, STE 105
JOHNSTON, IA 50131
SNYDER & ASSOCIATES
2727 SW SNYDER BLVD.
ANKENY, IOWA 50023
CONTACT: ERIC CANNON, P.E.
PHONE: (515) 964-2020
VICINITY MAP
PROJECT LOCATION
ENGINEER
SE
E
S
K
E
R
R
I
D
G
E
D
R
S
E
E
N
C
O
M
P
A
S
S
D
R
C100-C401, C600-C601
P
E
F
RO
S
S
O
N
LA
I
AC PNALCDS
CARH
E
CE
T
TII
A ETST F IO
AW
O
License Expires:
June 30, 2026
NICHOLAS L
HUSS
835
LANDSCAPE
ARCHITECT
NO.
Nicholas L. Huss, PLA
License Number
Pages or sheets covered by this seal:
835
Date
I hereby certify that the portion of this technical
submission described below was prepared by me
or under my direct supervision and responsible
charge. I am a duly licensed Professional
Landscape Architect under the laws of the
State of Iowa.
C500GR
A
N
D
P
R
A
I
R
I
E
P
K
W
Y
I hereby certify that this engineering document
was prepared by me or under my direct personal
supervision and that I am a duly licensed
Professional Engineer under the laws of the
State of Iowa.
Eric D. Cannon, P.E.Date
License Number P18954
My License Renewal Date is December 31, 2025
Pages or sheets covered by this seal:
ERIC D.
CANNON
P18954
D P R O F E
L
NS E
ICE
IONAL
E
N
G
I
N
E
ER
AIOW
SS
Sheet List Table
Sheet Number Sheet Title
C100 TITLE SHEET
C101 PROJECT INFORMATION
C200 DIMENSION PLAN
C300 UTILITY PLAN
C400 EROSION CONTROL PLAN
C401 DETAILED GRADING PLAN
C402 RAMP DETAILS
C500 PLANTING PLAN
C600 SITE DETAILS
C601 SITE DETAILS
ARCHITECT
J CORP DESIGN BUILD
3611 NE OTTERVIEW CIRCLE #42
ANKENY, IOWA 50021
CONTACT: NICK JENSEN
PHONE: (515) 290-3401
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
--
-
-
12
4
.
0
1
1
5
.
0
1
C1
0
1
124.0115.01
C101
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
PR
O
J
E
C
T
I
N
F
O
R
M
A
T
I
O
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
T
S
H
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
PR
O
J
E
C
T
I
N
F
O
R
M
A
T
I
O
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
2
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
UTILITY QUALITY SERVICE LEVELS
QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH
THE UTILITY TYPE AND WHEN APPLICABLE, SIZE. THE QUALITY LEVELS
ARE BASED ON THE CI / ASCE 38-02 STANDARD.
QUALITY LEVEL (D) INFORMATION IS DERIVED FROM EXISTING UTILITY
RECORDS OR ORAL RECOLLECTIONS.
QUALITY LEVEL (C) INFORMATION IS OBTAINED BY SURVEYING AND
PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND USING
PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH
QUALITY D INFORMATION.
QUALITY LEVEL (B) INFORMATION IS OBTAINED THROUGH THE
APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO
DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF
SUBSURFACE UTILITIES.
QUALITY LEVEL (A) IS HORIZONTAL AND VERTICAL POSITION OF
UNDERGROUND UTILITIES OBTAINED BY ACTUAL EXPOSURE OR
VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL
AS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS.
UTILITY WARNING
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR
MAKES NO GUARANTEE THAT THE UTILITIES OR SUBSURFACE
FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA,
EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER
DOES NOT WARRANT THAT THE UTILITIES OR SUBSURFACE
FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED
EXCEPT WHERE NOTED AS QUALITY LEVEL A.
FEATURES EXISTING PROPOSED
Spot Elevation
Contour Elevation
Fence (Barbed, Field, Hog)
Fence (Chain Link)
Fence (Wood)
Fence (Silt)
Tree Line
Tree Stump
Deciduous Tree \\ Shrub
Coniferous Tree \\ Shrub
Communication
Overhead Communication
Fiber Optic
Underground Electric
Overhead Electric
Gas Main with Size
High Pressure Gas Main with Size
Water Main with Size
Sanitary Sewer with Size
Duct Bank
Test Hole Location for SUE w/ID
(*) Denotes the survey quality service level for utilities
Sanitary Manhole
Storm Sewer with Size
Storm Manhole
Single Storm Sewer Intake
Double Storm Sewer Intake
Fire Hydrant
Fire Hydrant on Building
Water Main Valve
Water Service Valve
Well
Utility Pole
Guy Anchor
Utility Pole with Light
Utility Pole with Transformer
Street Light
Yard Light
Electric Box
Electric Transformer
Traffic Sign
Communication Pedestal
Communication Manhole
Communication Handhole
Fiber Optic Manhole
Fiber Optic Handhole
Gas Valve
Gas Manhole
Gas Apparatus
Fence Post or Guard Post
Underground Storage Tank
Above Ground Storage Tank
Sign
Satellite Dish
Mailbox
Sprinkler Head
Irrigation Control Valve
LEGEND
○
1
2
2
5
X 1225.25
●
X
1
2
2
5
1225.25
FEATURES FOUND SET
Section Corner
1/2" Rebar, Cap # 11579
(Unless Otherwise Noted)
ROW Marker
ROW Rail
Control Point
Bench Mark
Platted Distance P
Measured Bearing & Distance M
Recorded As R
Deed Distance D
Calculated Distance C
Minimum Protection Elevation MPE
Centerline
Section Line
1/4 Section Line
1/4 1/4 Section Line
Easement Line
NOTES
A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS NECESSARY DURING
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES
AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE
REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE.
B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE 2025 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS,
2025 STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) AND THE SOILS REPORTS PREPARED BY OTHERS.
C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE.
D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE
MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED
LANE CLOSURE.
E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO NOTIFY THE CITY OF WAUKEE
COMMUNITY DEVELOPMENT DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR HOLIDAY WORK.
F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% MAXIMUM DENSITY.
G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN.
H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY ON THE AS-BUILT DOCUMENTS.
I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF DESIGN. DEVIATIONS MAY BE
NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE
ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS
PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE
SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF WAUKEE STANDARDS.
J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE PROJECT TO AN APPROVED OFF-SITE
WASTE SITE.
K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES TO CONFORM TO
SUDAS SPECIFICATIONS SECTION 2010.
L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED.
M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION
ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT.
N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK.
O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL
CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A COSESCO PERMIT IS REQUIRED FOR THIS PROJECT.
P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH UTILITY SERVICE PROVIDER, CITY
OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION.
Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER SHALL BE CONSTRUCTED OF
REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE
CROSSING UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN TO THE STORM SEWER IS AT LEAST TEN FEET.
R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO CONSTRUCTION ACTIVITIES BEGINNING.
S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING PEDESTRIAN FACILITIES.
T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE COMMUNITY DEVELOPMENT
DEPARTMENT PRIOR TO CONSTRUCTION.
U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL IN WRITING BY THE CITY OF
WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT.
V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS ALL CLEANING AND
TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED.
W. ALL CONNECTIONS TO EXISTING SANITARY MANHOLES SHALL BE CORE DRILL WITH A LINK SEAL.
X. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT BETWEEN SIDEWALKS AND PCC PAVEMENT.
THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS SHALL BE SEALED.
Y. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT GRADES FOR DRAINAGE SWALES,
OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON
THE RECORD AS-BUILT DRAWINGS.
Z. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND ALL
UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING.
AA. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY FROM CONCRETE OPERATIONS TO
DISCHARGE OFFSITE.
BB. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AND CITY OF WAUKEE PUBLIC WORKS
SHALL WITNESS ALL TIE-INS.
CC. ALL SIGNAGE IS TO BE REVIEWED UNDER SEPARATE SIGN PERMIT PROCESS.
DD. ANY FUTURE BUILDING WILL REQUIRE A SEPARATE SITE PLAN APPROVAL.
GENERAL USE
CREDIT UNION/ RESTAURANT
PROPERTY DESCRIPTION
THE SHOPS AT KETTLESTONE NORTH PLAT 1, OUTLOT U
PROPERTY ADDRESS
2780 GRAND PRAIRIE PARKWAY
WAUKEE, IOWA 50263
ZONING
K-RC: KETTLESTONE RETAIL COMMUNITY ZONING DISTRICT
OPEN SPACE
SITE AREA: 91,225 SF (2.09 AC)
IMPERVIOUS AREA:64,309 SF (70.5%)
OPEN SPACE AREA:26,916 SF (29.5%)
BULK REGULATIONS
LOT AREA = NONE
FRONT YARD= NONE, 20' FOR ACCESSORY STRUCTURES
SIDE YARD = NONE, 5' FOR ACCESSORY STRUCTURES
REAR YARD = NONE, 5' FOR ACCESSORY STRUCTURES
MINIMUM OPEN SPACE = 20%
PARKING REQUIREMENTS
RESTAURANT:
15 PER /1,000 SF
4,945 SF/ 1,000 X 15 = 75 SPACES REQUIRED
CREDIT UNION:
3 PER /1,000 SF
2,278 SF/ 1,000 X 3 = 7 SPACES REQUIRED
FLEX SPACE:
8 PER /1,000 SF
2,359 SF/ 1,000 X 8 = 19 SPACES REQUIRED
GENERAL:
1 PER /1,000 SF
1,319 SF/ 1,000 X 1 = 2 SPACES REQUIRED
PATIOS:
1 PER /1,000 SF
1,122 SF/ 1,000 X 1 = 2 SPACES REQUIRED
TOTAL SPACES REQUIRED= 105 SPACES
TOTAL SPACES PROVIDED = 131 SPACES
(INCLUDING 5 ACCESSIBLE STALLS)
BICYCLE PARKING PER KETTLESTONE DESIGN GUIDELINES:
3% OF REQUIRED AUTO SPACES
.03 X 105 = 4 SPACES
BUILDING DESCRIPTION
BUILDING 1ST FLOOR= 9,335 SF
BUILDING 2ND FLOOR= 2,688 SF
TOTAL BUILDING= 12,023 SF
BUILDING HEIGHT= 28'-0" (2 STORY)
PROPOSED FLOOR AREA RATION = 0.10
POLLUTION PREVENTION NOTES
A.POLLUTION PREVENTION AND EROSION PROTECTION
1.CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL
POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE,
THE IOWA DEPARTMENT OF NATURAL RESOURCES (IDNR) NPDES PERMIT, THE U.S. CLEAN
WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL
NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT
SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A
RESULT OF PERFORMANCE.
2.DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER
HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM
DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE
ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE
NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH
COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED
NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO
THE CONTRACTOR.
B.STORM WATER DISCHARGE PERMIT
1.THIS PROJECT REQUIRES COVERAGE UNDER THE NPDES GENERAL PERMIT NO. 2 FOR
STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FROM THE
IDNR, AS REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THE GENERAL
CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR COMPLIANCE WITH
AND FULFILLMENT OF ALL REQUIREMENTS OF THE NPDES GENERAL PERMIT NO. 2 AS
SPECIFIED IN THE CONTRACT DOCUMENTS.
2.ALL DOCUMENTS RELATED TO THE STORM WATER DISCHARGE PERMIT, INCLUDING, BUT
NOT LIMITED TO, THE NOTICE OF INTENT, PROOF OF PUBLICATIONS, DISCHARGE
AUTHORIZATION LETTER, CURRENT SWPPP, SITE INSPECTION LOG, AND OTHER ITEMS,
SHALL BE KEPT ON SITE AT ALL TIMES AND MUST BE PRESENTED TO ANY JURISDICTIONAL
AGENCIES UPON REQUEST. FAILURE TO COMPLY WITH THE NPDES PERMIT
REQUIREMENTS IS A VIOLATION OF THE CLEAN WATER ACT AND THE CODE OF IOWA.
3.A "NOTICE OF DISCONTINUATION" MUST BE FILED WITH THE IDNR UPON FINAL
STABILIZATION OF THE DISTURBED SITE AND REMOVAL OF ALL TEMPORARY EROSION
CONTROL MEASURES. ALL PLANS, INSPECTION REPORTS, AND OTHER DOCUMENTS MUST
BE RETAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION. THE
CONTRACTOR SHALL RETAIN A RECORD COPY AND PROVIDE THE ORIGINAL DOCUMENTS
TO THE OWNER UPON PROJECT ACCEPTANCE AND/OR SUBMITTAL OF THE NOTICE OF
DISCONTINUATION.
C.POLLUTION PREVENTION PLAN
1.THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE DOCUMENT IN
ADDITION TO THESE PLAN DRAWINGS. THE CONTRACTOR SHOULD REFER TO THE SWPPP
FOR ADDITIONAL REQUIREMENTS AND MODIFICATIONS TO THE POLLUTION PREVENTION
PLAN MADE DURING CONSTRUCTION.
2.THE SWPPP ILLUSTRATES GENERAL MEASURES AND BEST MANAGEMENT PRACTICES
(BMP) FOR COMPLIANCE WITH THE PROJECT'S NPDES PERMIT COVERAGE. ALL BMP'S AND
EROSION CONTROL MEASURES REQUIRED AS A RESULT OF CONSTRUCTION ACTIVITIES
ARE THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, NOTE AND IMPLEMENT.
ADDITIONAL BMP'S FROM THOSE SHOWN ON THE PLAN MAY BE REQUIRED.
3.THE SWPPP AND SITE MAP SHOULD BE EXPEDITIOUSLY REVISED TO REFLECT
CONSTRUCTION PROGRESS AND CHANGES AT THE PROJECT SITE.
4.THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL REQUIREMENTS OF THE
GENERAL PERMIT AND SWPPP, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S
UNLESS INFEASIBLE OR NOT APPLICABLE:
a.UTILIZE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN
DISCHARGING FROM BASINS, PROVIDE AND MAINTAIN NATURAL BUFFERS AROUND
SURFACE WATERS, DIRECT STORM WATER TO VEGETATED AREAS TO INCREASE
SEDIMENT REMOVAL AND MAXIMIZE STORM WATER INFILTRATION, AND MINIMIZE SOIL
COMPACTION.
b.INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT
BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS
DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING
OPERATIONS.
c.PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND
LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT
ANY TIME.
d.MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN
WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT
REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL
DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY.
e.INSPECT THE PROJECT AREA AND CONTROL DEVICES (BY QUALIFIED PERSONNEL
ASSIGNED BY THE CONTRACTOR) EVERY SEVEN CALENDAR DAYS. RECORD THE
FINDINGS OF THESE INSPECTIONS AND ANY RESULTING ACTIONS IN THE SWPPP WITH A
COPY SUBMITTED WEEKLY TO THE OWNER OR ENGINEER DURING CONSTRUCTION.
REVISE THE SWPPP AND IMPLEMENT ANY RECOMMENDED MEASURES WITHIN 7 DAYS.
f.PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON
ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS,
SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY
ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR
FUTURE PREVENTION.
g.INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION
CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR
FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE
CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS
SOON AS STORM SEWERS ARE INSTALLED.
h.RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD)
ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER
IMPROVEMENTS ARE LOCATED.
i.STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX,
PERMANENT SEED MIX, SOD, OR PAVEMENT IMMEDIATELY AS SOON AS POSSIBLE UPON
COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES
IMMEDIATELY AFTER CONSTRUCTION ACTIVITY IS FINALLY COMPLETED OR
TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WHICH WILL NOT RESUME
FOR A PERIOD EXCEEDING 14 CALENDAR DAYS.
j.COORDINATE LOCATIONS OF STAGING AREAS WITH THE OWNER AND RECORD IN THE
SWPPP. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE
FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY
SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY.
CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT
BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE
POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED ONSITE.
k.REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND SITE WASTE PRIOR TO
FILING OF THE "NOTICE OF DISCONTINUATION".
UTILITY CONTACT INFORMATION
UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM THE IOWA
ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552402093.
FO1-FIBER OPTIC CENTURYLINK
SADIE HULL
(918)-547-0147
SADIE.HULL@LUMEN.COM
FO14-FIBER OPTIC CONSOLIDATED COMMUNICATIONS
PHILLIP WILLIAMS JR
(515)-867-4769
PHILLIP.WILLIAMS@CONSOLIDATED.COM
FO4-FIBER OPTIC AUREON NETWORK SERVICES
JEFF KLOCKO
(515)-830-0445
JEFF.KLOCKO@AUREON.COM
UE1-UNDERGROUND ELECTRIC MIDAMER-ELEC
JAMIE NEER
(515)-252-6972
MECDSMDESIGNLOCATES@MIDAMERICAN.COM
NO RESPONSE MI-FIBER
JUSTIN MILLER
(515)-897-8802
JMILLER@MI-FIBER.NET
FO8-FIBER OPTIC UNITE PRIVATE NETWORKS,LLC
JOE KILZER
(816)-425-3556
UPNGIS@UPNFIBER.COM
W1-WATER MAIN WAUKEE, CITY OF
ST1-STORM SEWER TIM ROYER
(515)-987-4363
TROYER@WAUKEE.ORG
CONTROL POINTS
IOWA SOUTH STATE PLANE COORDINATE SYSTEM
NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET
CP1 N=576871.36 E=1543103.37 Z=1042.23
CUT 'X' SOUTH CURB SE ESKER RIDGE DRIVE, WEST SIDE OF
MCDONALDS ENTRANCE, +/-400' WEST OF GRAND PRAIRIE PARKWAY
CP2 N=576711.21 E=1543406.88 Z=1038.99
CUT 'X' SOUTH CURB SE ESKER RIDGE DRIVE, +/-25' WEST OF GRAND
PRAIRIE PARKWAY, +/-25' EAST OF DOUBLE CURB INTAKE
CP3 N=577228.02 E=1543322.21 Z=1036.07
CUT 'X' NORTH CURB SE ENCOMPASS DRIVE, WEST SIDE OF PARKING
LOT ENTRANCE, +/-300' WEST OF GRAND PRAIRIE PARKWAY
CP4 N=577072.91 E=1543604.63 Z=1034.44
CUT 'X' NORTH CURB SE ENCOMPASS DRIVE, WEST EDGE CURB DROP,
+/-25' WEST OF GRAND PRAIRIE PARKWAY, +/-25' EAST OF CURB INTAKE
BENCHMARKS
NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A)
IARTN DERIVED - US SURVEY FEET
BM500 N=577169.-- E=1543437.-- ELEV=1036.49
BURY BOLT ON HYDRANT, +/-5' NORTH OF SE ENCOMPASS DRIVE,
+/-225' WEST OF GRAND PRAIRIE PARKWAY
DATE OF SURVEY
APRIL 8, 2024
FIRE SAFETY CONSTRUCTION NOTE
A. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO
BUILDING CONSTRUCTION COMMENCING AFTER FOOTING INSTALLED, AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN
100 FEET OF ALL PORTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE IFC.
TRASH
14
16
18
15
17
16
12
9
3
11
30' Ingress/ Egress Easement
T
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
R
UP
32
0
9
S
F
RE
S
T
A
U
R
A
N
T
88
6
S
F
LO
U
N
G
E
22
2
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
68
4
S
F
EN
T
R
Y
11
2
2
S
F
RE
S
T
A
U
R
A
N
T
P
A
T
I
O
19
8
S
F
WO
M
E
N
15
8
S
F
ME
N
BA
R
11
9
6
S
F
KI
T
C
H
E
N
73
S
F
UT
I
L
I
T
I
E
S
33
1
S
F
BR
E
A
K
R
M
VE
N
T
CH
A
S
E
AB
O
V
E
AP
P
R
O
X
.
HO
O
D
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
9
S
F
OF
F
I
C
E
13
4
S
F
OF
F
I
C
E
12
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
13
7
S
F
I.
T
.
/
D
A
T
A
31
8
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
IN
S
I
D
E
F
R
Y
E
R
G
R
E
A
S
E
T
A
N
K
R
E
C
L
A
M
A
T
I
O
N
-
SP
I
G
O
T
N
E
E
D
E
D
-
M
I
N
I
M
I
Z
E
A
P
P
E
A
R
A
N
C
E
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
13
5
S
F
OF
F
I
C
E
PROPOSED
BUILDING
9,335 SF
FFE= 1041.40
1
4
BM50
0
Intake = 1041.66
FL = 1036.01 15" RCP S
Intake = 1041.64
FL = 1035.59 15" RCP N
Intake = 1037.96
FL = 1034.51 15" RCP S
Rim = 1041.69
FL = 1031.49 24" RCP SW
FL = 1031.39 24" RCP NE
FL = 1029.70 24" RCP SW
FL = 1029.50 30" RCP NE
Intake = 1033.70
FL = 1029.35 24" RCP N
Intake = 1033.97
FL = 1030.62 15" RCP N
Storm C/O Rim = 1034.51
No Pa
r
k
i
n
g
Stop
Sidewalk
Concrete
Si
d
e
w
a
l
k
Co
n
c
r
e
t
e
Concrete
Concrete
SE Esker Ridge
D
r
Gr
a
n
d
P
r
a
i
r
i
e
P
k
w
y
Co
n
c
r
e
t
e
SE Encompass
D
r
Comm
u
n
i
t
y
C
h
o
i
c
e
S
i
g
n
Existin
g
1
0
'
W
i
d
e
T
r
a
i
l
Existin
g
5
'
Wide S
i
d
e
w
a
l
k
18'24'19'19'24'19'19'24'19'19'25'
12
.
5
'
6'
12
.
5
'
5'
18
'
24
'
8.
5
'
11
'
9'
10'24'18'6'8.1'
25
.
9
'
5'
R
5
0
'
R
7
4
'
R3.5'
R5'
R
5
'
R
5
'
R
5
'
R
1
5
'
R2
5
'
R2
5
'
R
2
5
'
R
3
'
R
3
'
R
2
5
'
R
2
5
'
R10
'
R
1
0
'
R2
5
'
R2
5
'
R25'R
2
5
'
R5'
R
5
'
23'
14
'
5'
5'
R
5
'
R5'
R5'
R5
'
R
5
'
R5'
R4'
R
4
'
R4'
R
4
'R4'
R
4
'
R
5
'
R
5
'
R
1
5
'
R5'
R
5
'
R5'
R
5
'
R5'
R5'
9'
9.
5
'
8'
R
5
'
R
2
5
'
R25'
10
.
4
'
6'
10
'
S2
6
°
5
5
'
1
9
"
W
3
2
2
.
7
1
'
M
S2
6
°
4
1
'
3
0
"
W
3
2
2
.
7
1
'
P
Outlot
'
U
'
The S
h
o
p
s
At Ket
t
l
e
s
t
o
n
e
N
o
r
t
h
Plat
1
(Bk 2
0
1
7
,
P
g
3
2
5
6
)
91,225 SF
2.09 AC
LOT 1
N61°28'13"W
3
0
2
.
5
8
'
M
N61°42'02"W
3
0
2
.
5
8
'
P
S84°43'28"E 45.79' M
S69°23'26"E
83.03' M
S69°37'15"E 83.03' P
N67°46'32"E 25.00' M
N67°32'43"E 25.00' P
C1
C2
C3
Existin
g
1
5
'
P
U
E
(Book
2
0
1
3
,
P
a
g
e
1
0
3
8
7
)
Existin
g
3
0
'
S
t
o
r
m
S
e
w
e
r
E
a
s
e
m
e
n
t
(Book
2
0
1
7
,
P
a
g
e
3
2
6
6
)
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
2A
3C
2C
2D
5A
4B4C
4C4B
5A
7
6B
6A
2B
2B
3H
3H
3I
3I
3J
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
6C
6C
1A
1A
2E
1A
2A3C
3E
3E
3D
3D
3D
4A
4A
4A
4A
4A
4A
4A
4A
3F
3F
3F
3F
1B
1B
1B
1B
1B
1B
1B
1B
1B
3G
3G
3B
3B
3B
1A
1A
1A
4C4B
3D
3K
6E
1A
1A
6D 6H
6G
6G
3H
PROPOSED 10' WIDE TRAIL
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
25' B/B
18
'
24
'
10
'
9.
5
'
9'
13
8
.
2
'
67'
R15
'
9'
9'
5'
9.
5
'
3B
5'
6F
4A
4C
2'
9.5'9'
9.
5
'
9'
9.5'9'
1B
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
D
I
M
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
DI
M
E
N
S
I
O
N
P
L
A
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
2
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 20
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
'
12
4
.
0
1
1
5
.
0
1
C2
0
0
124.0115.01
C200
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
DI
M
E
N
S
I
O
N
P
L
A
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
DIMENSION PLAN CONSTRUCTION NOTES
1. PROTECT ALL SITE FEATURES NOT SCHEDULED FOR DEMOLITION OR MODIFICATION. ANY
DAMAGES TO ITEMS NOT SHOWN FOR REMOVAL SHALL BE REPAIRED BY THE
CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION.
A.EXISTING UTILITIES. COORDINATE ANY NECESSARY RELOCATIONS OR ADJUSTMENTS
WITH THE OWNER AND UTILITY PROVIDER PRIOR TO CONSTRUCTION. ADJUSTMENTS
OF UTILITY APPURTENANCE TO FINISH GRADE IS CONSIDERED INCIDENTAL TO THE
PROJECT.
B.EXISTING PAVEMENTS TO REMAIN.
2. DEMOLITION. REMOVE AND DISPOSE OF THE FOLLOWING EXISTING ITEMS:
A.GRIND CURB AT DRIVEWAY CONNECTION LOCATIONS.
B.REMOVE EXISTING SIGNAGE AND RELOCATE.
C.REMOVE EXISTING CASTING AND REPLACE WITH TYPE Q CASTING. ADJUST RIM TO
PROPOSED GRADE.
D.REMOVE EXISTING SIDEWALK TO LIMITS SHOWN.
E.ADJUST MANHOLE TO GRADE. SEE UTILITY PLAN FOR MORE INFORMATION.
3. PAVEMENTS, PROVIDE THE FOLLOWING:
A.6" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95%
STANDARD PROCTOR DENSITY. (C4 PCC MIX).
B.4" DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95%
STANDARD PROCTOR DENSITY. PROVIDE 6" DEPTH PCC RAMP AT DRIVEWAY
ENTRANCES.
C.CONNECT TO EXISTING PAVEMENTS WITH SUDAS TYPE "A" CONNECTION.
D.6" STANDARD CURB.
E.PEDESTRIAN RAMP WITH A MAXIMUM SLOPE OF 8.33%. PROVIDE DETECTABLE
WARNING SYSTEM AT RAMPS WHERE PEDESTRIAN TRAFFIC MEETS VEHICULAR
TRAFFIC. 6" DEPTH PCC RAMP.
F.6" DEPTH PCC TRAIL. CONNECT TO EXISTING AT NEAREST JOINT.
G.8" DEPTH PCC PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95%
STANDARD PROCTOR DENSITY. (C4 PCC MIX)
H.ADA ACCESSIBLE RAMP AT 8.33% MAXIMUM SLOPE. TAPER FROM 6" INTEGRAL CURB
TO NO CURB. 6" DEPTH PCC RAMP.
I.6" INTEGRAL CURB AND SIDEWALK.
J.PRECAST PCC PARKING BARRIER.
K.OUTDOOR PATIO AREA. REFER TO ARCHITECTURAL PLANS FOR PAVEMENT DEPTH.
4. PAVEMENT MARKINGS PROVIDE THE FOLLOWING:
A.4" WIDE PAINTED PARKING STALL LINES, COLOR AS PER OWNER.
B.PAINTED STATE OF IOWA APPROVED ACCESSIBLE SYMBOL.
C.45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN.
5. ACCESSIBLE PARKING SIGNAGE:
A.PROVIDE SIGN WITH VAN ACCESSIBLE SYMBOL AS PER "ADAAG" STANDARDS.
6. SITE AMENITIES, PROVIDE THE FOLLOWING:
A.TRASH ENCLOSURE. SEE ARCHITECTURAL PLANS FOR DETAILS.
B.ITM WITH CANOPY. SEE ARCHITECTURAL PLANS FOR DETAILS.
C.SEGMENTAL BLOCK RETAINING WALL. COLOR AS PER OWNER. THE RETAINING WALL
WILL BE REQUIRED TO BE DESIGNED BY A STRUCTURAL ENGINEER LICENSED IN THE
STATE OF IOWA.
D.TRANSFORMER LOCATION.
E.RELOCATED "NO PARKING" SIGN.
F.TWO BIKE PARKING STALLS WITH ONE LOOP BIKE RACK.
G.ITM WAYFINDING SIGN.
H.MONUMENT SIGN.
7. SEE ARCHITECTURAL AND STRUCTURAL PLANS FOR DETAILED BUILDING CONSTRUCTION
INFORMATION.
8. THE CITY OF WAUKEE IS NOT RESPONSIBLE FOR PAVEMENT REPLACEMENT WITHIN THE
EXISTING 30' STORM SEWER EASEMENT IF PAVEMENT NEEDS TO BE REMOVED FOR
MAINTENANCE OF THE STORM SEWER.
TRASH
14
16
18
15
17
16
12
9
3
11
30' Ingress/ Egress Easement
T
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
R
UP
32
0
9
S
F
RE
S
T
A
U
R
A
N
T
88
6
S
F
LO
U
N
G
E
22
2
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
68
4
S
F
EN
T
R
Y
11
2
2
S
F
RE
S
T
A
U
R
A
N
T
P
A
T
I
O
19
8
S
F
WO
M
E
N
15
8
S
F
ME
N
BA
R
11
9
6
S
F
KI
T
C
H
E
N
73
S
F
UT
I
L
I
T
I
E
S
33
1
S
F
BR
E
A
K
R
M
VE
N
T
CH
A
S
E
AB
O
V
E
AP
P
R
O
X
.
HO
O
D
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
9
S
F
OF
F
I
C
E
13
4
S
F
OF
F
I
C
E
12
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
13
7
S
F
I.
T
.
/
D
A
T
A
31
8
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
IN
S
I
D
E
F
R
Y
E
R
G
R
E
A
S
E
T
A
N
K
R
E
C
L
A
M
A
T
I
O
N
-
SP
I
G
O
T
N
E
E
D
E
D
-
M
I
N
I
M
I
Z
E
A
P
P
E
A
R
A
N
C
E
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
13
5
S
F
OF
F
I
C
E
PROPOSED
BUILDING
9,335 SF
FFE= 1041.40
6"
W
6" W
6" SAN
100-Y
R
E
L
E
V
:
1
0
3
5
.
8
7
'
100-Y
R
E
L
E
V
:
1
0
3
8
.
6
3
150
'
H
y
d
r
a
n
t
C
o
v
e
r
a
g
e
(
T
y
p
)
150' Hydra
n
t
C
o
v
e
r
a
g
e
(
T
y
p
)
1
4
BM50
0
Intake = 1041.66
FL = 1036.01 15" RCP S
Intake = 1037.96
FL = 1034.51 15" RCP S
Rim = 1041.69
FL = 1031.49 24" RCP SW
FL = 1031.39 24" RCP NE
Intake = 1035.00
FL = 1029.70 24" RCP SW
FL = 1029.50 30" RCP NE
Intake = 1033.70
FL = 1029.35 24" RCP N
Intake = 1033.97
FL = 1030.62 15" RCP N
Storm C/O Rim = 1034.51
No Pa
r
k
i
n
g
Stop
Sidewalk
Concrete
Si
d
e
w
a
l
k
Co
n
c
r
e
t
e
Concrete
Concrete
SE Esker Ridge
D
r
Gr
a
n
d
P
r
a
i
r
i
e
P
k
w
y
Co
n
c
r
e
t
e
SE Encompass
D
r
Comm
u
n
i
t
y
C
h
o
i
c
e
S
i
g
n
Existin
g
1
0
'
W
i
d
e
T
r
a
i
l
Existin
g
5
'
Wide S
i
d
e
w
a
l
k
ST-3, 30'' NYLOPLAST DRAIN BASIN
W/ SOLID LID
RIM: 1038.24
INV: 1031.84 (OUT NW)
ST-2, 30'' NYLOPLAST DRAIN BASIN
W/ STANDARD GRATE
RIM: 1038.00
INV: 1032.50 (IN SE)
INV: 1031.84 (OUT NE)
ST-1B, 30'' NYLOPLAST DRAIN BASIN
W/ SOLID LID
RIM: 1036.92
INV: 1031.84 (IN NE)
INV: 1032.50 (IN SE)
INV: 1031.84 (OUT SW)
ST-1, INTAKE, SW-501
T/C: 1036.10
INV: 1032.06 (OUT SW)
CONNECT TO EXISTING MANHOLE
ADJUST RIM: 1038.38
INV: 1031.80 (IN SE)
72 LF OF 18" HDPE @ 0.30%
14 LF OF 18" HDPE @ 0.30%
1A
1A 1A
1A
1A
2C
2A
2A 2D
2B
3D
3C
3A
2E
3B
Outlot
'
U
'
The S
h
o
p
s
At Ket
t
l
e
s
t
o
n
e
N
o
r
t
h
Plat
1
(Bk 2
0
1
7
,
P
g
3
2
5
6
)
91,225 SF
2.09 AC
LOT 1
Existin
g
1
5
'
P
U
E
(Book
2
0
1
3
,
P
a
g
e
1
0
3
8
7
)
Existin
g
3
0
'
S
t
o
r
m
S
e
w
e
r
E
a
s
e
m
e
n
t
(Book
2
0
1
7
,
P
a
g
e
3
2
6
6
)
164 LF OF 10" HDP
E
@
1
.
5
2
%
155 LF OF 10" HD
P
E
@
2
.
6
0
%
ST-1A, CLEANOUT (10'') TYPE A1
RIM: 1041.33
INV: 1035.00 (OUT NW)
ST-2A, CLEANOUT (10'') TYPE A1
RIM: 1041.23
INV: 1036.52 (OUT NW)
7
1A
INV: 1031.67 (VERIFY)
3E 3B
INV: 1034.50
62F
9
3C
3C
8
8
ADJUST RIM T0: 1039.99
RIM: 1039.71
INV: 1032.93
RIM: 1039.27
INV: 1034.20
RIM: 1041.33
INV: 1035.00
RIM: 1041.36
INV: 1033.50
10
10
10
1
.
1
8
'
o
f
6
"
S
a
n
i
t
a
r
y
S
e
w
e
r
@
1
.
2
5
%
10
1
.
1
8
'
o
f
6
"
S
a
n
i
t
a
r
y
S
e
w
e
r
@
1
.
2
5
%
50.03' of 4" Sanitary
S
e
w
e
r
@
1
.
2
5
%
66.35' of 6" Sanitary
S
e
w
e
r
@
1
.
2
5
%
BP: 1034.9 (10"ST)
TP: 1033.7 (6"SAN)
BP: 1034.4 (6"WAT)
TP: 1032.9 (6"SAN)
150
'
H
y
d
r
a
n
t
C
o
v
e
r
a
g
e
(
T
y
p
)
2G
3F
50.67' of 6" Sanitary Sewer @ 1.25%
1A
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
U
T
I
L
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
UT
I
L
I
T
Y
P
L
A
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
3
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 20
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
'
12
4
.
0
1
1
5
.
0
1
C3
0
0
124.0115.01
C300
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
UT
I
L
I
T
Y
P
L
A
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
UTILITY PLAN CONSTRUCTION NOTES
1. PROTECT ALL SITE FEATURES NOT SCHEDULED FOR DEMOLITION OR MODIFICATION. ANY
DAMAGES TO ITEMS NOT SHOWN FOR REMOVAL SHALL BE REPAIRED BY THE
CONTRACTOR TO THE OWNERS SPECIFICATIONS WITHOUT ADDITIONAL COMPENSATION.
A.EXISTING UTILITIES. COORDINATE ANY NECESSARY RELOCATIONS OR ADJUSTMENTS
WITH THE OWNER AND UTILITY PROVIDER PRIOR TO CONSTRUCTION. ADJUSTMENTS
OF UTILITY APPURTENANCE TO FINISH GRADE IS CONSIDERED INCIDENTAL TO THE
PROJECT.
2. WATER SERVICES, PROVIDE THE FOLLOWING:
A.6" WATER SERVICE LINE.
B.BUILDING WATER FIRE SERVICE CONNECTION. VERIFY LOCATION AND DEPTH WITH
MECHANICAL PLANS PRIOR TO CONSTRUCTION.
C.CONNECT TO EXISTING WATER SERVICE. CONTRACTOR TO VERIFY LOCATION AND
DEPTH PRIOR TO CONSTRUCTION. REMOVE HYDRANT ASSEMBLY AND HYDRANT
ASSEMBLY.
D.2" DOMESTIC LINE WITH VALVE.
E.45° WATER BEND.
F.FIRE DEPARTMENT CONNECTION.
G.RELOCATED HYDRANT ASSEMBLY.
3. SANITARY SERVICES, PROVIDE THE FOLLOWING:
A.6" SANITARY SEWER SERVICE LINE AT MINIMUM 1.0% SLOPE.
B.CONNECT TO EXISTING 6" SANITARY SERVICE. VERIFY INVERT ELEVATION AND
LOCATION PRIOR TO CONSTRUCTION.
C.SANITARY CLEANOUT.
D.CONNECT SANITARY SERVICE TO BUILDING. VERIFY LOCATION AND DEPTH WITH
MECHANICAL PLANS PRIOR TO CONSTRUCTION.
E.WRA APPROVED GREASE INTERCEPTOR. SEE MECHANICAL PLANS FOR DETAILED
DRAWINGS OF GREASE INTERCEPTOR. COORDINATE EXACT SIZE/ ELEVATIONS WITH
MECHANICAL PLANS PRIOR TO CONSTRUCTION.
F.4" SANITARY SEWER SERVICE LINE AT MINIMUM 2.0% SLOPE.
4. COORDINATE ELECTRICAL SERVICES AND METER LOCATION WITH UTILITY SERVICE
PROVIDER PRIOR TO CONSTRUCTION. SEE ARCHITECTURAL AND MECHANICAL PLANS FOR
INTERIOR UTILITY ROUTING, METERS, DESIGN INFORMATION AND COORDINATE UTILITY
CONNECTIONS ACCORDINGLY.
5. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18" MINIMUM SEPARATION.
6. ROOF DRAIN LOCATION. SEE ARCHITECTURAL PLANS FOR DETAILS.
7. SEE SHEET C600-C601 FOR UNDERGROUND DETENTION DETAILS.
8. CRITICAL CROSSING. CONTRACTOR TO VERIFY ALL CROSSINGS AND PROVIDE 18"
MINIMUM SEPARATION.
9. UTILITY ROOM. SEE ARCHITECTURAL PLANS AND MECHANICAL PLANS FOR RISER
LOCATION.
10. GAS SERVICE LINE. COORDINATE WITH CITY OF WAUKEE ON DETAILS PRIOR TO
CONSTRUCTION.
A. NOTIFY THE CITY OF WAUKEE AT LEAST 48 HRS PRIOR TO CONNECTING TO ANY PUBLIC UTILITY.
B. ALL UTILITIES SHALL BE TESTED TO THE CITY OF WAUKEE STANDARD SPECIFICATION FOR
PUBLIC IMPROVEMENTS AND ANY TESTING OR TIE-INS SHALL BE WITNESSED BY THE CITY OF
WAUKEE ENGINEERING DEPARTMENT.
C. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO
PAVING. THE CITY OF WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE
REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER
MANHOLES SHALL BE VACUUM TESTED.
D. ALL WATERMAIN SHALL BE PRESSURE AND BACTERIA TESTED AND DECHLORINATED.
GENERAL CONSTRUCTION NOTES
1
C300
OUTLET STRUCTURE DETAIL (ST-3)
NO SCALE
18" OUTLET PIPE
INV:1031.84'
PROPOSED 3"
DIAMETER HOLE
ELEV:1031.84
TOP OF WEIR WALL
ELEV:1035.60' (CPV ELEVATION)
PROPOSED 30" NYLOPLAST
DRAIN STRUCTURE
10" SUMP
NOTE:
THE OWNER WILL INSPECT THE SYSTEM ON A BI-ANNUAL BASIN.
IF SEDIMENT IS BLOCKING THE 3” ORIFICE IN THE OUTLET
STRUCTURE, JET / VACUUM THE SYSTEM TO REMOVE THE SEDIMENT.
TRASH
14
16
18
15
17
16
12
9
3
11
30' Ingress/ Egress Easement
T
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
R
UP
32
0
9
S
F
RE
S
T
A
U
R
A
N
T
88
6
S
F
LO
U
N
G
E
22
2
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
68
4
S
F
EN
T
R
Y
11
2
2
S
F
RE
S
T
A
U
R
A
N
T
P
A
T
I
O
19
8
S
F
WO
M
E
N
15
8
S
F
ME
N
BA
R
11
9
6
S
F
KI
T
C
H
E
N
73
S
F
UT
I
L
I
T
I
E
S
33
1
S
F
BR
E
A
K
R
M
VE
N
T
CH
A
S
E
AB
O
V
E
AP
P
R
O
X
.
HO
O
D
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
9
S
F
OF
F
I
C
E
13
4
S
F
OF
F
I
C
E
12
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
13
7
S
F
I.
T
.
/
D
A
T
A
31
8
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
IN
S
I
D
E
F
R
Y
E
R
G
R
E
A
S
E
T
A
N
K
R
E
C
L
A
M
A
T
I
O
N
-
SP
I
G
O
T
N
E
E
D
E
D
-
M
I
N
I
M
I
Z
E
A
P
P
E
A
R
A
N
C
E
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
13
5
S
F
OF
F
I
C
E
PROPOSED
BUILDING
9,335 SF
FFE= 1041.40
1
4
BM50
0
Intake = 1041.66
FL = 1036.01 15" RCP S
Intake = 1037.96
FL = 1034.51 15" RCP S
Rim = 1041.69
FL = 1031.49 24" RCP SW
FL = 1031.39 24" RCP NE
Intake = 1035.00
FL = 1029.70 24" RCP SW
FL = 1029.50 30" RCP NE
Intake = 1033.70
FL = 1029.35 24" RCP N
Intake = 1033.97
FL = 1030.62 15" RCP N
Storm C/O Rim = 1034.51
No Pa
r
k
i
n
g
Stop
Sidewalk
Concrete
Si
d
e
w
a
l
k
Co
n
c
r
e
t
e
Concrete
Concrete
SE Esker Ridge
D
r
Gr
a
n
d
P
r
a
i
r
i
e
P
k
w
y
Co
n
c
r
e
t
e
SE Encompass
D
r
1
0
4
0
1037
1037
1
0
3
8
1
0
3
9
1
0
4
1
1
0
4
2
10
3
5
1
0
3
4
10
3
9
10
3
9
10
4
2
Sidewalk Concr
e
t
e
Comm
u
n
i
t
y
C
h
o
i
c
e
S
i
g
n
1035
1036
1037
1038
104
0
1037
103
8
1039
1041
1042
104
3
Existin
g
1
0
'
W
i
d
e
T
r
a
i
l
Existin
g
5
'
Wide S
i
d
e
w
a
l
k
6"
W
6" W
6" SAN
100-Y
R
E
L
E
V
:
1
0
3
5
.
8
7
'
100-Y
R
E
L
E
V
:
1
0
3
8
.
6
3
Outlot
'
U
'
The S
h
o
p
s
At Ket
t
l
e
s
t
o
n
e
N
o
r
t
h
Plat
1
(Bk 2
0
1
7
,
P
g
3
2
5
6
)
91,225 SF
2.09 AC
LOT 1
Existin
g
1
5
'
P
U
E
(Book
2
0
1
3
,
P
a
g
e
1
0
3
8
7
)
Existin
g
3
0
'
S
t
o
r
m
S
e
w
e
r
E
a
s
e
m
e
n
t
(Book
2
0
1
7
,
P
a
g
e
3
2
6
6
)
1
0
4
0
1
0
3
6
1
0
3
7
1
0
3
8
1
0
3
9
103
9
1
0
3
9
1
0
4
1
10
4
0
10
4
1
10
4
1
10
4
2
104
0
104
0
10
4
0
1
0
3
9
103
9
104
1
1041
1041
STAGING AREA
CONCRETE
WASHOUT
STABALIZED
CONSTRUCTION
ENTRANCE
1
0
3
5
10
4
0
10
4
0
10
4
0
1
0
4
0
1
0
3
6
1036
10
3
6
10
3
6
1
0
3
7
10
3
7
10
3
8
10
3
8
10
3
9
1
0
3
9
1
0
4
1
104
1
SEDIMENT
BASKET
SEDIMENT
BASKET
SEDIMENT
BASKET
SEDIMENT
BASKET X2
SEDIMENT
BASKET X2
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●●●●●●●●●●●●
●●●●●
●●●●●●●●
●
●
●
●
●
DUMPSTER
PORTABLE
TOILET
ST-3
POST CONSTRUCTION
FACILITY
UNDERGROUND DETENTION
(POST CONSTRUCTION FACILITY)
ULTIMATE
DISCHARGE POINT
TO FOX CREEK
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
E
R
O
S
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
3
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 20
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
'
12
4
.
0
1
1
5
.
0
1
C4
0
0
124.0115.01
C400
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
QUANTITIES
SUDAS TYPE 4 SEEDING, FERTILIZING & MULCHING 2.37 AC.
SILT FENCE 955 LF
SEDIMENT BASKETS 7 EA
DISTURBED AREA 2.37 AC.
SOD 0.72 AC .
1.UTILITY WARNING:
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS
OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT
WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED.
2.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE
FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO
UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S
CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE ANY UTILITY
RELOCATIONS WITH UTILITY PROVIDER.
3.ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF
PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED.
4.ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE AND INCLUDE FLARED END SECTION.
5.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD
TO MINIMUM 8" DEPTH TO FINISH GRADES.
6.THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM STREETS, DRIVEWAYS
AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES BY THE END OF THE WORK DAY AND PRIOR
TO A RAIN EVENT.
7.SLOPES OF ALL UNPAVED AREAS TO BE 2.0% MINIMUM.
8.CONTRACTOR TO CONTAIN SAWCUTTING/GRINDING SLURRY ON SITE AND DISPOSE OF ACCORDING
TO IOWA DNR GENERAL PERMIT NO. 2
9.PROVIDE SEDIMENT BASKETS AT ALL INTAKES.
10.PROVIDE SILT FENCE WHERE SHOWN AND AS DETAILED ON THIS SHEET. MAINTAIN AND ADJUST SILT
FENCE AS NECESSARY DURING CONSTRUCTION.
GRADING NOTES
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
(Profile View)
FLOW
'T
'
S
T
E
E
L
FE
N
C
E
P
O
S
T
4'
-
0
"
M
I
N
SEE PLANS FOR SPACING
TYPICAL SILT FENCE INSTALLATION ON LONGITUDINAL SLOPES
(Plan View)
DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES
ATTACHMENT TO POST
200'-0" MAX LENGTH PER SECTION
600'-0" IF SLOPE IS FLATTER THAN 5%
36
"
24
"
8'-0" SPACING
TYPICAL SILT FENCE DITCH CHECK
BAC
K
S
L
O
P
E
FOR
E
S
L
O
P
E
VARIABLE (20'-0" FOR A NORMAL 10'-0" WIDE DITCH)
POST SPACING
(5'-0" MAX)
POST SPACING
5'-0" MAX)
2"
MI
N
20
"
M
I
N
1
1
2
GROUND LINE
FABRIC
GROUND CONTOURS
INSTALL "J-HOOK" AT EACH END OF AN
INDIVIDUAL SECTION OF SILT FENCE
INSTALL PARALLEL TO
GROUND CONTOUR
FABRICGROUND LINE
FABRIC
POST
WIRE OR
CABLE TIES
2
2
1
C400
SILT FENCE DETAIL
NO SCALE
1 INSERT 12 INCHES OF FABRIC A
MINIMUM OF 6 INCHES DEEP
(FABRIC MAY BE FOLDED BELOW
THE GROUND LINE.
2 REDUCE POST SPACING TO 5'-0"
AT WATER CONCENTRATION
AREAS, OR AS REQUIRED TO
ADEQUATELY SUPPORT FENCE.
TRASH
30' Ingress/ Egress Easement
T
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
R
UP
32
0
9
S
F
RE
S
T
A
U
R
A
N
T
88
6
S
F
LO
U
N
G
E
22
2
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
68
4
S
F
EN
T
R
Y
11
2
2
S
F
RE
S
T
A
U
R
A
N
T
P
A
T
I
O
19
8
S
F
WO
M
E
N
15
8
S
F
ME
N
BA
R
11
9
6
S
F
KI
T
C
H
E
N
73
S
F
UT
I
L
I
T
I
E
S
33
1
S
F
BR
E
A
K
R
M
VE
N
T
CH
A
S
E
AB
O
V
E
AP
P
R
O
X
.
HO
O
D
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
9
S
F
OF
F
I
C
E
13
4
S
F
OF
F
I
C
E
12
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
13
7
S
F
I.
T
.
/
D
A
T
A
31
8
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
IN
S
I
D
E
F
R
Y
E
R
G
R
E
A
S
E
T
A
N
K
R
E
C
L
A
M
A
T
I
O
N
-
SP
I
G
O
T
N
E
E
D
E
D
-
M
I
N
I
M
I
Z
E
A
P
P
E
A
R
A
N
C
E
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
13
5
S
F
OF
F
I
C
E
PROPOSED
BUILDING
9,335 SF
FFE= 1041.40
1
4
BM50
0
Intake = 1041.66
FL = 1036.01 15" RCP S
Intake = 1037.96
FL = 1034.51 15" RCP S
Rim = 1041.69
FL = 1031.49 24" RCP SW
FL = 1031.39 24" RCP NE
FL = 1029.70 24" RCP SW
FL = 1029.50 30" RCP NE
Intake = 1033.70
FL = 1029.35 24" RCP N
Intake = 1033.97
FL = 1030.62 15" RCP N
Storm C/O Rim = 1034.51
No Pa
r
k
i
n
g
Stop
Sidewalk
Concrete
Si
d
e
w
a
l
k
Co
n
c
r
e
t
e
Concrete
Concrete
SE Esker Ridge
D
r
Gr
a
n
d
P
r
a
i
r
i
e
P
k
w
y
Co
n
c
r
e
t
e
SE Encompass
D
r
1
0
4
0
1037
1037
1
0
3
8
1
0
3
9
1
0
4
1
1
0
4
2
10
3
5
1
0
3
4
10
3
9
10
3
9
10
4
2
Comm
u
n
i
t
y
C
h
o
i
c
e
S
i
g
n
1035
1036
1037
1038
104
0
1037
103
8
1039
1041
1042
104
3
Existin
g
1
0
'
W
i
d
e
T
r
a
i
l
Existin
g
5
'
Wide S
i
d
e
w
a
l
k
6"
W
6" W
6" SAN
100-Y
R
E
L
E
V
:
1
0
3
5
.
8
7
'
100-Y
R
E
L
E
V
:
1
0
3
8
.
6
3
1
0
4
0
10
3
7
1
0
3
8
1
0
3
9
10
4
1
104
010
4
0
1
0
4
0
1
0
3
9
103
9
104
1
103
5
1
0
3
6
1
0
3
9
.
2
5
1
0
3
9
.
0
5
1
0
3
8
.
3
5
1
0
3
8
.
0
1
L
P
1
0
3
8
.
6
5
(
O
V
E
R
F
L
O
W
)
1
0
3
8
.
4
0
1
0
3
7
.
0
9
1
0
3
6
.
3
0
1
0
3
6
.
2
0
1
0
3
7
.
2
3
1
0
3
8
.
4
1
1
0
3
8
.
2
8
1
0
3
8
.
6
3
1
0
4
0
.
0
0
1
0
4
0
.
0
0
104
0
.
5
0
1
0
4
0
.
5
0
1
0
4
0
.
5
0
1
0
3
8
.
8
4
1
0
3
7
.
9
4
1
0
3
6
.
7
4
1
0
3
5
.
8
6
1
0
3
8
.
8
9
1
0
3
9
.
0
0
1039
.
3
4
1
0
3
9
.
5
8
1
0
4
0
.
0
0
104
0
.
0
0
1
0
4
0
.
8
0
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
4
0
10
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
2
4
10
4
1
.
1
5
1
0
4
1
.
1
5
1
0
4
1
.
3
3
1041
.
4
0
1
0
4
1
.
4
0
1041
.
1
0
1040.6
0
1040
.
6
0
104
1
.
1
0
1040.5
0
1040.50
1041.00 TC
1040.50 G
104
1
.
0
0
T
C
104
0
.
5
0
G
1041.10 TC
1040.60 G
1041.60 TC
1041.10 G
1
0
4
1
.
6
5
1
0
4
1
.
4
0
1
0
4
0
.
4
0
1
0
4
0
.
4
0
1
0
4
1
.
1
5
1
0
4
0
.
9
0
1
0
4
0
.
8
7
1
0
4
0
.
9
5
1
0
4
0
.
8
1
1
0
4
0
.
7
3
1040.80 TC
1040.30 G
1
0
4
0
.
1
0
1
0
4
0
.
1
0
104
0
.
1
0
104
0
.
1
0
1
0
4
0
.
3
0
1
0
4
0
.
3
0
1040.80 TC
1040.30 G
1040.30 TC
1039.80 G
1
0
3
9
.
6
2
1
0
3
9
.
4
6
1
0
3
8
.
7
8
1
0
3
8
.
9
0
103
9
.
0
4
103
9
.
2
0
103
9
.
2
5
103
9
.
4
0
1039
.
4
5
1
0
3
8
.
5
9
1
0
3
8
.
4
0
1
0
3
8
.
5
1
1
0
3
8
.
8
8
103
9
.
3
7
1
0
3
8
.
5
0
1
0
3
7
.
0
9
1041.20 TC
1040.70 G
1041.20 TC
1040.70 G
1
0
4
1
.
2
0
T
C
1
0
4
0
.
7
0
G
1039.36 TC
1038.86 G
1036.10 TC
1035.60 G 1037.99 TC
1037.49 G
1036
.
5
9
1037.75 TC
1037.25 G
1037.56 TC
1037.06 G
103
6
.
2
0
(OV
E
R
F
L
O
W
)
1039.90 TC
1039.40 G
1039.40 TC
1038.90 G
1040.00 TC
1039.50 G
1040.70 TC
1040.20 G
1041.54 TC
1041.04 G
1040.15 TC
1039.65 G
103
8
.
9
4
103
9
.
6
6
104
0
.
6
0
104
0
.
9
7
1
0
4
0
10
4
0
10
4
0
10
4
0
10
4
0
1
0
4
0
10
4
0
1
0
4
0
1
0
3
6
1
0
3
6
1
0
3
6
10
3
7
10
3
7
1
0
3
7
10
3
8
103
8
1
0
3
8
10
3
9
10
3
9
103
9
10
3
9
1
0
3
9
1
0
3
9
10
3
9
1
0
3
9
10
4
1
10
4
1
104
1
10
4
1
1041
1041
103
9
.
3
8
1040.30 TC
1039.80 G
1040.
3
0
T
C
1039.
8
0
G
(1039
.
4
2
)
(1039
.
2
8
)
(1037
.
1
4
)
(1037
.
2
2
)
(1035
.
4
0
)
(1035
.
0
7
)
(1034
.
8
9
)
(1035
.
6
8
)
(
1
0
4
1
.
8
0
)
(
1
0
4
1
.
5
3
)
(
1
0
4
1
.
2
9
)
(
1
0
4
1
.
1
7
)
1040.70 TC
1040.20 G
1040.40 TC
1039.90 G
1039.85 TC
1039.35 G
1040.10 TC
1039.60 G
1039.77 TC
1039.27 G
1
0
4
1
.
0
8
1
0
4
1
.
2
3
1
0
4
0
.
3
0
1
0
4
0
.
1
5
TW:
1
0
3
6
.
0
0
FG:
1
0
3
5
.
5
0
TW:
1
0
4
0
.
0
4
FG:
1
0
3
5
.
2
6
TW:
1
0
4
0
.
3
8
FG:
1
0
3
5
.
1
9
TW:
1
0
3
9
.
3
3
FG:
1
0
3
5
.
1
7
TW:
1
0
3
7
.
6
2
FG:
1
0
3
5
.
7
2
TW:
1
0
3
6
.
8
7
FG:
1
0
3
5
.
9
1
TW:
1
0
3
6
.
5
0
FG:
1
0
3
6
.
0
0
1040.75 TC
1040.25 G
1040.45 TC
1039.95 G
1040.51 TC
1040.01 G
1
0
3
9
.
7
0
10
3
9
.
7
0
Outlot
'
U
'
The S
h
o
p
s
At Ket
t
l
e
s
t
o
n
e
N
o
r
t
h
Plat
1
(Bk 2
0
1
7
,
P
g
3
2
5
6
)
91,225 SF
2.09 AC
LOT 1
Existin
g
1
5
'
P
U
E
(Book
2
0
1
3
,
P
a
g
e
1
0
3
8
7
)
Existin
g
3
0
'
S
t
o
r
m
S
e
w
e
r
E
a
s
e
m
e
n
t
(Book
2
0
1
7
,
P
a
g
e
3
2
6
6
)
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
3
9
.
5
8
1
0
3
9
.
6
0
1
0
3
9
.
4
2
1
0
3
9
.
4
5
1040
.
3
5
T
C
1039
.
8
5
G
HP
1040.95 TC
1040.45 G
1036.70 TC
1036.20 G
1040.00 TC
1039.50 G
-5:1
-4
:
1
4:1
1041.00 TC
1040.50 G
-
4
.
0
0
%
-
6
.
0
0
%
1039.10 TC
1038.60 G
(1039
.
2
5
)
(1034
.
6
4
)
1035.
6
5
1041.
6
5
10
4
1
.
3
1
1
0
4
1
.
2
8
1
0
4
1
.
1
3
1
0
4
1
.
2
1
1
0
4
1
.
3
6
1042.12 TC
1041.62 G
-3:1
-3:1
1
0
4
1
.
2
4
1
0
4
1
.
1
5
1
0
4
1
.
1
5
-2.00%
1
0
4
1
.
8
4
1
0
4
1
.
9
9
(1035
.
6
7
)
(1035
.
7
8
)
(1036
.
5
6
)
(1036
.
5
8
)
-4
:
1
-5
.
2
0
%
1036.20 TC
1035.70 G
1
0
4
1
.
4
0
1
0
4
1
.
4
0
1
0
4
1
.
3
3
-
6
.
0
0
%
-3.00%
1
0
4
0
.
9
8
1
0
4
0
.
6
5
1
0
3
9
.
4
4
-3:1
-3:1
-3:1
11
.
0
0
%
14
.
3
4
%
1037.07 TC
1036.57 G
-1
.
4
2
%
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
G
R
D
G
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
DE
T
A
I
L
E
D
G
R
A
D
I
N
G
P
L
A
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
3
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 20
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
'
12
4
.
0
1
1
5
.
0
1
C4
0
1
124.0115.01
C401
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
DE
T
A
I
L
E
D
G
R
A
D
I
N
G
P
L
A
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
1.UTILITY WARNING:
THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS
OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT
WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED.
2.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE
FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO
UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S
CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE ANY UTILITY
RELOCATIONS WITH UTILITY PROVIDER.
3.ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF
PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED.
4.ALL STORM SEWER PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE AND INCLUDE FLARED END SECTION.
5.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD
TO MINIMUM 8" DEPTH TO FINISH GRADES.
6.THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM STREETS, DRIVEWAYS
AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES BY THE END OF THE WORK DAY AND PRIOR
TO A RAIN EVENT.
7.SLOPES OF ALL UNPAVED AREAS TO BE 2.0% MINIMUM.
8.CONTRACTOR TO CONTAIN SAWCUTTING/GRINDING SLURRY ON SITE AND DISPOSE OF ACCORDING
TO IOWA DNR GENERAL PERMIT NO. 2
9.PROVIDE SEDIMENT BASKETS AT ALL INTAKES.
10.PROVIDE SILT FENCE WHERE SHOWN AND AS DETAILED ON THIS SHEET. MAINTAIN AND ADJUST SILT
FENCE AS NECESSARY DURING CONSTRUCTION.
GRADING NOTES
12
3
T
88
6
S
F
LO
U
N
G
E
68
4
S
F
EN
T
R
Y
73
S
F
UT
I
L
I
T
I
E
S
VE
N
T
CH
A
S
E
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
OF
F
I
C
E
1
0
4
0
6" W
6" SAN
104
0
.
1
0
104
0
.
3
0
104
0
.
3
0
104
0
.
8
0
T
C
104
0
.
3
0
G
104
0
.
8
0
T
C
104
0
.
3
0
G
104
0
.
1
0
104
0
.
1
0
104
0
.
1
0
104
0
.
5
0
104
1
.
0
0
T
C
104
0
.
5
0
G
104
0
.
5
0
104
1
.
0
0
T
C
104
0
.
5
0
G
1040.0
0
1039.
9
9
104
0
.
6
0
104
0
.
6
0
104
1
.
1
0
1041
.
1
0
104
0
.
9
0
104
0
.
4
0
104
0
.
4
0
104
0
.
9
0
0.
0
%
0.
0
%
6.
1
%
6.
1
%
6.
1
%
6.
1
%
1.7%
1.7%
1.7%
0.
0
%
0.
0
%
5.
6
%
5.
6
%
1.7%
1.7%
1.7%
1039.
9
9
1040.
0
0
103
9
.
8
2
103
9
.
8
2
103
9
.
8
2
103
9
.
8
0
0.
0
%
0.
0
%
0.
0
%
0.
0
%
0.9%
0.9%
0.9%
1.1%
1.1%
1.1%
1.1%
1.7%
5.
6
%
5.
6
%
0.
0
%
0.
0
%
0.
0
%
0.
0
%
0.
0
%
0.
0
%
0.
0
%
14
10
3
5
1037
SE Encompass Dr
1
0
3
5
.
1
3
103
5
.
2
0
1
0
3
5
.
2
1
103
5
.
6
3
103
5
.
6
5
103
5
.
7
1
103
5
.
7
4
103
6
.
5
4
103
6
.
4
6
103
6
.
3
8
103
6
.
4
6
103
6
.
0
6
103
6
.
0
6
103
5
.
9
6
(
1
0
3
6
.
5
6
)
(10
3
6
.
5
8
)
(1
0
3
5
.
7
8
)
(103
5
.
6
7
)
3.5%
2.4%
1.5%
1.5%
5.9%
5.8%
0.1%
0.2%5.9%0.8%0.8%
0.5%0.4%5.9%
1.
9
%
2.
2
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
0.
4
%
1.
3
%
1.
5
%
1
1041
10
4
2
SE Esker Ridge Dr
1041.
5
0
104
1
.
3
1
10
4
1
.
6
7
1
0
4
1
.
6
4
104
2
.
1
2
1042
.
2
7
1042
.
3
2
1042
.
1
0
104
1
.
7
9
104
1
.
4
8
104
1
.
9
4
104
1
.
9
9
104
1
.
8
4
10
4
1
.
7
9
C11.0%
1.0%
5.7%
5.4%
0.9%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.0%
1.0%
6.0%1.7%
5.7%
1.
5
%
1.
5
%
1.
5
%
N67°46'32"E 25.00' M
N67°32'43"E 25.00' P
(10
3
8
.
8
9
)
(10
3
9
.
1
8
)
(10
3
9
.
2
8
)
(1
0
3
9
.
0
1
)
103
9
.
2
5
(10
3
9
.
3
8
)
(10
3
9
.
2
8
)
(10
3
9
.
4
1
)
10
3
9
.
1
0
1.5%
1.1%
4
.
5
%
5.
3
%
1
.
9
%
0.
8
%
1.0%
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
R
A
M
P
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
RA
M
P
D
E
T
A
I
L
S
,
20
2
5
/
0
9
/
0
2
,
9:
3
4
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 10
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
10
'
12
4
.
0
1
1
5
.
0
1
C4
0
2
124.0115.01
C402
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
RA
M
P
D
E
T
A
I
L
S
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
TRASH
14
16
18
15
17
16
12
9
3
11
30' Ingress/ Egress Easement
T
OWNE
R
:
MN W
A
U
K
E
E
H
O
L
D
I
N
G
S
,
L
L
C
1409
N
R
I
V
E
R
F
O
N
T
D
R
MANK
A
T
O
,
M
N
5
6
0
0
1
R
UP
32
0
9
S
F
RE
S
T
A
U
R
A
N
T
88
6
S
F
LO
U
N
G
E
22
2
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
68
4
S
F
EN
T
R
Y
11
2
2
S
F
RE
S
T
A
U
R
A
N
T
P
A
T
I
O
19
8
S
F
WO
M
E
N
15
8
S
F
ME
N
BA
R
11
9
6
S
F
KI
T
C
H
E
N
73
S
F
UT
I
L
I
T
I
E
S
33
1
S
F
BR
E
A
K
R
M
VE
N
T
CH
A
S
E
AB
O
V
E
AP
P
R
O
X
.
HO
O
D
AB
O
V
E
19
8
S
F
OF
F
I
C
E
16
9
S
F
OF
F
I
C
E
13
4
S
F
OF
F
I
C
E
12
8
S
F
OF
F
I
C
E
16
0
S
F
JA
N
.
/
S
T
O
R
.
13
7
S
F
I.
T
.
/
D
A
T
A
31
8
S
F
PR
I
V
A
T
E
D
I
N
I
N
G
IN
S
I
D
E
F
R
Y
E
R
G
R
E
A
S
E
T
A
N
K
R
E
C
L
A
M
A
T
I
O
N
-
SP
I
G
O
T
N
E
E
D
E
D
-
M
I
N
I
M
I
Z
E
A
P
P
E
A
R
A
N
C
E
SE
R
V
I
C
E
E
N
T
R
Y
ME
C
H
W
E
L
L
AB
O
V
E
13
5
S
F
OF
F
I
C
E
PROPOSED
BUILDING
9,335 SF
FFE= 1041.40
4
BM50
0
Intake = 1041.66
FL = 1036.01 15" RCP S
Intake = 1037.96
FL = 1034.51 15" RCP S
Rim = 1041.69
FL = 1031.49 24" RCP SW
FL = 1031.39 24" RCP NE
FL = 1029.70 24" RCP SW
FL = 1029.50 30" RCP NE
Intake = 1033.70
FL = 1029.35 24" RCP N
Intake = 1033.97
FL = 1030.62 15" RCP N
Storm C/O Rim = 1034.51
No Pa
r
k
i
n
g
Stop
Sidewalk
Concrete
Si
d
e
w
a
l
k
Co
n
c
r
e
t
e
Concrete
Concrete
SE Esker Ridge
D
r
Gr
a
n
d
P
r
a
i
r
i
e
P
k
w
y
Co
n
c
r
e
t
e
SE Encompass
D
r
Comm
u
n
i
t
y
C
h
o
i
c
e
S
i
g
n
Existin
g
1
0
'
W
i
d
e
T
r
a
i
l
Existin
g
5
'
Wide S
i
d
e
w
a
l
k
6"
W
6" W
6" SAN
1 - AG
2 - TI
1 - CO
1 - CO
1 - CO
1 - CO
1 - CO
1 - CO
1 - QB
1 - AA
1 - QB
1 - AA
1 - QB
1 - QB
1 - QB
1 - AA
1 - AA
1 - AA
1 - TA
1 - AG
1 - TA
2 - TA
1 - TA
4 - BG
1 - GI
1 - GI
1 - GB
1 - GB
1 - GB
1 - GB
1 - PF
1 - TA 1 - TA
5 - HA
1 - MS
1 - AB
1 - MS
1 - MS2 - GI
2 - GI
2 - CB
2 - CB
2 - GI
2 - AA
2 - GI
1 - GB
1 - CB
1 - AA
1 - AA
1 - GB
1 - TI
1 - TI
3 - SK
5 - HA
5 - CK
5 - HO
1 - AB
2 - GI
2 - AB
1 - AB
1 - CB
9 - BG
3 - HA
1 - TI
1 - TI
11 - CK
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
L
N
D
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
PL
A
N
T
I
N
G
P
L
A
N
,
20
2
5
/
0
9
/
0
2
,
9:
3
4
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FEET
0 20
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
20
'
12
4
.
0
1
1
5
.
0
1
C5
0
0
124.0115.01
C500
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
PL
A
N
T
I
N
G
P
L
A
N
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
PLANTING PLAN GENERAL NOTES
A.UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR
RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL
SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT
WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED.
B.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR
DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES AND
SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S CARELESSNESS SHALL BE
CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY COMPANIES
DURING CONSTRUCTION.
C.ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN STANDARDS
FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION).
D.CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF
INSTALLATION.
PLANTING PLAN CONSTRUCTION NOTES
1.SOD ALL DISTURBED AREAS UNLESS NOTED OTHERWISE. REFER TO EROSION CONTROL PLAN FOR
ADDITIONAL INFORMATION.
2.PROVIDE A 3-IN DEPTH SHREDDED HARDWOOD MULCH IN A 3-FOOT PERIMETER RING AROUND ALL TREES.
PROVIDE VERTICAL CUT NATURAL EDGE TO A DEPTH OF 4-INCHES.
3.PROVIDE 1-2'' RIVER ROCK TO A DEPTH OF 4-INCHES. TAPER MULCH DEPTH TOWARDS BED EDGING AND/OR
PAVEMENT EDGE EXPOSING 1-INCH HEIGHT OF EDGE.
4.PROVIDE 3 /16 " BLACK STEEL EDGER WITH STAKES.
5.PLANTING SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY THE COMMUNITY DEVELOPMENT
DEPARTMENT.
6.ALL DISTURBED AREAS IN THE RIGHT-OF-WAY WILL BE REQUIRED TO BE SODDED.
PLANTING PLAN REQUIREMENTS
(LANDSCAPE CALCULATIONS BASED UPON CITY OF WAUKEE ZONING CODE REQUIREMENTS)
OPEN SPACE:
20% OPEN SPACE REQUIRED
91,225.25 SF (TOTAL LOT) x 20% = 18,245.05 SF REQUIRED (28,369.38 SF OR 31.10% PROVIDED)
1.5 OVERSTORY TREES, 0.5 UNDERSTORY TREES, AND 2 SHRUB PER 1,000 SF OF REQUIRED OPEN SPACE.
MINIMUM OF 50% OF TOTAL REQUIRED TREES SHALL BE OVERSTORY SHADE TREES.
18,245.05 SF /1,000 = 18.3 PLANT UNITS (PU'S)
1.5 OVERSTORY TREES x 18.3 PU'S = 27.45 TREES REQUIRED (28 TREES PROVIDED, 21 OVERSTORY, 7 EVERGREEN)
0.5 UNDERSTORY TREES X 18.3 PU'S = 9.15 UNDERSTORY TREES REQUIRED (10 PROVIDED)
2 SHRUBS X 18.3 PU'S = 36.6 SHRUBS REQUIRED (50 PROVIDED)
STREET TREE REQUIREMENTS:
ONE TREE FOR EVERY 40 FEET OF STREET FRONTAGE, NOT COUNTING DRIVEWAY
GRAND PRAIRIE PARKWAY
268.44/40 = 6.71 TREES REQUIRED (7 PROVIDED)
SE ESKER RIDGE PKWY
273.65/40 = 6.84 TREES REQUIRED (7 PROVIDED)
BUFFER REQUIREMENT:
NO BUFFER REQUIRED.
OFF-STREET PARKING AREA REQUIREMENT:
1 TREE FOR EVERY PARKING LOT ISLAND
16 PARKING LOT ISLANDS
16 TREES REQUIRED (16 TREES PROVIDED)
TREE HEIGHT MINIMUM REQUIREMENTS
OVERSTORY TREES MUST BE 8 FEET TALL MINIMUM AT TIME OF PLANTING.
EVERGREEN TREES MUST BE 6 FEET TALL MINIMUM AT TIME OF PLANTING.
ORNAMENTAL TREES MUST BE 6 FEET TALL MINIMUM AT TIME OF PLANTING.
STREET TREES MUST BE 12 FEET TALL MINIMUM AT TIME OF PLANTING.
CODE QTY BOTANICAL NAME COMMON NAME SIZE TYPE
CANOPY TREES
AA 9 Acer rubrum 'Armstrong'Armstrong Red Maple 1.5" Cal.B&B
CB 6 Carpinus betulus European Hornbeam 1.5" Cal.B&B
CO 6 Celtis occidentalis Common Hackberry 1.5" Cal.B&B
GB 6 Ginkgo biloba Maidenhair Tree 1.5" Cal.B&B
GI 12 Gleditsia triacanthos inermis Thornless Honey Locust 1.5" Cal.B&B
QB 5 Quercus bicolor Swamp White Oak 1.5" Cal.B&B
TA 7 Tilia americana American Linden 1.5" Cal.B&B
EVERGREEN TREES
PF 1 Pinus strobus 'Fastigiata'Pyramidal White Pine 6` Ht.B&B
TI 6 Thuja x 'Green Giant'Green Giant Arborvitae 6` Ht.B&B
ORNAMENTAL TREES
AB 5 Acer buergerianum Trident Maple 6` Ht.
AG 2 Amelanchier x grandiflora 'Autumn Brilliance'Autumn Brilliance Apple Serviceberry 6` Ht.B&B
MS 3 Malus x 'Spring Snow'Spring Snow Crabapple 6` Ht.B&B
CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER
SHRUBS
BG 13 Buxus x 'Green Velvet'Green Velvet Boxwood 3 GAL POT
CK 16 Calamagrostis x acutiflora 'Karl Foerster'Karl Foerster Feather Reed Grass 2' ft POT
HO 5 Hemerocallis x 'Stella de Oro'Stella de Oro Daylily 1 GAL POT
HA 13 Hydrangea arborescens 'Abetwo'Incrediball® Hydrangea 3 GAL POT
SK 3 Syringa pubescens patula 'Miss Kim'Miss Kim Korean Lilac 3 GAL POT
PLANT SCHEDULE
1
1
1 TYP.
2 TYP.
2 TYP.
2 TYP.
2 TYP.
3
3
3
3 4
43
2 TYP.
1 TYP.
1 TYP.
1 TYP.
1 TYP.
2 TYP.
2 TYP.
2 TYP.
43
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
12
4
.
0
1
1
5
.
0
1
C6
0
0
124.0115.01
C600
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
SI
T
E
D
E
T
A
I
L
S
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
T
S
H
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
SI
T
E
D
E
T
A
I
L
S
,
20
2
5
/
0
9
/
0
2
,
9:
3
4
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
FORM
GRADE
ELEV.
6"
4
C600
INTEGRAL SIDEWALK AND CURB DETAIL
NO SCALE
ADJACENT PAVEMENT
SIDEWALK
4"
M
I
N
2
C600
TYPICAL PAVEMENT CROSS SECTIONS
NO SCALE
PCC PAVEMENT SECTION
PCC SIDEWALK SECTION
1
C600
CONCRETE DRIVEWAY, TYPE A
NO SCALE
CUR
B
O
P
E
N
I
N
G
DR
I
V
E
W
A
Y
W
I
D
T
H
AS
S
P
E
C
I
F
I
E
D
1'-
0
"
M
I
N
TYPE A WITH RADII DETAIL B
TYPICAL SECTION
DETAIL A
(Residential/Agricultural Only)
3'-0" MIN
5'-0" MAX
TYPE A WITH FLARES
1'-
0
"
M
I
N
CUR
B
O
P
E
N
I
N
G
DR
I
V
E
W
A
Y
W
I
D
T
H
AS
S
P
E
C
I
F
I
E
D
SLOPE AS
PER PLANS
2% MAX
P
R
O
P
E
R
T
Y
LI
N
E
10
10
9
1 DRIVEWAY RADIUS (R).
RESIDENTIAL: 10 FOOT MINIMUM, 15 FOOT
MAXIMUM.
COMMERCIAL AND INDUSTRIAL: AS SPECIFIED IN
THE CONTRACT DOCUMENTS.
2 TRANSITION THE CURB HEIGHT TO 0 INCHES AT
END OF TAPER/RADIUS OR AT THE FRONT EDGE
OF SIDEWALK. DO NOT EXTEND RAISED CURB
ACROSS SIDEWALK.
3 PAVEMENT THICKNESS.
RESIDENTIAL: 6 INCHES MINIMUM.
COMMERCIAL AND INDUSTRIAL: 7 INCHES
MINIMUM.
4 SIDEWALK THICKNESS THROUGH DRIVEWAY TO
MATCH THICKNESS OF DRIVEWAY.
5 CENTER REINFORCING BAR VERTICALLY IN THE
PAVEMENT.
6 MATCH THICKNESS OF ADJACENT ROADWAY. 8
INCHES MINIMUM.
7 PROVIDE 'E' JOINT AT BACK OF CURB UNLESS 'B'
JOINT IS SPECIFIED.
8 FOR ALLEYS, INVERT THE PAVEMENT CROWN 2%
TOWARD CENTER OF ALLEY.
9 TARGET CROSS SLOPE OF 1.5% WITH A
MAXIMUM CROSS SLOPE OF 2.0%. IF SPECIFIED
IN THE CONTRACT DOCUMENTS, CONSTRUCT
THE SIDEWALK THROUGH THE DRIVEWAY 5 FEET
WIDE TO SERVE AS A PASSING SPACE.
10 IF CROSS SLOPE OF ADJACENT SIDEWALK
PANEL EXCEEDS 2.0%, REMOVE AND REPLACE
TO TRANSITION FROM EXISTING SIDEWALK TO
SIDEWALK THROUGH DRIVEWAY. IF ELEVATION
CHANGE REQUIRES A CURB RAMP, COMPLY
WITH FIGURE 7030.205; VERIFY NEED FOR
DETECTABLE WARNING PANEL WITH ENGINEER.
5
1
4
P
R
O
P
E
R
T
Y
LI
N
E
9
10
10
4 1
2"
7 1
2"
6"
12"18"
1'
-
0
"
1'-0"
18"12"
DROP CURB
HEIGHT:0" TO 2"
3
C600
6-INCH STANDARD CURB
NO SCALE
R3"
R3"
1" RADIUS
SEALED 'E' JOINT
PCC PAVEMENT, SEE PLANS
FOR THICKNESS & LOCATIONS
12" DEPTH PREPARED SUBGRADE
2 - 6" LIFTS UNLESS NOTED OTHERWISE
SIDEWALK PAVEMENT, SEE PLANS
FOR THICKNESS & LOCATIONS
6" DEPTH PREPARED SUBGRADE
'E' JOINT
'B' JOINT
'C' JOINT
BACK OF
CURB
REFER TO DETAIL B
BACK OF CURB
#5x36" REINFORCING
BAR R
SIDEWALK
DRIVEWAY
CURB
BACK OF CURB
BACK OF
CURB
REFER TO DETAIL A
'C' JOINT
'E' JOINT
'B' JOINT
'C' OR 'E'
JOINT
'C' OR 'E'
JOINT
TYPICAL SECTION
Exact dimensions, wall batter, backfill limits,
reinforcement, and leveling pad materials and
dimensions will be specified by the wall
manufacturer.
1 If exposed height is greater than 4 feet, the
wall manufacturer shall provide design by a
licensed structural engineer.
1
6
C600
SEGMENTAL BLOCK RETAINING WALL
NO SCALE
8"
M
i
n
.
6"
M
i
n
.
6"
M
i
n
.
He
i
g
h
t
V
a
r
i
e
s
Topsoil or Suitable Backfill Material
Granular Backfill Material
Geogrid (if required)
Excavation Line
Geogrid (if required)
Subdrain
Wrap porous backfill material with
engineering fabric.
Excavation Line
Finished Grade
Wall Unit (Typ.)
Finished Grade (slope varies)
Pins or Lip to Ensure Proper
Block Setback
Cap Stone
Compacted Foundation
Construct a 6" thick X 18" wide
(min.) leveling pad
5
C600
LOOP BIKE RACK
NO SCALE
NOTES:
1.INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS.
2.1
2"x3 3
4" EXPANSION ANCHOR BOLTS PROVIDED FOR SURFACE MOUNT.
FINISH OPTIONS:
COATED WITH ZINC RICH EPOXY THEN FINISHED WITH POLYESTER COATING. COLOR AS PER OWNER.
18 MIN
30
"
M
I
N
4 1
2" DIA
ANCHOR CIRCLE
6" DIA
8 1
8" DIA
27
"
M
A
X
10 GA. STL. SPINNING
SURFACE MOUNT
(ONLY)
2" RS 40 GALV. PIPE
(2 3
8" O.D.)
5
8"x1 1
2" S.STL. FLT.
SKT HD CAP SCREW
3
8"x6" DIA
STL. PLATE
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
C
LJ
M
KM
M
07
-
2
2
-
2
0
2
5
12
4
.
0
1
1
5
.
0
1
C6
0
1
124.0115.01
C601
KE
T
T
L
E
S
T
O
N
E
C
O
M
M
U
N
I
T
Y
C
H
O
I
C
E
C
R
E
D
I
T
U
N
I
O
N
SI
T
E
D
E
T
A
I
L
S
WA
U
K
E
E
,
I
O
W
A
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
RE
V
I
S
E
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
08
-
0
7
-
2
5
08
-
1
9
-
2
5
LJ
M
LJ
M
12
TT
N
-
R
R
W
-
S
S
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
S
P
_
1
2
4
0
1
1
5
_
T
S
H
.
d
w
g
LO
G
A
N
M
Y
E
R
S
,
SI
T
E
D
E
T
A
I
L
S
,
20
2
5
/
0
9
/
0
2
,
9:
3
4
A
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
NW Corner Parcel U
The Shops At Kettlestone North Plat 1 &
NE Corner Parcel 18-163
(Book 2018, Page 23782)
S61°42'02"E 1.86' R
S61°28'13"E 1.86' M
S2
6
°
5
5
'
1
9
"
W
3
2
2
.
7
1
'
M
S2
6
°
4
1
'
3
0
"
W
3
2
2
.
7
1
'
P
91,225 SF
2.09 AC
LOT 1
N6
1
°
2
8
'
1
3
"
W
3
0
2
.
5
8
'
M
N6
1
°
4
2
'
0
2
"
W
3
0
2
.
5
8
'
P
S84°43'28"E 45.79' M
S84°57'17"E 45.79' P
S69
°
2
3
'
2
6
"
E
83.0
3
'
M
S69
°
3
7
'
1
5
"
E
8
3
.
0
3
'
P
N67°46'32"E 25.00' M
N67°32'43"E 25.00' P
C1
C2
C3
Existing 15' PUE
(Book 2013, Page 10387)
Existing 30' Storm Sewer Easement
(Book 2017, Page 3266)
Existing 62' Public Ingress/Egress Easement
(Book 2019, Page 10433)
INGRESS/EGRESS EASEMENT
INGRESS/EGRESS EASEMENT
(TO BE RECORDED IN SEPARATE DOCUMENT)
Northerly Corner Parcel 18-163
Found 1/2" Rebar With
Blue Plastic Cap #19880
SW Corner Outlot U
The Shops At Kettlestone North Plat 1
Found 5/8" Rebar With
Yellow Plastic Cap #13156
Found 5/8" Rebar With
Yellow Plastic Cap #13156
Found 5/8" Rebar With
Yellow Plastic Cap #13156
Found 5/8" Rebar With
Yellow Plastic Cap #13156
Found 5/8" Rebar With
Yellow Plastic Cap #13156
Found 5/8" Rebar With
Yellow Plastic Cap #13156
NE Corner Outlot U
The Shops At Kettlestone North Plat 1
Found 1/2" Rebar With
Blue Plastic Cap #19880
SE
E
S
K
E
R
R
I
D
G
E
D
R
I
V
E
(R.
O
.
W
.
V
A
R
I
E
S
)
OUTLOT
A
THE SH
O
P
S
A
T
KETTLE
S
T
O
N
E
NORTH
P
L
A
T
7
LOT 2
THE SH
O
P
S
A
T
K
E
T
T
L
E
S
T
O
N
E
N
O
R
T
H
P
L
A
T
7
OUTLOT
U
THE SH
O
P
S
A
T
K
E
T
T
L
E
S
T
O
N
E
N
O
R
T
H
P
L
A
T
1
PARCEL
1
8
-
1
6
3
(BOOK
2
0
1
8
,
P
A
G
E
2
3
7
8
2
)
BEING A
P
A
R
T
O
F
OUTLOT
B
THE SH
O
P
S
A
T
K
E
T
T
L
E
S
T
O
N
E
N
O
R
T
H
P
L
A
T
5
GRAND
PRAIRIE
PARK W A Y
22.
7
3
'
C4
C5
S2
6
°
3
5
'
5
8
"
W
2
2
0
.
9
7
'
C6
S31°49'10"W 17.47'
C7
LOT 2
KEETOW
N
L
O
O
P
P
L
A
T
1
LOT 1
KEETOW
N
L
O
O
P
P
L
A
T
5
N6
1
°
4
2
'
0
2
"
W
3
0
4
.
4
4
'
P
S6
1
°
2
8
'
1
3
"
E
3
0
4
.
4
4
'
M
CURVE TABLE
CURVE NO.
C1 M
C2 M
C3 M
Δ
5°50'13"
2°36'48"
9°41'18"
RADIUS
1065.00'
1050.00'
1587.50'
ARC LENGTH
108.50'
47.89'
268.44'
TANGENT
54.30'
23.95'
134.54'
CHORD BEARING/LENGTH
S61°30'52"E 108.45'
S68°05'02"E 47.89'
N27°58'09"E 268.12'
C1 P 5°50'13"1065.00'108.50'54.30'S61°44'41"E 108.45'
C2 P 2°36'48"1050.00'47.89'23.95'S68°18'51"E 47.89'
C3 P 9°41'18"1587.50'268.43'134.54'S27°44'20"W 268.11'
C4
C5
C6
C7
15°06'40"
17°53'30"
5°13'12"
0°39'12"
115.00'
85.00'
315.00'
1065.00'
30.33'
26.54'
28.70'
12.14'
15.25'
13.38'
14.36'
6.07'
S36°56'08"W 30.24'
S35°32'43"W 26.44'
S29°12'34"W 28.69'
N58°55'21"W 12.14'
GRAND
PRAIRIE
P A R K W A Y
S
E
E
S
K
E
R
RID
GE
DRIVE
SE
P
A
R
K
V
I
E
W
C
R
O
S
S
I
N
G
D
R
I
V
E
DRAFT
V:
\
P
r
o
j
e
c
t
s
\
2
0
2
4
\
1
2
4
.
0
1
1
5
.
0
1
\
C
A
D
D
\
F
P
L
T
_
1
2
4
0
1
1
5
.
d
w
g
AU
S
T
I
N
D
A
V
E
N
P
O
R
T
,
22
X
3
4
E
X
H
I
B
I
T
L
,
20
2
5
/
0
7
/
2
2
,
1:
3
5
P
M
,
AN
S
I
F
U
L
L
B
L
E
E
D
D
(
3
4
.
0
0
X
2
2
.
0
0
I
N
C
H
E
S
)
BY
DA
T
E
RE
V
I
S
I
O
N
MA
R
K
Sc
a
l
e
:
Te
c
h
n
i
c
i
a
n
:
T-
R
-
S
:
SN
Y
D
E
R
&
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
|
Ch
e
c
k
e
d
B
y
:
En
g
i
n
e
e
r
:
Da
t
e
:
1"
=
Pr
o
j
e
c
t
N
o
:
Sh
e
e
t
Project No:
Sheet
27
2
7
S
.
W
.
S
N
Y
D
E
R
B
L
V
D
AN
K
E
N
Y
,
I
O
W
A
5
0
0
2
3
51
5
-
9
6
4
-
2
0
2
0
|
w
w
w
.
s
n
y
d
e
r
-
a
s
s
o
c
i
a
t
e
s
.
c
o
m
ED
G
AJ
D
KM
H
07
-
2
2
-
2
0
2
5
30
'
12
4
.
0
1
1
5
.
0
1
1
o
f
1
124.0115.01
1 of 1
TH
E
S
H
O
P
S
A
T
K
E
T
T
L
E
S
T
O
N
E
N
O
R
T
H
P
L
A
T
9
FI
N
A
L
P
L
A
T
WA
U
K
E
E
,
I
O
W
A
78
N
-
2
6
W
-
4
FEET
0 30
AREA ABOVE RESERVED FOR RECORDER
INDEX LEGEND
SURVEYOR'S NAME / RETURN TO:
ERIN D. GRIFFIN
EGRIFFIN@SNYDER-ASSOCIATES.COM
SERVICE PROVIDED BY:
SNYDER & ASSOCIATES, INC.
SURVEY LOCATED:
OUTLOT U
THE SHOPS AT KETTLESTONE NORTH PLAT 1
SEC. 4-78-26
REQUESTED BY:
COMMUNITY CHOICE CREDIT UNION
THE SHOPS AT KETTLESTONE NORTH PLAT 9
FINAL PLAT
SNYDER & ASSOCIATES, INC.
2727 S.W. SNYDER BLVD
ANKENY, IOWA 50023
515-964-2020
LEGEND
FEATURES FOUND SET
Section Corner
1/2" Rebar, Yellow Plastic Cap # 19710
(Unless Otherwise Noted)
ROW Marker
ROW Rail
Control Point
Bench Mark
Platted Distance P
Measured Bearing & Distance M
Recorded As R
Deed Distance D
Calculated Distance C
Yellow Plastic Cap YPC
Centerline
Section Line
1/4 Section Line
1/4 1/4 Section Line
Easement Line
PROPERTY DESCRIPTION
OUTLOT U IN THE SHOPS AT KETTLESTONE NORTH PLAT 1, AN OFFICIAL PLAT, NOW INCLUDED IN AND
FORMING A PART OF THE CITY OF WAUKEE, DALLAS COUNTY, IOWA.
DATE OF SURVEY
07-22-2025
PROPERTY OWNER
COMMUNITY CHOICE CREDIT UNION
6163 NW 86TH STREET, STE 105
JOHNSTON IA, 50131
AREA SUMMARY
GROSS AREA: 2.09 ACRES (91,224 SF)
ZONING
K-RC: KETTLESTONE RETAIL COMMUNITY
BULK REGULATIONS
LOT AREA: NO MINIMUM REQUIREMENT
LOT WIDTH: NO MINIMUM REQUIREMENT
SIDE YARDS: NO MINIMUM FOR PRINCIPAL PERMITTED USES UNLESS ADJACENT TO ADJOINING
SINGLE-FAMILY, IN WHICH CASE THE MINIMUM SETBACK SHALL BE 50 FEET.
5 FEET FOR ACCESSORY STRUCTURES.
REAR YARD: NO MINIMUM FOR PRINCIPAL PERMITTED USES UNLESS ADJACENT TO ADJOINING
SINGLE-FAMILY, IN WHICH CASE THE MINIMUM SETBACK SHALL BE 50 FEET.
5 FEET FOR ACCESSORY STRUCTURES.
MAXIMUM HEIGHT: PRINCIPAL BUILDING - 4 STORIES
ACCESSORY BUILDING - 1 STORY
FLOODPLAIN
THE FLOOD ZONE DESIGNATION FOR THE SUBJECT PROPERTY IS ZONE X, BEING AREA OF MINIMAL FLOOD
HAZARD, AS PER THE FLOOD INSURANCE RATE MAP FOR THE CITY OF WAUKEE, IOWA, PANEL NUMBER
19049C0355F, EFFECTIVE DATE DECEMBER 07, 2018.
VICINITY MAP
WAUKEE, IOWA
Erin D. Griffin, PLS Date
License Number 19710
My License Renewal Date is December 31, 2025
Pages or sheets covered by this seal:
ERIN D.
GRIFFIN
19710
AIOW
L
I
CENSED P R O F E S S I ONAL LA
N
D
S
U
R
V
EYOR
I hereby certify that this land surveying document
was prepared and the related survey work was
performed by me or under my direct personal
supervision and that I am a duly licensed
Professional Land Surveyor under the laws of the
State of Iowa.
Sheet 1 of 1
PLAT LOCATION
1ST FLOOR
0' -0"
2ND FLOOR
14' -0"
HIGH ROOF
28' -0"
BRICK -WARM WHITE
NICHIHA FIBER CEMENT PANEL -DARK GREY
ALUMINUM FASCIA -BLACK
NICHIHA FIBER CEMENT PANEL -WOOD-LOOK
NICHIHA FIBER CEMENT PANEL -DARK GREY
ALUMINUM FASCIA -BLACK
1ST FLOOR
0' -0"
2ND FLOOR
14' -0"
HIGH ROOF
28' -0"
BRICK -WARM WHITE
NICHIHA FIBER CEMENT PANEL -DARK GREY
ALUMINUM FASCIA -BLACK
NICHIHA FIBER CEMENT PANEL -WOOD-LOOK
GEOLAM SOLEO WOOD-LOOK ELEMENTS
1ST FLOOR
0' -0"
2ND FLOOR
14' -0"
HIGH ROOF
28' -0"
BRICK -WARM WHITE NICHIHA FIBER CEMENT PANEL -DARK GREY
ALUMINUM FASCIA -BLACK
NICHIHA FIBER CEMENT PANEL -WOOD-LOOK
GEOLAM SOLEO WOOD-LOOK ELEMENTS
1ST FLOOR
0' -0"
2ND FLOOR
14' -0"
HIGH ROOF
28' -0"
BRICK -WARM WHITE
NICHIHA FIBER CEMENT PANEL -DARK GREY
ALUMINUM FASCIA -BLACK
NICHIHA FIBER CEMENT PANEL -WOOD-LOOK
GEOLAM SOLEO WOOD-LOOK ELEMENTS
SCALE:1/8" = 1'-0"3 SOUTH ELEVATION
SCALE:1/8" = 1'-0"2 NORTH ELEVATION
SCALE:1/8" = 1'-0"4 WEST ELEVATION
SCALE:1/8" = 1'-0"1 EAST ELEVATION
3611 NE Otterview Circle #42 Ankeny, IA 50021
www.jcorpdesignbuild.com 06 / 06 / 2025CCCU Mixed Use
Elevations
6"
13
'
-
0
"
6"
6"10"20'-4"10"6"
14
'
-
0
"
A1
6
1'-7"9'-2"
10'-0" LONG x 0'-6" DIA CONCRETE
FILLED GATE POST ENCASED IN
FOOTING WITH 6'-0" ABOVE GRADE
TYP WALL SECTION
6"9'-2"1'-7"
22'-0"
23'-0"
6'-0" TALL -METAL TRASH
ENCLOSURE GATE PAINTED BLACK
MODULAR BRICK -LIGHT
MODULAR BRICK -LIGHT
MODULAR BRICK -LIGHT
MODULAR BRICK -LIGHT
BLACK METAL CAP -TYP.
6'
-
0
"
PARAPET CAP FLASHING
6" CMU
BRICK TO MATCH
BUILDING
(1) #4 CONT.
#4's @ 48" O.C.
(1) #5 CONT. T&B
#4's @ 24" O.C.
METAL DRIP EDGE ABOVE FINISH
GRADE -VERIFY WITH G.C.
MORTAR DEFLECTION DEVICE w/
MORTAR MAZE CELL VENTS @ 24"
O.C. HEAD JOINTS
THRU-WALL FLASHING
EYE & PINTLE WALL TIES
@ 16" O.C.
1'-0"
3'
-
4
"
8"
SCALE:3/8" = 1'-0"4 FRONT ELEVATION
SCALE:3/8" = 1'-0"5 REAR ELEVATION
3611 NE Otterview Cir #42
Ankeny, IA 50021
www.jcorpdesignbuild.com
CONTENTS:
SHEET NO:
PROJECT NO:
PR
O
J
E
C
T
:
REVISIONS:
A1
25-009
CC
C
U
M
i
x
e
d
U
s
e
-
T
r
a
s
h
E
n
c
l
o
s
u
r
e
08 / 07 / 2025
Plan, Elevations, Sections
SCALE:3/8" = 1'-0"1 PLAN
SCALE:3/8" = 1'-0"3 LEFT ELEVATION
SCALE:3/8" = 1'-0"2 RIGHT ELEVATION
SCALE:1 1/2" = 1'-0"6 SECTION