Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025-11-17 I01E_03 Waukee Public Safety_Change Order 19
\AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 17, 2025 AGENDA ITEM:Consideration of approval of Change Order No. 19 (Combined) for the Waukee Public Safety Building Project, increasing the contract in the amount of $11,569.50 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Substantial completion of the Waukee Public Safety Building has been completed. With the Police and Fire Departments moving into the space, there continue to be some minor changes that have been identified. Change Order No. 19 relates to some door hardware modifications, improvements associated with a video wall in the police side of the building and some minor wall repairs. This project is close to wrapping up and staff does not anticipate any significant change orders moving forward. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:The net result of this Change Order increases the contract price in the amount of $11,569.50. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the Change Order. ATTACHMENTS: I. Change Order 19 PREPARED BY: Brad Deets, City Administrator REVIEWED BY: I1E3 Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com October 28, 2025 Brad Deets, City Administrator City of Waukee 230 W. Hickman Road Waukee, IA 50263 Re: Waukee Public Safety Building: Change Order No. 19: Multiple Pricing Request Approvals Dear Brad: Change Order No.19 for the Waukee Public Safety Building includes the following revisions: · CR 154 Wire Gate Hardware Changes: Add $3,979.58 · CR 161 PD Video Wall: Add $6,787.89 · CR 168 431C Hardware Change: Add $490.49 · CR 170 Wall Base: Add $311.54 Ryan Companies recommends approval of the Prime Contractors for Change Order No.19 at a combined value of $11,569.50. Please see attached Change Order No.19 individual change orders and associated back up for each individual change request (CR) for additional information. If you have any questions or comments regarding this information, please contact me at your convenience. Thank you. Sincerely, RYAN COMPANIES US, INC. Jill Boetger Project Manager Enclosed: WPS Prime CO No. 19 Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com CC: Matt Van Loon, Ryan Companies Ryan Pigneri, Ryan Companies Angie Pfannkuch, Sidekick Development Danielle Hermann, OPN Architects Aaron Twedt, OPN Architects Alex Streyffeler, OPN Architects Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:06:36 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA49) 1 PROJECT: (name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS)Contract For: Bid Package #1 General Construction Change Order Number: WPS CO 19 (DDVI No. 16) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 11.17.2025 OWNER: (name and address)ARCHITECT: (name and address)CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) DDVI Inc PO Box 743 Indianola, IA 50125 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR 154 Wire Gate Hardware Add $2936.80 WPS CR 161 PD Video Wall Add $652.19 WPS CR 168 431C Hardware Change Add $490.49 WPS CR 170 RFI 164 Wall Base Add $311.54 The original Contract Sum was $2,905,000.00 Net change by previously authorized Change Orders $137374.22 The Contract Sum prior to this Change Order was $3,042,374.22 The Contract Sum will be increased by this Change Order in the amount of $4,391.02 The new Contract Sum including this Change Order will be $3,046,765.24 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name)CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE:DATE: DDVI Inc.City of Waukee Iowa CONTRACTOR (Firm name)OWNER (Firm name) Docusign Envelope ID: 216A53CD-3D9C-4241-A9D8-C3550FE8FB68 11/7/2025 11/7/2025 AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:06:36 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA49) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE:DATE: Docusign Envelope ID: 216A53CD-3D9C-4241-A9D8-C3550FE8FB68 Rich Piper 11/7/2025 Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:09:58 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA50) 1 PROJECT: (name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS)Contract For: Bid Package #13 Electrical & Communications Change Order Number: WPS CO 19 (Van Maanen No. 17) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 11.17.2025 OWNER: (name and address)ARCHITECT: (name and address)CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Van Maanen Electric, Inc. 500 Iowa Speedway Dr. Newton, IA 50208 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR154 Wire Gate Hardware Changes ADD $1042.78 The original Contract Sum was $4,711,425.00 Net change by previously authorized Change Orders $218,962.32 The Contract Sum prior to this Change Order was $4,930,387.32 The Contract Sum will be increased by this Change Order in the amount of $1,042.78 The new Contract Sum including this Change Order will be $4,931,430.10 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name)CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr. Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE:DATE: Van Maanen Electric, Inc. City of Waukee Iowa CONTRACTOR (Firm name)OWNER (Firm name) Docusign Envelope ID: 9B46A610-81DF-4B52-9A15-3F1CF0CFB6FA 11/7/202511/7/2025 AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:09:58 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA50) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE:DATE: Docusign Envelope ID: 9B46A610-81DF-4B52-9A15-3F1CF0CFB6FA 11/7/2025 Scott Handeland Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:11:30 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA3F) 1 PROJECT: (name and address)CONTRACT INFORMATION:CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS)Contract For: Bid Package #10 Framing, Drywall, & Ceilings Change Order Number: WPS CO 19 (HSI No. 12) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 11.17.2025 OWNER: (name and address)ARCHITECT: (name and address)CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Hilsabeck Schacht, Inc. 617 S. 19th Street West Des Moines, IA 50265 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR161 PD Video Wall Add $6,135.70 The original Contract Sum was $2,562,500.00 Net change by previously authorized Change Orders $41,624.28 The Contract Sum prior to this Change Order was $2,604,124.28 The Contract Sum will be increased by this Change Order in the amount of $6,135.70 The new Contract Sum including this Change Order will be $2,610,259.98 The Contract Time will be increased by (0) days. The Contractor’s Work shall be substantially complete on June 18, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name)CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Ryan Pigneri, Sr Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE:DATE: Hilsabeck Schacht, Inc. City of Waukee Iowa CONTRACTOR (Firm name)OWNER (Firm name) Docusign Envelope ID: D0EC7C8F-55E2-4609-999E-CC11AE0BE07F 11/7/202511/7/2025 AIA Document G731 – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:11:30 ET on 11/06/2025 under Order No.4104251064 which expires on 12/31/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA3F) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE:DATE: Docusign Envelope ID: D0EC7C8F-55E2-4609-999E-CC11AE0BE07F Dean Hixenbaugh 11/7/2025 Waukee Public Safety - Change Request Summary 10/7/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 154.0 DDVI Furnish and install (1) electric latches with (2) center mounting plates, and paint. $2,936.80 154.1 Jordison Construction No response $0.00 154.2 Enterprise Precast No response $0.00 154.3 TSF Structures No response $0.00 154.4 Northwest Steel No response $0.00 154.5 Forman Ford No response $0.00 154.6 Academy Roofing No response $0.00 154.7 Ford Metro No response $0.00 154.8 Skold Door No response $0.00 154.9 Hilsabeck Schacht No response $0.00 154.10 Elite Fire Sprinkler No response $0.00 154.11 Kruck Plumbing and Heating No response $0.00 154.12 Van Maanen Furnish and install (2) conduit and cable extensions.$1,042.78 154.13 TriCity Electric No response $0.00 154.14 Wenthold No response $0.00 154.15 Absolute No response $0.00 154.16 Jordison Construction No response $0.00 154.17 Alpha Landscapes No response $0.00 $3,979.58 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$129.34 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $4,108.92 Change Request 154 Summary: Wire mesh gate hardware changes. Baker Group costs excluded. Change Request 154 Subtotal Change Request 154 Cost Change Total Waukee Public Safety - Change Request Summary 10/24/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 161.0 DDVI Paint and touch up floor/wall base.$652.19 161.1 Jordison Construction No response $0.00 161.2 Enterprise Precast No response $0.00 161.3 TSF Structures No response $0.00 161.4 Northwest Steel No response $0.00 161.5 Forman Ford No response $0.00 161.6 Academy Roofing No response $0.00 161.7 Ford Metro No response $0.00 161.8 Skold Door No response $0.00 161.9 Hilsabeck Schacht Frame wall, relocate, plywood, rock, tape, finish. Touch up ceiling.$6,135.70 161.10 Elite Fire Sprinkler No response $0.00 161.11 Kruck Plumbing and Heating No response $0.00 161.12 Van Maanen No response $0.00 161.13 TriCity Electric Furnish and install video wall, including rough-in requirements. Billed direct to Police Dept. NIC 161.14 Wenthold No response $0.00 161.15 Absolute No response $0.00 161.16 Jordison Construction No response $0.00 161.17 Alpha Landscapes No response $0.00 $6,787.89 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$220.61 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $7,008.50 Change Request 161 Summary: Owner request to add video wall in room 401. Tri-City electrical and equipment costs billed direct to the City per Sidekick direction. Change Request 161 Subtotal Change Request 161 Cost Change Total $305.00 $15.25 $8.54 $328.79 DDVI LANCE @ TCE $305.00 $92.00 $85.00 $125.00 $100.00 $414.00 $382.50 $250.00 $100.00 $1146.50 $19.00 $437.00 $13.00 $104.00 $98.00(1) BOX $98.00 (1 lb)$6.00 $30.00 $26.00 $26.00 $695.00 $1841.50 $92.00 $85.00 $125.00 $100.00 $19.00 $6.00 $30.00 $19.00 $276.00 $255.00 $250.00 $100.00 $881.00 $49.00Material Total $930.00 $92.00 $85.00 $125.00 $125.00 $100.00 $75.00 $506.00 $467.50 $250.00 $250.00 $100.00 $600.00 $2,173.50 $26.52 $212.16 $74.46 $670.14 $6.00 $30.00 $6.00 $30.00 $2.34 $11.70 $7.80 $7.80 $19.50 $19.50 $28.60 $28.60 $3.60 $10.80 $1020.70 $3,194.20Total $85.00 $170.00 $170.00 $170.00 Waukee Public Safety - Change Request Summary 10/7/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 168.0 DDVI Change locking side of 431C and add dummy cylinder.$490.49 168.1 Jordison Construction No response $0.00 168.2 Enterprise Precast No response $0.00 168.3 TSF Structures No response $0.00 168.4 Northwest Steel No response $0.00 168.5 Forman Ford No response $0.00 168.6 Academy Roofing No response $0.00 168.7 Ford Metro No response $0.00 168.8 Skold Door No response $0.00 168.9 Hilsabeck Schacht No response $0.00 168.10 Elite Fire Sprinkler No response $0.00 168.11 Kruck Plumbing and Heating No response $0.00 168.12 Van Maanen No response $0.00 168.13 TriCity Electric No response $0.00 168.14 Wenthold No response $0.00 168.15 Absolute No response $0.00 168.16 Jordison Construction No response $0.00 168.17 Alpha Landscapes No response $0.00 $490.49 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$15.94 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $506.43 Change Request 168 Summary: Opening 431C locking side change request from original hardware set. Change Request 168 Subtotal Change Request 168 Cost Change Total Waukee Public Safety - Change Request Summary 10/20/2025 Ryan Companies US, Inc. Change Request Subcontractor Comments Cost Change 170.0 DDVI Furnish and install wall base at storm pipe box out.$311.54 170.1 Jordison Construction No response $0.00 170.2 Enterprise Precast No response $0.00 170.3 TSF Structures No response $0.00 170.4 Northwest Steel No response $0.00 170.5 Forman Ford No response $0.00 170.6 Academy Roofing No response $0.00 170.7 Ford Metro No response $0.00 170.8 Skold Door No response $0.00 170.9 Hilsabeck Schacht No response $0.00 170.10 Elite Fire Sprinkler No response $0.00 170.11 Kruck Plumbing and Heating No response $0.00 170.12 Van Maanen No response $0.00 170.13 TriCity Electric No response $0.00 170.14 Wenthold No response $0.00 170.15 Absolute No response $0.00 170.16 Jordison Construction No response $0.00 170.17 Alpha Landscapes No response $0.00 $311.54 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$10.13 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 $321.67 Change Request 170 Summary: Cost to add wall base at storm piping box out, added in RFI-164. Change Request 170 Subtotal Change Request 170 Cost Change Total