Loading...
HomeMy WebLinkAbout2025-12-01 I04 The Pitch Phase 2_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 1, 2025 AGENDA ITEM: Consideration of approval of resolution approving a site plan for The Pitch Phase 2 (705 NW 2nd Street) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a site plan for the second phase of a multi-family residential development. The property is located south of NW Douglas Parkway and east of NW 2nd Street, containing 3.71-acres. The first phase of The Pitch included three apartment buildings and one clubhouse building. Only the clubhouse and two of the apartment buildings (108 total units) were built. Building #3 on the north side of the site, as proposed on the Phase 1 site plan, was never built which was proposed to be a 52-unit building. The applicant is now proposing a new site plan for Phase 2 of the project which includes fewer total units than previously proposed and larger townhome-style units with attached garages. The project involves the construction of four (4) townhome-style buildings. The total number of units proposed is 42 units. Building #1 will include 11 units, Building #2 will include 12 units, Building #3 will include 9 units, and Building #4 will include 10 units. Each building is two stories and between 24 and 27-feet in height. The footprints of each building will range from 9,975 square feet to 12,350 square feet. Each unit includes an attached garage. All but one of the garages includes 2 stalls. One of the garages is a one-car garage. There will be two access points to this site off of NW Douglas Parkway. A ten-foot-wide trail exists along the south side of NW Douglas Parkway, adjacent to the subject site. A pedestrian connection will be provided into the site from the existing trail. A total of 93 parking spaces are required for the proposed site plan and they are providing 153 spaces. Public utilities are provided to the site. Storm water detention will be provided with a detention basin located just to the south of the proposed project. The owner of the property will be responsible for the ownership and maintenance of the detention areas and the private utilities within the site. A minimum of 20% of the project area is required to be open space, and the applicant will be providing 36% open space. A 25-foot landscape buffer will be provided along the north, east and west sides of the site. I4 Parkland dedication requirements were satisfied within the Prairie Rose development to the east. The elevations of the buildings will be constructed of mostly fiber cement siding, stone and asphalt shingles. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the site plan request at their meeting on November 25, 2025, and recommended approval: Approval of a Site Plan for The Pitch Phase 2 (705 NW 2nd Street) Melissa DeBoer, Planning Coordinator, introduced the request for approval of a site plan for the second phase of a multi-family residential development, as requested by Pitch, LLC, represented by Erin Ollendike of CDA. The property is generally located south of NW Douglas Parkway and east of NW 2nd Street, containing approximately 3.71-acres. The property was included in the Prairie Rose Phase II rezoning and preliminary plat that were both approved in 2021. The subject property was platted as Lot 1, The Pitch Plat 1 in 2022. The first phase of The Pitch included three apartment buildings and one clubhouse building. Only the clubhouse and two of the apartment buildings (108 total units) were built. Building #3 on the north side of the site, as proposed on the Phase 1 site plan, was never built, which was proposed to be a 52-unit building. The applicant is now proposing a new site plan for Phase 2 of the project which includes fewer total units than previously proposed and larger townhome-style units with attached garages. The project involves the construction of four (4) townhome-style buildings. The total number of units proposed is 42 units. Building #1 will include 11 units, building #2 will include 12 units, building #3 will include 9 units, and building #4 will include 10 units. Each building is two stories and between 24 and 27 feet in height. The footprints of each building will range from 9,975 square feet to 12,350 square feet. Each unit includes an attached garage. All but one of the garages includes 2 stalls. One of the garages is a one-car garage. Two accesses are proposed into the site from NW Douglas Parkway. A ten-foot-wide trail exists along the south side of NW Douglas Parkway, adjacent to the subject site. A pedestrian connection will be provided into the site from the existing trail. A total of 93 parking spaces are required for the proposed site plan and they are providing 153 spaces. All public utilities are provided to the site. Stormwater detention is provided with a basin within Phase 1, just to the south of the proposed project. The owner of the property will be responsible for the ownership and maintenance of the detention areas and the private utilities within the site. A 25-foot landscape buffer will be provided along the north, east and west sides of the development. A minimum amount of 20% of open space is required and the site plan identifies that a total of 36% of open space is being provided. Parkland dedication requirements were satisfied with the single-family residential development to the east within the Prairie Rose development. Elevations of the buildings will be constructed of mostly fiber cement siding, stone and asphalt shingles. The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan subject to remaining staff comments. Discussion as follows: • Discussion of clubhouse access; a representative from Lloyd Co. verified that everyone in the development would have clubhouse access • General discussion of no shared drive between the two phases due to topography, grading and detention location Motion by Commissioner Tuel for Approval of a Site Plan for The Pitch - Phase 2 (705 NW 2nd Street), seconded by Commissioner Bannister. Ayes: Broderick, Streit, Bankole, Beenken, Lohse, Tuel, and Bannister. Nays: None. Motion carried. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan IV. Building Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2025- APPROVING THE SITE PLAN FOR THE PITCH – PHASE 2 (705 NW 2ND STREET) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for The Pitch – Phase 2, subject to remaining staff comments on November 25, 2025; AND, WHEREAS, the Site Plan for The Pitch – Phase 2 is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for The Pitch – Phase 2 is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 1st day of December, 2025, that the Site Plan for The Pitch – Phase 2 is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: The Pitch - Phase 2 – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning Corrdinator REPORT DATE: November 21, 2025 MEETING DATE: November 25, 2025 GENERAL INFORMATION Owner/Applicant: Pitch, LLC Owner’s Representative: Erin Ollendike, P.E. – CDA Request: The applicant is requesting approval of a site plan for the second phase of a multi-family residential development. Location and Size: Property is generally located south of NW Douglas Parkway and east of NW 2nd Street, containing approximately 3.71-acres. AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. November 21, 2025 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Single Family Residential R-3 (Multi-Family Residential District) North Single-Family Residential Single Family Residential R-2 (One & Two Family Residential District) South Multi-Family Residential (Phase 1 of The Pitch) Single Family Residential R-3 (Multi-Family Residential District) East Single-Family Residential Single Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay) West Triumph Park Institutional A-1 (Agricultural District) HISTORY The subject property is located south of NW Douglas Parkway and east of NW 2nd Street. The property was included in the Prairie Rose Phase II rezoning and preliminary plat that were both approved in 2021. The subject property was platted as Lot 1, The Pitch Plat 1 in 2022. The first phase of The Pitch included three apartment buildings and one clubhouse building. Only the clubhouse and two of the apartment buildings (108 total units) were built. Building #3 on the north side of the site, as proposed on the Phase 1 site plan, was never built which was proposed to be a 52-unit building. The applicant is now proposing a new site plan for Phase 2 of the project which includes fewer total units than previously proposed and larger townhome-style units with attached garages. PROJECT DESCRIPTION The project involves the construction of four (4) townhome-style buildings. The total number of units proposed is 42 units. Building #1 will include 11 units, Building #2 will include 12 units, Building #3 will include 9 units, and Building #4 will include 10 units. Each building is two stories and between 24 and 27-feet in height. The footprints of each building will range from 9,975 square feet to 12,350 square feet. Each unit includes an attached garage. All but one of the garages includes 2 stalls. One of the garages is a one-car garage. ACCESS AND PARKING Two accesses are proposed into the site from NW Douglas Parkway. A ten-foot-wide trail exists along the south side of NW Douglas Parkway, adjacent to the subject site. A pedestrian connection will be provided into the site from the existing trail. A total of 93 parking spaces are required for the proposed site plan and they are providing 153 spaces. UTILITIES All public utilities are provided to the site. Stormwater detention is provided with a basin within Phase 1, just to the south of the proposed project. The owner of the property will be responsible for the ownership and maintenance of the detention areas and the private utilities within the site. November 21, 2025 3 of 3 LANDSCAPING & OPEN SPACE A 25-foot landscape buffer will be provided along the north, east and west sides of the development. A minimum amount of 20% of open space is required and the site plan identifies that a total of 36% of open space is being provided. PARKLAND DEDICATION Parkland dedication requirements were satisfied with the single-family residential development to the east within the Prairie Rose development. ELEVATIONS Elevations of the buildings will be constructed of mostly fiber cement siding, stone and asphalt shingles. Elevations of the proposed buildings have been provided for review. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan subject to remaining staff comments. THE PITCH - PHASE 2 4121 NW URBANDALE DRIVE, URBANDALE, IA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE UTILITY WARNING EXISTING/ PROPOSED USE CONSTRUCTION SCHEDULE DEVELOPMENT SUMMARY SUBMITTAL DATES PROJECT SITE ADDRESS SURVEYOR ZONING OWNER/DEVELOPER INDEX OF SHEETSVICINITY MAP GENERAL LEGEND ENGINEER LEGAL DESCRIPTION DATE OF SURVEY BENCHMARKS THE PITCH - PHASE 2 SITE PLAN FOR: WAUKEE, IOWA PRELIMI N A R Y NOT FOR C O N S T R U C T I O N l l l l l l www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call WAUKEE, IOWA PRELIMI N A R Y NOT FOR C O N S T R U C T I O N SITE DOUGLAS PK W Y NW NW 2 N D S T R E E T ARCHITECT WH RE F RE F UP RE F WH RE F WH RE F WH RE F RE F RE F RE F WH WH WH WH WH UP WH RE F RE F UP RE F WH RE F WH RE F WH RE F WH RE F RE F RE F RE F WH WH W H WH WH UP WH WH WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 W H WH WH W H WH WH WH WH WH WH WH R R R R UP R R R R R R UP R F1 FE FE REF.DW FT FT FT FT FT M FT FT N W D O U G L A S P A R K W A Y NW 2 N D S T R E E T S62°03'33"E 5.29' N47 ° 0 7 ' 4 4 " E 1 1 6 . 3 5 ' N74°32' 4 6 " E 1 2 7 . 0 7 ' Δ=2°11'21" L=43.56' R=1140.00' CH=43.55' CHB=N61°40'28"W N6 2 ° 4 6 ' 0 8 " W 5 9 8 . 2 6 ' S27°13'39"W 15.05' S72°13'39"W 75.00' S2 7 ° 1 3 ' 3 9 " W 4 3 3 . 4 7 ' Δ=27°17'47" L=219.15' R=460.00' CH=217.08' CHB=S13°34'43"W S0 0 ° 0 4 ' 0 9 " E 1 2 7 . 6 8 ' S89°49'22"E 567.03' N0 0 ° 1 0 ' 3 8 " E 2 4 8 . 1 1 ' N47 ° 0 7 ' 4 4 " E 1 6 0 . 3 5 ' N W R O S E M O N T C I R C L E OVERALL SITE PR E L I M I N A R Y P L A T C2.0 CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 WAUKEE, IOWA THE PITCH - PHASE 2THE PITCH - PHASE 2 PRELIMINARY PLAT FOR: FE FE REF. DW NW DOUGLAS PARKWAY NW 2 N D S T R E E T NW ROSEMO N T COURT CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 TO P O G R A P H I C S U R V E Y & D E M O L I T I O N P L A N C3.0 DEMOLITION NOTES WHREF REF UP REF WH REF WH REF WH REFREFREF REF WH WH WH WH WH UP WHREF REF UP REF WH REF WH REF WHREFREFWHWHWHWH UP WH WH WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH R R R R R R R R UP F1 NW DOUGLAS PARKWAY NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 DI M E N S I O N P L A N C4.0 TRAFFIC CONTROL NOTES PAVEMENT THICKNESS GENERAL NOTES REF WH REF WH REF WH REFREFREF REFWHWHWHWH WHREF REF UP REF WH REF WH REF WH REF WH REFREFREFREF WH WH WH WH WH UP WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH WH WH WH R R R R UPR R R R R R UP R F1 NW DOUGLAS PARKWAY CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 DI M E N S I O N P L A N C4.1 WHREF REF UP REF WH REF WH REF WH REFREFREF REF WH WH WH WH WH UP WHREF REF UP REF WH REF WH REF WHREFREFWHWHWHWH UP WH WH WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH R R R R R R R R UP F1 NW DOUGLAS PARKWAY NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 GR A D I N G P L A N C5.0 GRADING NOTES SOIL QUALITY RESTORATION NOTES REF WH REF WH REF WH REFREFREF REFWHWHWHWH WHREF REF UP REF WH REF WH REF WH REF WH REFREFREFREF WH WH WH WH WH UP WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH WH WH WH R R R R UPR R R R R R UP R F1 NW DOUGLAS PARKWAY CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 GR A D I N G P L A N C5.1 WH WH UP WH WH REF WH UP CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 GR A D I N G P L A N C5.2 DETAIL 'C' DETAIL 'A' DETAIL 'D' DETAIL 'B' DETAIL 'E' WHREF REF UP REF WH REF WH REF WH REF REF REF REF WH WH WH WH WH UP WHREF REF UP REF WH REF WH REF WH REF WH REF REF REF REF WH WH WH WH WH UP WH WH WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH WH WH WH R R R R UPR R R R R R UP R F1 FE l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll ll l l l l l l l l l l l l l l l l l l l l llllll l lllllllllllllllllll ll l lllll l lllll l l l R l l l l l l l l l l l l l l l l l l l l l l l l l NW DOUGLAS PARKWAY NW 2 N D S T R E E T DA #1 3.77 AC EROSION AND SEDIMENT CONTROL PLAN R l l l l SWPPP LEGEND VICINITY MAP WAUKEE, IOWA DISCHARGE POINT SUMMARYSTABILIZATION QUANTITIES ER O S I O N A N D S E D I M E N T C O N T R O L P L A N NOTES: THE PITCH - PHASE 2VICINITY MAP THE PITCH - PHASE 2 DOUGLAS PK W Y NW NW 2 N D S T R E E T SITE CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 C6.0 l l l l WHREF REF UP REF WH REF WH REF WH REFREFREF REF WH WH WH WH WH UP WHREF REF UP REF WH REF WH REF WHREFREFWHWHWHWH UP WH WH WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH R R R R R R UP F1 NW DOUGLAS PARKWAY NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 UT I L I T Y P L A N C7.0 UTILITY NOTES REF WH REF WH REF WH REFREFREF REFWHWHWHWH WHREF REF UP REF WH REF WH REF WH REF WH REFREFREFREF WH WH WH WH WH UP WH WH WH WH WH WH WH WH WH WH R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH WH WH WH R R R R UPR R R R R R UP R F1 NW DOUGLAS PARKWAY CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 UT I L I T Y P L A N C7.1 CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 DE T A I L S C8.0 MAILBOX PAD DETAIL MAILBOX CLUSTER PAD DETAIL INTEGRAL 6" STANDARD SPOT ELEVATION REFERENCE DETAIL DETECTABLE WARNING STRIP DETAIL HYDRANT ASSEMBLY DETAIL CONCRETE DRIVEWAY TYPE 'A' CLASS "A" INTEGRAL CURB AND SIDEWALK DOME GRATE 3" ROLLED CURB DETAILROCK APRON FOR PIPE OUTLET CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 DE T A I L S C8.1 CLEANOUT CASTING (DIMENSION ARE NOMINAL) SW-203 - SANITARY SEWER CLEANOUT TYPICAL SIGN POST 12" SUBGRADE PREPARATION ° SANITARY SEWER SERVICE RISER ° CITY OF WAUKEE OUTSIDE DROP CONNECTION PCC FLUME PCC LETDOWN FLUME DETAIL CURB RAMP FOR CLASS B OR C SIDEWALK EXISTING MODIFIED SW-513 INTAKE (POND 1C) CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 DE T A I L S C8.2FD-6HC HYDRODYNAMIC SEPARATOR MAINTENANCE PLANS FOR HYDRODYNAMIC SEPARATORS: UP UP UP UP UP UP F1 UP UP F1 FE FE REF.DW FT FT FT FT FT M FT FT LA N D S C A P E P L A N L1.0 CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 N W D O U G L A S P A R K W A Y NW 2 N D S T R E E T OVERALL SITE GENERAL NOTES OPEN SPACE REQUIREMENTS NORTH 25' BUFFER REQUIREMENTS WEST 25' BUFFER REQUIREMENTS EAST 25' BUFFER REQUIREMENTS SOUTH 25' BUFFER REQUIREMENTS MINIMUM PLANTING REQUIREMENTS W H RE F RE F UP RE F WH RE F W H RE F W H RE F RE F RE F RE F WH W H WH WH W H UP WH RE F RE F UP RE F W H RE F W H RE F WH RE F W H RE F RE F RE F RE F W H WH W H W H WH UP W H WH WH W H WH WH WH WH WH W H WH W H R R R R R R UP R R R R R R UP F1 WH WH WH WH WH WH WH WH WH WH W H R R R R UP R R R R R R UP R F1 FE FE N W D O U G L A S P A R K W A Y NW 2 N D S T R E E T CODE QTY COMMON NAME BOTANICAL NAME CONDITION AND SIZE OVERSTORY TREES EVERGREEN TREES ORNAMENTAL TREES PLANT SCHEDULE EAST BUFFER CODE QTY COMMON NAME BOTANICAL NAME CONDITION AND SIZE OVERSTORY TREES EVERGREEN TREES ORNAMENTAL TREES PLANT SCHEDULE NORTH BUFFER CODE QTY COMMON NAME BOTANICAL NAME CONDITION AND SIZE OVERSTORY TREES EVERGREEN TREES ORNAMENTAL TREES PLANT SCHEDULE WEST BUFFER CODE QTY COMMON NAME BOTANICAL NAME CONDITION AND SIZE OVERSTORY TREES EVERGREEN TREES SHRUBS PLANT SCHEDULE OPEN SPACE CI V I L D E S I G N A D V A N T A G E TH E P I T C H - P H A S E 2 EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 08 / 2 6 / 2 0 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 2506.474 SHEET NUMBER: EI : M A E SE C O N D S U B M I T T A L 10 / 1 4 / 2 0 2 5 TH I R D S U B M I T T A L 11 / 0 4 / 2 0 2 5 FO U R T H S U B M I T T A L 11 / 2 0 / 2 0 2 5 LA N D S C A P E P L A N L1.1 GENERAL NOTES - EXTERIOR 1. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATION AND COORDINATION. 2. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND / OR THE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE A/E FOR RESOLUTION PRIOR TO WORK. SHOULD THE DRAWINGS OR THE SPECIFICATIONS DISAGREE WITH THEMSELVES OR WITH EACH OTHER, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AND/OR MATERIALS. 3. ALL TRADES ARE REQUIRED TO REVIEW THE CONTRACT DOCUMENTS AS A WHOLE. NOT REVIEWING THE CONTRACT DOCUMENTS IN THEIR ENTIRETY, IS AT THE SOLE RISK OF THE CONTRACTOR. ERRORS AND OMISSIONS FROM NOT REVIEWING THE ENTIRE PROJECT SCOPE WILL NOT BE ACCEPTABLE. 4. EXTERIOR LOUVERS & PENTRATIONS TO MATCH SURROUNDING EXTERIOR FINISH COLOR. VERIFY FINAL COLOR WITH ARCHITECT. 5. EXTERIOR METER PANELS TO FIXED ON FLAT PANEL SIDING WITH 4" TRIM. VERIFY FINAL SIZE WITH ELECTRICAL PRIOR TO ORDER / INSTALLATION. 6. PROVIDE WEATHER TIGHT SEAL AROUND ALL PENETRATIONS THROUGH BUILDING ENVELOPE. 7. ALL INSTALLED MATERIALS TO BE COMPATIBLE WITH ONE ANOTHER CAUSING NO DELETERIOUS EFFECTS. FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 * NOTE ALL BUMPOUTS TO BE WRAPPED WITH FRONT SIDING COLOR FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 * NOTE ALL BUMPOUTS TO BE WRAPPED WITH FRONT SIDING COLOR SHEET TITLE: PROJECT: LDG PROJECT NO: PRELIMINARY NOT FOR CONSTRUCTION ISSUE: REVISION SCHEDULE: 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-323-2820 LLOYDCOMPANIES.COM ARCHITECT: LLOYD DESIGN GROUP LAURA DEVINE 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-328-2820 E: laura.devine@lloydcompanies.com CO P Y R I G H T 2 0 2 4 10 / 3 0 / 2 0 2 5 1 : 2 5 : 1 7 P M 25117 A400 10-31-2025 PITCH PHASE 2 WAUKEE, IA 9U SILOS SCHEMATIC SET EXTERIOR ELEVATIONS 3/32" = 1'-0" SILOS 9U - EAST1 3/32" = 1'-0" SILOS 9U- WEST2 3/32" = 1'-0" SILOS 9U - SOUTH3 3/32" = 1'-0" SILOS 9U - NORTH4 REV. # REV. DSC. REV. DATE EXTERIOR MATERIALS PALETTE- LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN LP SMARTSIDE- -6" LAP SIDING EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING Northern Ash 49% 29%22% GENERAL NOTES - EXTERIOR 1. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATION AND COORDINATION. 2. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND / OR THE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE A/E FOR RESOLUTION PRIOR TO WORK. SHOULD THE DRAWINGS OR THE SPECIFICATIONS DISAGREE WITH THEMSELVES OR WITH EACH OTHER, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AND/OR MATERIALS. 3. ALL TRADES ARE REQUIRED TO REVIEW THE CONTRACT DOCUMENTS AS A WHOLE. NOT REVIEWING THE CONTRACT DOCUMENTS IN THEIR ENTIRETY, IS AT THE SOLE RISK OF THE CONTRACTOR. ERRORS AND OMISSIONS FROM NOT REVIEWING THE ENTIRE PROJECT SCOPE WILL NOT BE ACCEPTABLE. 4. EXTERIOR LOUVERS & PENTRATIONS TO MATCH SURROUNDING EXTERIOR FINISH COLOR. VERIFY FINAL COLOR WITH ARCHITECT. 5. EXTERIOR METER PANELS TO FIXED ON FLAT PANEL SIDING WITH 4" TRIM. VERIFY FINAL SIZE WITH ELECTRICAL PRIOR TO ORDER / INSTALLATION. 6. PROVIDE WEATHER TIGHT SEAL AROUND ALL PENETRATIONS THROUGH BUILDING ENVELOPE. 7. ALL INSTALLED MATERIALS TO BE COMPATIBLE WITH ONE ANOTHER CAUSING NO DELETERIOUS EFFECTS. FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 * NOTE ALL BUMPOUTS TO BE WRAPPED WITH FRONT SIDING COLOR FIRST FLOOR 100' -0" T.O. STRUCTURE 124' -1 5/16" TRS BRG 118' -9" FLR TRS BRG 109' -1 1/8" W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 * NOTE ALL BUMPOUTS TO BE WRAPPED WITH FRONT SIDING COLOR SHEET TITLE: PROJECT: LDG PROJECT NO: ISSUE: REVISION SCHEDULE: 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-323-2820 LLOYDCOMPANIES.COM ARCHITECT: LLOYD DESIGN GROUP LAURA DEVINE 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-328-2820 E: laura.devine@lloydcompanies.com CO P Y R I G H T 2 0 2 4 10 / 3 0 / 2 0 2 5 1 : 2 7 : 0 7 P M 00000 A400 10-30-2025 PITCH PHASE 2 WAUKEE, IA 10U SILOS SCHEMATIC SET EXTERIOR ELEVATIONS KEYNOTE SCHEDULE 3/32" = 1'-0" SILOS 1OU - WEST ELEVATION1 3/32" = 1'-0" SILOS 10U - EAST ELEVATION2 3/32" = 1'-0" SILOS 10U - SOUTH ELEVATION3 3/32" = 1'-0" SILOS 10U - NORTH ELEVATION4 REV. # REV. DSC. REV. DATE EXTERIOR MATERIALS PALETTE- LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN LP SMARTSIDE- -6" LAP SIDING EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING Northern Ash 48% 32%20% GENERAL NOTES - EXTERIOR 1. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATION AND COORDINATION. 2. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND / OR THE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE A/E FOR RESOLUTION PRIOR TO WORK. SHOULD THE DRAWINGS OR THE SPECIFICATIONS DISAGREE WITH THEMSELVES OR WITH EACH OTHER, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AND/OR MATERIALS. 3. ALL TRADES ARE REQUIRED TO REVIEW THE CONTRACT DOCUMENTS AS A WHOLE. NOT REVIEWING THE CONTRACT DOCUMENTS IN THEIR ENTIRETY, IS AT THE SOLE RISK OF THE CONTRACTOR. ERRORS AND OMISSIONS FROM NOT REVIEWING THE ENTIRE PROJECT SCOPE WILL NOT BE ACCEPTABLE. 4. EXTERIOR LOUVERS & PENTRATIONS TO MATCH SURROUNDING EXTERIOR FINISH COLOR. VERIFY FINAL COLOR WITH ARCHITECT. 5. EXTERIOR METER PANELS TO FIXED ON FLAT PANEL SIDING WITH 4" TRIM. VERIFY FINAL SIZE WITH ELECTRICAL PRIOR TO ORDER / INSTALLATION. 6. PROVIDE WEATHER TIGHT SEAL AROUND ALL PENETRATIONS THROUGH BUILDING ENVELOPE. 7. ALL INSTALLED MATERIALS TO BE COMPATIBLE WITH ONE ANOTHER CAUSING NO DELETERIOUS EFFECTS. FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 4 " / 1 2 "4" / 12"4 " / 1 2 "4 " / 1 2 " W2 W2 W1 W1 W1 W1 W2 W2 W3 W2 W1 W1 4" / 12" W1 W1 W2W2 W3 W2 W1 W1 4" / 12" FIRST FLOOR 100' -0" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 4 " / 1 2 "4" / 12"4 " / 1 2 "4" / 12" W1 W1 W2 W2 W3 W2 W1 W1 W1 W1 W2 W2 W3 W2 W1 W1 W1 W1 W2 W2 4" / 1 2 " 4" / 1 2 " 3" / 12" FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" W1 W1 W1 FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" SHEET TITLE: PROJECT: LDG PROJECT NO: ISSUE: REVISION SCHEDULE: 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-323-2820 LLOYDCOMPANIES.COM ARCHITECT: LLOYD DESIGN GROUP LAURA DEVINE 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-328-2820 E: laura.devine@lloydcompanies.com CO P Y R I G H T 2 0 2 4 PRELIMINARY NOT FOR CONSTRUCTION 10 / 1 0 / 2 0 2 5 1 1 : 1 5 : 2 3 A M 25104 A400 08-07-2025 PITCH PHASE 2 WAUKEE, IA 11U COVINGTON SCHEMATIC SET EXTERIOR ELEVATIONS KEYNOTE SCHEDULE 1/8" = 1'-0" COVINGTON 11U - NORTH ELEVATION3 1/8" = 1'-0" COVINGTON 11U - SOUTH ELEVATION4 1/8" = 1'-0" COVINGTON 11U - EAST ELEVATION1 1/8" = 1'-0" COVINGTON 11U - WEST ELEVATION2 REV. # REV. DSC. REV. DATE EXTERIOR MATERIALS PALETTE- LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN LP SMARTSIDE- -6" LAP SIDING EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING Northern Ash 33% 50%27% - BUILDING 1 - BUILDING 1 - BUILDING 1 - BUILDING 1 GENERAL NOTES - EXTERIOR 1. SEE CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL FOR ADDITIONAL INFORMATION AND COORDINATION. 2. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND / OR THE SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE A/E FOR RESOLUTION PRIOR TO WORK. SHOULD THE DRAWINGS OR THE SPECIFICATIONS DISAGREE WITH THEMSELVES OR WITH EACH OTHER, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AND/OR MATERIALS. 3. ALL TRADES ARE REQUIRED TO REVIEW THE CONTRACT DOCUMENTS AS A WHOLE. NOT REVIEWING THE CONTRACT DOCUMENTS IN THEIR ENTIRETY, IS AT THE SOLE RISK OF THE CONTRACTOR. ERRORS AND OMISSIONS FROM NOT REVIEWING THE ENTIRE PROJECT SCOPE WILL NOT BE ACCEPTABLE. 4. EXTERIOR LOUVERS & PENTRATIONS TO MATCH SURROUNDING EXTERIOR FINISH COLOR. VERIFY FINAL COLOR WITH ARCHITECT. 5. EXTERIOR METER PANELS TO FIXED ON FLAT PANEL SIDING WITH 4" TRIM. VERIFY FINAL SIZE WITH ELECTRICAL PRIOR TO ORDER / INSTALLATION. 6. PROVIDE WEATHER TIGHT SEAL AROUND ALL PENETRATIONS THROUGH BUILDING ENVELOPE. 7. ALL INSTALLED MATERIALS TO BE COMPATIBLE WITH ONE ANOTHER CAUSING NO DELETERIOUS EFFECTS. FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 4 " / 1 2 "4" / 12"4 " / 1 2 "4 " / 1 2 " W2 W2 W1 W1 W1 W1 W2 W2 W3 W2 W1 W1 4" / 12" W3 W2W1W1 W1 W1 W2W2 W3 W2 W1 W1 7.76 7.32 7.51 7.51 7.58 TYP. TYP. TYP. 7.56 TYP.TYP. TYP. TYP. 4" / 12" 7.79 TYP. 26.04 10.04 TYP. TYP. 7.51 7.51 7.51 TYP. TYP. 7.51 7.86 TYP.7.86 7.86 7.51 TYP. FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 4 " / 1 2 "4" / 12"4 " / 1 2 "4" / 12" W2 W1 W1 W3 W1 W1 W2 W2 W3 W2 W1 W1 W1 W1 W2 W2 W3 W2 W1 W1 W1 W1 W2 W2 7.76 7.32 TYP. 7.58 TYP. 7.56 7.58 TYP.TYP. 7.51 TYP. TYP. 4" / 1 2 " 4" / 1 2 " 4" / 1 2 " 7.51 7.51 7.51 7.3226.04 TYP. 10.04 TYP. 7.85 7.79 TYP. 7.56 7.58 7.57 7.57 7.86 7.86 TYP. 7.86 7.51 FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 7.32 TYP. 7.85 7.76 7.76 TYP. 7.51 7.51 7.86 7.51 7.51 7.57 FIRST FLOOR 100' -0" T.O. STRUCTURE 127' -6 1/8" FLR TRS BRG 109' -1 1/8" TRS BRG 118' -9" 4 " / 1 2 "4" / 12" 7.32 7.76 7.85 7.567.57 TYP. 7.51 7.51 7.76 7.85 TYP. TYP. TYP. 7.76 SHEET TITLE: PROJECT: LDG PROJECT NO: ISSUE: REVISION SCHEDULE: 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-323-2820 LLOYDCOMPANIES.COM ARCHITECT: LLOYD DESIGN GROUP LAURA DEVINE 150 E. 4TH PLACE SUITE 600 SIOUX FALLS, SD 57104 PH: 605-328-2820 E: laura.devine@lloydcompanies.com CO P Y R I G H T 2 0 2 4 PRELIMINARY NOT FOR CONSTRUCTION 10 / 1 0 / 2 0 2 5 8 : 5 2 : 4 8 A M 25104 A400 10-10-2025 PITCH PHASE 2 WAUKEE, IA 12U COVINGTON SCHEMATIC SET EXTERIOR ELEVATIONS 1/8" = 1'-0" COVINGTON 12U -SOUTH ELEVATION 3 1/8" = 1'-0" COVINGTON 12U - NORTH ELEVATION 4 1/8" = 1'-0" COVINGTON 12U - WEST ELEVATION A 1 1/8" = 1'-0" COVINGTON 12U - EAST ELEVATION B 2 REV. # REV. DSC. REV. DATE EXTERIOR MATERIALS PALETTE- LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN LP SMARTSIDE- -6" LAP SIDING EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING Northern Ash 30% 41%29% - BUILDING 2 - BUILDING 2 - BUILDING 2 - BUILDING 2