HomeMy WebLinkAbout2025-12-15 I01F_01 Waukee Public Safety Building_Pmt Est 24AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 15, 2025 AGENDA ITEM:Consideration of approval of Payment Estimate No. 24 (Combined) for the Waukee Public Safety Building Project in the amount of $54,732.46. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: The new Public Safety Building (Station 92) is substantially completed and the building is now fully occupied by both the Police and Fire Departments. Pay Estimate 24 for the Waukee Public Safety Building project generally reflects the payout of retainage for several of the individual bids on the project as well as some general construction costs. The building is considered 99.78% complete and approximately $64,000 remains to be paid out on the project. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: Payment Estimate No. 24 is in the amount of $54,732.46. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Pay Estimate No. 24 ATTACHMENTS: I. Pay Estimate No. 24 PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F1 Document G736™ – 2009 Project Application and Project Certificate for Payment, Construction Manager as Adviser Edition AIA Document G736 – 2009 (formerly G722™CMa – 1992). Copyright © 1981, 1992 and 2009. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:06:39 ET on 12/02/2025 under Order No.4104251064 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA4D) 1 APPLICATION NO:24 Distribution to:TO OWNER:City of Waukee 230 W. Hickman Road Waukee, IA 50263>>>>> PROJECT: Waukee Public Safety Building 815 NW 20th Street Waukee, IA 50263>>>>> PERIOD TO: November 30, 2025 ATTENTION: Brad Deets VIA CONSTRUCTION MANAGER:Ryan Companies US, Inc.PROJECT NOS:6173-000 / 21841001 OWNER: CONSTRUCTION MANAGER: ARCHITECT: OTHER : PROJECT APPLICATION FOR PAYMENT PROJECT CERTIFICATE FOR PAYMENT Application is made for Payment, as shown below, in connection with the Project. AIA Document G737™–2009, Summary of Contractors' Applications for Payment, is attached. 1. TOTAL CONTRACT SUMS (Item A Totals)28,868,514.50 2. TOTAL NET CHANGES BY CHANGE ORDERS (Item B Totals)430,126.69 3. TOTAL CONTRACT SUM TO DATE (Item C Totals)29,298,641.19 In accordance with the Contract Documents, based on evaluation of the Work and the data comprising this Application, the Construction Manager certifies to the Owner that to the best of its knowledge, information and belief the Work has progressed as indicated; the quality of the Work is in accordance with the Contract Documents; and the Construction Manager recommends to the Owner and Architect that the Contractors be paid the AMOUNTS set forth in the attached Summary of Contractors' Applications for Payment. 4. TOTAL COMPLETED & STORED TO DATE (Item F Totals)29,234,297.29 5. RETAINAGE (Item H Totals)674,470.63 6. LESS PREVIOUS TOTAL PAYMENTS (Item I Totals)28,505,094.20 TOTAL OF AMOUNTS CERTIFIED ...........................................................54,732.46 7. CURRENT PAYMENT DUE (Item J Totals)54,732.46 CONSTRUCTION MANAGER: By:Date:The undersigned Construction Manager certifies that to the best of its knowledge, information and belief this Project Application for Payment is an accurate compilation of the Contractors' Applications for Payment, attached hereto. CONSTRUCTION MANAGER: By:Date: State of: In accordance with the Contract Documents, based on evaluation of the Work, the data comprising this Application, and the Construction Manager's recommendation, the Architect certifies to the Owner that to the best of its knowledge, information and belief the Work has progressed as indicated; the quality of the Work is in accordance with the Contract Documents; and the Contractors are entitled to payments of the AMOUNTS set forth in the attached Summary of Contractors' Applications for Payment. County of: ARCHITECT: Subscribed and sworn to before me this day of By:Date: Notary Public: My Commission expires: Document G737™ – 2009 Summary of Contractors' Applications for Payment, Construction Manager as Adviser Edition AIA Document G737 – 2009(formerly G723™CMa – 1992). Copyright © 1992 and 2009. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 17:06:32 ET on 12/02/2025 under Order No.4104251064 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3B9ADAA4) 1 APPLICATION NO.:24 APPLICATION DATE:December 02, 2025 AIA Document G732, Application and Certificate for Payment, has been completed by each Contractor. The content of those G732 forms is summarized below.PERIOD FROM:November 01, 2025 PERIOD TO:November 30, 2025 In tabulations below, amounts are in US dollars.PROJECT NOS.:Ryan Co.: 6173-000 /OPN: 21841001 0 A B C D E F G H I J K L DESCRIPTION OF WORK CONTRACTOR'S NAME ORIGINAL CONTRACT SUM NET CHANGES IN THE WORK CONTRACT SUM TO DATE WORK IN PLACE TO DATE STORED MATERIALS (Not in D or I) TOTAL COMPLETED AND STORED TO DATE (D + E) RETAIN- AGE % RETAINAGE AMOUNT PREVIOUS PAYMENTS CURRENT PAYMENT (F – H – I) BALANCE TO FINISH (C – F) % COMPL. (F ÷ C) General Const DDVI 2,905,000.00 142,045.52 3,047,045.52 3,042,374.22 0.00 3,042,374.22 5.00%152,118.71 2,890,255.51 0.00 4,671.30 99.85% Building Concrete Jordison Const 1,271,000.00 -1,563.00 1,269,437.00 1,269,437.00 0.00 1,269,437.00 0.00%0.00 1,269,437.00 0.00 0.00 100.00% Precast Material Enterprise Precast 1,833,316.00 -2,822.13 1,830,493.87 1,830,493.87 0.00 1,830,493.87 0.00%0.00 1,830,493.87 0.00 0.00 100.00% Steel Material TSF Structures 1,932,100.00 6,640.00 1,938,740.00 1,938,740.00 0.00 1,938,740.00 0.00%0.00 1,938,740.00 0.00 0.00 100.00% Erection Northwest Steel 1,064,188.00 13,560.00 1,077,748.00 1,077,748.00 0.00 1,077,748.00 0.00%0.00 1,077,748.00 0.00 0.00 100.00% Metal Panels Forman Ford 575,239.00 0.00 575,239.00 575,239.00 0.00 575,239.00 0.00%0.00 575,239.00 0.00 0.00 100.00% Roofing Academy Roofing 998,000.00 5,530.75 1,003,530.75 1,003,530.75 0.00 1,003,530.75 0.00%0.00 1,003,530.75 0.00 0.00 100.00% Glass & Glazing Ford Metro 1,069,100.00 2,740.33 1,071,840.33 1,071,840.33 0.00 1,071,840.33 0.00%0.00 1,071,840.33 0.00 0.00 100.00% Overhead Doors Skold Door 310,000.00 1,346.00 311,346.00 311,346.00 0.00 311,346.00 5.00%15,567.30 295,778.70 0.00 0.00 100.00% Frame & Drywall Hilsabeck Schacht 2,562,500.00 47,759.98 2,610,259.98 2,610,259.98 0.00 2,610,259.98 5.00%130,513.01 2,470,748.91 8,998.06 0.00 100.00% Fire Protection Elite Fire Sprinkler 364,700.00 0.00 364,700.00 364,700.00 0.00 364,700.00 0.00%0.00 364,700.00 0.00 0.00 100.00% Mech & Plumbing Kruck Plumbing 5,947,000.00 67,676.51 6,014,676.51 6,014,676.51 0.00 6,014,676.51 0.00%0.00 6,014,676.51 0.00 0.00 100.00% Elec & Comm Van Maanen 4,711,425.00 224,651.60 4,936,076.60 4,936,076.60 0.00 4,936,076.60 5.00%246,803.83 4,645,795.69 43,477.08 0.00 100.00% Audio-Visual TriCity Electric 602,832.00 -4,351.00 598,481.00 598,481.00 0.00 598,481.00 0.00%0.00 598,481.00 0.00 0.00 100.00% Earthwork Wenthold 803,330.50 379.00 803,709.50 804,050.10 0.00 804,050.10 5.00%40,202.51 763,847.60 0.00 -340.60 100.04% SWPPP Absolute 155,000.00 -95,391.00 59,609.00 47,084.00 0.00 47,084.00 5.00%2,354.20 43,723.75 1,006.05 12,525.00 78.99% Site Concrete Jordison Const 1,110,000.00 26,594.13 1,136,594.13 1,136,594.13 0.00 1,136,594.13 5.00%56,829.79 1,078,513.07 1,251.27 0.00 100.00% Landscape & Irrig Alpha Landscapes 653,784.00 -4,670.00 649,114.00 601,625.80 0.00 601,625.80 5.00%30,081.29 571,544.51 0.00 47,488.20 92.68% 0.00 0.00 0.00 0.00 0.00 0.00 0.00%0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00 0.00 0.00 0.00%0.00 0.00 0.00 0.00 0.00% TOTALS $28,868,514.50 $430,126.69 $29,298,641.19 $29,234,297.29 $0.00 $29,234,297.29 2.31%$674,470.63 $28,505,094.20 $54,732.47 $64,343.90 99.78% Waukee Public Safety Building: Pay Application No. 24 Pay Apps Due to Ryan Co: 11/23/2025 Pay Apps Due to OPN: 12/07/2025 Council Packet Info to Waukee: 12/10/2025 by midnight Council Approval: 12/15/2025 Payment Due to Prime C ontractors no later than: 11/18/2025 Prime Contractors Current (less retainage) Bid Package #1: General C onstruction (DDVI) Bid Package #2: Building C oncrete (Jordison Construction) Bid Package #3: Precast Material (Enterprise Precast) Bid Package #4: Steel Material & Misc. Metals (TSF Structures) Bid Package #5: Precast & Steel Erection (Northwest Steel) Bid Package #6: Metal Panels (Forman Ford) Bid Package #7: Roofing (Academy Roofing) Bid Package #8: Glass & Glazing (Ford Metro) Bid Package #9: Overhead Doors (Skold Door) Bid Package #10: Framing, Drywall & Ceilings (Hilsabeck Schacht)8,998.06 Bid Package #11: Fire Protection (Elite Fire Sprinkler) Bid Package #12: Mechanical & Plumbing (Kruck Plumbing & Heating) Bid Package #13: Electrical & Communications (Van Maanen Electric)43,477.08 Bid Package #14: Audio-Visual (Tri-C ity Electric) Bid Package #15: Earthwork & Utilities (Wenthold Excavating) Bid Package #16: SWPPP (Absolute Group)1,006.05 Bid Package #17: Site Concrete (Jordison Construction)1,251.27 Bid Package #18: Landscaping & Irrigation (Alpha Landscapes) Pay Application Subtotal 54,732.46