HomeMy WebLinkAbout2026-01-05 I01F_03 Lift Stations 4 & 6 Rehab_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 5, 2026 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Wendler, Inc., f/k/a WRH, Inc., for the Lift Stations No. 4 & 6 Rehabilitation Project, increasing the contract amount by $11,991.11. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is for replacing the existing 4-inch force main pipes between the wet well and valve manhole at Lift Station No. 4; the original pipes were found to be severely corroded when the piping was exposed during construction and two outdoor mounted stainless steel disconnects were installed at Lift Station No. 4 as the original disconnects were found to be unusable. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $11,991.11. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Rudy Koester RK I1F3 December 29, 2025 Rudy Koester Director of Public Works City of Waukee 805 University Avenue Waukee, Iowa 50263 CITY OF WAUKEE, IOWA LIFT STATION NOS. 4 & 6 REHABILITATION CHANGE ORDER NO. 1 Enclosed are three copies of Change Order No. 1 for the Lift Station Nos. 4 & 6 Rehabilitation project. Change Order No. 1 is for replacing the existing 4-inch force main pipes between the wet well and valve manhole at Lift Station No. 4. The pipes were found to be severely corroded when the piping was exposed during construction. Change Order No. 1 is also for providing two outdoor mounted stainless steel disconnects to be installed at Lift Station No. 4. The existing disconnects to be reused were found to be unusable. Change Order No. 1 increases the contract price by $11,991.11. Change Order No. 1 also extends the completion date of the project from November 21, 2025 to April 30, 2026 due to conditions outside of the control of the contractor. We recommend approval of Change Order No. 1 by the City Council of the City of Waukee. Please sign all copies of Change Order No. 1 in the spaces provided. Return one signed copy of Change Order No. 1 to our office and one signed copy to Wendler, Inc. Rudy Koester December 29, 2025 Page 2 If you have any questions, please contact us at 515-225-8000. VEENSTRA & KIMM, INC. Forrest S. Aldrich FSA:crt 275374 Enclosure cc: Brad Oja, Wendler, Inc. (email) Sara Kappos, City of Waukee – w/enclosure (email) Tim Royer, City of Waukee - w/enclosure (email) Becky Schuett, City of Waukee – w/enclosure (email) Lisa Bauman, City of Waukee – w/enclosure (email) Rachel Bruns, City of Waukee – w/enclosure (email) Tracy Lovetinsky, City of Waukee – w/enclosure (email)