HomeMy WebLinkAbout2026-01-05 I06 US Signal Addition_Site Plan AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: January 5, 2026
AGENDA ITEM: Consideration of approval of resolution approving a site plan for US Signal –
Addition (390 NE Alice’s Road)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a site plan for a
building addition to an existing data center. The property is located north of
Hickman Road and west of NE Alice’s Road, containing 5-acres.
The property includes an existing data center building and exterior mechanical
units. The existing building is approximately 19,453 square feet in area and
22-ft in height at the tallest point. The existing building was built in 2009.
The project includes additions to the existing building. A total of 33,522
square feet of building space is being proposed to be added to the existing
building. This includes a 2,145 square foot office addition along the east side
of the building and a 31,377 square foot warehouse addition along the west
side of the building. Both of these spaces are proposed to be single-story and a
maximum of 22-feet in height at the tallest point.
The project also includes additional parking to accommodate the new space, a
trash enclosure at the northwest corner of the site, additional mechanical
equipment on site for the data center, a loading dock at the northwest corner
of the building, and a 6-foot-tall ornamental fence surrounding the entire
property with a gate at the entrance.
The existing access into the site from NE Alice’s Road will remain.
The project includes an expansion of the parking lot in order to provide
additional parking. The site currently includes a total of 30 parking spaces.
The proposed site plan will add a total of 35 parking spaces, for a total of 65
parking spaces for the overall site, including 2 accessible spaces. This will
meet the required amount of parking spaces.
The new addition will be serviced with all public utilities. Stormwater
detention is provided both offsite and within the southeast corner of the site.
A minimum of 25% of the project area is required to be open space. The total
amount of open space proposed is 40%. The landscape plan meets the
requirements of the Landscape and Open Space Ordinance.
The elevations of the office portion of the building addition are proposed to be
constructed of brick veneer to match the existing building, aluminum
paneling, and storefront glazing. The elevations of the warehouse portion of
the building addition are proposed to be constructed of precast paneling and
I6
brick to match the existing building. The trash enclosure will be constructed
of the same brick to match the building.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission
reviewed the site plan request at their meeting on November 25, 2025,
and recommended approval:
Approval of a Site Plan for US Signal - Addition (390 NE Alice’s Road)
Melissa DeBoer, Planning Coordinator, introduced the request for approval of a site plan for a building
addition, as requested by ONENECK DATA CENTER HOLDINGS LLC, represented by Jordan
Cogley of Etzel.
The property is generally located north of Hickman Road and west of NE Alice’s Road, containing
approximately 5 acres. This location includes an existing data center building and exterior mechanical
units. The existing building is approximately 19,453 square feet in area and 22-ft in height at the
tallest point. The existing building was built in 2009.
The project includes additions to the existing building. A total of 33,522 square feet of building space
is being proposed to be added to the existing building. This includes a 2,145 square foot office addition
along the east side of the building and a 31,377 square foot warehouse addition along the west side of
the building. Both of these spaces are proposed to be single-story and a maximum of 22-feet in height
at the tallest point.
The project also includes additional parking to accommodate the new space, a trash enclosure at the
northwest corner of the site, additional mechanical equipment on site for the data center, a loading
dock at the northwest corner of the building, and a 6-foot-tall ornamental fence surrounding the entire
property with a gate at the entrance. The existing access into the site from NE Alice’s Road will
remain.
The project includes an expansion of the parking lot in order to provide additional parking. The site
currently includes a total of 30 parking spaces. The proposed site plan will add a total of 35 parking
spaces, for a total of 65 parking spaces for the overall site, including 2 accessible spaces. This will
meet the required amount of parking spaces.
No new public sidewalks or trails are proposed with this project. Private sidewalks will be provided
internal to the site in order to provide pedestrian access from the parking lot to the building. The new
addition will be serviced with all public utilities. Stormwater detention is provided both offsite and
within the southeast corner of the site. A minimum of 25% of the project area is required to be open
space. The total amount of open space proposed is 40%. The landscape plan meets the requirements of
the Landscape and Open Space Ordinance.
The elevations of the office portion of the building addition are proposed to be constructed of brick
veneer to match the existing building, aluminum paneling, and storefront glazing. The elevations of the
warehouse portion of the building addition are proposed to be constructed of precast paneling and
brick to match the existing building. The trash enclosure will be constructed of the same brick to
match the building.
The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff
recommends approval of the site plan subject to remaining staff comments.
Discussion as follows:
• Staff verified no correspondence has been received
• General discussion of potential equipment noise in the area
• Discussion of gate system and parking
Motion by Commissioner Broderick for Approval of a Site Plan for US Signal - Addition (390 NE
Alice’s Road), seconded by Commissioner Lohse. Ayes: Broderick, Streit, Bankole, Beenken, Lohse,
Tuel, and Bannister. Nays: None. Motion carried.
RECOMMENDATION: Approve the resolution subject to remaining staff comments.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan
IV. Building Elevations
PREPARED BY: Melissa DeBoer, Planning Coordinator
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2026-
APPROVING THE SITE PLAN FOR US SIGNAL – ADDITION (390 NE ALICE’S ROAD)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for US Signal – Addition, subject to remaining staff comments on November 25,
2025; AND,
WHEREAS, the Site Plan for US Signal – Addition is in general conformance with §160 – Site
and Building Development Standards Ordinance of the Waukee Municipal Code; AND,
WHEREAS, the Site Plan for US Signal – Addition is in general conformance with §161 –
Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 5th day of January, 2026, that the Site Plan for US Signal – Addition is approved.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Kala Anderson
Chris Crone
Rob Grove
Lori Lyon
Anna Bergman Pierce
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: US Signal - Addition – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning
Coordinator
REPORT DATE: November 21, 2025
MEETING DATE: November 25, 2025
GENERAL INFORMATION
Owner/Applicant: ONENECK DATA CENTER HOLDINGS LLC
Project Manager:
Jordan Cogley, Etzel
Request: The applicant is requesting approval of a site plan for
a building addition.
Location and Size: Property is generally located north of Hickman Road
and west of NE Alice’s Road, containing
approximately 5 acres.
Property Address:
390 NE Alice’s Road
AREA MAP
ABOVE: Aerial of subject property (outlined in RED).
November 21, 2025
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Data Center Business Park C-4 (Office Park Commercial District)
North MidAmerican
Energy Substation Business Park C-1 (Community and Highway Service
Commercial District)
South Regional Detention
Basin
Business Park C-4 (Office Park Commercial District)
East Single-Family
Residential / Rural
Residential (City of
Clive)
N/A (City of Clive) N/A (City of Clive)
West Townhome
Residential
Medium Density
Residential
R-4 (Row Dwelling and Townhome
Dwelling District)
HISTORY
The property includes an existing data center building and exterior mechanical units. The existing building is
approximately 19,453 square feet in area and 22-ft in height at the tallest point. The existing building was built
in 2009.
PROJECT DESCRIPTION
The project includes additions to the existing building. A total of 33,522 square feet of building space is being
proposed to be added to the existing building. This includes a 2,145 square foot office addition along the east
side of the building and a 31,377 square foot warehouse addition along the west side of the building. Both of
these spaces are proposed to be single-story and a maximum of 22-feet in height at the tallest point.
The project also includes additional parking to accommodate the new space, a trash enclosure at the
northwest corner of the site, additional mechanical equipment on site for the data center, a loading dock at
the northwest corner of the building, and a 6-foot-tall ornamental fence surrounding the entire property with
a gate at the entrance.
ACCESS AND PARKING
The existing access into the site from NE Alice’s Road will remain.
The project includes an expansion of the parking lot in order to provide additional parking. The site currently
includes a total of 30 parking spaces. The proposed site plan will add a total of 35 parking spaces, for a total of
65 parking spaces for the overall site, including 2 accessible spaces. This will meet the required amount of
parking spaces.
SIDEWALKS/TRAILS
No new public sidewalks or trails are proposed with this project. Private sidewalks will be provided internal to
the site in order to provide pedestrian access from the parking lot to the building.
UTILITIES
The new addition will be serviced with all public utilities. Stormwater detention is provided both offsite and
within the southeast corner of the site.
November 21, 2025
3 of 3
LANDSCAPING & OPEN SPACE
A minimum of 25% of the project area is required to be open space. The total amount of open space
proposed is 40%. The landscape plan meets the requirements of the Landscape and Open Space Ordinance.
ELEVATIONS
The elevations of the office portion of the building addition are proposed to be constructed of brick veneer to
match the existing building, aluminum paneling, and storefront glazing. The elevations of the warehouse
portion of the building addition are proposed to be constructed of precast paneling and brick to match the
existing building. The trash enclosure will be constructed of the same brick to match the building.
STAFF RECOMMENDATION
The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff
recommends approval of the site plan subject to remaining staff comments.
PROPOSED CONCRETE SIDEWALK 4" THICKNESS
PROPOSED LANDSCAPING
PROPOSED FENCE
PROPOSED CONCRETE PAVEMENT 7" THICKNESS
PROPOSED GRAVEL
PROPOSED STORM INLET
SITE PLAN LEGEND
MB
B
S
ST
TH
T
WV
DYH
IH
EH
PROPERTY LINE
EASEMENT
BUILDING SETBACK
EXISTING ROAD CENTERLINE
EXISTING SIGN- SINGLE POST
EXISTING FLOOD LIGHT
EXISTING LIGHT WITH CONCRETE BASE
EXISTING UTILITY POLE
EXISTING MAILBOX
EXISTING BOLLARD
EXISTING MONUMENT FOUND (FIRST TYPE)
EXISTING BENCHMARK
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM SEWER MANHOLE
EXISTING DRAINAGE INTAKE
EXISTING SINGLE CURB INTAKE
EXISTING BEEHIVE INTAKE (SIZE VARIES)
EXISTING TELECOM MANHOLE
EXISTING TELECOM HANDHOLE
EXISTING CONIFEROUS TREE (SIZE VARIES)
EXISTING DECIDUOUS TREE (SIZE VARIES)
EXISTING SHRUB (SIZE VARIES)
EXISTING WATER VALVE
EXISTING FIRE HYDRANT
EXISTING IRRIGATION HANDHOLE
EXISTING ELECTRIC HANDHOLE
EXISTING FENCE
PROPOSED DRAINAGE MANHOLE
PROPOSED SIGN
PROPOSED LIGHT POLE
PROPOSED FDC
HWY 6
NE
A
L
I
C
E
'
S
R
D
NE
W
E
S
T
G
A
T
E
D
R
NE HORIZON DR
PKWY
BOSTO
N
NE
NE
A
R
C
H
E
R
A
V
E
O
W
R
O
W
R
O
W
RN89°51'39"E 600.53'
S0
0
°
2
3
'
0
8
"
W
3
6
8
.
0
2
'
S89°51'39"W 509.21'
N50
°
0
7
'
1
6
"
W
1
1
8
.
4
6
'
N0
0
°
2
4
'
2
3
"
E
2
9
1
.
8
4
'
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX. O
E
EX. O
E
EX. O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX. OE
EX. OE
EX. BE
EX. B
E
EX. BE EX. BE EX. BE
EX
.
B
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
B
E
EX.
B
E
EX. BE
EX. BE
EX. BE
EX. BE
EX. BE
EX. BE EX. BE
EX. BE
PROP. BUILDING
DATA CENTER
31,377 SF
(PROPOSED USE: WAREHOUSE)
WV
DYH
THTHIH
IH
WV
B
B
B
T
TH
TH
TH
THTH
WV
DYH
IH
IH
EH
IH
MB
IH
IH
IH
IH
TH
TH
TH TH
TH
TH
TH
T
T
T
T
TH
TH
T
NE
A
L
I
C
E
'
S
R
D
R.
O
.
W
1
2
0
'
C
O
N
C
R
E
T
E
60
60
S
EX. GENERATOR YARD
ELECTRIC TRANSFORMER
MIDAMERICAN
CONCRETE
EX. CONCRETE
EX. ELECTRIC TRANSFORMER
ON CONCRETE PAD
EX. MECHANICAL EQUIPMENT
ON CONCRETE PAD
EX. ROCK
LANDSCAPING
EX. ROCK
LANDSCAPING
EX
.
S
I
D
E
W
A
L
K
EX. 1 STORY BUILDING
MASONRY AND STEEL
CONSTRUCTION
EXTERIOR BUILDING: 20,093 SF
EX. ROCK
LANDSCAPING
9.9' PUE
BK. 2008 PG. 7678
17.2' TELECOM
EASEMENT
BK. 702 PG. 23
19.9' UNDERGROUND
ELECTRIC EASEMENT
BK. 2001 PG. 1723
33.9' OVERHEAD
ELECTRIC EASEMENT
BK. 1999 PG. 003413
30' SANITARY SEWER
EASEMENT
BK 2008, PG 11527
10' P.U.E.
BK 2008, PG 7678
20' UNDERGROUND
ELECTRIC EASEMENT
BK 2001, PG 1723
33' OVERHEAD
ELECTRIC LINE
EASEMENT
BK 1999, PG 3413
16.5' TELECOMMUNICATIONS
EASEMENT
BK 702, PG 23
10' P.U.E.
BK2020, PG29981
5' P.U.E.
BK2014, PG 10241
60' PRIVATE'
STORM EASEMENT
BK 2018, PG 17884
30.0'
BUILDING SETBACK
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
BEEHIVE INTAKE
RIM ELEV: 1017.29'
OUTSIDE LIMITS
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
EX. SANITARY MANHOLE
RIM ELEV: 1014.28'
8" TRUSS FL OUT S ELEV: 1005.18'
14 - P
R
O
P
O
S
E
D
P
A
R
K
I
N
G
S
P
A
C
E
S
9' X 1
9
'
33.
0
'
55
.
2
'
10
9
.
5
'
22
.
8
'
20.0'
12
.
0
'
12
.
0
'
4 - PROPOSED PARKING SPACES
9' X 19'
3 - PROP. PA
R
K
I
N
G
S
P
A
C
E
S
9' X 19'
82.4
'
PROP.
BUILDING
OFFICE
2,145 SF
(PROPOSED
USE: OFFICE)
119.1'
75.6'
16
1
.
4
'
79.6'
207.0'
15
1
.
6
'
43
.
6
'
12 - PROPOSED PARKING SPACES
9' X 19'
FU
T
U
R
E
1
5
'
MI
D
A
M
E
R
I
C
A
N
EA
S
E
M
E
N
T
(P
R
I
V
A
T
E
)
30.
0
'
BU
I
L
D
I
N
G
SE
T
B
A
C
K
30
.
0
'
BU
I
L
D
I
N
G
SE
T
B
A
C
K
40.0' BUILDING SETBACK
30
.
0
'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
PROPOSED ADA
PARKING SPACE
PROPOSED SWING GATE
PROPOSED SWING GATE
W/ KNOX BOX
PROPOSED 6'
ORNAMENTAL FENCE
(PER ARCH PLANS)
PROPOSED 6'
ORNAMENTAL FENCE
(PER ARCH PLANS)
PROPOSED 6'
ORNAMENTAL FENCE
(PER ARCH PLANS)
PROPOSED 6'
ORNAMENTAL FENCE
(PER ARCH PLANS)
PROPOSED 6'
ORNAMENTAL FENCE
(PER ARCH PLANS)
PROPOSED 6'
ORNAMENTAL
FENCE
(PER ARCH
PLANS)
PROPOSED
DUMPSTER
ENCLOSURE
PROPOSED 6'
ORNAMENTAL FENCE
PROPOSED RETAINING
WALL
PROPOSED LOADING
DOCK
PROPOSED
SIDEWALK
RAMPPROPOSED
CONCRETE PADS
FOR TRANSFORMERSPROPOSED
CONCRETE PAD
FOR
GENERATORS
PROPOSED
CONCRETE PAD
FOR CHILLERS
PROPOSED EXTERIOR
PUMP ROOM
EX. CONCRETE
EX.
S
I
D
E
W
A
L
K
Pu
m
p
e
r
F
i
r
e
T
r
u
c
k
R25
.
0
'
R25
.
0
'
5.
0
'
5.
0
'
5.0'
9.0'
3.0
'
24
.
0
'
PROPOSED
ADA
SIGN
8 - P
R
O
P
O
S
E
D
P
A
R
K
I
N
G
S
P
A
C
E
S
9' X
1
9
'
PROP. SIDEWALK
EX. 66" RCP FES
FL ELEV: 1004.17'
EX. 66" RCP FES
FL ELEV: 1003.12'
EX. CONCRETE
PROPOSED FDC
(PLACED AGAINST
BUILDING PER CITY
COMMENTS)
13
2
.
9
'
EX. ENCLOSED
MECH ROOM
3.0
'
32
.
0
'
27.0'
PROPOSED GENERATOR YARD
9 - PROPOSED PARKING SPACES
9' X 19'
15 - PROPOSED PARKING SPACES
9' X 19'
FUTURE CURB
ALICE'S RD
EXPANSION
PROPOSED PATIO WITH
RETAINING WALL > 4'
(TO BE DESIGNED BY
STRUCTURAL ENGINEER)
PROPOSED PATIO WITH
RETAINING WALL > 4'
(TO BE DESIGNED BY
STRUCTURAL ENGINEER)
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
north
0 60'30'
SCALE 1" = 30'
SM
GENERAL NOTES
1.CONTRACTOR SHALL MAKE ARRANGEMENTS FOR THE PROPER BRACING, SHORING AND
OTHER REQUIRED PROTECTION OF ALL ROADWAYS AND EXCAVATIONS BEFORE
CONSTRUCTION BEGINS.
2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTING CONDITION,
INCLUDING BUT NOT LIMITED TO, THE PROPERTY BOUNDARY, THE BENCHMARK, EXISTING
BUILDING, PAVEMENT AND GROUND ELEVATIONS AND UTILITY HORIZONTAL AND VERTICAL
LOCATIONS BEFORE THE START OF CONSTRUCTION.
3.CONTRACTOR SHALL REPAIR AND REPLANT ANY EXISTING GRASS OR SOIL THAT IS
DISTURBED BY CONSTRUCTION ACTIVITY.
4.LOCATIONS OF ALL UTILITY LINES TO BE FIELD VERIFIED WITHIN AREA OF WORK.
CONTRACTOR TO NOTIFY OWNER/ENGINEER OF ANY DISCREPANCIES.
5.CONTRACTOR SHALL OBTAIN ALL NECESSARY JURISDICTIONAL PERMITS AND APPROVALS
PRIOR TO CONSTRUCTION BEGINNING.
6.THE TOPOGRAPHIC SURVEY WAS PROVIDED BY MCCLURE, JOB NO. 2025001453-000, DATED
06/18/2025. THESE IMPROVEMENT PLANS DO NOT WARRANT THE ACCURACY OF THE
PROVIDED SURVEY.
7.BASIS OF BEARINGS ARE BASED ON IOWA REGIONAL COORDINATE SYSTEM (RCS) - ZONE 8.
8.THE GEOTECHNICAL REPORT WAS PROVIDED BY TERRACON, JOB NO. 08245197-01, DATED
08/05/2025. ACTUAL CONDITIONS OF SOILS, PAVEMENTS, ETC. MAY VARY FROM THIS
REPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING CONDITIONS
FOUND IN THE FIELD AND REPORT VARIANCES FROM ASSUMPTIONS IN THE GEOTECHNICAL
REPORT TO THE ENGINEER.
9.VERTICAL DATUM ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF
1988 (NAVD88).
10.ALL WORK SHALL BE IN ACCORDANCE WITH 2025 CITY OF WAUKEE STANDARD
SPECIFICATIONS AND 2025 IOWA SUDAS.
11.REMOVE ALL DEBRIS AND MUD SPILLED INTO ROW AT THE END OF EACH WORK DAY AND
PRIOR TO A RAIN EVENT.
12.CONSTRUCTION MATERIALS AND EQUIPMENT SHALL NOT BE STORED IN THE RIGHT OF
WAY.
13.ALL STAKING, INCLUDING PEDESTRIAN FACILITIES, SHALL BE DONE UNDER THE DIRECTION
OF A LICENSED ENGINEER OR SURVEYOR.
ADDRESS:390 NE ALICE'S RD, WAUKEE, IA 50263
FOLIO NUMBER:1227403002
OWNER:US SIGNAL
ZONING: OFFICE PARK COMMERCIAL DISTRICT (C-4)
PROPOSED USE:COMBINATION OF OFFICE & WAREHOUSE
FUTURE LAND USE:BUSINESS PARK
ADJACENT ZONING:(N): C-1; (NW): R-4; (W); R-4; (E): CITY OF CLIVE RESIDENTIAL; (S): R-3
SITE AREA:217,800 SF (5.00 AC)
PROJECT AREA:217,800 SF (5.00 AC)
IMPERVIOUS / OPEN SPACE / (OPEN SPACE %)
EXISTING: 1.28 AC / 3.72 AC / (74%)
PROPOSED: 2.65 AC / 2.35 AC / (47%)
REQUIRED OPEN SPACE: 25%
BUILDING AREAS + HEIGHTS:
HEIGHT MAX ALLOWABLE HEIGHT
EX. OFFICE BUILDING (1-STORY) = 3,308 SF*16'40'
EX. WAREHOUSE (1-STORY) =16,127 SF*22'40'
EX. TOTAL = 19,453*
PROP. OFFICE (1-STORY)=2,145 SF 16'40'
PROP. WAREHOUSE (1-STORY)=31,377 SF 22'
TOTAL =52,957
REQUIRED YARD SETBACKS:
LOCATION REQUIRED PROVIDED
FRONT YARD (E)40'125.1'
SIDE YARD (N) ADJACENT TO 'R' ZONING 30'161.1'
SIDE YARD (N) 0'161.4'
SIDE YARD (S)30'55.2'
SIDE YARD (SW)30'33.0'
REAR YARD (W)30'75.6'
VEHICLE PARKING:
CODE REQUIRED :
SPACES REQ'D SPACES REQ'D BUILDING AREA TOTAL #
USE (PER SF)(PER EMPLOYEE)(SF)EMPLOYEES OF SPACES REQ'D
OFFICE 3 / 1,000 N/A 5,453 SF 17
WAREHOUSE 1 / 1,000 1 / 2 47,504 SF 0*48
TOTAL REQUIRED = 65
EX. PARKING SPACES TO REMAIN = 30
PROP. PARKING SPACES = 35
TOTAL PROVIDED = 65
PROP. PARKING SPACE TYPES:
ACCESSIBLE SPACES =2
STANDARD SPACES = 63
TOTAL VEHICLE SPACES = 65
*US SIGNAL WILL PROVIDE THE CITY OF WAUKEE WITH A PROJECTED EMPLOYEE AND STAFFING PLAN.
SITE DATA
VICINITY MAP- 1" = 2000'
LEGAL DESCRIPTION
LOT 1, THE CROSSING AT ALICE'S ROAD PLAT 3, AN OFFICIAL PLAT RECORDED IN BOOK 2008,
PAGE 11526, AT THE DALLAS COUNTY RECORDER'S OFFICE, CITY OF WAUKEE, DALLAS
COUNTY, IOWA AND CONTAINING 5.000 ACRES (217,800 S.F.) MORE OR LESS.
OWNER/DEVELOPER/APPLICANT
US SIGNAL
201 IONIA AVE SW,
GRAND RAPIDS, MI 49503
(866)-274-4625
ETZEL DESIGN AND BUILD
PROJECT MANAGER: JORDAN COGLEY
205 WEST WATER STREET
SAXONBURG, PA 16056
(724)-524-1280
EXP U.S. SERVICES
27777 FRANKLIN ROAD,
SUITE 1510
SOUTHFIELD, MI 48034
(248)-351-8200
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
SITE PLAN
C-200
PROJECT SITE
ADDRESS
390 NE ALICE'S ROAD, WAUKEE, IOWA 50263
SITE PLAN 3RD REVIEW
C
IH EH
EX.
B
E
EX.
B
E
EX.
B
E
EX.
B
E
EX.
W
M
1011
.
8
8
M
E
1011
.
8
6
M
E
1011.
8
5
M
E
1011.
8
1
M
E
1012.
2
9
1011
.
5
4
1011
.
6
9
1011
.
6
6
10
1
1
.
7
0
10
1
1
.
7
5
1011
.
9
5
M
E
10
1
2
.
0
0
M
E
10
1
2
.
3
0
M
E
10
1
2
.
2
8
M
E
1012.
2
6
1011
.
0
0
1012.
1
6
1012
0.5
%
1.2
%
5.6%
0.5%
0.7
%
0.5
%
0.4%
6.0%0.7
%
LEGEND
PROPOSED CONCRETE SIDEWALK
PROPOSED LANDSCAPING
PROPOSED FENCE
PROPOSED CONCRETE PAVEMENT
PROPOSED RIVER ROCK
PROPERTY LINE
EASEMENT
WM PROPOSED WATER MAIN
<PROPOSED STORM PIPE
PROPOSED STORM INLET
PROPOSED SIGN
PROPOSED DRAINAGE MANHOLE
PROPOSED CLEAN OUT
PROPOSED FDC
((PROPOSED SANITARY SERVICE
PROPOSED CONTOURXXXX
PROPOSED ADS BASIN
PROPOSED FOOTING DRAIN
BE PROPOSED BURIED ELECTRIC
FO PROPOSED FIBER OPTIC
PROPOSED OVERFLOW ARROW
HWL HIGH WATER LINE (100-YEAR STORM)
WM
WM
WM
WM
WM
WM
WM
WM
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<<
<<<<<<<<<<<<<
<
<
<
<<<<<<
<
<
<
<
<<<<<<<<<<<<<<<<<<<<<<<
(
<<<
<
BE
BE
BE
BE
BE BE
BE
BE
BE
BE
BE
BE
BE
<
<
BE
BE BEBEBEBE
FO
FO
FO
FO
FO
FO
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<<<<<<<<<<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
BE
BE
BE
BE
(
(
(((
BEBEBEBEBEBEBEBEBEBEBEBEBEBEBE
BE
BE
BE BE BE BE
BE
BE
O
W
R
O
W
R
O
W
RN89°51'39"E 600.53'
S0
0
°
2
3
'
0
8
"
W
3
6
8
.
0
2
'
S89°51'39"W 509.21'
N50
°
0
7
'
1
6
"
W
1
1
8
.
4
6
'
N0
0
°
2
4
'
2
3
"
E
2
9
1
.
8
4
'
WV
DYH
THTHIH
IH
WV
B
B
B
T
TH
TH
TH
THTH
WV
DYH
IH
IH
EH
IH
MB
IH
IH
IH
IH
TH
TH
TH TH
TH
TH
TH
T
T
T
T
TH
NE
A
L
I
C
E
'
S
R
D
R.
O
.
W
1
2
0
'
C
O
N
C
R
E
T
E
60
60
3.96'
S
EX
.
S
S
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. O
E
EX. O
E
EX. O
E
EX
.
B
E
EX
.
B
E
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX. CM
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX. CM
EX. CM
EX. CM
EX. CM
EX. CM
EX.
B
E
EX.
B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE EX. BE EX. BE EX. BE EX. BE
EX
.
B
E
EX. BE EX. BE
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX.
B
E
EX.
B
E
EX. B
EEX. BE
EX. BE
EX. BE EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE
EX. BE
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX.
B
E
EX. BE EX. BE EX. BE EX. BE
EX.
B
E
EX.
B
E
EX.
B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX. W EX. W EX. W EX. W EX. W EX. W EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM
EX
.
W
M
EX.
W
M
EX.
W
M
EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM
EX.
W
M
EX.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX. CM
EX. CM
EX. C
M
EX. C
M
EX. C
M
EX. C
M
EX. C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX. C
M
EX. CM
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX.
D
R
EX. DREX. DREX. DREX. DR
EX. DR
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX. DR EX. DR EX. DR EX. DR
EX. DR EX. DR
EX.
D
R
EX.
D
R
EX.
D
R
EX.
D
R
EX.
D
R
100
3
100
4
100
5
100
6
100
7
100
8
100
9
101
0
1010
101
0
1010
1010
100
2
100
4
1006
1008
100
8
1008
1012
1012
101
2
1014
1016
10
1
8
1006
10
0
6
1007
10
0
7
100
8
10
0
8
100
9
1009
1010
10
1
0
1011
10
1
1
1012
10
1
2
10
1
3
10
1
3
10
1
4
10
1
4
10
1
4
101
5
1015
10
1
6
1016
1017 1017
101
7
1017
101
8
1018
PROP. BUILDING
FF = 1015.60
(WAREHOUSE)
PROP.
BUILDING
FF = 1015.60
(OFFICE)
10
0
5
100
6
100
7
1008
10
0
9
10101011101210131014
10
1
4
1014
10
1
4
10
1
4
10
1
5
1015
10
1
5
10
1
5
1015
10
1
6
10
1
6
1016
10
1
7
10
1
7
10
1
8
10
1
8
10
1
9
10
1
9
1015
1014
1013
1014
10
0
8
10
0
9
10
1
0
10
1
1
10
1
2
10
1
3
101
4
1015
1013
1014
1015
1016
10
1
7
10
1
7
1017
1017
1017
101
7 1017
10
1
7
10
1
7
10
1
8
10
1
8
10
1
8
101
8
10
1
8
10
1
9
10
1
9
101
9
PROP. DUMPSTER ENCLOSURE
EX
.
S
I
D
E
W
A
L
K
EX. ROCK
LANDSCAPING
FU
T
U
R
E
MI
D
A
M
E
R
I
C
A
N
EA
S
E
M
E
N
T
(P
R
I
V
A
T
E
)
CCI
ELECTRIC
TRANSFORMER
MIDAMERICAN
NEXGEN
EX. UNKNOWN UTILITY
GPR DETECTED
EX. SANITARY MANHOLE
RIM ELEV: 1014.28'
8" TRUSS FL OUT S ELEV: 1005.18'
9.87' PUE
BK. 2008 PG. 7678
17.15' TELECOM
EASEMENT
BK. 702 PG. 23
19.87' UNDERGROUND
ELECTRIC EASEMENT
BK. 2001 PG. 1723
32.86' OVERHEAD
ELECTRIC EASEMENT
BK. 1999 PG. 003413
10' P.U.E.
BK 2008, PG 7678
20' UNDERGROUND
ELECTRIC EASEMENT
BK 2001, PG 1723
33' OVERHEAD
ELECTRIC LINE
EASEMENT
BK 1999, PG 3413
16.5' TELECOMMUNICATIONS
EASEMENT
BK 702, PG 23
10' P.U.E.
5' P.U.E.
EX. 1 STORY BUILDING
MASONRY AND STEEL
CONSTRUCTION
EXTERIOR BUILDING: 20,093 SF
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS EX. 66" RCP FES
FL ELEV: 1004.17'
EX. 66" RCP FES
FL ELEV: 1003.12'
EX. 6" CPP ROOF DRAIN
TOP OF PIPE: 1009.31'
BEEHIVE INTAKE
RIM ELEV: 1017.29'
OUTSIDE LIMITS
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
10
1
5
10
1
5
1015
10
1
5
PROP. UNDERGROUND STORM DETENTION
SEE INSET 2/C-300
PROP. CROSSING
PROP. 8" WM UNDER
PROP. 15" PVC DRAIN
MIN CLEARANCE: 1.5'
PROP. CROSSING
EX. 8" WM UNDER
PROP. 6" PVC DRAIN
MIN CLEARANCE: 1.5'
PROP. CROSSING
PROP. 12" STORM OVER
PROP. DUCT BANK
MIN CLEARANCE: 1.0'
PROP. CROSSING
EX.DUCT BANK OVER
PROP. 24" STORM DRAIN
MIN CLEARANCE: 1.0'
PROP. CROSSING
EX.DUCT BANK OVER
PROP. 24" STORM DRAIN
MIN CLEARANCE: 1.0'
PROPOSED CROSSING
PROP. FIBER OPTIC
OVER PROP 15" STORM
MIN CLEARANCE: 0.5'
PROPOSED CROSSING
PROP. FIBER OPTIC
OVER PROP 15" STORM
MIN CLEARANCE: 0.5'
101
4
1014
101
5
1015
1015
10
1
5
10
1
5
STM CO-3
STM CO-4
STM CO-1
STM CO-9
ADS-4
ADS-3
STM CO-5
STM CO-6
ADS-5
ADS-6
ADS-7
STM CO-2
STM CO-7
10
1
5
10
1
5
1015
ADS-8
10
0
2
10
0
3
10
0
4
10
0
5
10
0
6
10
0
7
10
0
8
10
0
9
10
1
0
10
1
1
10
1
2
10
1
3
10
1
4
10
1
5
1010
1011
1012
1013
1014
101
4 1014 101
4
1014
10
1
5
1015
10
1
3
1013
ADS-9
10
1
4
10
1
5
OVERFLOW
ELEVATION = 1015.20
OVERFLOW
ELEVATION = 1011.50
ADS-10
ADS-11
PROP. CROSSING
PROP. 6" STORM OVER
PROP. DUCT BANK
MIN CLEARANCE: 1.0'
PROP. CROSSING
PROP. 8" STORM OVER
PROP. DUCT BANK
MIN CLEARANCE: 1.0'
STM CO-10
STM CO-8
STM CO-11
ST-1
ST-2
ST-3
ST-4
ST-6
ST-8
ST-7
ST-9
ST-10
ST-11
PROP. TRENCH DRAIN
RIM: 1011.60
INV (W): 1010.83
ADS-1
EX. ROCK
LANDSCAPING
45-LF OF 24" RCP
@ 0.40%
136-LF OF 24" RCP
@ 0.22%
7-LF OF 24" RCP
@ 0.0%
34-LF OF 24" RCP
@ 0.2%
11-LF OF 24" RCP
@ 0.15%
7-LF OF 15" RCP
@ 0.15%
4-LF OF 24" RCP
@ 0.15%
231-LF OF 24" RCP
@ 0.40%
33-LF OF 24" RCP
@ 0.40%
68-LF OF 24" RCP
@ 0.40%
125-LF OF 15" RCP
@ 0.40%
39-LF OF 8" PVC @ 1.7%
40-LF OF 15" PVC
@ 0.4%
54-LF OF 15" PVC
@ 0.40%
10-LF OF 15" RCP
@ 0.40%
ST-5
ADS-2
28-LF OF 15" PVC
@ 0.40%
60-LF OF 15" PVC
@ 0.40%
36-LF OF 12" PVC
@ 1.0%
54-LF OF 8" PVC
@ 1.0%
38-LF OF 8" PVC
@ 1.0%
186-LF OF 24" RCP
@ 0.4%
26-LF OF 6" PVC
MIN 1.0%
16-LF OF 4" PVC
MIN 1.0%62-LF OF 4" PVC
MIN 1.0%
INV: 1008.7
30-LF OF 15" PVC
1.0%
EX. CONCRETE
ROOF DRAIN
INTAKE
EX. CONCRETE ROOF
DRAIN INTAKE
ST-12
88-LF OF 24" RCP
@ 0.2%
72-LF OF 6" PVC
@ 2.0%
36-LF OF 8" PVC
@ 2.0%
56-LF OF 8" PVC
@ 2.0%
37-LF OF 12" PVC
@ 1.0%
103-LF OF 12" PVC
@ 1.0%
SEE MEP PLANS FOR CONTINUATION
SEE MEP PLANS FOR CONTINUATION
SEE MEP PLANS FOR CONTINUATION
62-LF OF 15" PVC
@ 0.40%
36-LF OF 6" PVC
@ 1.0%
SEE MEP PLANS FOR CONTINUATION
59-LF OF 6" PVC
@ 1.0%
SEE MEP PLANS FOR CONINTUATIONSEE MEP PLANS FOR CONINTUATIONSEE MEP PLANS FOR CONINTUATIONSEE MEP PLANS FOR CONINTUATIONSEE MEP PLANS FOR CONINTUATION
1014.
4
9
1015
.
5
0
1015.50
1014.
6
0
1015
.
1
6
M
E
1015.
1
0
M
E
1014.
8
5
M
E
1013.
0
0
1013.
0
1
1013.
0
5
1014.
0
1
1018
.
5
3
M
E
1019
.
2
7
M
E
1019
.
3
7
M
E
1013.
5
4
M
E
1017
.
0
0
M
E
1016.
6
4
M
E
1014.
9
7
M
E
1014.
2
9
M
E
1013.
9
9
1014
.
0
5
1013.86 1013
.
9
2
1014.
2
8
1013.
4
0
1013.01
1013
.
4
0
1012.
6
8
1012
.
9
9
M
E
1013
.
3
7
1013.
4
6
1013.
5
2
1013.
3
7
1013
.
3
8
101
3
.
5
2
1013
.
5
9
1013.
4
2
101
3
.
8
8
1013
.
5
3
1013.
5
3
1012
.
4
6
1012.
2
2
1011
.
6
7
1012.
5
7
M
E
1012.
0
9
M
E
1014.15
1014.15
1013
.
6
7
1016
.
1
9
M
E
1015
.
7
7
M
E
1015
.
6
0
1015.
3
0
1015.50
1015
.
6
0
1015.60
1015.
4
3
1012.90
1013
.
0
5
1012.
5
9
1012
.
8
0
1012
.
6
7
1013.
8
8
1013
.
3
3
1011.
0
0
1015.23
1014
.
0
0
M
E
1013
.
1
7
1015.05
1014.74
1012.59
1014
.
4
7
1015.
0
2
10
1
4
.
5
4
1015.
0
4
1014.
8
2
1012.
8
1
1015
.
1
5
1015
.
1
5
1015.
1
5
1014.
8
2
1015.
0
0 1015
.
0
0
1015.
2
0
1015.
2
0
1015
.
3
0
1015
.
2
0
1014.
6
0
1015.
2
0
1014
.
6
0
1015
.
2
0
1015.
0
7
1015.
0
7
1014
.
5
3
1014.
0
1
1014.
0
2
1015.
1
6
1015
.
1
6
1014
.
9
4
1015
.
1
4
1013
.
5
1
1014.
1
4
1015
.
5
0
10
1
5
.
6
0
1015.
6
0
1015
.
4
0
T
P
1013
.
5
6
G
101
5
.
5
7
T
P
101
3
.
5
5
G
1015.
5
4
T
P
1014.
6
5
G
101
5
.
6
0
T
P
10
1
4
.
5
9
G
10
1
5
.
0
1
1015
.
0
0
1012.
3
0
1014
.
9
5
1015
.
1
6
1014.
8
9
1013.
7
6
1013
.
4
0
1012
.
4
5
1012
.
4
0
1014.
5
0
1014
.
0
7
1015
.
5
8
1015.
4
9
PROP. CROSSING
EX. ELEC CONDUIT OVER
PROP. 24" STORM DRAIN
MIN CLEARANCE: 1.0'
PROP. CROSSINGS
PROP. 8" STORM
OVER PROP. DUCT BANK
MIN CLEARANCE: 1.0'
TYP.
232-LF OF STORM PIPE SHALL COMPLY WITH
HORIZONTAL SEPARATION REQUIREMENTS FROM
EXISTING WATER MAIN, IN ACCORDANCE WITH
EITHER NOTE 3.3 OR 3.4 OF UTILITY NOTES ON
SHEET C-400
1013
.
3
2
1013
.
9
0
1012.
3
9
1012.
1
6
10
1
2
1012
10131013
1013
1012
1014
1012
.
4
0
1017.
7
7
1010
.
7
6
1014.
0
1
8.7%
5.0%
1.
0
%
11.7%
11.7%
13.3%
10.8%
11.7
%
5.
9
%
30
.
9
%
28
.
2
%
2.
5
%
24.7%
24.0%
8.
9
%
1011.
6
0
HWL=1011.67
HW
L
=
1
0
1
3
.
8
0
HW
L
=
1
0
1
4
.
6
4
HWL=1
0
1
2
.
5
6
PROP. CROSSING
PROP. 4" ROOF DRAIN B.O.P. 1008.69
PROP. 8" WM T.O.P. 1004.69
CLEARANCE: 1.0'
66" RCP
FL OF PIPE: 1001.64'
HWL
=
1
0
1
4
.
5
7
OUTLET INVERT 1005.70'
BOTTOM = 1001.64
AREA = 2265 SF
HWL=1014.94
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
2 GRADING AND DRAINAGE PLAN
1" = 10'
north
1 GRADING AND DRAINAGE PLAN
1" = 20'
GENERAL NOTES
1.CONTRACTOR SHALL MAKE ARRANGEMENTS FOR THE PROPER BRACING, SHORING AND
OTHER REQUIRED PROTECTION OF ALL ROADWAYS AND EXCAVATIONS BEFORE
CONSTRUCTION BEGINS.
2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTING CONDITION,
INCLUDING BUT NOT LIMITED TO, THE PROPERTY BOUNDARY, THE BENCHMARK,
EXISTING BUILDING, PAVEMENT AND GROUND ELEVATIONS AND UTILITY HORIZONTAL
AND VERTICAL LOCATIONS BEFORE THE START OF CONSTRUCTION.
3.CONTRACTOR SHALL REPAIR AND REPLANT ANY EXISTING GRASS OR SOIL THAT IS
DISTURBED BY CONSTRUCTION ACTIVITY.
4.LOCATIONS OF ALL UTILITY LINES TO BE FIELD VERIFIED WITHIN AREA OF WORK.
CONTRACTOR TO NOTIFY OWNER/ENGINEER OF ANY DISCREPANCIES.
5.CONTRACTOR SHALL OBTAIN ALL NECESSARY JURISDICTIONAL PERMITS AND
APPROVALS PRIOR TO CONSTRUCTION BEGINNING.
6.THE TOPOGRAPHIC SURVEY WAS PROVIDED BY MCCLURE, JOB NO. 2025001453-000,
DATED 06/18/2025. THESE IMPROVEMENT PLANS DO NOT WARRANT THE ACCURACY OF
THE PROVIDED SURVEY.
7.THE GEOTECHNICAL REPORT WAS PROVIDED BY TERRACON, JOB NO. 08245197-01,
DATED 08/05/2025. ACTUAL CONDITIONS OF SOILS, PAVEMENTS, ETC. MAY VARY FROM
THIS REPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING
CONDITIONS FOUND IN THE FIELD AND REPORT VARIANCES FROM ASSUMPTIONS IN THE
GEOTECHNICAL REPORT TO THE ENGINEER.
8.VERTICAL DATUM ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88).
1.THE MINIMUM FINISHED FLOOR ELEVATION OF ALL BUILDINGS AND CRITICAL EQUIPMENT PADS SHALL BE
1015.60' PER THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
2.ALL WALKS EXTERNAL TO THE BUILDING SHALL MEET ADA ACCESSIBLITY CRITERIA UNLESS OTHERWISE
SPECIFICALLY NOTED NOT TO BE REQUIRED IN SPECIFIC AREAS OF THE PLAN VIEW.
3.PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE GRADE UNLESS
OTHERWISE NOTED ON DRAWINGS
4.EXISTING AND PROPOSED ELEVATION POINTS/CONTOURS/ETC. SHOWN ON PRINTED PLANS MAY NOT
DIRECTLY REFLECT ALL DATA USED TO CONSTRUCT SAID FEATURES. REFER TO THE SURFACE OR
DIGITAL ELEVATIONS MODEL FOR ADDITIONAL GRADING DETAILS AND DATA SOURCES.
5.ALL ELEVATIONS AND SURFACE WATER FLOW PATTERNS WITHIN THE PROJECT AREA ARE TO MATCH
EXISTING UNLESS A SUB-AREA IS SPECIFICALLY NOTED OTHERWISE IN THE PLAN VIEW.
6.ALL WALKS EXTERNAL TO THE BUILDING SHALL MEET ADA ACCESSIBLITY CRITERIA UNLESS OTHERWISE
SPECIFICALLY NOTED NOT TO BE REQUIRED IN SPECIFIC AREAS OF THE PLAN VIEW.
7.PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE GRADE UNLESS
OTHERWISE NOTED ON DRAWINGS
8.EXISTING AND PROPOSED ELEVATION POINTS/CONTOURS/ETC. SHOWN ON PRINTED PLANS MAY NOT
DIRECTLY REFLECT ALL DATA USED TO CONSTRUCT SAID FEATURES. REFER TO THE SURFACE OR
DIGITAL ELEVATIONS MODEL FOR ADDITIONAL GRADING DETAILS AND DATA SOURCES.
9.ALL ELEVATIONS AND SURFACE WATER FLOW PATTERNS WITHIN THE PROJECT AREA ARE TO MATCH
EXISTING UNLESS A SUB-AREA IS SPECIFICALLY NOTED OTHERWISE IN THE PLAN VIEW.
10.UNDERGROUND STORAGE DETENTION:
10.1.INTERNAL CAPACITY: 20418.43 CF
10.2.TOP ELEVATION: 1011.28 FT
10.3.BOTTOM ELEVATION 1006.28 FT
GRADING AND DRAINAGE NOTES
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
GRADING AND DRAINAGE PLAN
C-300SITE PLAN 3RD REVIEW
0 40'20'
B
A
TP TOP
G GROUND
ME MATCH EXISTING
HWL HIGH WATER LINE (100-YEAR STORM)
ACRONYMS
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
north
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
GRADING AND DRAINAGE PLAN
C-301SITE PLAN 3RD REVIEW
0 40'20'
DRAINAGE STRUCTURE TABLE
STRUCTURE RIM STRUCTURE TYPE LID TYPE DIRECTION INVERT ELEV.
ST-1 1011.00 SW-502 TYPE R INV NW 1007.10
ST-2 1012.21 SW-401 TYPE 4B INV N 1006.66
INV W 1007.67
INV SE 1006.76
INV S V.I.F.
ST-3 1012.59 FLOW DIVERSION
STRUCTURE (SEE
DETAIL)
TYPE F INV N 1006.54
INV S 1006.64
INV E 1006.54
ST-4 1012.81 HDS DEVICE (SEE
DETAIL)
TYPE F INV W 1006.50
INV S 1006.50
ST-5 1013.16 CONTROL
STRUCTURE
TYPE F INV W 1006.28
INV SE 1006.28
ST-6 1011.37 SW-401 TYPE F INV NW 1005.98
INV SE 1005.88
ST-7 1012.80 SW-511 TYPE 6 INV E 1008.04
INV W 1008.14
ST-8 1012.67 SW-502 TYPE Q INV E 1008.43
INV S 1008.53
INV W V.I.F.
ST-9 1013.00 SW-512 TYPE 3A INV N 1008.64
INV S 1008.74
ST-10 1013.01 SW-512 TYPE 3A INV N 1008.88
INV S 1008.98
INV E 1010.12
ST-11 1013.05 SW-512 TYPE 3A INV N 1009.23
INV SW 1009.33
ADS-2 1014.74 15" ADS NYLOPLAST
BASIN
DOME GRATE INV W 1010.31
ADS-3 1014.82 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV W 1011.75
NOTE: CATCH BASINS, MANHOLES, CLEANOUTS, AND LIDS SPECIFIED IN TABLE ARE PER DIVISION 6 OF THE IOWA STATEWIDE URBAN
DESIGN AND SPECIFICATIONS (SUDAS) SPECIFICATIONS MANUAL
SECTION A
PROPERTY
LINE
50.0'
GREENSPACE
PROP. CONCRETE SIDEWALK
(SEE CIVIL DETAIL)
PROP LOADING DOCK
(SEE STRUCTURAL
PLANS)
PROP
RETAINING
WALL
(SEE
STRUCTURAL
PLANS)
22.0'
NOT TO SCALE
10.0-15.0%
6.0-10.0%
2% MAX
CROSS
SLOPE
30.0'
GREENSPACE
3
1
(MAX)
2.0% - 3.0%
2.0% - 3.0%
2.0% - 3.0%
24.0'19.0'8.0'
7.5"
PROP. DRIVE AISLE GRADE = 1015.73
PROP. PARKINGPROP. PARKING
PROP.
CONCRETE
SECTION
(REFER TO
CIVIL DETAILS)
PROP. 6"
INTEGRAL
CURB
(REFER TO
CIVIL DETAILS)PROP. 2 1
4 DEPRESSED
CURB
(REFER TO CIVIL DETAILS)
SECTION B
NOT TO SCALE
7.5"
PROPERTY
LINE
ST-12 1012.90 INV N 1006.83
INV SW 1006.93
SW-401 TYPE F
INV S 1008.74
ADS-1 1015.23 15" ADS NYLOPLAST
BASIN
DOME GRATE INV NW 1009.49
ADS-4 1015.04 18" ADS NYLOPLAST
BASIN
FLAT GRATE INV N 1010.80
ADS-5 1014.14 18" ADS NYLOPLAST
BASIN
FLAT GRATE INV E 1010.07
ADS-6 1014.02 18" ADS NYLOPLAST
BASIN
FLAT GRATE INV N 1009.04
ADS-7 1014.01 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV NW 1010.88
INV E 1009.59
INV W 1009.04
INV E 1009.04
INV S 1010.07
ADS-8 1013.51 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV E 1010.43
INV S 1010.43
INV W 1010.80
INV SW 1010.88
INV SW 1010.80
INV S 1010.50
ADS-9 1014.50 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV S 1011.74
ADS-10 1014.85 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV N 1011.38
INV W 1011.38
INV E 1011.38
ADS-11 1014.07 12" ADS NYLOPLAST
BASIN
FLAT GRATE INV SE 1010.52
INV W 1010.52
INV NE 1010.50
INV NW 1010.50
c
c
O
W
R
O
W
R
O
W
R
WV
DYH
THTHIH
IH
WV
B
B
B
T
TH
TH
TH
THTH
WV
DYH
IH
IH
EH
IH
MB
IH
IH
IH
IH
TH
TH
TH TH
TH
TH
TH
T
T
T
T
TH
TH
T
NE
A
L
I
C
E
'
S
R
D
R.
O
.
W
1
2
0
'
C
O
N
C
R
E
T
E
60
60
3.96'
S
F3
F2
F1
EX
.
S
S
EX
.
S
S
EX
.
S
S
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. O
E
EX. O
E
EX. O
E
EX
.
B
E
EX
.
B
E
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX. CM
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX. CM
EX. CM
EX. CM
EX. CM
EX. CM
EX.
B
E
EX.
B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE EX. BE EX. BE EX. BE EX. BE
EX
.
B
E
EX. BE EX. BE
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
O
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX.
B
E
EX.
B
E
EX. B
EEX. BE
EX. BE
EX. BE EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE
EX. BE
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX.
B
E
EX. BE EX. BE EX. BE EX. BE
EX.
B
E
EX.
B
E
EX.
B
E
EX.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX
.
B
E
EX. BE
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX
.
G
A
S
EX. W EX. W EX. W EX. W EX. W EX. W EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM
EX
.
W
M
EX.
W
M
EX.
W
M
EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM EX. WM
EX.
W
M
EX.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
W
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. CM EX. CM EX. CM EX. CM
EX
.
C
M
EX. CM
EX. CM
EX. C
M
EX. C
M
EX. C
M
EX. C
M
EX. C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX.
C
M
EX
.
C
M
EX
.
C
M
EX. CM
EX. C
M
EX. CM
EX. CM
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX. C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX
.
C
M
EX.
D
R
EX. DREX. DREX. DREX. DR
EX. DR
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX
.
D
R
EX. DR EX. DR EX. DR EX. DR
EX. DR EX. DR
EX.
D
R
EX.
D
R
EX.
D
R
EX.
D
R
EX.
D
R
EX. CONCRETE
ROOF DRAIN
INTAKE
EX. CONCRETE ROOF
DRAIN INTAKE
EX. ELECTRIC TRANSFORMER
ON CONCRETE PAD
EX. MECHANICAL EQUIPMENT
ON CONCRETE PAD
EX. ROCK
LANDSCAPING
EX. ROCK
LANDSCAPING
EX
.
S
I
D
E
W
A
L
K
1 STORY BUILDING
MASONRY AND STEEL
CONSTRUCTION
EXTERIOR BUILDING: 20,093 SF
EX. ROCK
LANDSCAPING
EX.
S
I
D
E
W
A
L
K
O
W
R
O
W
R
O
W
R
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
66" RCP FES
FL ELEV: 1003.12'
66" RCP
FL OF PIPE: 1001.64'
6" CPP ROOF DRAIN
TOP OF PIPE: 1009.31'
BEEHIVE INTAKE
RIM ELEV: 1017.29'
OUTSIDE LIMITS
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
UTILITY BUILDING
STEEL CONSTRUCTION
EXTERIOR BUILDING: 454 SF
EX. SANITARY MANHOLE
RIM ELEV: 1014.28'
8" TRUSS FL OUT S ELEV: 1005.18'
66" RCP FES
FL ELEV:
1004.17'
WM
WM
WM
WM
WM
WM
WM
WM
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<<
<<<<<<<<<<<<<
<
<
<
<<<<<<
<
<
<
<
<<<<<<<<<<<<<<<<<<<<<<<
(
<<<
<
BE
BE
BE
BE
BE BE
BE
BE
BE
BE
BE
BE
BE
<
<
BE
BE BEBEBEBE
FO
FO
FO
FO
FO
FO
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
<<<<<<<<<<
<
<
<
<
<
<
<
<
<
<
<
<
<
<
BE
BE
BE
BE
(
(
(((
BEBEBEBEBEBEBEBEBEBEBEBEBEBEBE
BE
BE
BE BE BE BE
BE
BE
PROP. BUILDING
(WAREHOUSE)
PROP. BUILDING
(OFFICE)
PROP. 8" 45° BEND
PROP. 8" TAPPING SLEEVE
AND VALVE
PROP. 8" TAPPING SLEEVE AND VALVE
PROP. CONNECT EX. SAN
SERVICE W/WYE FITTING
PROP. 45 LF OF 6" PVC SANITARY
SERVICE @ 1.5% SL.
PROPOSED FDC
(REFER TO FIRE PROTECTION)
PROP. 178 LF OF DIP WATER MAIN
PROP. 37 LF OF 8" DIP WATER MAIN
PROP. SAN CO-2
PROP. 23 LF OF 6" PVC SANITARY SERVICE
@ 1.5% SL.
PROP. SAN CO-1
CCI
SEGRAELECTRIC
TRANSFORMER
MIDAMERICAN
MCI
MI FIBER
NEXGEN
EX. UNKNOWN UTILITY
GPR DETECTED
9.87' PUE
BK. 2008 PG. 7678
17.15' TELECOM
EASEMENT
BK. 702 PG. 23
19.87' UNDERGROUND
ELECTRIC EASEMENT
BK. 2001 PG. 1723
32.86' OVERHEAD
ELECTRIC EASEMENT
BK. 1999 PG. 003413
30' SANITARY SEWER
EASEMENT
BK 2008, PG 11527
10' P.U.E.
BK 2008, PG 7678
20' UNDERGROUND
ELECTRIC EASEMENT
BK 2001, PG 1723
33' OVERHEAD
ELECTRIC LINE
EASEMENT
BK 1999, PG 3413
16.5' TELECOMMUNICATIONS
EASEMENT
BK 702, PG 23
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS EX. 66" RCP FES
FL ELEV: 1004.17'
EX. 66" RCP FES
FL ELEV: 1003.12'
EX. 6" CPP ROOF DRAIN
TOP OF PIPE: 1009.31'
BEEHIVE INTAKE
RIM ELEV: 1017.29'
OUTSIDE LIMITS
BEEHIVE INTAKE
RIM ELEV: 1017.09'
OUTSIDE LIMITS
FU
T
U
R
E
MI
D
A
M
E
R
I
C
A
N
EA
S
E
M
E
N
T
(P
R
I
V
A
T
E
)
PROP. PLUG
PROP. SAN CO-4
PROP. 32 LF OF 6" PVC
SANITARY SERVICE
@ 1.5%
CONNECT TO EX. SEWER MAIN
INV: 1005.18
EX. SANITARY MANHOLE
RIM ELEV: 1014.28'
8" TRUSS FL OUT S ELEV: 1005.18'
PROP. 6 LF OF 6" PVC
SANITARY SERVICE
@ 1.5% SL.
PROP. 8" 45° BEND
PROP. 8" 45° BEND
PROP. CROSSING
PROP. 8" WM OVER EX. DUCT BANK
MIN CLEARANCE: 1.0'
PROP. CROSSING
EX. ELECTRIC CONDUIT OVER
PROP. 8" WM
MIN CLEARANCE: 0.5'
PROP. CROSSING
PROP. 8" WM UNDER PROP. 4" ROOF DRAIN
MIN CLEARANCE: 1.5'
PROP. 6" SAN SERVICE INVERT: 1007.43'
SEE MEP PLANS FOR CONTINUATION
PROPOSED CROSSING
PROP. FIBER OPTIC
UNDER PROP. STORM
MIN CLEARANCE: 1.0'
PROP. FIBER OPTIC
(REFER TO ELECTRICAL)
PROP. FIBER BOX
(REFER TO ELECTRICAL)
10' P.U.E.
BK2020, PG 29981
5' P.U.E.
BK2014, PG 10241
60' PRIVATE'
STORM EASEMENT
BK 2018, PG 17884
PROP. GENERATORS
(REFER TO MECHANICAL)
PROP. CHILLERS
(REFER TO MECHANICAL)
PROP. TRANSFORMERS
(REFER TO ELECTRICAL)
PROP. SWITCHGEARS
PROPOSED CROSSING
PROP. BURIED ELECTRIC
UNDER PROP. 8" STORM
MIN CLEARANCE: 1.0'
PROPOSED CROSSING
PROP. BURIED ELECTRIC
UNDER PROP. 6" UNDERDRAIN
MIN CLEARANCE: 1.0'
PROPOSED CROSSING
PROP. FIBER OPTIC
UNDER PROP. STORM
MIN CLEARANCE: 1.0'PROPOSED CROSSING
PROP. BURIED ELECTRIC CONDUIT
OVER PROP. 8" WATER MAIN
MIN CLEARANCE: 1.0'
FUTURE
MIDAMERICAN
EASEMENT
(PRIVATE)
PROP. BURIED ELECTRIC DUCT
BANK (REFER TO ELECTRICAL)
PROP. BURIED ELECTRIC DUCT
BANK (REFER TO ELECTRICAL)
PROP. BURIED LIGHTING CONDUIT
(REFER TO ELECTRICAL)
PROP. BURIED ELECTRIC CONDUIT
(REFER TO ELECTRICAL), TYP
PROPOSED CROSSING
PROP. BURIED ELECTRIC
UNDER PROP. 12" STORM
MIN CLEARANCE: 1.0'
PROPOSED CROSSING
PROP. BURIED ELECTRIC
UNDER PROP. 15" STORM
MIN CLEARANCE: 1.0'
PROPOSED CROSSINGS
PROP. BURIED ELECTRIC
UNDER PROP. 8" STORM
MIN CLEARANCE: 1.0'
TYP.
PROP. GENERATOR
(REFER TO MECHANICAL)
19.85'8.42'
13.66'
105.38'
31
.
7
5
'
PROP. 6" 45° BEND
PROP. 6" WYE
PROP. SAN CO-3
PROP. 6 LF OF 6" PVC
SANITARY SERVICE
@ 1.5% SL.
PROP. 6" 45° BEND
5.
0
0
'
(
M
I
N
)
11.15'
27
.
0
6
'
27-LF OF SANITARY PIPE SHALL COMPLY WITH
HORIZONTAL SEPARATION REQUIREMENTS FROM
EXISTING WATER SERVICE, IN ACCORDANCE WITH
NOTE 3.3 OF UTILITY NOTES ON SHEET C-400
PROPOSED FIBER BOX
(COORDINATE LOCATION WITH ELECTRICAL)
LEGEND
PROPOSED CONCRETE SIDEWALK
PROPOSED LANDSCAPING
PROPOSED FENCE
PROPOSED CONCRETE PAVEMENT
PROPOSED RIVER ROCK
PROPERTY LINE
EASEMENT
WM PROPOSED WATER MAIN
<PROPOSED STORM PIPE
PROPOSED STORM INLET
PROPOSED SIGN
PROPOSED DRAINAGE MANHOLE
PROPOSED CLEAN OUT
PROPOSED FDC
((PROPOSED SANITARY SERVICE
PROPOSED CONTOURXXXX
PROPOSED FOOTING DRAIN
PROPOSED ADS BASIN
BE PROPOSED BURIED ELECTRICFOPROPOSED FIBER OPTIC
FO PROPOSED FIBER OPTIC
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
north
0 40'20'
SCALE 1" = 20'
SM
GENERAL NOTES
1.CONTRACTOR SHALL MAKE ARRANGEMENTS FOR THE PROPER BRACING, SHORING AND
OTHER REQUIRED PROTECTION OF ALL ROADWAYS AND EXCAVATIONS BEFORE
CONSTRUCTION BEGINS.
2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTING CONDITION,
INCLUDING BUT NOT LIMITED TO, THE PROPERTY BOUNDARY, THE BENCHMARK,
EXISTING BUILDING, PAVEMENT AND GROUND ELEVATIONS AND UTILITY HORIZONTAL
AND VERTICAL LOCATIONS BEFORE THE START OF CONSTRUCTION.
3.CONTRACTOR SHALL REPAIR AND REPLANT ANY EXISTING GRASS OR SOIL THAT IS
DISTURBED BY CONSTRUCTION ACTIVITY.
4.LOCATIONS OF ALL UTILITY LINES TO BE FIELD VERIFIED WITHIN AREA OF WORK.
CONTRACTOR TO NOTIFY OWNER/ENGINEER OF ANY DISCREPANCIES.
5.CONTRACTOR SHALL OBTAIN ALL NECESSARY JURISDICTIONAL PERMITS AND
APPROVALS PRIOR TO CONSTRUCTION BEGINNING.
6.THE TOPOGRAPHIC SURVEY WAS PROVIDED BY MCCLURE, JOB NO. 2025001453-000,
DATED 06/18/2025. THESE IMPROVEMENT PLANS DO NOT WARRANT THE ACCURACY OF
THE PROVIDED SURVEY.
7.THE GEOTECHNICAL REPORT WAS PROVIDED BY TERRACON, JOB NO. 08245197-01,
DATED 08/05/2025. ACTUAL CONDITIONS OF SOILS, PAVEMENTS, ETC. MAY VARY FROM
THIS REPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING
CONDITIONS FOUND IN THE FIELD AND REPORT VARIANCES FROM ASSUMPTIONS IN THE
GEOTECHNICAL REPORT TO THE ENGINEER.
8.VERTICAL DATUM ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88).
UTILITY NOTES
1.CONTRACTOR SHALL PLAN ALL PROPOSED UTILITY CROSSINGS PRIOR TO INSTALLATION
TO CONFIRM HORIZONTAL AND VERTICAL CLEARANCES CALLED FOR IN THE PLANS ARE
MET AND/OR WILL MEET THE REQUIREMENTS OF ALL AGENCIES HAVING JURISDICTION
OVER THE UTILITIES.
2.WATER AND SEWER MAINS SHALL BE INSTALLED WITH A MINIMUM OF TEN FEET
HORIZONTAL CLEARANCE FROM OUTSIDE WALLS OF PIPE UNLESS OTHERWISE
NOTED/ALLOWED.
3.WATER SERVICES SHALL BE INSTALLED WITH A MINIMUM OF TEN FEET HORIZONTAL
CLEARANCE BETWEEN STORMWATER OR SANITARY SEWER PIPES MEASURED FROM
OUTSIDE WALLS OF PIPE UNLESS OTHERWISE NOTED/ALLOWED. WHEN IMPOSSIBLE TO
MAINTAIN A TEN FEET HORIZONTAL SEPARATION, MAINTAIN A MINIMUM SEPARATION OF
3 FEET AND UTILIZE ONE OF THE FOLLOWING WITHIN 10 FEET MEASURED EDGE-TO
EDGE:
3.1.CONSTRUCT THE WATER MAIN OF DUCTILE IRON PIPE WITH GASKETS IMPERMEABLE
TO HYDROCARBONS.
3.2.ENCLOSE THE WATER MAIN IN A WATERTIGHT CASING PIPE WITH EVENLY SPACED
ANNULAR GAP AND WATERTIGHT END SEALS.
3.3.CONSTRUCT STORM SEWER PIPE OF WATER MAIN MATERIALS.
3.4.CONSTRUCT STORM SEWERS OF REINFORCED CONCRETE PIPE WITH GASKETS
MANUFACTURED ACCORDING TO ASTM C443.
4.WATER SERVICES SHALL CROSS ABOVE STORMWATER AND SEWER PIPES WHERE
POSSIBLE AND MAINTAIN A MINIMUM CLEARANCE OF ONE AND A HALF FOOT FROM
OUTSIDE WALLS OF PIPE UNLESS OTHERWISE NOTED/ALLOWED. IF WATER MUST CROSS
UNDERNEATH, THERE SHALL BE A MINIMUM CLEARANCE OF ONE AND A HALF FEET FROM
OUTSIDE WALLS OF PIPE UNLESS OTHERWISE NOTED/ALLOWED. WATER/WATER
CROSSINGS MAY BE ALLOWED WITH A MINIMUM OF ONE HALF FOOT CLEARANCE.
5.WATER MAINS (INCLUDING FIRE LINES) SHALL BE INSTALLED A MINIMUM OF FOUR FEET
BELOW FINISHED GRADE OR ONE FOOT BELOW FROST DEPTH, WHICHEVER IS GREATER.
6.WATER SERVICES (DOMESTIC AND IRRIGATION) SHALL BE INSTALLED A MINIMUM OF
FOUR FEET BELOW FINISHED GRADE OR ONE FOOT BELOW FROST DEPTH, WHICHEVER
IS GREATER.
7.DRY UTILITIES (POWER, COMMUNICATIONS, ETC.) SHALL BE INSTALLED A MINIMUM OF
THREE FEET BELOW FINISHED GRADE OR BELOW FROST DEPTH, WHICHEVER IS
GREATER. REFER TO MEP AND TECHNOLOGY PLANS FOR THE DETAILS OF ALL
PROPOSED DRY UTILITIES.
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
UTILITY PLAN
C-400
c
OWNER'S CERTIFICATION
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE
GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT
AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM THE
CONSTRUCTION SITE AS PART OF THIS CERTIFICATION. FURTHER, BY MY SIGNATURE, I
UNDERSTAND THAT I AM BECOMING A CO-PERMITTEE, ALONG WITH THE CONTRACTOR AND
SUBCONTRACTORS SIGNING SUCH CERTIFICATIONS, TO THE IOWA DEPARTMENT OF NATURAL
RESOURCES NPDES GENERAL PERMIT NO.2 FOR "STORM WATER DISCHARGE ASSOCIATED WITH
INDUSTRIAL ACTIVITY FOR CONSTRUCTION ACTIVITIES" AT THE IDENTIFIED SITE. AS A
CO-PERMITTEE, I UNDERSTAND THAT I, AND MY ORGANIZATION, ARE LEGALLY REQUIRED UNDER
THE CLEAN WATER ACT AND THE CODE OF IOWA, TO ENSURE COMPLIANCE WITH THE TERMS AND
CONDITIONS OF THE STORM WATER POLLUTION PREVENTION PLAN DEVELOPED UNDER THIS NPDES
PERMIT AND THE TERMS OF THIS NPDES PERMIT.
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE
PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO
ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHERED AND EVALUATED THE INFORMATION
SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS WHO MANAGE THE SYSTEM, OR
THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, THE INFORMATION
SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I
AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION,
INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS."
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE
GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT
AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM
THE CONSTRUCTION SITE AS PART OF THIS CERTIFICATION. FURTHER, BY MY SIGNATURE, I
UNDERSTAND THAT I AM BECOMING A CO-PERMITTEE, ALONG WITH THE OWNER'S AND OTHER
CONTRACTORS AND SUBCONTRACTORS SIGNING SUCH CERTIFICATIONS, TO THE IOWA
DEPARTMENT OF NATURAL RESOURCES NPDES GENERAL PERMIT NO.2 FOR "STORM WATER
DISCHARGE ASSOCIATED WITH INDUSTRIAL ACTIVITY FOR CONSTRUCTION ACTIVITIES" AT THE
IDENTIFIED SITE. AS A CO-PERMITTEE, I UNDERSTAND THAT I AND MY COMPANY ARE LEGALLY
REQUIRED UNDER THE CLEAN WATER ACT AND THE CODE OF IOWA, TO ENSURE COMPLIANCE
WITH THE TERMS AND CONDITIONS OF THE STORM WATER POLLUTION PREVENTION PLAN
DEVELOPED UNDER THIS NPDES PERMIT AND THE TERMS OF THIS NPDES PERMIT.
NAME/ TITLE: ___________________________________________________________
COMPANY: ____________________________________ DATE: ___________________
TELEPHONE NUMBER: ___________________________________________________
GENERAL CONTRACTOR
SUBCONTRACTOR -GRADING
NAME/ TITLE: ___________________________________________________________
COMPANY: ____________________________________ DATE: ___________________
TELEPHONE NUMBER: ___________________________________________________
SUBCONTRACTOR -EROSION AND SEDIMENT CONTROL
NAME/ TITLE: ___________________________________________________________
COMPANY: ____________________________________ DATE: ___________________
TELEPHONE NUMBER: ___________________________________________________
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
12/12/25
SM
VICINITY MAP
BUILDING
LOCATION
north
STORM WATER POLLUTION PREVENTION PLAN
(SWPPP)
SITE DESCRIPTION
-OWNER/APPLICANT: US SIGNAL / ETZEL ENGINEER & BUILD
-LOCATION: 390 NE ALICES RD, WAUKEE, IOWA 50263
PART OF SE 1
4, SECTION 27, TOWNSHIP 79 NORTH, RANGE 26 WEST OF THE 5TH P.M.
-NATURE OF CONSTRUCTION ACTIVITY: CONSTRUCTION OF OFFICE/WAREHOUSE REDEVELOPMENT
-AREAS:
TOTAL SITE AREA: 5.0 ACRES
SITE AREA AFFECTED: 3.2 ACRES
-RUNOFF COEFFICIENT: 0.58
-EXISTING SOILS DATA:
LEAN CLAY AND SANDY LEAN CLAY, VARYING SAND CONTENT
LEAN CLAY, TRACE SAND
LEAN TO FAT CLAY, TRACE SAND
(SOURCE: SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION FROM TERRACON CONSULTANTS, LLC., IN AUGUST, 2025).
-RECEIVING WATER(S) AND ULTIMATE RECEIVING WATER(S): RUNOFF FROM THIS PROJECT WILL FLOW INTO UNDERGROUND STORM DETENTION AND WILL FLOW INTO UNNAMED
DITCHES WHICH WILL FLOW INTO LITTLE WALNUT CREEK, TO WALNUT CREEK.
-EXISTENCE OF QUANTITATIVE STORM WATER DISCHARGE DATA: NO
SEQUENCE OF SOIL DISTURBING ACTIVITIES AND IMPLEMENTATION CONTROLS
1.CLEARING AND GRUBBING
2.EROSION AND SEDIMENT CONTROLS
3.STABILIZATION PRACTICES
4.EXISTING VEGETATION IS PRESERVED WHENEVER POSSIBLE.
5.PERMANENT SEEDING AND/OR SODDING AFTER CONSTRUCTION.
6.PROTECTION OF TREES AND PRESERVATION OF MATURE VEGETATION WHEREVER POSSIBLE.
7.DRAINAGE SWALES
8.STORM WATER MANAGEMENT
9.VELOCITY DISSIPATION BY USE OF ORIFICE IN UNDERGROUND STORAGE DETENTION TO PROVIDE NON-EROSIVE VELOCITY FLOWS.
10.ALL MATERIAL WASTES MUST BE REMOVED FROM THE SITE.
11.ON-SITE VEHICLE TRACKING SEDIMENT PAD TO REDUCE SEDIMENTS OFF-SITE.
12.TOTAL COMPLIANCE WITH STATE/LOCAL WASTE DISPOSAL REGULATIONS.
13.CONTROLS MUST BE IN GOOD OPERATING CONDITION UNTIL THE CONSTRUCTION ACTIVITY IS COMPLETE AND FINAL STABILIZATION HAS BEEN REACHED.
14.PLACEMENT OF INLET PROTECTIONS
15.PLACEMENT OF SILT FENCES
16.EARTHWORK AND GRADING
17.REMOVE INLET PROTECTIONS, SILT FENCES, AND SILT WORMS
18.CLEAN ALL CONSTRUCTION DEBRIS FROM CONSTRUCTION SITE
MAINTENANCE
-ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORT.
-BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD OF THE HEIGHT OF THE FENCE.
-PROTECT ALL INLETS SURROUNDING CONSTRUCTION SITE.
-STREET SWEEPING AND DUST PREVENTION MUST BE IMPLEMENTED DAILY.
-CONTAINMENT OR REMOVAL OF POLLUTANTS SHALL BE IN ACCORDANCE WITH ALL APPLICABLE STATE AND CITY OF WAUKEE AND IOWA DOT/SUDAS SPECIFICATIONS.
-THE RESPONSIBLE PERSONS FOR MONITORING AND MAINTAINING THE EROSION CONTROL DEVICES SHALL BE SITE CONTRACTOR/CONTRACTOR'S DESIGNATED SUPERINTENDENT.
-ANY SOIL OR SPILL WASHED, TRACKED OR DROPPED ON TO ADJOINING RIGHT-OF-WAYS AND PROPERTY SHALL BE CLEANED UP BY THE CONTRACTOR WITHIN AT THE END OF THE
WORK DAY AND PRIOR TO A RAIN EVENT. EARTH RAMPS SHALL NOT BE CONSTRUCTED IN THE STREET GUTTER.
-SILT FENCING SHALL BE CLEANED WHEN THEY HAVE LOST 50% OF THEIR CAPACITY.
-ALL INTAKES AND MANHOLES TO HAVE SILT FENCES AROUND THEM FOR PRIOR TO PAVING AND INLET FILTERS AFTER PAVING.
NAME/ TITLE: ___________________________________________________________
COMPANY: ____________________________________ DATE: ___________________
TELEPHONE NUMBER: ___________________________________________________
CONTRACTOR CERTIFICATION
IMPLEMENTATION AND MAINTENANCE
1. SILT FENCE WILL BE PLACED BY THE CONTRACTOR PRIOR TO BEGINNING GRADING OR CLEARING AND GRUBBING OPERATIONS ALONG THE PERIMETER OF THE PROJECT AT LOCATIONS IN
WHICH RUNOFF CAN MOVE OFFSITE. VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION SHALL BE PRESERVED. THIS SILT FENCE SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION
HAS BEEN ACHIEVED.
2.INSTALL UPSTREAM DIVERSIONS DIVERSIONS, DOWNSLOPE, AND SIDESLOPE PERIMETER CONTROLS BEFORE COMMENCING LAND DISTURBING ACTIVITIES.
3.STABILIZATION TO OCCUR IMMEDIATELY WHENEVER ANY CLEANING, GRADING, EXCAVATING, OR OTHER EARTH DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED ON ANY PORTION OF
THE SITE OR TEMPORALLY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS.
4.TREE PROTECTION FENCE WILL BE PLACED BY CONTRACTOR PRIOR TO BEGINNING CLEARING OF VEGETATION.
5.DO NOT DISTURB AN AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED.
6.TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT ON SEASONAL WEATHER CHANGES.
7.DO NOT REMOVE PERIMETER CONTROLS UNTIL UPSTREAM AREAS ARE STABILIZED.
8.ROCK OUTLET PROTECTION SHALL REMAIN INTACT.
9.PRESERVE EXISTING VEGETATION WHERE ATTAINABLE AND STABILIZE DISTURBED AREAS.
10.ALL INLETS THAT ARE ACTIVE ARE TO BE COVERED DURING CONSTRUCTION TO REDUCE SEDIMENT DEPOSITS WITHIN THE STORM SEWER. INLETS ARE TO BE CLEARED DAILY OF DEBRIS.
11.PRIOR TO MASS GRADING, CONSTRUCT DIVERSION DRAINAGE SWALES ON THE UPHILL SIDES OF THE DISTURBED AREA TO DIVERT UPHILL RUNOFF FROM EXPOSED SOILS.
12.DRAINAGE SWALES REMAIN UNDISTURBED.
13.TEMPORARY EARTH PILE SHALL HAVE DOWNSLOPE SILT FENCE PROTECTION.
14.SOIL STOCKPILES SHALL BE STABILIZED WITHIN VEGETATION OR COVERED. MOWING MAY BE REQUIRED IF THE VEGETATION BECOMES NUISANCE.
15.WORK REQUIRING ENTERING AND LEAVING THE SITE OVER THE COUNTY ROADWAYS INCLUDING MATERIAL DELIVERY AND MOVEMENT OF EQUIPMENT SHALL NOT BE PERMITTED DURING
PERIODS WHEN THE GROUND IS EXCEPTIONALLY SOFT AND WET AND EROSION BY VEHICLE IS A CERTAINTY.
16.MATERIAL OR EQUIPMENT STORAGE AREAS MUST BE WITHIN THE LIMITS OF SOIL DISTURBING ACTIVITY. THESE AREAS SHALL BE INSPECTED FOR POTENTIAL POLLUTANTS ENTERING THE
SYSTEM.
17.ALL INTAKES AND MANHOLES TO HAVE SILT WORM AROUND THEM PRIOR TO PAVING AND INLET FILTERS AFTER PAVING. THESE FILTERS HALL REMAIN IN PLACE UNTIL CONSTRUCTION IS
COMPLETE.
18.SOIL SHALL BE WATERED DURING DRY, WINDY CONDITIONS TO MINIMIZE EROSION.
19.ANY SOIL OR SPILL WASHED, TRACKED OR DROPPED ON TO ADJOINING RIGHT-OF-WAYS AND PROPERTY SHALL BE CLEANED UP BY THE CONTRACTOR AT THE END OF EACH WORK DAY AND
PRIOR TO A RAIN EVENT. EARTH RAMPS SHALL NOT BE CONSTRUCTED IN THE STREET GUTTER.
20.AFTER INITIAL GRADING PRIOR TO UTILITY CONSTRUCTION, ALL DISTURBED AREAS OUTSIDE THE PROPOSED RIGHT-OF-WAYS ARE TO HAVE TEMPORARY SEEDING AND MULCHING.
CONTRACTORS AND SUBS ARE TO MINIMIZE DISTURBANCE TO THESE SEEDED AREAS THROUGH THE USE OF SPECIFIC ACCESS ROUTES WITHIN THE SITE.
21.DURING CONSTRUCTION IF IT BECOMES EVIDENT THAT A DISTURBED AREA WILL NOT BE DISTURBED FOR 14 DAYS, IT SHALL BE SEEDED BY IMMEDIATELY.
22.SILT FENCING SHALL BE CLEANED WHEN THEY HAVE LOST 50% OF THEIR CAPACITY.
23.AFTER GRADING OPERATIONS HAVE BEEN COMPLETED, ALL AREAS THAT WILL NOT BE DISTURBED BY SUBSEQUENT CONSTRUCTION ACTIVITIES SHALL BE SEEDED.
24.FINISH GRADING AND PERMANENT SEEDING SHALL BE COMPLETED AS SOON AS IT IS PRACTICAL.
25.PERMANENT SEEDING A ND MULCHING TO BE DONE IMMEDIATELY AFTER FINAL GRADING PER SUDAS STANDARD SPECIFICATIONS SECTION 9010.
26.PERMANENT FINAL PLANT COVERING OR STRUCTURES SHALL BE INSTALLED AS SOON AS POSSIBLE BUT NOT LONGER THAN SEVEN (7) DAYS AFTER FINAL GRADING IS COMPLETED.
REPLANTING MAY BE REQUIRED TO ENSURE ADEQUATE VEGETATIVE COVER IS ESTABLISHED. ADEQUATE VEGETATIVE COVER IS CONSIDERED TO BE AT LEAST 70% COVERAGE OF THE SOIL
SURFACE BY THE INTENDED SPECIES. IF NATIVE LANDSCAPE IS USED, THEN 70% COVERAGE BY THE COVER CROP IS REQUIRED.
27.ANY FAILED AREA OF SEEDING SHALL BE RESEEDED. IN THE EVENT THAT SEEDING/MULCHING DOES NOT OCCUR PRIOR TO WINTER, ALL DISTURBED AREAS SHALL BE MULCHED.
DES MOINES DATA CENTER EXPANSION
390 N ALICES ROAD, WAUKEE, IA 50263
INSPECTIONS
1.QUALIFIED PERSONNEL SHALL INSPECT DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
2.INSPECT SITE FOR EVIDENCE OF, OR THE POTENTIAL OF, POLLUTANTS ENTERING THE DRAINAGE SYSTEM FROM STORED MATERIALS .
3.OBSERVE EROSION AND SEDIMENT CONTROL MEASURES TO ENSURE THAT THEY ARE OPERATING CORRECTLY, REPAIR AND REPLACE AS NECESSARY.
4.LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING.
5.INSPECT DISCHARGE LOCATIONS AT THE END OF EACH WORK DAY TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO
RECEIVING WATER.
6.ANY MODIFICATIONS TO THE PLAN AS A RESULT OF AN INSPECTION SHALL BE IMPLEMENTED WITHIN 72 HOURS OF THE INSPECTION.
7.AN INSPECTION REPORT SHALL BE PREPARED AND RETAINED AS PART OF THE PREVENTION PLAN UNTIL PROJECT TERMINATION, THIS REPORT WILL CONTAIN THE FOLLOWING:
7.1.A SUMMARY OF THE SCOPE OF THE INSPECTION.
7.2.QUALIFICATIONS OF THE PERSONNEL MAKING THE INSPECTION.
7.3.MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION OF THE PREVENTION PLAN.
7.4.ANY ACTIONS TAKEN
7.5.SIGNATURE
8.THE REPORTS SHALL CONFORM TO THE STANDARDS SET BY THE IOWA DNR. COPIES OF THESE REPORTS SHALL BE FORWARDED TO THE OWNER.
9.THE CONTRACTOR IS TO TAKE NECESSARY ACTIONS TO CORRECT DEFICIENCIES FOUND DURING INSPECTIONS AS SOON AS PRACTICABLE BUT IN NO CASE LATER THAN SEVEN (7) DAYS
AFTER THE INSPECTION.
10.RECORDS SHALL BE RETAINED FOR AT LEAST THREE (3) YEARS OR UNTIL PROJECT TERMINATION.
NON-STORM WATER DISCHARGES
1.WATER MAIN FLUSHING
1.1.FLUSHED WATER WILL BE DECHLORINATED AND DISCHARGED INTO THE STORM SEWER SYSTEM WHERE, WHEN DISCHARGED, IT WILL UNDERGO EROSION AND SEDIMENT CONTROLS
CONSISTING OF:
1.1.1.SILTATION BASINS
1.1.2.ROCK OUTLET PROTECTION (RIPRAP)
1.1.3.SILT FENCING
1.1.4.EXISTING VEGETATION
2.PETROLEUM STORAGE INCLUDING BUT NOT LIMITED TO FUEL, GEAR OIL, ENGINE OIL, HYDRAULIC OIL, WASTE OIL SHALL NOT BE STORED ON SITE.
3.CONCRETE WASHOUT AREAS SHALL BE CONTAINED TO A 50' BY 50' AREA SURROUNDED BY GRAVEL BAGS AND HAVE PLASTIC LINING.
4.PORTABLE TOILETS SHALL HAVE DOWNSLOPE SILT FENCE PROTECTION. THE HOLDING TANK WILL BE PUMPED OUT AS NEEDED AND DISPOSED OFF-SITE
FEDERAL CONSTRUCTION AND DEVELOPMENT EFFLUENT GUIDELINES
1.EROSION AND SEDIMENT CONTROLS
1.1.STORM WATER CONTROL STRUCTURE
1.1.1.AN UNDERGROUND STORMWATER DETENTION SYSTEM, DESIGNED BY STORMVAULT AND INSTALLED BY THE CONTRACTOR, WILL BE INSTALLED TO DETAIN THE CHANNEL PROTECTION
VOLUME FOR A 1-YEAR, 24-HOUR STORM EVENT. THE SYSTEM SHALL HAVE A STORAGE CAPACITY OF 19,456 CUBIC FEET. OPERATION AND MAINTENANCE SHALL BE THE RESPONSIBILITY
OF THE OWNER AND PERFORMED IN ACCORDANCE WITH STORMVAULT’S PUBLISHED OPERATION AND MAINTENANCE GUIDELINES TO ENSURE CONTINUED PERFORMANCE AND
COMPLIANCE WITH THE DESIGN INTENT.
1.1.2.A STORMWATER CONTROL STRUCTURE, DESIGNED BY THE ENGINEER OF RECORD (EOR) AND CONSTRUCTED AND INSTALLED BY THE CONTRACTOR, WILL BE INSTALLED TO REGULATE
THE VELOCITY OF STORMWATER DISCHARGED FROM THE DETENTION SYSTEM. THE CONTROL STRUCTURE SHALL HAVE A PEAK FLOW RATE OF 0.29 CUBIC FEET PER SECOND (CFS) FOR
A 1-YEAR, 24-HOUR STORM EVENT. THE OWNER SHALL INSPECT THE STRUCTURE TWICE ANNUALLY AND FOLLOWING SIGNIFICANT RAINFALL EVENTS TO IDENTIFY AND ADDRESS ANY
DEFICIENCIES, ENSURING THE STRUCTURE CONTINUES TO PERFORM IN ACCORDANCE WITH THE DESIGN INTENT.
1.2.MEASURES TO MINIMIZE THE DISTURBANCE OF STEEP SLOPES
1.1.1.LIMIT DISTURBANCE TO ONLY THE AREAS NECESSARY FOR CONSTRUCTION; AVOID GRADING ON SLOPES STEEPER THAN 3:1 UNLESS UNAVOIDABLE.
1.1.2.PHASE CONSTRUCTION SO THAT STEEP SLOPES ARE EXPOSED FOR THE SHORTEST TIME POSSIBLE.
1.1.3.STABILIZE EXPOSED SLOPES IMMEDIATELY AFTER GRADING USING EROSION CONTROL BLANKETS, TURF REINFORCEMENT MATS, OR HYDROSEEDING.
1.1.4.INSTALL SLOPE BREAKS SUCH AS SILT FENCE, WATTLES, OR COIR LOGS AT INTERVALS ALONG LONG SLOPES TO SLOW RUNOFF AND CAPTURE SEDIMENT.
1.1.5.DIVERT UPSLOPE RUNOFF AWAY FROM DISTURBED SLOPES USING DIVERSION SWALES, BERMS, OR SLOPE DRAINS.
1.2.SOIL AND EROSION CONTROL
2.DEWATERING
2.1.DISCHARGES FROM DEWATERING ACTIVITIES, INCLUDING DISCHARGES FROM DEWATERING OF TRENCHES AND EXCAVATION, ARE PROHIBITED UNLESS MANAGED BY APPROPRIATE
CONTROLS.
3.PROHIBITED DISCHARGES
3.1.THE FOLLOWING DISCHARGES ARE PROHIBITED: WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER
CONSTRUCTION MATERIALS, FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE, AND SOAPS OR SOLVENTS USED IN VEHICLE AND
EQUIPMENT WASHING.
4.PERMANENT STORMWATER MANAGEMENT CONTROLS
4.1.A "STORMSETTLER" HYDRODYNAMIC SEPARATOR (HDS), DESIGNED BY STORMTRAP, WILL BE INSTALLED TO PROVIDE WATER QUALITY TREATMENT FOR A 1.25-INCH STORM EVENT,
ACHIEVING AN ANTICIPATED 80% TOTAL SUSPENDED SOLIDS (TSS) REMOVAL EFFICIENCY. THE SYSTEM SHALL BE OPERATED AND MAINTAINED BY OWNER IN ACCORDANCE WITH
STORMTRAP’S PROVIDED OPERATION AND MAINTENANCE GUIDELINES TO ENSURE CONTINUED PERFORMANCE AND COMPLIANCE WITH DESIGN INTENT.
5.POLLUTION PREVENTION MEASURES
5.1.CONTRACTOR TO MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER AND OTHER WASH WATERS. WASH WATERS MUST BE
TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE.
5.2.MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS,
SANITARY WASTE AND OTHER MATERIALS PRESENT ON THE TO PRECIPITATION AND STORM WATER.
5.3.CONTRACTOR TO MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS .
OTHER CONTROLS
CONTRACTOR TO MINIMIZE OFF-SITE TRACKING OF SEDIMENTS AND GENERATION OF DUST OR EQUIVALENT.
SEQUENCE OF MAJOR ACTIVITIES
1.PRE-CONSTRUCTION: SILT FENCE WILL BE PLACED BY THE CONTRACTOR PRIOR TO BEGINNING GRADING OR
CLEARING AND GRUBBING OPERATIONS ALONG THE PERIMETER OF THE PROJECT AT LOCATIONS IN WHICH
RUNOFF CAN MOVE OFFSITE. VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION SHALL BE
PRESERVED. THIS SILT FENCE SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ACHIEVED.
2.GRADING: AFTER GRADING OPERATIONS HAVE BEEN COMPLETED, ALL AREAS THAT WILL NOT BE DISTURBED
BY SUBSEQUENT CONSTRUCTION ACTIVITIES SHALL BE SEEDED.
3.FINISH GRADING AND SEEDING: FINISH GRADING AND PERMANENT SEEDING SHALL BE COMPLETED AS SOON
AS IT IS PRACTICAL.
CONTRACTOR
1.CONTRACTOR WILL HAVE A COPY OF THE SWPPP ON SITE.
2.CONTRACTOR SHALL FOLLOW THE SWPPP DOCUMENTATION AND PROCESS FOR MAINTAINING EROSION AND
POLLUTION CONTROLS. IF CHANGES ARE REQUIRED BUT NOT MADE WITHIN 72 HOURS OF REQUIRED WEEKLY
INSPECTION, IT SHALL BE DOCUMENTED IN THE PLAN WHY IT IS IMPRACTICAL AND WITH AN ESTIMATED
COMPLETION DATE AND PROVIDED WITH THE INSPECTION REPORTS.
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
SWPP PLAN COVER
C-500
NOTE
THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES AT THE SITE. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO
NOTIFY THE OWNERS OF UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. THE CONTRACTOR SHALL NOTIFY THE PROPER UTILITY IMMEDIATELY UPON BREAKING OR DAMAGE
TO ANY UTILITY LINE OF APPURTENANCE, OR THE INTERRUPTION OF THEIR SERVICE. HE SHALL NOTIFY THE PROPER UTILITY INVOLVED. IF EXISTING UTILITY LINES ARE ENCOUNTERED THAT
CONFLICT IN LOCATION WITH NEW CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER SO THAT THE CONFLICT MAY BE RESOLVED.
C
TOM DEJONGE / VP OF FACILITIES
US SIGNAL COMPANY 11/17/25
626-233-7137
JORDAN COGLEY / PROJECT MANAGER
ETZEL ENGINEER AND BUILD 11/17/25
412-638-8138
REPORT ANY HAZARDOUS CONDITIONS
1.MODIFY SWPPP WITHIN 5 CALENDAR DAYS OF HAZARDOUS CONDITION. PLAN UPDATE SHALL INCLUDE RELEASE AND CIRCUMSTANCES OF RELEASE AND PLANS TO PREVENT FUTURE
REOCCURRENCE OF SUCH RELEASES. THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802) AND THE IOWA DEPARTMENT OF NATURAL RESOURCES 24/7 (515-725-8694)
2.IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN BY THE SUBCONTRACTOR TO CONTAIN AND REMOVE THE SPILLED MATERIAL. THE SPILL SHALL BE REPORTED
TO THE APPROPRIATE AGENCIES NOT MORE THAN SIX HOURS AFTER ONSET OF SAID HAZARDOUS CONDITION OR SPILL.
3.ALL HAZARDOUS M MATERIALS, INCLUDING CONTAMINATED SOIL AND LIQUID CONCRETE WASTE, SHALL BE DISPOSED OF BY THE SUBCONTRACTOR IN THE MANNER SPECIFIED BY FEDERAL,
STATE, AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS.
4.THE SUBCONTRACTOR SHALL PREPARE A WRITTEN RECORD OF ANY SPILL ASSOCIATED CLEAN-UP ACTIVITIES OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF 1
GALLON OR REPORTABLE QUANTITIES, WHICHEVER LESS, ON THE DAY OF THE SPILL. THE SUBCONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO OWNER IMMEDIATELY UPON
IDENTIFICATION OF ANY SPILL.
F3
F2
F1
SF
SF
SF
SF
SFSFSFSF
EQUIPMENT MATERIAL STORAGE AREA
(
FO
FO
FO
FO
FO
FO
(
(
(((
O
W
R
O
W
R
O
W
RN89°51'39"E 600.53'
S0
0
°
2
3
'
0
8
"
W
3
6
8
.
0
2
'
S89°51'39"W 509.21'
N50
°
0
7
'
1
6
"
W
1
1
8
.
4
6
'
N0
0
°
2
4
'
2
3
"
E
2
9
1
.
8
4
'
WV
DYH
IH
IH
WV
B
B
B
WV
DYH
IH
IH
EH
IH
MB
IH
IH
IH
IH
NE
A
L
I
C
E
'
S
R
D
R.
O
.
W
1
2
0
'
C
O
N
C
R
E
T
E
60
60
3.96'
S
PROP. BUILDING
(WAREHOUSE)
PROP. BUILDING
(OFFICE)
SF
SF
SF
SF
SF
SF SF SF SF
SF SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
1 STORY BUILDING
MASONRY AND STEEL
CONSTRUCTION
EXTERIOR BUILDING: 20,093 SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
POST CONSTRUCTION FACILITY:
STORM WATER QUALITY DEVICE
10
1
4
10
1
4
10
1
6
10
1
8
10
1
4
10
1
2
10
1
4
1014
1014
101
6
1016
1014
101
4
101
4
1014
1014 1014
10
1
4
10
1
4
10
1
4
101
4
10
0
8
10
1
0
10
1
2
10
1
4
1010
1012
100
2
.
0
0
100
2
.
0
0
1004.00
100
4
.
0
0
1006.00
100
6
.
0
0
100
8
.
0
0
101
0
.
0
0
10
1
0
.
0
0
1010.00
100
2
.
0
0
100
4
.
0
0
100
4
.
0
0
100
6
.
0
0
100
6
.
0
0
1006
.
0
0
100
6
.
0
0
10
0
8
.
0
0
1008
.
0
0
10
0
8
.
0
0
1008.00
1010.00
10
1
2
.
0
0
1014.00
1010.00
1010.0
0
1010.
0
0
101
0
.
0
0
1010
.
0
0
1012.00
1012.00
1012.00
1012.00
10
1
2
.
0
0
10
0
4
.
0
0
10
0
4
.
0
0
100
6
.
0
0
10
0
6
.
0
0
100
8
.
0
0
10
0
8
.
0
0
10
1
0
.
0
0
10
1
0
.
0
0
10
1
2
.
0
0
10
1
4
.
0
0
10
1
4
.
0
0
1016.0
0
1018.00
10
1
8
.
0
0
10
1
8
.
0
0
101
8
.
0
0
1018.00 1020.00
1020.
0
0
1010
.
0
0
10
0
8
.
0
0
10
1
4
.
0
0
1016.00
14.5%
12.2%
9.2%
8.7%
3.
3
%
1.
0
%
9.2
%
24.7%
0.
5
%
0.0%
1.1
%
1.6
%
1.9
%
3.
2
%
2.
3
%
POST CONSTRUCTION FACILITY:
PROP. UNDERGROUND STORM WATER DETENTION
SOIL DISTURBANCE AREA
XX
X
XX
X
X X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
PROP. TEMPORARY ERTEC
SLOT GUARD
PROP. TEMPORARY
TYPICAL INLET
PROTECTION
PROP. TEMPORARY
TYPICAL INLET
PROTECTION
PROP. TEMPORARY
TYPICAL INLET
PROTECTION
PROP. TEMPORARY
TYPICAL INLET
PROTECTION
PROP.
TEMPORARY
TYPICAL INLET
PROTECTION
PROP. TEMPORARY
TYPICAL INLET
PROTECTION
PROP. TEMPORARY CURB
INLET PROTECTION
XX
XX
XX
XX
XX
XX
XX
XX XX XX
XX
TREE PROTECTION (TYP.)
TREE PROTECTION (TYP.)
TREE PROTECTION (TYP.)
ULTIMATE DISCHARGE LOCATION TO
LITTLE WALNUT CREEK TO WALNUT CREEK
STOCKPILE LOCATION
63.52'69.23'
1012
1012
PROP. TEMPORARY MANUFACTURED
TRACK-OUT PAD
XXSF
SF
PROP. ROCK OUTLET
APRON
EROSION STONE
5 SF
PROP. ROCK OUTLET
APRON
CLASS "E"
50 TONS
POST CONSTRUCTION FACILITY:
STORM WATER VELOCITY
CONTROL STRUCTURE
LEGEND
SOIL STABILIZATION
PROPOSED FENCE
SF TEMPORARY SILT FENCE
PROPERTY LINE
EASEMENT
TEMPORARY INLET PROTECTION
TEMPORARY CONCRETE WASHOUT
X TEMPORARY TREE PROTECTION
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
12/12/25
north
0 40'20'
SCALE 1" = 20'
SM
GENERAL NOTES
1.CONTRACTOR SHALL MAKE ARRANGEMENTS FOR THE PROPER BRACING, SHORING AND
OTHER REQUIRED PROTECTION OF ALL ROADWAYS AND EXCAVATIONS BEFORE
CONSTRUCTION BEGINS.
2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTING CONDITION,
INCLUDING BUT NOT LIMITED TO, THE PROPERTY BOUNDARY, THE BENCHMARK,
EXISTING BUILDING, PAVEMENT AND GROUND ELEVATIONS AND UTILITY HORIZONTAL
AND VERTICAL LOCATIONS BEFORE THE START OF CONSTRUCTION.
3.CONTRACTOR SHALL REPAIR AND REPLANT ANY EXISTING GRASS OR SOIL THAT IS
DISTURBED BY CONSTRUCTION ACTIVITY.
4.LOCATIONS OF ALL UTILITY LINES TO BE FIELD VERIFIED WITHIN AREA OF WORK.
CONTRACTOR TO NOTIFY OWNER/ENGINEER OF ANY DISCREPANCIES.
5.CONTRACTOR SHALL OBTAIN ALL NECESSARY JURISDICTIONAL PERMITS AND
APPROVALS PRIOR TO CONSTRUCTION BEGINNING, INDCLUDING IOWA DNR GENERAL
PERMIT #2 AND CITY OF WAUKEE COSESCO PERMIT.
6.THE TOPOGRAPHIC SURVEY WAS PROVIDED BY MCCLURE, JOB NO. 2025001453-000,
DATED 06/18/2025. THESE IMPROVEMENT PLANS DO NOT WARRANT THE ACCURACY OF
THE PROVIDED SURVEY.
7.THE GEOTECHNICAL REPORT WAS PROVIDED BY TERRACON, JOB NO. 08245197-01,
DATED 08/05/2025. ACTUAL CONDITIONS OF SOILS, PAVEMENTS, ETC. MAY VARY FROM
THIS REPORT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING
CONDITIONS FOUND IN THE FIELD AND REPORT VARIANCES FROM ASSUMPTIONS IN THE
GEOTECHNICAL REPORT TO THE ENGINEER.
8.VERTICAL DATUM ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88).
SWPP/SESC NOTES
1.CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION AND SEDIMENTATION CONTROL AS
DETAILED IN THE STORMWATER POLLUTION PREVENTION (SWPP) PLAN TO PREVENT
TRANSMISSION OF SEDIMENT TO THE DRAINAGE FACILITIES.
2.EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE
FIRST PART OF CONSTRUCTION. SEDIMENT CONTROL MEASURES MUST PROTECT ALL
DRAINAGE FACILITIES FROM SEDIMENTATION.
3.EROSION AND SEDIMENT CONTROL MEASURES TO BE INSPECTED DAILY. REPAIRS TO BE
MADE AS NECESSARY AND WITHIN 24 HOURS OF INSPECTION.
4.EROSION CONTROL MEASURES SHALL BE INSTALLED AROUND ANY DIRT OR TOPSOIL
STOCKPILES AND OTHER TEMPORARILY DISTURBED AREAS.
5.ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE REMOVED AND
DISPOSED OF IN ACCORDANCE WITH ALL JURISDICTIONAL GOVERNMENTAL AGENCY
REQUIREMENTS WITHIN 30 DAYS OF FINAL STABILIZATION.
6.CONTRACTOR TO MINIMIZE COMPACTION ON AREAS TO BE REGRADED AND PRESERVE
TOP SOIL WHERE FEASIBLE.
7.ALL SAWCUTTING AND GRINDING OPERATIONS SHALL INCLUDE FULL CONTAINMENT OF
SLURRY TO PREVENT DISCHARGE INTO STORM DRAINS, WATERWAYS, OR SURROUNDING
SOIL. SLURRY SHALL BE COLLECTED USING APPROVED VACUUM OR CONTAINMENT
METHODS AND STORED IN LEAK-PROOF CONTAINERS. DISPOSAL SHALL COMPLY WITH
ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS, INCLUDING THOSE
GOVERNING NON-HAZARDOUS LIQUID WASTE. UNDER NO CIRCUMSTANCES SHALL
SLURRY BE ALLOWED TO ENTER THE STORMWATER SYSTEM OR FLOW OFFSITE.
8.IN THE EVENT THAT SEEDING DOES NOT OCCUR PRIOR TO WINTER, ALL DISTURBED
AREAS WILL BE MULCHED.
9.THE CONTRACTOR SHALL FIELD ADJUST AND/OR PROVIDE ADDITIONAL EROSION
CONTROL BMP'S AS NEEDED TO PREVENT EROSION AND OFF-SITE SEDIMENT
DISCHARGE FROM THE CONSTRUCTION SITE LOG AND RECORD ANY ADJUSTMENTS AND
DEVIATIONS FROM THE APPROVED EROSION CONTROL PLANS WITHIN THE SWPPP
DOCUMENTS STORED IN JOB SITE TRAILER.
EROSION AND SEDIMENT CONTROLS
SILT FENCE: 1800 L.F.
SEEDING/MULCHING/SODDING: 1 AC.
CRUSHED STONE FOR TEMPORARY CONSTRUCTION ENTRANCE: 170 SY
INLET PROTECTION FILTERS: 8
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
SWPP PLAN
C-501
C
C
C
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
TREE PROTECTION FENCING
NOT TO SCALE
18"
AREA
GRADE
MIN. 12-1/2 GA.
INTERMEDIATE
WIRES
WOVEN WIRE FABRIC
ORANGE, UV RESISTANT,
VARIABLE AS DIRECTED BY THE ENGINEER
POLY BARRICADE FABRIC (TYPICAL)
HIGH - TENSILE STRENGTH,
THAN ONE SIGN PER PROTECTION AREA.
DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS.
ORANGE, UV RESISTANT,
HIGH - TENSILE STRENGTH,
POLY BARRICADE FABRIC (TYPICAL)
STEEL POST
GRADE
WARNING SIGN
THEREAFTER.
THEREAFTER.
NOTES:2'
-
0
"
SIDE VIEW
WI
D
T
H
32
"
M
I
N
.
3'
-
0
"
26
"
MIN. 10 GA.
LINE WIRES
AREA
WARNING SIGN
4"
3"
4"
3"
4"
TREE PROTECTION
DO NOT ENTER
8' MAX.
FRONT VIEW
FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS
PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER
ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF GREEN BAY INSPECTIONS
PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER
LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED.
ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS.
MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT.
WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL.
WARNING SIGN DETAIL
DO NOT ENTER
TREE PROTECTION
40"
AN ALTERNATE 3/4" TO 1" GRAVEL FILTER OVER A WIRE SCREEN MAY BE USED IN PLACE OF GRAVEL BAGS.
THE WIRE MESH SHALL EXTEND ABOVE THE TOP OF THE CONCRETE BLOCKS AND THE GRAVEL PLACED
OVER THE WIRE SCREEN
TO THE TOP OF THE CONCRETE BLOCKS.
FLOW
SECTIONPLAN
BAGS
GRAVEL
BLOCKS
16" CINDER
GUTTER
CURB
BAGS
GRAVEL
BLOCKS
16" CINDER
MAINTENANCE REQUIREMENTSINSTALLATION REQUIREMENTS
BLOCK AND GRAVEL BAG CURB INLET PROTECTION NOTES
1. INLET PROTECTION SHALL BE INSTALLED
IMMEDIATELY AFTER CONSTRUCTION OF INLET.
2. CONCRETE BLOCKS ARE TO BE LAID AROUND
THE INLET IN A SINGLE ROW ON THEIR SIDES,
ABUTTING ONE ANOTHER WITH THE OPEN ENDS
OF THE BLOCK FACING OUTWARD.
3. GRAVEL BAGS ARE TO BE PLACED AROUND THE
CONCRETE BLOCKS CLOSELY ABUTTING ONE
ANOTHER SO THERE ARE NO GAPS.
4. GRAVEL BAGS ARE TO CONTAIN WASHED SAND
OR GRAVEL APPROXIMATELY 3/4 INCH IN
DIAMETER.
5. BAGS ARE TO BE MADE OF 1/4" INCH WIRE
MESH (USED WITH GRAVEL ONLY) OR
GEOTEXTILE.
1. CONTRACTOR SHALL INSPECT INLET
PROTECTION IMMEDIATELY AFTER EACH
RAINFALL, AT LEAST DAILY DURING PROLONGED
RAINFALL, AND WEEKLY DURING PERIODS NO
RAINFALL.
2. DAMAGED OR INEFFECTIVE INLET PROTECTION
SHALL PROMPTLY BE REPAIRED OR REPLACED.
3. SEDIMENT SHALL BE REMOVED WHEN
SEDIMENT HAS ACCUMULATED TO
APPROXIMATELY 1/2 THE DESIGN DEPTH OF THE
TRAP.
4. INLET PROTECTION SHALL BE REMOVED WHEN
ADEQUATE VEGETATIVE COVER IS ATTAINED
WITHIN THE DRAINAGE AREA AS APPROVED BY
THE CITY.
CURB INLET PROTECTION
N.T.S.
CONCRETE WASHOUT
NOT TO SCALE
GENERAL NOTES:
SECTION
PLAN
12'10'
12'
10'
GRAVEL
BAGS
EXCAVATION
12"
GRAVEL
BAGS
1. SECURE POLYETHYLENE LINING WITH UV-STABILIZED GEOTEXTILE FABRIC
SANDBAGS.
2. POLYETHYLENE LINING SHALL BE 10MM MIN. AND FREE OF HOLES, TEARS,
OR OTHER DEFECTS. THE SHEET SHALL BE APPROPRIATELY SIZED TO FIT
THE ENTIRE WASHOUT SYSTEM WITHOUT SEAMS OR OVERLAPS. REPLACE
LINER AS NECESSARY.
3. EXCAVATION SHALL BE A 10'x10' MIN. AND SIZED TO CONTAIN ALL LIQUID
AND WASTE EXPECTED TO BE GENERATED.
1.
5
"
GENERAL NOTES:
FRAME: TOP FLANGE FABRICATED FROM 1 1
4"X1 1
4"X1/R" ANGLE. BASE RIM
FABRICATED FROM 1 1
2"X1
2"X1/R" CHANNEL. HANDLES AND SUSPENSION
BRACKETS FABRICATED FROM 1 1
4"X1
4" FLAT STOCK. ALL DOMESTIC STEEL
CONFORMING TO ASTM-A36. SEDIMENT BAG: BAG FABRICATED FROM 4
OZ/SQ.YD. NON-WOVEN POLYPROPYLENE GEOTEXTILE REINFORCED WITH
POLYESTER MESH. BAG SECURED TO BASE RIM WITH A STAINLESS STEEL
STRAP AND LOCK.
TYPICAL INLET PROTECTION
N.T.S.
SM
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
SWPP DETAILS
C-502
D
SEE PLANS
D=24"=2'
L=13'
W=L+D=15'
T=0.75''
D=66"=5.5'
L=35'
W=41.5'
T=1.05'
c
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-600
CONCRETE FILL
WEIR WALL
ORIFICE OPENING 3"
CONCRETE FILL
WEIR WALL
ORIFICE OPENING
INFLOW FROM VAULT OUTFLOW
6.0'
A
B
SECTION B
SECTION A
TOP
CONTROL STRUCTURE (ST-5)
N.T.S.
INFLOW FROM VAULT OUTFLOW
Lowest
Flowline
Depth
(12'-0'' max.)
Adjustment Rings
4t1
Top
Wall
Height
Wall
4'
Weir Wall
8" min. Class I
Bedding Material
Base
Reinforcing
6'
OV
E
R
F
L
O
W
T
O
V
A
U
L
T
TO HDS DEVICEINFLOW FROM SITE
INFLOW FROM SITE
TO HDS DEVICE
Weir Wall
TOP
SECTION A
A
DIVERSION STRUCTURE (ST-3)
N.T.S.
INVERT ELEV = 1006.28
ELEV: 1006.28
ELEV: 1006.28
ELEV: 1009.13
ELEV: 1013.17
INV: 1006.28
ELEV: 1006.64
ELEV: 1006.54
ELEV: 1006.64
ELEV: 1007.50
ELEV: 1012.59
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-601
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-602
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-603
c
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-604
c
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-605
c
DE
S
M
O
I
N
E
S
D
A
T
A
C
E
N
T
E
R
DRAWING NUMBER
DRAWING TITLE
PROJECT NUMBER:
PROJECT DATE:
DRAWN BY:
CHECKED BY:
SCALE:
NO. DATE REVISION
SEAL
US
S
i
g
n
a
l
39
0
N
E
A
l
i
c
e
'
s
R
o
a
d
Wa
u
k
e
e
,
I
A
5
0
2
6
3
R
2
0
5
W
e
s
t
W
a
t
e
r
S
t
r
e
e
t
,
S
a
x
o
n
b
u
r
g
P
A
1
6
0
5
6
PH
(
7
2
4
)
5
2
4
-
1
2
8
0
W
W
W
.
E
t
z
e
l
E
n
g
B
l
d
.
C
o
m
27
7
7
7
F
r
a
n
k
l
i
n
R
o
a
d
,
Su
i
t
e
1
5
1
0
So
u
t
h
f
i
e
l
d
,
M
I
4
8
0
3
4
U.
S
.
A
.
t:
+
1
.
2
4
8
.
3
5
1
.
8
2
0
0
ww
w
.
e
x
p
.
c
o
m
ex
p
U
.
S
.
S
e
r
v
i
c
e
s
I
n
c
.
07/22/25 DD ISSUE
12/12/25
10/22/25 SITE PLAN 2ND REVIEW
08/26/25 SITE PLAN REVIEW
10/10/25 BID/PERMIT ISSUE
10/31/25 ADDENDUM A
10/24/25 BUILDING PERMIT ISSUE
12/12/25 SITE PLAN 3RD REVIEWc
09/12/25 75% ISSUE
CONCRETE PAVEMENT
NOT TO SCALE
PROP. 12" STABILIZED
STRUCTURAL FILL (LBR 40)
COMPACTED TO 98% MAX DENSITY
PER AASHTO T-180
PROP. 7" 4000 PSI PCC
PROP.4" AGGREGATE BASE IADOT
COMPACTED TO 98% MAX DENSITY
PER AASHTO T-180
BROOM FINISH
STABILIZE AND PROOF ROLL
EXISTING SUBGRADE PER
GEOTECHNICAL REPORT
RECOMMENDATIONS
CONCRETE SIDEWALK SECTION
NOT TO SCALE
0.5"
SEE NOTE 3
VARIES (REFER TO PLAN)SOD/GRAVEL
NOTE:
1.CONCRETE TO BE CLASS 1, 3,000 PSI IN 28 DAYS.
2.4" THICK MIN. (TYP.)
3.SIDEWALK SLOPES SHALL MEET THE REQUIREMENTS OF THE
AMERICANS WITH DISABILITIES ACT.
4.PROVIDE 1/8" CONSTRUCTION JOINTS AT 5' C.C., MIN DEPTH 1/2".
PROVIDE 1/2" EXPANSION JOINTS WITH NON-RISING FILLER AT 30' C.C,
ABUTTING CURB, OTHER WALKS OR STRUCTURES, AND CHANGES OF
DIRECTION.
5.CURE ALL CONCRETE WITH CLEAN SAND, PLASTIC MEMBRANE, OR
OTHER APPROVED METHOD.
6.REFER TO HARDSCAPE PLANS FOR COLORING AND FINISHES, IF
APPLICABLE.
PROP. 8" COMPACTED SUBGRADE
(LBR 40) COMPACTED TO 95% MAX
DENSITY PER AASHTO T-180
FINISHED GRADE
2% SLOPE, MAX
CURB/PAVEMENT
$250 FINE
RESERVED
PARKING
ADA PARKING SPACE
SM
SITE PLAN 3RD REVIEW
RUS-25008152-A0
MMW
NSK
AS SHOWN
CIVIL
DETAILS
C-606
CONCRETE BOLLARD
NOT TO SCALE
1/2 " WASH
6" SCHEDULE 80 STEEL POST,
FILLED WITH CONC., 3,000 PSI MIN.
STRENGTH @ 28 DAYS
ROUND CONC. TOP AS SHOWN
FINISHED
GRADE
4'
-
0
"
4'
-
4
"
4'
-
0
"
4"
18" MIN.
6" MIN.