HomeMy WebLinkAbout2026-03-16 I08 Trailridge Baseball-Softball Storage SP AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 16, 2026 AGENDA ITEM: Consideration of approval of resolution approving a site plan for Trailridge Baseball/Softball Storage (1455 NW Douglas Parkway) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The Waukee Community School District is requesting approval of a site plan for a storage building and batting cages located near the baseball and soft ball fields at Trailridge School. The property is located north of NW Douglas Parkway and west of NW 10th Street. The subject property has been developed in recent years for three (3) separate facilities for the Waukee Community School District. Two school buildings and a natatorium have been constructed on the property. In addition to the buildings, the School District has constructed outdoor athletic fields on the property. The project includes the construction of an 800 square foot storage building near the baseball and softball fields in the northeast corner of the site. In addition, a 3-bay batting cage will be constructed. Sidewalk extensions will be completed as part of the project to allow for pedestrian circulation. No additional parking is required for the proposed improvements. The building is proposed to be constructed primarily of masonry materials. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the site plan request at their meeting on March 10, 2026, and recommended approval: Approval of a Site Plan for Trailridge Baseball/Softball Storage (1455 NW Douglas Parkway) Andy Kass, Community Development Director, introduced the request for approval of a site plan for a storage building and batting cages, as requested by Waukee Community School District, represented by James Rodemyer of Bishop Engineering. The property is generally located west of NW 10th Street and north of NW Douglas Parkway. The subject property has been developed in recent years for three (3) separate facilities for the Waukee Community School District. Two school buildings and a natatorium have been constructed on the property. In addition to the buildings, the School District has constructed outdoor athletic fields on the property. The project includes the construction of an 800 square foot storage building near the baseball and softball fields in the northeast corner of the site. In addition, a 3-bay batting cage will be constructed. I8 Sidewalk extensions will be completed as part of the project to allow for pedestrian circulation. No additional parking is required for the proposed improvements. The site is already served by public utilities. Some minor storm sewer improvements are proposed to improve drainage on the property. The building is proposed to be constructed primarily of masonry materials. The site plan is in conformance with the Site Plan Ordinance. Staff recommends approval of the site plan subject to remaining staff comments. Discussion as follows: (None) Motion by Commissioner Bannister for Approval of a Site Plan for Trailridge Baseball/Softball Storage (1455 NW Douglas Parkway), seconded by Commissioner Lohse. Ayes: Broderick, Bankole, Beenken, Lohse, and Bannister. Nays: None. Motion carried. RECOMMENDATION: Approve the resolution ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan IV. Building Elevations PREPARED BY: Andy Kass, Community Development Director REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2026- APPROVING THE SITE PLAN FOR TRAILRIDGE BASEBALL/SOFTBALL STORAGE (1455 NW DOUGLAS PARKWAY) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Trailridge Baseball/Softball Storage, subject to remaining staff comments on March 10, 2026; AND, WHEREAS, the Site Plan for Trailridge Baseball/Softball Storage is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Trailridge Baseball/Softball Storage is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 16th day of March, 2026, that the Site Plan for Trailridge Baseball/Softball Storage is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Kala Anderson Chris Crone Rob Grove Lori Lyon Anna Bergman Pierce PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Trailridge Baseball/Softball Storage – Site Plan PREPARED BY: Andy Kass, AICP – Community Development Director REPORT DATE: March 6, 2026 MEETING DATE: March 10, 2026 GENERAL INFORMATION Owner: Waukee Community School District Applicant: Waukee Community School District Owner’s Representative: James Rodemyer, P.E. – Bishop Engineering Request: The applicant is requesting approval of a site plan for a storage building and batting cages Location: Property is generally located west of NW 10th Street and north of NW Douglas Parkway. Property Address: 1455 NW Douglas Parkway AREA MAP ABOVE: Aerial of property (outlined in BLUE). March 6, 2026 2 of 2 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Educational Single-Family Residential A-1 (Agricultural District) North Single-Family Residential Single-Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay District) South Single-Family Residential Single-Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay District) East Single-Family Residential Single-Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay District) West Undeveloped Single-Family Residential A-1 (Agricultural District) HISTORY The subject property has been developed in recent years for three (3) separate facilities for the Waukee Community School District. Two school buildings and a natatorium have been constructed on the property. In addition to the buildings, the School District has constructed outdoor athletic fields on the property. PROJECT DESCRIPTION The project includes the construction of an 800 square foot storage building near the baseball and softball fields in the northeast corner of the site. In addition, a 3-bay batting cage will be constructed. Sidewalk extensions will be completed as part of the project to allow for pedestrian circulation. No additional parking is required for the proposed improvements. UTILITIES The site is already served by public utilities. Some minor storm sewer improvements are proposed to improve drainage on the property. ARCHITECTURAL The building is proposed to be constructed primarily of masonry materials. STAFF RECOMMENDATION The site plan is in conformance with the Site Plan Ordinance Staff recommends approval of the site plan subject to remaining staff comments. SITE TRAILRIDGE BASEBALL/SOFTBALL STORAGE SITE PLAN IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. PROPERTY DESCRIPTION: (FINAL PLAT BOOK 2022, PAGE 22405) LOT 1, TRAILRIDGE SCHOOL, AN OFFICIAL PLAT NOW INCLUDED IN AND FORMING A PART OF THE CITY OF WAUKEE, DALLAS COUNTY, IOWA SUBJECT TO AND TOGETHER WITH ANY AND ALL EASEMENTS AND RESTRICTIONS OF RECORD. ADDRESS: 1455 NW DOUGLAS PARKWAY WAUKEE, IA 50263 OWNER: WAUKEE COMMUNITY SCHOOLS 560 SE UNITVERSITY AVE. WAUKEE, IA 50263 PREPARED FOR: WAUKEE COMMUNITY SCHOOLS 560 SE UNIVERSITY AVE. WAUKEE, IA 50263 PHONE # 515-987-5161 ZONING: INFORMATION OBTAINED FROM CITY OF WAUKEE A-1 (AGRICULTURAL DISTRICT) FOR AN OFFICIAL ZONING REPORT PLEASE CALL CITY OF WAUKEE AT 515-978-7897 OPEN SPACE& IMPERVIOUS SURFACE: TOTAL SITE AREA = 3,310,854 SF EXISTING IMPERVIOUS SURFACE = 1,114,700 SF ADDED IMPERVIOUS SURFACE = 8,800 SF TOTAL IMPERVIOUS SURFACE = 1,123,500 SF (33.9%) TOTAL OPEN SPACE = 2,187,354 SF (66.1%) SITE CONTROL AND BENCHMARKS: BASIS OF BEARING OBTAINED FROM GPS OBSERVATIONS DATUM = NAD 83, IOWA SOUTH BENCHMARK DATUM = CITY DATUM OR NAVD88, GEOID 18 POINT # 9200, CUT "X" NORTHING = 594714.92 EASTING = 1531578.13 ELEVATION = 1015.73 DESCRIPTION:LOCATED ON THE SOUTH SIDE OF THE SIDEWALK INTERSECTION, ABOUT 294 EAST OF THE CONCESSION STAND BUILDING POINT # 9201, CUT "X" NORTHING = 594742.65 EASTING = 1531313.35 ELEVATION = 1018.64 DESCRIPTION:LOCATED APPROX. 35' NORTHEAST OF THE CONCESSION BUILDING ON THE NORTH EDGE OF THE SIDEWALK VICINITY MAP SCALE: 1" = 1,000' COPYRIGHT 2026 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW. SHEET INDEX: C-001 COVER SHEET C-201 LAYOUT PLAN & DETAILS C-301 GRADING & UTILITY PLAN UTILITY CONFLICT NOTES: 1.UTILITY CONFLICTS MAY EXIST ACROSS THE SITE WITH NEW UTILITIES, GRADING, PAVING ETC. MOST UTILITY CONFLICTS HAVE BEEN CALLED OUT FOR CONTRACTOR CONVENIENCE. 2.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONFLICTS THAT ARE EITHER CALLED OUT ON THE PLANS OR THAT CAN BE SEEN ON THE PLANS BETWEEN AN EXISTING UTILITY AND PROPOSED CONSTRUCTION WETLAND NOTES: 1.BISHOP ENGINEERING DOES NOT PERFORM WETLAND STUDIES OR WETLAND MITIGATION. IT IS THE OWNER'S RESPONSIBILITY TO DETERMINE IF ANY WETLANDS ARE LOCATED ON THE PROJECT SITE AND PERFORM ANY NECESSARY MITIGATION PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. SURVEY NOTES: 1.SURVEY WORK WAS COMPLETED BY BISHOP ENGINEERING ON 11.05.2025. GENERAL NOTES: 1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2026 SUDAS STANDARD SPECIFICATIONS AND 2025 WAUKEE STANDARD SPECIFICATIONS. THE CITY OF WAUKEE MUST BE NOTIFIED BY ALL CONTRACTORS 48 HOURS PRIOR TO COMMENCING WORK. 2.IN EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES. ANY DAMAGE TO SAID UTILITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. 4.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT O.S.H.A. CODES AND STANDARDS. NOTHING INDICATED ON THESE PLANS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE APPROPRIATE SAFETY REGULATIONS. 5.ALL NECESSARY CONSTRUCTION SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES REQUIRED DURING CONSTRUCTION WILL BE FURNISHED BY THE CONTRACTOR. SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES MUST BE IN CONFORMANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS." 6.BISHOP ENGINEERING SHALL NOT BE LIABLE FOR ANY INJURIES THAT HAPPEN ON SITE. THIS SHALL INCLUDE BUT NOT BE LIMITED TO TRENCH COLLAPSES FROM VARYING SOIL CONDITIONS OR INJURIES CAUSED BY UNDERGROUND UTILITIES INCLUDING UTILITIES THAT ARE NOT SHOWN ON PLAN. 7.THE CONTRACTOR IS LIABLE FOR ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY CAUSED BY THEIR ACTION OR INACTION IN PROVIDING FOR STORM WATER FLOW DURING CONSTRUCTION. DO NOT RESTRICT FLOWS IN EXISTING DRAINAGE CHANNELS, STORM SEWER, OR FACILITIES. 8.THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCHEDULE FOR PERFORMANCE OF WORK ITEMS. THIS SCHEDULE SHALL BE PROVIDED BY THE CONTRACTOR AT THE PROJECT PRECONSTRUCTION CONFERENCE. NO WORK SHALL BEGIN UNTIL A SCHEDULE HAS BEEN SUBMITTED AND ACCEPTED. THE CONTRACTOR SHALL THEN PERFORM WORK TO CONFORM TO THE ACCEPTED SCHEDULE. 9.LABORATORY TESTS SHALL BE PERFORMED BY THE OWNER UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE SAMPLES OF MATERIAL REQUIRED FOR LABORATORY TESTS AND TESTING IN ACCORDANCE WITH THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. 10.SOIL IMPORT OR EXPORT ON THIS PROJECT SHALL BE CONSIDERED INCIDENTAL AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY. 11.THE CONTRACTOR SHALL PROTECT ALL STRUCTURES NOT SHOWN AS REMOVALS ON THE PLANS. 12.THE CONTRACTOR SHALL OBTAIN ANY AND ALL NECESSARY PERMITS PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL WORK WITH OWNER OR OWNERS REPRESENTATIVE ON ALL REQUIRED STORM WATER DISCHARGE PERMITS FROM THE IOWA DEPARTMENT OF NATURAL RESOURCES AND THE CITY OF WAUKEE. 13.GRADING AND EROSION CONTROL SHALL BE DONE IN ACCORDANCE WITH THE APPROVED GRADING PLAN, SWPPP, NPDES DOCUMENTS, AND IOWA DEPARTMENT OF NATURAL RESOURCES REQUIREMENTS. 14.THE CONTRACTOR SHALL PICK UP ANY DEBRIS SPILLED ONTO THE ADJACENT RIGHT OF WAY OR ABUTTING PROPERTIES AS THE RESULT OF CONSTRUCTION, AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. 15.THE CONTRACTOR IS RESPONSIBLE FOR THE PROMPT REMOVAL OF ALL MUD THAT HAS BEEN TRACKED OR WASHED UNTO ADJACENT PROPERTY OR RIGHT OF WAY UNTIL SUCH TIME THAT PERMANENT VEGETATION HAS BEEN ESTABLISHED. 16.DISPOSE OF ALL EXCESS MATERIALS AND TRASH IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS. PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT DESIRABLE FOR INCORPORATION INTO THE PROJECT. PAVING NOTES: 1.THE PAVING/ GRADING CONTRACTOR SHALL BACKFILL THE PAVING SLAB AND FINE GRADE THE RIGHT OF WAY AS SOON AFTER THE PAVING AS POSSIBLE. ALL AREAS SHALL BE SEEDED IN ACCORDANCE WITH CITY OFWAUKEE STANDARD SPECIFICATIONS AND THE CURRENT VERSION OF SUDAS. 2.SUBGRADE PREPARATION AND PAVEMENTS WILL BE CONSTRUCTED FOLLOWING RECOMMENDATIONS IN THE SOILS REPORT. APPROVED SOILS ENGINEER MUST SIGN OFF ON SUB BASE PRIOR TO ANY PAVEMENT BEING PLACED. 3.SEE DETAILS FOR ALL PAVEMENT THICKNESS. 4.ALL WALKS, PARKING LOTS, HANDICAP PARKING, RAMPS, ETC. SHALL COMPLY WITH ALL A.D.A. AND CITY CODES. HANDICAP PARKING SIGNAGE IS REQUIRED FOR ALL HANDICAP STALLS AND SHALL BE CONSIDERED INCIDENTAL. IN EVENT OF A DISCREPANCY BETWEEN THE PLANS AND THE A.D.A./CITY CODES THE A.D.A./CITY CODES SHALL GOVERN. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING A.D.A. CODES ARE MET. UTILITY NOTES: 1.QUANTITY CALLOUTS ON PIPE LENGTHS ARE APPROXIMATE AND SHOULD BE USED FOR REFERENCE ONLY. 2.THE CONTRACTOR SHALL PROVIDE AS-BUILTS OF ALL UTILITIES, INCLUDING DEPTH AND LOCATION OF ALL SERVICES. 3.THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OF ANY AND ALL EXISTING AND PROPOSED UTILITIES TO PROPOSED GRADES. EXISTING UTILITIES SHALL BE RAISED OR LOWERED IN ACCORDANCE WITH THE UTILITY OWNER REQUIREMENTS. ANY NECESSARY ADJUSTMENTS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 4.ACTIVE EXISTING FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE REPAIRED, REROUTED, OR CONNECTED TO PUBLIC OR PRIVATE STORM SEWER TO REMAIN IN SERVICE. 5.ALL PROPOSED RCP STORM SEWER PIPE JOINTS SHALL BE FABRIC WRAPPED AND THE LAST 3 PIPE SECTIONS ON THE APRON SHALL BE TIED WITH RF-14 TYPE II CONNECTORS. ALL APRONS SHALL HAVE A STANDARD FOOTING AND TRASH GUARD. DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 55 5 1 7 t h s t r e e t , s u i t e 2 0 1 , d e s m o i n e s , i o w a 5 0 3 0 9 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s SI T E P L A N TR A I L R I D G E B A S E B A L L / S O F T B A L L S T O R A G E WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I A 1018u02 MARCH 2026 35 0 1 1 0 4 t h S t r e e t , U r b a n d a l e , I A 5 0 3 2 2 P h : 5 1 5 - 2 7 6 - 0 4 6 7 BI S H O P E N G I N E E R I N G + UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD. C-001 - C-301 ABBREVIATIONS: AC ACRES ASPH ASPHALT BK BOOK CONC CONCRETE D DEEDED DISTANCE EX EXISTING ENCL ENCLOSURE FF FINISHED FLOOR FL FLOW LINE FRAC FRACTIONAL M MEASURED DISTANCE MH MANHOLE OPC ORANGE PLASTIC CAP P PLATTED DISTANCE PG PAGE POB POINT OF BEGINNING POC POINT OF COMMENCEMENT PRA PREVIOUSLY RECORDED AS PUE PUBLIC UTILITY EASEMENT ROW RIGHT OF WAY RPC RED PLASTIC CAP SF SQUARE FEET SAN SANITARY TYP TYPICAL YPC YELLOW PLASTIC CAP N NORTH S SOUTH E EAST W WEST ELECTRIC VAULT TRANSFORMER POLE TRANSFORMER POLE LIGHT POLE ELECTRIC JUNCTION BOX ELECTRIC PANEL TRANSFORMER GROUND LIGHT GUY WIRE ELECTRIC HANDHOLE GAS METER GAS VALVE AIR CONDITIONING UNIT TELEPHONE RISER TELEPHONE VAULT TELEPHONE MANHOLE TRAFFIC SIGNAL MANHOLE FIBER OPTIC MANHOLE FIBER OPTIC RISER FIBER OPTIC VAULT CABLE TV RISER SIGN BOLLARDS 7 DENOTES NUMBER OF PARKING STALLS PROPERTY CORNER - FOUND AS NOTED PROPERTY CORNER- PLACED 5/8" IRON ROD WITH YELLOW PLASTIC CAP ID # XXXXX OR AS NOTED SECTION CORNER - FOUND AS NOTED SITE CONTROL POINT - MONUMENT AS NOTED ELEC EJ EP GM GV A/C T TEL T TS FO F/O TV F/O SAN SANITARY SEWER ST STORM SEWER W WATER LINE G GAS LINE U/E UNDERGROUND ELECTRIC O/E OVERHEAD ELECTRIC TELE TELEPHONE LINE F/O FIBER OPTIC CATV CABLE TV STORM MANHOLE CURB INTAKE SURFACE INTAKE FLARED END SECTION ROOF DRAIN DOWNSPOUT SANITARY MANHOLE CLEANOUT FIRE HYDRANT SPRINKLER IRRIGATION CONTROL VALVE WATER MANHOLE WELL WATER VALVE WATER SHUT OFF YARD HYDRANT FLAGPOLE ELECTRIC MANHOLE ELECTRIC METER ELECTRIC RISER D S CO H Y D ICV W WSO YA DR E EM E W WV LEGEND L: \ L A N D P R O J E C T S 2 0 2 5 \ 2 5 0 4 4 7 T R A I L R I D G E B B - S B S T O R A G E \ D W G \ C 0 C O V E R . D W G 2/ 1 6 / 2 0 2 6 3 : 5 4 : 4 1 P M C-001 COVER SHEET STAKING NOTES: 1.CONTRACTOR IS REQUIRED TO HAVE ALL STAKING DONE UNDER THE SUPERVISION OF A LICENSED LAND SURVEYOR AND IN COORDINATION WITH THE PROJECT ENGINEER. 2.CONTRACTOR IS REQUIRED TO HAVE ALL STAKING DONE DIRECTLY UNDER THE GENERAL CONTRACTOR BY A SINGLE COMPANY. 3.STAKING DOES NOT RELIEVE CONTRACTOR OF ULTIMATE RESPONSIBILITY TO CONSTRUCT THE PROJECT PER PLAN. EARTHWORK BALANCE NOTES: 1.IT IS ANTICIPATED THIS SITE DOES NOT BALANCE. SOIL IMPORT OR EXPORT ON THIS PROJECT SHALL BE CONSIDERED INCIDENTAL AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY. CONTRACTOR RESPONSIBLE FOR MAKING THE SITE EARTHWORK BALANCE. NO CHANGE ORDERS WILL BE ISSUED AS IT RELATES TO EARTHWORK QUANTITIES. THIS INCLUDES BUT IS NOT LIMITED TO TOPSOIL, POOR SOILS AND STRUCTURAL FILL NECESSARY TO MEET PROJECT PLANS AND SPECIFICATIONS. FARM TILE NOTES: 1.ACTIVE EXISTING FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE REPAIRED, REROUTED, OR CONNECTED TO PUBLIC OR PRIVATE STORM SEWER TO REMAIN IN SERVICE. CONNECT TO STORM SEWER WITH AN INSERT-A-TEE OR DIRECTLY TO A STORM STRUCTURE. 2.IT IS ANTICIPATED THAT THE SITE CONTAINS FIELD TILES, HOWEVER, LIMITED INFORMATION IS AVAILABLE. 3.THIS WORK WILL BE ELIGIBLE FOR A CHANGE ORDER IF, AND ONLY IF, PROPOSED SITE STORM SEWER IS NOT WITHIN 50 FEET OF THE FIELD TILE. 4.CONTRACTOR SHALL PROVIDE AS-BUILTS OF FARM TILES TO BISHOP ENGINEERING WITH BOTH ELEVATIONS AND STATE PLANE COORDINATES. STORM & SANITARY TELEVISING NOTES: 1.CONTRACTOR IS REQUIRED TO TELEVISE ALL SANITARY AND STORM SEWER SYSTEM PRIOR TO PAVING OPERATIONS. 2.CONTRACTOR SHALL SEND VIDEO INSPECTION TO THE ENGINEER FOR APPROVAL PRIOR TO PAVING. 3.CONTRACTOR SHALL PROVIDE COPIES OF THE REPORTS AND VIDEOS TO THE WAUKEE ENGINEERING DEPARTMENT FOR APPROVAL PRIOR TO PAVING. SWPPP NOTES: 1.DISTURBED AREA IS 26,500 SF IS LESS THAN 1 ACRE. THEREFORE, NO SWPPP OR GENERAL PERMIT #2 ARE REQUIRED. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING PERIMETER SILT FENCE, BELOW GRADE INLET PROTECTION AND A CONCRETE WASHOUT FACILITY TO MEET THE REQUIREMENTS OF SUDAS SPECIFICATION SECTION 11,050. SECURITY NOTES: 1.CONTRACTOR RESPONSIBLE FOR SECURITY OF THE SITE. 2.TEMPORARY FENCES OR ANY OTHER SECURITY MEASURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3.NO SECURITY MEASURES WILL BE ELIGIBLE FOR A CHANGE ORDER AND MUST BE INCLUDED IN THE BASE BID. SPECIFICATIONS NOTES: 1.ALLWORK SHALL BE DONE IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE 2025 CITY OF WAUKEE STANDARD SPECIFICATIONS AND 2026 SUDAS SPECIFICATIONS. 2.FOR ANY DISCROPANCIES BETWEEN THE PROJECT SPECIFICATIONS AND THE CURRENT EDITION OF IOWA SUDAS, THE PROJECT SPECIFICATIONS SHALL GOVERN UNLESS DIRECTED OTHERWISE BY THE CITY OF WAUKEE OR THE PROJECT ENGINEER. 3.FOR ALL SPECIFICATION DISCREPANCIES, PROJECT ENGINEER SHALL BE CONTACTED PRIOR TO PROCEEDING WITH CONSTRUCTION. IF ENGINEER IS NOT CONTACTED, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY PROBLEMS THAT RESULT FROM SAID DISCREPANCIES. 4.FOR ALL SPECIFICATION DISCREPANCIES, CONTRACTOR MUST OBTAIN WRITTEN APPROVAL FROM THE CITY OF WAUKEE ENGINEERING DEPARTMENT FOR ANY CHANGES TO PROPOSED SITE INFRASTRUCTURE OR GRADES PRIOR TO PROCEEDING WITH ANY CHANGES. FIRE DEPARTMENT ACCESS NOTES: 1.AN APPROVED FIRE APPARATUS ACCESS ROAD SHALL BE PROVIDED FOR ALL BUILDINGS, OR PORTIONS OF A BUILDING AS SOON AS VERTICAL CONSTRUCTION OF THE BUILDING COMMENCES. 2.FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF 2015 IFC 503.2 AND SHALL EXTEND TO WITHIN 150 FEET OF ALL EXTERIOR PORTIONS OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING. 3.FIRE APPARATUS TRAIL SHALL BE INSTALLED PRIOR TO BUILDING GOING VERTICAL. IF PAVEMENT IS NOT PLANNED TO BE INSTALLED PRIOR TO THE BUILDING GOING VERTICAL, THAN TEMPORARY ROCK ACCESS SHALL BE PROVIDED AROUND THE BUILDING AND CONNECTED TO THE ROCK CONSTRUCTION ENTRANCE. 4.ANY TEMPORARY ROCK USED FOR THE FIRE DEPARTMENT ACCESS ROUTE SHALL BE REMOVED FROM THE SITE PRIOR TO TOPSOIL SPREADING AND SEEDING. SEE TOPSOIL NOTES ON COVER SHEET AND GRADING PLAN. 5.ANY AND ALL FIRE APPARATUS ACCESS ROAD WORK NECESSARY TO COMPLY WITH WAUKEE FIRE DEPARTMENT REQUIREMENTS SHALL BE CONSIDERED INCIDENTAL TO BID. PAVEMENT SAWCUT NOTES: 1.CONTRACTOR SHALL FOLLOW JOINTING SHOWN ON PLANS. IF CONTRACTOR WANTS TO DEVIATE FROM JOINTING SHOWN, CONTRACTOR SHALL PROVIDE SAWCUT JOINTING PLAN TO JAMES RODEMYER, BISHOP ENGINEERING (515-276-0467 OR JRODEMYER@BISHOPENGR.COM) PRIOR TO ANY CONCRETE PAVEMENT INSTALLATION. 2.PAVEMENT MAY BE REQUIRED TO BE REMOVED AND REPLACED IF PLACED NOT IN COMPLIANCE WITH JOINTING PLAN. SOD & WATERING NOTES: 1.CONTRACTOR SHALL SOD ALL DISTURBED AREA. 2.AREA TO BE SODDED MUST BE FREE OF ALL CONSTRUCTION DEBRIS AND ROCKS & DIRT CLUMPS OVER 1" IN DIAMETER. 3.THOROUGHLY WATER SOD UPON INSTALLATION. CONTRACTOR SALL MAINTAIN WATERING UNTIL SOD IS ESTABLISHED WITH ROOTS KNITTED IN SUBSURFACE. PROPOSED 20'x40' STORAGE BUILDING FF=1015.50 R1 5 0 ' R25' REF ARCH FOR BATTING CAGES & TURF 12' WIDE GATE 8' TALL BLACK VINYL CHAIN LINK FENCE IN 12" WIDE MOW STRIP (REF DETAIL 1/C-201) 8' TALL BLACK VINYL CHAIN LINK FENCE IN 12" WIDE MOW STRIP (REF DETAIL 1/C-201) R33' R1 5 8 ' R1 0 ' R50' R58' R50' R58' BEGIN REMOVAL OF 80LF OF EX 8' CHAINLINK FENCE IN MOW STRIP END REMOVAL OF 80LF OF EX 8' CHAINLINK FENCE IN MOW STRIP STOOP TO SIDEWALK TRANSITION (REF DETAIL 3/C-201) STOOP TO SIDEWALK TRANSITION (REF DETAIL 3/C-201) SOD ALL DISTURBED AREA SOD ALL DISTURBED AREA SOD ALL DISTURBED AREA ST 6" PCC W/ #4 FIBER BARS 24" O/C BOTH WAYS FOR BATTING CAGES (REF DETAIL 4/C-201)8' 8' 5" PCC WALK (REF DETAIL 2/C-201, TYP) 5" PC C W A L K 5" P C C W A L K 48' 79 '8' 3' 8' 5" P C C W A L K CP #9200 CO CO CO 2" TREE 2" TREE 2" TREE 3" TREE 2" TREE 2" PINE 2" PINE 2" PINE 2" TREE 2" TREE 3" TREE 2" TREE 2" TREE 2" TREE 2" PINE 2" TREE 2" TREE 2" PINE 2" PINE 2" PINE 2" PINE 2" PINE 2" TREE 2" TREE 2" TREE 2" PINE 2" PINE 2" TREE 2" PINE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" PINE 2" PINE 2" TREE 2" TREE D ICV ICV ICVICV ICVICVICV 2" TREE 2" TREE 2" TREE 3" TREE 2" TREE 3" TREE 3" TREE3" TREE 3" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE ICV ICV ICV EP EP EP EP ICV 3" TREE 3" TREE 3" TREE 3" TREE 2" TREE 2" TREE2" TREE 2" TREE 2" TREE2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE 2" TREE2" TREE 2" TREE 2" TREE2" TREE 2" TREE 2" TREE CP #9201 CP #9202 CP #9203 X X X X X X X X X X X X X U/E U/E U/E U/E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X X X X X XXXXXXXXXXX U/E U/E U/E U/E U/E U/E U/E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/ E U/ E U/ E U/E U/ E U/ E U/ E U/ E U/E U/ E U/ E U/E U/E U/E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" EX BUILDING 2741 SF ST 15" ST 15" ST 15" ST12" ST 12" ST 15 " ST 15 " EX DUGOUT 311SF EX D U G O U T 39 2 S F CANOPY EX D U G O U T 47 1 S F ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30" ST 30" ST 30" ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" ST 30" ST 30" ST 30" ST 30" ST 30" ST 30" ST 30" ST12" ST12" ST12" ST 12 " ST 12 " ST 12 " ST 30" ST 30" ST 30" ST 30" ST 30" ST 30" LOT 1 X X ST 24" ST 24" 18" ST18" ST18" ST18" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST8" ST8" ST8"ST8" ST8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST8" ST8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8"ST 8"ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST8" ST8" ST8" EX 10' CHAINLINK FENCE EX 4' CHAINLINK FENCE EX CONCRETE EX CONCRETE EX CONCRETEEX CONCRETE EX CONCRETE EX L O N G J U M P W I T H T R A C K S U R F A C I N G EX GRAVEL EX G R A V E L EX CONCRETE EX 8' CHAINLINK FENCE BACKSTOP NETTING EX GRAVEL EX G R A V E L EX 8' CHAINLINK FENCE EX 8' CHAINLINK FENCE EX G R A V E L EX 6' CHAINLINK FENCE W/ CONCRETE EX 8' CHAINLINK FENCE IN MOW STRIP EX 8' CHAINLINK FENCE EX 8' CHAINLINK FENCE EX GATE EX 8' CHAINLINK FENCE IN MOW STRIP EX GATE EX GATE EX 4' CHAINLINK FENCE EX GATE EX GATE EX 8' CHAINLINK FENCE IN MOW STRIP EX 8' CHAINLINK FENCE EX C O N C R E T E EX C O N C R E T E EX C O N C R E T E EX CO N C R E T E EX GRAVEL EX G R A V E L EX 8' CHAINLINK FENCE EX GATE EX GATE EX GATE BACKSTOP NETTING BACKSTOP NETTING POLE, TYP BACKSTOP NETTING POLE, TYP EX GATE EX GATE EX GATE EX GATE EX GATE EX GATE EX GATE EX GATE EX GATE DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 55 5 1 7 t h s t r e e t , s u i t e 2 0 1 , d e s m o i n e s , i o w a 5 0 3 0 9 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s SI T E P L A N TR A I L R I D G E B A S E B A L L / S O F T B A L L S T O R A G E WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I A 1018u02 MARCH 2026 35 0 1 1 0 4 t h S t r e e t , U r b a n d a l e , I A 5 0 3 2 2 P h : 5 1 5 - 2 7 6 - 0 4 6 7 BI S H O P E N G I N E E R I N G + L: \ L A N D P R O J E C T S 2 0 2 5 \ 2 5 0 4 4 7 T R A I L R I D G E B B - S B S T O R A G E \ D W G \ C 2 L A Y O U T . D W G 2/ 1 6 / 2 0 2 6 3 : 5 5 : 0 8 P M GRAPHIC SCALE 020 10 20 40 C-201 LAYOUT PLAN & DETAILS SIDEWALK DETAIL SCALE NONE 2 C-201 FINISHED GROUND GRADE (INCLUDING SOD) SHALL BE 1/4" BELOW FINISHED PAVEMENT GRADE ON DOWNHILL SIDE WIDTH PER PLAN NOTE: SLOPE SIDEWALK IN ACCORDANCE WITH GRADING PLAN, 1.5% CROSS SLOPE 4" ROCK BASE SEE SPEC SECTION 32 11 23 5" MIN WALK THICKNESS - SEE PLANS FOR EXACT THICKNESS 12" 12" MOW STRIP DETAIL SCALE NONE 1 C-201 PER FENCE MANUFACTURER 6" 5" PCC 6" GRASS FLUSH WITH EDGE OF CONCRETE TROWEL JOINT AT EVERY POST 1" FOAM BETWEEN POLE & CONCRETE SEAL FOAM W/ GRAY MASTIC JOINT SEALANT XXX 36" 2" 5'-0" 12"12" STRUCTURAL STOOP / SIDEWALK TRANSITION DETAIL SCALE NONE 3 C-201 5" 6" PCC #4 @ 12" O.C. STRUCTURAL STOOP SEE STRUCTURAL 1/4" EXPANSION JOINT FILLED W/ GRAY MASTIC JOINT SEALANTKEYED JOINT SIDEWWALK SEE PLANS FOR THICKNESS 4" VOID FORMS X WIDTH OF SIDEWALK #4 @ 12" O.C. THUS: 60" ROCK BASE SEE OTHER DETAILS POROUS BACKFILL (IOWA DOT SPEC 4131 OR EQUAL) 6" SUBDRAIN BATTING CAGE PAVING DETAIL SCALE NONE 4 C-201 FINISHED GROUND GRADE (INCLUDING SOD) SHALL BE 1/4" BELOW FINISHED PAVEMENT GRADE ON DOWNHILL SIDE 4" ROCK BASE SEE SPEC SECTION 32 11 23 12" 6" PCC C-4 MIX W/ #4 FIBER BARS 24" O/C BOTH WAYS 12" SUBGRADE PREPARATION IN TWO 6" LIFTS PROPOSED 20'x40' STORAGE BUILDING FF=1015.50 0.3 % 1.0% 0. 0 % 1.0% 0. 0 % 1.0% 0. 2 % 1.0% 0.0 % 3. 7 % 1.5% 1. 5 % 1. 2 % 1.5% 0. 5 % 0.0 % 1.0% 1.0% 0. 5 % 1.0% 0.9 % 0. 0 % 1.0% 3.4% 0. 5 % 0. 5 % 0. 5 % 0. 5 % 1.5% 0. 0 % 0. 0 % 0.4% 1.5% 0.5% 1. 0 % 0.5% 2.9% 1. 5 % 2.7% 2.1% 1.5% 2.0% 4.8 % 1.1% 3.5 % 3. 5 % 0.0 % 8.4% 4.0% 2.1 % 6.8% 1.1% 2.0% 2.8% 2.0% 1.0% 2.0%2.0% 2.0% 2.0 % 3.8% 1.5% 1.1% 1. 1 % 3. 0 % 101 7 10 1 8 10 1 6 101 5 1014 1015 101 5 10 1 4 10 1 5 STRUCTURE #1 INSTALL 30" NYLOPLAST BASIN OVER EX LINE RIM=1014.00 EX FL(E-W)=1008.22± 1.5 % 1015 1015 101 5 8.5% 1.0% 1.5% 0. 0 % 1.5% 0. 0 % 100-YR ELEV=1012.70 PER BISHOP PN 200188 1016.00 EX 1016.00 EX 1015.97 1016.04 EX 1016.01 1016.04 EX 1016.01 1016.05 EX 1016.02 1016.05 EX 1016.04 1015.61 1015.49 1015.35 1015.23 1015.15 1015.23 1014.75 1014.36 1014.84 1014.95 1014.87 OVERTOPPING 1014.74 1014.66 1015.50 1015.50 1015.001015.00 1015.00 1015.50 1015.00 1015.50 1015.42 1015.35 1015.27 1014.92 1014.80 1017.99 1017.87 1018.78 1018.69 1018.87 EX1018.86 EX 1015.00 1015.00 1015.62 1015.62 1015.00 1015.00 1013.75 EX1014.31 EX OVERTOPPING 1015.25 1014.66 1014.64 1014.001014.55 1013.55 1013.53 ADJUST RIM OF MANHOLE TO 1013.74 OVERTOPPING 1013.75 1013.51 1013.89 EX 1013.89 EX 1013.00 EX 1012.35 EX 1015.95 1015.83 1015.35 1015.23 1014.911015.42 1015.42 1015.42 DOWNSPOUT CONNECTION (SEE DETAIL 1/C-301) FL=1012.50 6" INSERTA-TEE FL(N)=1009.78 FL(E,W)=1008.53± ST 57LF 6" N-12 @ S=4.80% DOWNSPOUT CONNECTION & 7LF 6" N-12 @ S=2.00% MIN (SEE DETAIL 1/C-301) TRANSITION TO SLOTTED N-12 AT STOOP 24LF 6" SUBDRAIN & INSERTA-TEE CONNECTION TO EX STORM SEWER 100-YR ELEV=1013.92 100-YR ELEV=1014.24 100-YR ELEV=1013.18 CP #9200 CO CO CO EX INTAKE RIM=1016.71 **FL(S 6"CPP)=1012.58** **FL(NW 24"RCP)=1011.40** FL(SW 18"CPP)=1010.66 FL(E 30"RCP)=1010.66 **PER OLD PLANS** EX INTAKE RIM=1014.50 FL(N)=1010.69 EX INTAKE RIM=1014.06 FL(S 12"CPP)=1010.18 FL(NE 12"CPP)=1010.08 EX 15" RCP FES FL=1012.55 EX INTAKE RIM=1013.45 **FL(W 12"CPP)=1009.26** FL(S 6"CPP)=1009.15 FL(SW 12"CPP)=1009.10 FL(E 15"CPP)=1009.08 **PER OLD PLANS** EX 15" RCP FES FL=1010.60 D EX STORM MH RIM=1012.80 FL(W 15"CPP)=1007.80 FL(S 30"RCP)=1007.80 FL(E 30"RCP)=1007.50 EX INTAKE RIM=1012.94 FL(S 30"RCP)=1008.04 FL(N 30"RCP)=1008.02 EX INTAKE RIM=1013.58 FL(S 30"RCP)=1008.58 FL(N 30"RCP)=1008.56 ICV EX INTAKE RIM=1013.94 FL(S 15"CPP)=1009.14 FL(W 30"CPP)=1009.09 FL(N 30"CPP)=1008.84 EX INTAKE RIM=1014.62 FL(W 15"CPP)=1010.28 FL(E 12"CPP)=1010.28 FL(N 15"CPP)=1010.11 ICV ICVICV ICVICVICV ICV ICV ICV EP EP EP EP ICV CP #9201 CP #9202 CP #9203 X X X X X X X X X X X X X U/E U/E U/E U/E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X X X X X X X XXXXXXXXXXX U/E U/E U/E U/E U/E U/E U/E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/ E U/ E U/ E U/E U/ E U/ E U/ E U/ E U/E U/ E U/ E U/E U/E U/E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E 10 1 0 10 1 1 10 1 2 10 1 3 100 9 101 4 1015 1014 1013 1012 1011 1010 1009 1014 101 3 101 4 101 4 10 1 5 1015 10 1 6 101 6 1017 1015 101610171018 1019 10 1 9 1018 1017 101 8 101 8 10 1 7 101 6 10 1 5 10 1 5 101 5 101 6 10 1 7 10 1 8 1018 10 1 7 10 1 6 10 1 5 101 4 101 4 1015 1014 1013 1012 1010 1014 1013 1012 1011 1013 1012 1014 1013 1012 1011 1014 101 6 101 5 101 6 ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" 1014 EX BUILDING 2741 SF 1016 10 1 6 10 1 6 101 6 1017 ST 15" ST 15" ST 15" ST12" ST 12" ST 15 " ST 15 " 10 1 4 1015 EX DUGOUT 311SF EX D U G O U T 39 2 S F CANOPY EX D U G O U T 47 1 S F ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30 " ST 30" ST 30" ST 30" ST 15" ST 15" ST 15" ST 15" ST 15" ST 15" ST 30" ST 30" ST 30" ST 30" ST 30" ST12" ST12" ST12" ST 12 " ST 12 " ST 12 " ST 30" ST 30" ST 30" ST 30" ST 30" ST 30" EX INTAKE RIM=1014.45 FL(W 30"RCP)=1009.85 FL(E 30"RCP)=1009.83 LOT 1 X X ST 24" ST 24" ST18" ST18" ST18" ST18" 2" SUBDRAIN LATERALS IN FIELD NOT SHOWN OR LOCATED 8"X8" TEE PER OLD PLAN ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST 12" ST8" ST8"ST8" ST8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST8" ST8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST 8"ST 8"ST 8" ST 8" ST 8" ST 8" ST 8" ST 8" ST8" ST8" ST8" 8" SLOTTED DRAIN PER PLAN 8" SLOTTED DRAIN PER PLAN 8" SLOTTED DRAIN PER PLAN 8" SLOTTED DRAIN PER PLAN 2" SUBDRAIN LATERALS IN FIELD NOT SHOWN OR LOCATED 8" SLOTTED DRAIN PER PLAN 8" SLOTTED DRAIN PER PLAN TOPSOIL NOTES: 1.STRIP AND STOCKPILE THE TOP 8" OF SOIL ON ALL DISTURBED AREAS. 2.RESPREAD TOPSOIL TO A MINIMUM DEPTH OF 8" ON ALL GREEN (NON PAVED) AREAS. IMPORT TOPSOIL AS NECESSARY TO ACHIEVE A MINIMUM DEPTH OF 6". 3.TOPSOIL SHALL BE FREE OF ALL ROCK AND DEBRIS LARGER THAN 3/4" IN SIZE. 4.TOPSOIL IS DEFINED AS: FERTILE, FRIABLE LOAM, CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH, FROM WELL DRAINED SITE FREE FROM FLOODING, NOT IN FROZEN OR MUDDY CONDITIONS; REASONABLE FREE FROM SUBSOIL, CLAY LUMPS, ROOTS, GRASS, WEEDS, STONES LARGER THAN 3/4 INCH IN DIAMETER, AND FOREIGN MATTER; ACIDITY RANGE (PH) OF 5.5 TO 7.5; CONTAINING MINIMUM 4 PERCENT AND MAXIMUM 20 PERCENT ORGANIC MATTER. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET. DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 55 5 1 7 t h s t r e e t , s u i t e 2 0 1 , d e s m o i n e s , i o w a 5 0 3 0 9 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s SI T E P L A N TR A I L R I D G E B A S E B A L L / S O F T B A L L S T O R A G E WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I A 1018u02 MARCH 2026 35 0 1 1 0 4 t h S t r e e t , U r b a n d a l e , I A 5 0 3 2 2 P h : 5 1 5 - 2 7 6 - 0 4 6 7 BI S H O P E N G I N E E R I N G + GRADING LEGEND: EXISTING CONTOUR PROPOSED CONTOUR FINISHED GROUND ELEVATION TOP OF CURB ELEVATION GUTTER ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION EDGE OF WALK ELEVATION TOP OF STAIR ELEVATION BOTTOM OF STAIR ELEVATION NOTE: WALL ELEVATIONS SHOWN ON PLAN ARE FINISHED GROUND GRADES AT THE TOP AND BOTTOM OF THE WALL. 150.50E/W 150.50B/W 150.50T/W 150.50G 150.50T/C 150.50 150 150 150.50T/S 150.50B/S L: \ L A N D P R O J E C T S 2 0 2 5 \ 2 5 0 4 4 7 T R A I L R I D G E B B - S B S T O R A G E \ D W G \ C 3 G R A D I N G . D W G 2/ 1 6 / 2 0 2 6 3 : 5 5 : 3 8 P M GRAPHIC SCALE 020 10 20 40 C-301 GRADING & UTILITY PLAN FLOOR SLAB DOWNSPOUT CONNECTION DETAIL SCALE NONE 1 C-301 EXTERIOR WALL DOWNSPOUT (REF ARCH) INSTALL CAP ON STORM SEWER PIPE & EXTEND DOWNSPOUT INTO CAP COVER. DO NOT GROUT CAP WATER TIGHT INSTALL BENDS AS NEEDED TO AVOID FOUNDATION PROPOSED GROUND 6" N-12 PIPE 6" 90° BEND FOUNDATION WALL MAIN LEVEL EL: 0" T.O. MASONRY EL: 14' -0" METAL WALL PANEL PREFIN METAL FASCIA FACEBRICK HM DOOR & FRAME, PNT, TYP MAIN LEVEL EL: 0" T.O. MASONRY EL: 14' -0" METAL WALL PANEL PREFIN METAL FASCIA FACEBRICK 1'-0" 7/8" MAIN LEVEL EL: 0" T.O. MASONRY EL: 14' -0" METAL WALL PANEL PREFIN METAL FASCIA FACEBRICK MAIN LEVEL EL: 0" T.O. MASONRY EL: 14' -0" METAL WALL PANEL PREFIN METAL FASCIA FACEBRICK HM DOOR & FRAME, PNT, TYP frk architects + engineers WAUKEE COMMUNITY SCHOOL DISTRICT TRAILRIDGE BB/ SB STORAGE WAUKEE, IOWA 1/4" = 1'-0"AD-101 2 EAST 1/4" = 1'-0"AD-101 1 NORTH ELEVATION 1/4" = 1'-0"AD-101 3 SOUTH 1/4" = 1'-0"AD-101 4 WEST MATERIAL BREAKDOWN: 68.7% BRICK 19.7% METAL WALL PANEL 11.6% DOORS (INC. OVERHEAD)