HomeMy WebLinkAbout2026-04-20 I01G_04 University Ave Area Improvements Phase 2_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 20, 2026 AGENDA ITEM:Consideration of approval of a motion approving Change Order No.1 to Vanderpool Construction for the University Avenue Area Improvements – Phase 2 Project, increasing the contract in the amount of $2,130.00. FORMAT:Consent SYNOPSIS INCLUDING PRO & CON: Change Order No.1 includes price increases for a 12” water main connection adjustment and yard hydrant removal on the vineyard property, as well as a deduct for the material substitution of a PVC water meter pit instead of precast concrete. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $2,130.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Change Order No.1 ATTACHMENTS: I. Change Order No.1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos SKK I1G4 S-H Project No.: 4203290 April 14, 2026 Rudy Koester, Public Works Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #1 – Review and Recommendation to Approve University Avenue Area Improvements - Phase 2 Dear Mr. Koester: Please find attached Change Order #1 for the University Avenue Area Improvements - Phase 2 project. The change order includes the following items: • Watermain Connection Adjustments • Yard Hydrant Removal • Water Meter Pit Change This change order will modify the contract to address field conditions encountered during construction and approved material substitutions. Adjustments include revised quantities and add compensation associated with a modified 12-inch water main connection utilizing an existing buried tee identified through exploratory excavation, removal of an existing yard hydrant found within the construction limits that conflicted with planned work, and a credit reflecting approval of a PVC meter pit in lieu of the precast concrete meter pit originally assumed at bid. These changes align the contract with actual site conditions and approved design and material revisions. We have reviewed the change order items and unit prices, and both are in line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $2,130.00 to the construction contract for the University Avenue Area Improvements - Phase 2 with Vanderpool Construction of Indianola, IA. Sincerely, SHIVE-HATTERY, INC. Patrick M. Watts, PE Civil Engineer Enc. Change Order #1 CITY OF WAUKEE 230 W HICKMAN ROAD WAUKEE, IOWA 50263 Contractor: 1100 N 14th St Indianola, IA 50125 $9,198,722.55 1/19/2026 43 EA $ 1,875.00 (1.00) ($1,875.00) CO-1.1 LS $ 3,690.00 1.00 $3,690.00 CO-1.2 LS $ 775.00 1.00 $775.00 CO-1.3 LS ($460.00)1.00 ($460.00) $ 2,130.00 $9,198,722.55 $0.00 $9,198,722.55 $2,130.00 $9,200,852.55 0.02% 0 Days 0 Days November 20, 2026 May 31, 2027 CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Landscaping/Site Restoration/Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 1 TOTAL The Original Contract Sum was Unit April 13, 2026 Contractor: Vanderpool Construction Vanderpool Construction Signature: Name: Jamie Crubaugh The Landscaping/Site Restoration/Final Completion Contract Time will be changed by FITTING, DUCTILE IRON, 12 IN. WATER CONNECTION ADJUSTMENT The Grading/Structure/Utility/Paving Contract Time will be changed by The date of Grading/Structure/Utility/Paving Completion as of the date of this Change Order therefore is YARD HYDRANT REMOVAL WATER METER PIT CHANGE Title: Project Manager Date: University Avenue Area Improvements - Phase 1 4203290 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description THE CONTRACT IS CHANGED AS FOLLOWS: Items 43 is modified and Item CO‑1.1 is added to adjust quantities associated with a revised 12‑inch water main connection. Exploratory excavation identified an existing buried tee fitting, which was utilized in lieu of the proposed new tee. The revised connection required additional excavation and abandonment of the originally proposed tee location. Compensation covers additional labor and time associated with the exploratory excavation. Item CO‑1.2 is added to compensate for the removal of an existing yard hydrant discovered within the old grape vine structures during clearing operations. The yard hydrant was located within the construction limits and was determined to be in conflict with planned construction activities. Removal was required to allow work to proceed. This item compensates for the labor and materials necessary to remove the yard hydrant and associated tee connection, and to splice the existing service line back together following removal of the tee. Item CO‑1.3 is added as a credit to reflect approval of a PVC meter pit in lieu of the precast concrete meter pit assumed by the Contractor at the time of bid. This credit adjusts the contract to account for the material substitution allowed for the meter pit installation. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Date: Approved By: City of Waukee Signature: Name: Brad Deets Title: City Administrator Date: Recommended By: Shive-Hattery Inc. Signature: Name: Patrick Watts Title: Civil Engineer P:\Projects\DM\4203290\Construction\_University Avenue Phase 2\CASupport\Change Order\CO 1 - NOT DONE\ChangeOrder01_UniversityAvenuePhase2.xlsx 1 of 1