2026-05-04 I01H Public Safety Building Renovation Project_Change Order 1_Ryan Contract
AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 4, 2026 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 1/Construction Management Services Agreement to Ryan Companies, US, Inc., for the Waukee Existing Public Safety Building Renovation Project, amended Schedule of Fees FORMAT:Motion SYNOPSIS INCLUDING PRO & CON:The City entered into a contract for Professional Consulting Services with Ryan Companies at Construction Manager of the renovation to the building located at 1300 SE LA Grant Parkway on December 15, 2025. Their contract includes both fixed costs as well as variable costs. The variable costs are based on a percentage of the actual bid prices for construction. Bids have been received on all thirteen packages, and the total price of construction was less than the estimated cost that was put together prior to bidding. The proposed Change Order No. 1 to the Construction Management Services Agreement results in a reduction to the contract of $147,018.00. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:The Amendment is for a reduction in fees to Ryan Companies in the amount of $147,018. The revised contract value is $881,526.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the Change Order. ATTACHMENTS: I. Changer Order #1 to Ryan Companies Construction Management Services Agreement PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H Ryan Companies 111 E Grand Avenue, Suite 200 Des Moines, IA 50309 ph: 515-309-8500 ryancompanies.com May 4, 2026 Brad Deets, City Administrator City of Waukee 230 W. Hickman Road Waukee, IA 50263 Re: Waukee Existing Fire/Police Building Renovation Construction Management Proposal as per AIA C132 Agreement: CO No. 01 Dear Brad: Thank you for the opportunity to work with you and your team on the Waukee Existing Fire/Police Building Renovation project. We respectfully submit the following Change Order No. 01 to our agreement for Construction Management Services dated January 5th, 2026. Our executed contract is based on the Schematic Design (SD) budget. This change order incorporates the 100% Bid Documents Budget Update dated 04.28.2026 to align with full construction project buyout and the milestone of beginning construction. The following updates to our contract are included: Management Time, General Conditions, Fee o AIA C132, 11.1.2 is updated as follows: !This change order updates Construction Phase Services based on the 100% Bid Documents Budget Update dated 04.28.2026. See Attachment 4 – Schedule of Fees. !Construction Services (Management Staff): $430,911.00 !General Conditions: $147,169.00 !CMA & Cost of Work Fee (3.25%): $203,446.00 Safety o Specification Section 00 60 00.04 - Exhibit B Safety Requirements and Procedures is included in the Project Documents and outlines the Owner’s Safety Requirements for the Prime Contractors. Ryan Companies CMA Agreement has been updated to reflect these additional safety requirements. o AIA C132, 3.2.12 is updated as follows: o § 3.2.12 The Construction Manager shall provide recommendations and information to the Owner regarding the allocation of responsibilities for safety programs among the Contractors. Owner’s Safety Plan: Owner has instructed Construction Manager that it will be requiring each Prime Contractor to comply with Owner’s safety requirements and procedures set forth on Exhibit B hereto (the “Safety Requirements”). Construction Manager’s sole responsibility regarding Project safety shall be to act as Owner’s agent in enforcing the Safety Ryan Companies 111 E Grand Avenue, Suite 200 Des Moines, IA 50309 ph: 515-309-8500 ryancompanies.com Requirements on Owner’s behalf. Owner agrees to defend, indemnify and hold Construction Manager harmless from and against any and all liability arising from enforcing the Safety Requirements. Schedule o The CPM schedule has been updated to reflect the CPM schedule included with BP#2-13 contracts. o Substantial Completion remains at 12.14.2026 (no change). Hourly Rates have been updated to our Ryan Co. 2026 hourly rates in accordance with AIA C132 11.5. This change order reflects an update to the executed AIA Document C132-2019 dated January 5th, 2026. (the “CMA Agreement”). The following original contract Attachments are updated to the respective versions included hereto. Attachment 1 – Schedule Attachment 2 – Hourly Rates The following new attachments will become part of the CMA Agreement: Attachment 3 - Exhibit B – Safety Requirements Attachment 4 - Schedule of Fees Original Contract Value: $1,028,544.00 Net Change by Previous Change Orders: $0.00 Contract Value Prior to this Change Order: $1,028,544.00 Value of Current Change Order: -$147,018.00 New Contract Value including this Change Order: $881,526.00 Executing below will constitute a change order to the Construction Management Agreement. Thanks again for the opportunity to be a part of this exciting project. Sincerely, RYAN COMPANIES US, INC. Ryan Companies 111 E Grand Avenue, Suite 200 Des Moines, IA 50309 ph: 515-309-8500 ryancompanies.com Jill Boetger Senior Project Manager Cc: Matt Van Loon, Ryan Co. Zach Eaton, Ryan Co. Agreed to this ___________ day of May, 2026. City of Waukee, Iowa Ryan Companies US, Inc. By:______________________ By:______________________ Its: City Administrator Its: Matt Hillis, VP of Construction IDID Task Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors Resource Names 0 Waukee Existing Fire/Police RenovationWaukee Existing Fire/Police Renovation 363 days Thu 8/7/25 Fri 1/8/27 1 Design Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early Procurement 189 days Thu 8/7/25 Mon 5/4/26 2 Design Development 143 days Thu 8/7/25 Fri 2/27/26 3 Site Survey 45 days Thu 8/7/25 Thu 10/9/25 4 4 Site Plan Submittal Package 69 days Fri 10/10/25 Mon 1/19/26 3 5 5 Site Plan Submittal 1 day Tue 1/20/26 Tue 1/20/26 4 6 6 Site Plan Review (City)15 days Wed 1/21/26 Tue 2/10/26 5 7 7 Site Plan Approval 1 day Wed 2/11/26 Wed 2/11/26 6 397 8 Schematic Design 50 days Thu 8/7/25 Thu 10/16/25 9 9 Schematic Design Deliverable 1 day Fri 10/17/25 Fri 10/17/25 8 17,10,12 1010 Design Development 38 days Mon 10/20/25 Thu 12/11/25 9 1111 1111 Design Development DeliverableDesign Development Deliverable 1 day Fri 12/12/25 Fri 12/12/25 10,17 18,14 1212 Early Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction Documents 19 days Mon 10/20/25 Thu 11/13/25 9 1313 1313 Early Bid Packages Deliverable 1 day Fri 11/14/25 Fri 11/14/25 1212 1919 1414 100% Construction Documents - Full Set (Remaining P100% Construction Documents - Full Set (Remaining Pkgs)52 days Mon 12/15/25 Thu 2/26/26 1111 1515 1515 100% Construction Documents - Full Set Deliverable100% Construction Documents - Full Set Deliverable 1 day Fri 2/27/26 Fri 2/27/26 1414 24,388 1616 PreConstruction 138 days Mon 10/20/25 Mon 5/4/26 1717 Schematic Design Estimate 15 days Mon 10/20/25 Fri 11/7/25 9 1111 1818 Design Development Estimate 20 days Mon 12/15/25 Tue 1/13/26 1111 2424 1919 Early Bid Packages - Prep for BidEarly Bid Packages - Prep for Bid 5 days Mon 11/17/25 Fri 11/21/25 1313 2020 2020 Early Bid Packages Bidding 15 days Mon 11/24/25 Mon 12/15/25 1919 2121 2121 Early Bid Packages - Bids Due 1 day Tue 12/16/25 Tue 12/16/25 2020 2222 2222 Early Bid Packages - Award, Contracts, Insurance, eEarly Bid Packages - Award, Contracts, Insurance, etc.20 days Wed 12/17/25 Thu 1/15/26 2121 2323 2323 Early Bid Packages - Contracts Executed (Council)Early Bid Packages - Contracts Executed (Council)5 days Fri 1/16/26 Thu 1/22/26 2222 117,166,35 2424 Full Buyout Prep for Bid (Remaining Pkgs)Full Buyout Prep for Bid (Remaining Pkgs)5 days Mon 3/2/26 Fri 3/6/26 18,15 2525 2525 Full Buyout Bidding (Remaining Pkgs)Full Buyout Bidding (Remaining Pkgs)16 days Mon 3/9/26 Mon 3/30/26 2424 2626 2626 Full Buyout (Remaining Pkgs) - Bids DueFull Buyout (Remaining Pkgs) - Bids Due 1 day Tue 3/31/26 Tue 3/31/26 2525 28,27FS+3 days,31 2727 Full Buyout - City Council Public Hearing / Award CFull Buyout - City Council Public Hearing / Award Contract 1 day Mon 4/6/26 Mon 4/6/26 26FS+3 days 2828 2828 Full Buyout - Award, Contracts, Insurance, etc.Full Buyout - Award, Contracts, Insurance, etc.9 days Tue 4/7/26 Fri 4/17/26 26,27 30,29 2929 Full Buyout - City Council Contract & Bonds ApproveFull Buyout - City Council Contract & Bonds Approved 1 day Mon 4/20/26 Mon 4/20/26 2828 3030 3030 Full Buyout - Contracts Executed & Ready to MobilzeFull Buyout - Contracts Executed & Ready to Mobilze 4 days Tue 4/21/26 Fri 4/24/26 28,29 369,357,142,203,123,129,160,397,254,260,136,382,363 3131 BP13 Rebid - Bidding 16 days Wed 4/1/26 Wed 4/22/26 2626 3232 3232 BP13 Rebid - Bids Due 1 day Thu 4/23/26 Thu 4/23/26 3131 33FS+6 days 3333 BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved & Executed 1 day Mon 5/4/26 Mon 5/4/26 32FS+6 days 399FS+2 days,400FS+2 days,401FS+2 days 3434 Procurement 187 days Thu 1/22/26 Wed 10/14/26 3535 Begin Early Procurement ProcessBegin Early Procurement Process 0 days Thu 1/22/26 Thu 1/22/26 2323 3636 Begin Standard Procurement ProcessBegin Standard Procurement Process 0 days Fri 4/24/26 Fri 4/24/26 3030 3737 Site 91 days Mon 4/27/26 Tue 9/1/26 3838 Site Grading 26 days Mon 4/27/26 Tue 6/2/26 13 - Earthwork 3939 Buyout ( site grading ) 1 day Mon 4/27/26 Mon 4/27/26 3030 4040 4040 Submittal Development (site grading )Submittal Development (site grading )5 days Tue 4/28/26 Mon 5/4/26 3939 4141 4141 Ryan Submittal Review ( site grading )Ryan Submittal Review ( site grading )5 days Tue 5/5/26 Mon 5/11/26 4040 4242 4242 Designer Submittal Approval ( site grading )Designer Submittal Approval ( site grading )10 days Tue 5/12/26 Tue 5/26/26 4141 4343 4343 Fabrication & Delivery ( site grading )Fabrication & Delivery ( site grading )5 days Wed 5/27/26 Tue 6/2/26 4242 426 4444 Site Grading / Utilities 21 days Mon 4/27/26 Tue 5/26/26 13 - Earthwork 4545 Buyout ( site grading / utilities ) 1 day Mon 4/27/26 Mon 4/27/26 3030 4646 4646 Submittal Development (site grading/utilities )Submittal Development (site grading/utilities )5 days Tue 4/28/26 Mon 5/4/26 4545 4747 4747 Ryan Submittal Review ( site grading / utilities )Ryan Submittal Review ( site grading / utilities )5 days Tue 5/5/26 Mon 5/11/26 4646 4848 4848 Designer Submittal Approval ( site grading / utilitDesigner Submittal Approval ( site grading / utilities )5 days Tue 5/12/26 Mon 5/18/26 4747 4949 4949 Fabrication & Delivery (utilities )5 days Tue 5/19/26 Tue 5/26/26 4848 426 5050 Landscaping 36 days Mon 4/27/26 Tue 6/16/26 02 - General 5151 Buyout ( landscaping ) 1 day Mon 4/27/26 Mon 4/27/26 3030 5252 5252 Submittal Development ( landscaping )Submittal Development ( landscaping )10 days Tue 4/28/26 Mon 5/11/26 5151 5353 5353 Ryan Submittal Review ( landscaping )Ryan Submittal Review ( landscaping )5 days Tue 5/12/26 Mon 5/18/26 5252 5454 5454 Designer Submittal Approval ( landscaping )Designer Submittal Approval ( landscaping )10 days Tue 5/19/26 Tue 6/2/26 5353 5555 5555 Fabrication & Delivery ( landscaping )Fabrication & Delivery ( landscaping )10 days Wed 6/3/26 Tue 6/16/26 5454 441 5656 Site Lighting 56 days Mon 4/27/26 Tue 7/14/26 12 - Electrical 5757 Buyout ( site lighting ) 1 day Mon 4/27/26 Mon 4/27/26 3030 5858 5858 Submittal Development ( site lighting )Submittal Development ( site lighting )15 days Tue 4/28/26 Mon 5/18/26 5757 5959 5959 Ryan Submittal Review ( site lighting )Ryan Submittal Review ( site lighting )5 days Tue 5/19/26 Tue 5/26/26 5858 6060 6060 Designer Submittal Approval ( site lighting )Designer Submittal Approval ( site lighting )10 days Wed 5/27/26 Tue 6/9/26 5959 6161 6161 Fabrication & Delivery ( site lighting )Fabrication & Delivery ( site lighting )5 wks Wed 6/10/26 Tue 7/14/26 6060 438 6262 Exterior Signage 91 days Mon 4/27/26 Tue 9/1/26 02 - General 6363 Buyout ( signage ) 1 day Mon 4/27/26 Mon 4/27/26 3030 6464 6464 Submittal Development ( signage )Submittal Development ( signage )15 days Tue 4/28/26 Mon 5/18/26 6363 6565 WWaauukkeeee EExxiissttiing Fire/Police RenovationWWaauukkeeee EExxiissttiing Fire/Police RenovationWWaauukkeeee EExxiissttiing Fire/Police Renovationng Fire/Police Renovation Design Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early ProcDesign Development, Preconstruction, and Early Procurement Design DevelopmentDesign Development 8/7 Site SurveySite Survey 10/10 Site Plan Submittal PackageSite Plan Submittal Package 1/201/20 Site Plan SubmittalSite Plan Submittal 1/211/21 Site Plan Review (City)Site Plan Review (City) 2/112/11 Site Plan ApprovalSite Plan Approval 8/7 Schematic DesignSchematic Design 10/17 Schematic Design DeliverableSchematic Design DeliverableSchematic Design Deliverable 10/20 Design DevelopmentDesign DevelopmentDesign Development 12/12 Design Development DeliverableDesign Development DeliverableDesign Development DeliverableDesign Development Deliverable 10/20 Early Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction DocumentsEarly Bid Packages - 100% Construction Documents 11/14 Early Bid Packages DeliverableEarly Bid Packages DeliverableEarly Bid Packages DeliverableEarly Bid Packages Deliverable 12/15 100% Construction Documents - Full Set (Remaining P100% Construction Documents - Full Set (Remaining P100% Construction Documents - Full Set (Remaining P100% Construction Documents - Full Set (Remaining P100% Construction Documents - Full Set (Remaining Pkgs) 2/272/27 100% Construction Documents - Full Set Deliverable100% Construction Documents - Full Set Deliverable100% Construction Documents - Full Set Deliverable100% Construction Documents - Full Set Deliverable100% Construction Documents - Full Set Deliverable PreConstructionPreConstruction 10/20 Schematic Design EstimateSchematic Design EstimateSchematic Design Estimate 12/15 Design Development EstimateDesign Development Estimate 11/17 Early Bid Packages - Prep for BidEarly Bid Packages - Prep for BidEarly Bid Packages - Prep for BidEarly Bid Packages - Prep for Bid 11/24 Early Bid Packages BiddingEarly Bid Packages BiddingEarly Bid Packages Bidding 12/16 Early Bid Packages - Bids DueEarly Bid Packages - Bids DueEarly Bid Packages - Bids Due 12/17 Early Bid Packages - Award, Contracts, Insurance, eEarly Bid Packages - Award, Contracts, Insurance, eEarly Bid Packages - Award, Contracts, Insurance, eEarly Bid Packages - Award, Contracts, Insurance, eEarly Bid Packages - Award, Contracts, Insurance, etc. 1/161/16 Early Bid Packages - Contracts Executed (Council)Early Bid Packages - Contracts Executed (Council)Early Bid Packages - Contracts Executed (Council)Early Bid Packages - Contracts Executed (Council)Early Bid Packages - Contracts Executed (Council) 3/2 Full Buyout Prep for Bid (Remaining Pkgs)Full Buyout Prep for Bid (Remaining Pkgs)Full Buyout Prep for Bid (Remaining Pkgs)Full Buyout Prep for Bid (Remaining Pkgs)Full Buyout Prep for Bid (Remaining Pkgs) 3/9 Full Buyout Bidding (Remaining Pkgs)Full Buyout Bidding (Remaining Pkgs)Full Buyout Bidding (Remaining Pkgs)Full Buyout Bidding (Remaining Pkgs) 3/31 Full Buyout (Remaining Pkgs) - Bids DueFull Buyout (Remaining Pkgs) - Bids DueFull Buyout (Remaining Pkgs) - Bids DueFull Buyout (Remaining Pkgs) - Bids DueFull Buyout (Remaining Pkgs) - Bids Due 4/6 Full Buyout - City Council Public Hearing / Award CFull Buyout - City Council Public Hearing / Award CFull Buyout - City Council Public Hearing / Award CFull Buyout - City Council Public Hearing / Award CFull Buyout - City Council Public Hearing / Award Contractontract 4/1 BP13 Rebid - BiddingBP13 Rebid - Bidding 4/23 BP13 Rebid - Bids DueBP13 Rebid - Bids DueBP13 Rebid - Bids Due 5/4 BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved & Executed ProcurementProcurement 1/221/22 Begin Early Procurement ProcessBegin Early Procurement ProcessBegin Early Procurement ProcessBegin Early Procurement Process 4/24 Begin Standard Procurement ProcessBegin Standard Procurement ProcessBegin Standard Procurement ProcessBegin Standard Procurement ProcessBegin Standard Procurement Process Site Site GradingSite Grading 4/27 Buyout ( site grading ) Buyout ( site grading ) Buyout ( site grading ) 4/28 Submittal Development (site grading )Submittal Development (site grading )Submittal Development (site grading )Submittal Development (site grading )Submittal Development (site grading ) 5/5 Ryan Submittal Review ( site grading )Ryan Submittal Review ( site grading )Ryan Submittal Review ( site grading )Ryan Submittal Review ( site grading )Ryan Submittal Review ( site grading ) 5/12 Designer Submittal Approval ( site grading )Designer Submittal Approval ( site grading )Designer Submittal Approval ( site grading )Designer Submittal Approval ( site grading )Designer Submittal Approval ( site grading ) 5/27 Fabrication & Delivery ( site grading )Fabrication & Delivery ( site grading )Fabrication & Delivery ( site grading )Fabrication & Delivery ( site grading )Fabrication & Delivery ( site grading ) Site Grading / UtilitiesSite Grading / UtilitiesSite Grading / Utilities 4/27 Buyout ( site grading / utilities ) Buyout ( site grading / utilities ) Buyout ( site grading / utilities ) Buyout ( site grading / utilities ) 4/28 Submittal Development (site grading/utilities )Submittal Development (site grading/utilities )Submittal Development (site grading/utilities )Submittal Development (site grading/utilities )Submittal Development (site grading/utilities ) 5/5 Ryan Submittal Review ( site grading / utilities )Ryan Submittal Review ( site grading / utilities )Ryan Submittal Review ( site grading / utilities )Ryan Submittal Review ( site grading / utilities )Ryan Submittal Review ( site grading / utilities ) 5/12 Designer Submittal Approval ( site grading / utilitDesigner Submittal Approval ( site grading / utilitDesigner Submittal Approval ( site grading / utilitDesigner Submittal Approval ( site grading / utilitDesigner Submittal Approval ( site grading / utilities )ies ) 5/19 Fabrication & Delivery (utilities )Fabrication & Delivery (utilities )Fabrication & Delivery (utilities )Fabrication & Delivery (utilities ) Landscaping 4/27 Buyout ( landscaping ) Buyout ( landscaping ) Buyout ( landscaping ) 4/28 Submittal Development ( landscaping )Submittal Development ( landscaping )Submittal Development ( landscaping )Submittal Development ( landscaping )Submittal Development ( landscaping ) 5/12 Ryan Submittal Review ( landscaping )Ryan Submittal Review ( landscaping )Ryan Submittal Review ( landscaping )Ryan Submittal Review ( landscaping )Ryan Submittal Review ( landscaping ) 5/19 Designer Submittal Approval ( landscaping )Designer Submittal Approval ( landscaping )Designer Submittal Approval ( landscaping )Designer Submittal Approval ( landscaping )Designer Submittal Approval ( landscaping ) 6/3 Fabrication & Delivery ( landscaping )Fabrication & Delivery ( landscaping )Fabrication & Delivery ( landscaping )Fabrication & Delivery ( landscaping ) Site Lighting 4/27 Buyout ( site lighting ) Buyout ( site lighting ) Buyout ( site lighting ) 4/28 Submittal Development ( site lighting )Submittal Development ( site lighting )Submittal Development ( site lighting )Submittal Development ( site lighting )Submittal Development ( site lighting ) 5/19 Ryan Submittal Review ( site lighting )Ryan Submittal Review ( site lighting )Ryan Submittal Review ( site lighting )Ryan Submittal Review ( site lighting )Ryan Submittal Review ( site lighting ) 5/27 Designer Submittal Approval ( site lighting )Designer Submittal Approval ( site lighting )Designer Submittal Approval ( site lighting )Designer Submittal Approval ( site lighting )Designer Submittal Approval ( site lighting ) 6/10 Fabrication & Delivery ( site lighting )Fabrication & Delivery ( site lighting )Fabrication & Delivery ( site lighting )Fabrication & Delivery ( site lighting ) Exterior Signage Exterior Signage 4/27 Buyout ( signage ) Buyout ( signage ) 4/28 Submittal Development ( signage )Submittal Development ( signage )Submittal Development ( signage )Submittal Development ( signage ) J S N J M M J S N J M M J S N J M Half 2, 2025Half 2, 2025Half 2, 2025 Half 1, 2026Half 1, 2026Half 1, 2026 Half 2, 2026Half 2, 2026Half 2, 2026 Half 1, 2027Half 1, 2027Half 1, 2027 Half 2, 2027Half 2, 2027Half 2, 2027 Half 1, 2028Half 1, 2028Half 1, 2028 Ryan Companies US, Inc.Ryan Companies US, Inc.Waukee Existing Fire/Police Renovation Waukee Existing Fire/Police Renovation Waukee Existing Fire/Police Renovation Waukee Public Safety Renovation Ryan Companies US, Inc. Page 1 Thu 4/9/26 9:48 AMPage 1 Thu 4/9/26 9:48 AM 0101 ADD BP13 Rebid - Bidding 16 days Wed 4/1/26 Wed 4/22/26 2626 3232 BP13 Rebid - Bids Due 1 day Thu 4/23/26 Thu 4/23/26 3131 33FS+6 days BP13 Rebid - City Council Contract & Bond Approved BP13 Rebid - City Council Contract & Bond Approved & Executed 1 day Mon 5/4/26 Mon 5/4/26 32FS+6 days 399FS+2 days,400FS+2 days,401FS+2 days399FS+2 days,400FS+2 days,401FS+2 days 010101010101 ADDADDADD Attachment 1 - ScheduleAttachment 1 - Schedule ID Task Name Duration Start Finish Predecessors Successors Resource Names 65 Ryan Submittal Review ( signage )5 days Tue 5/19/26 Tue 5/26/26 64 66 66 Designer Submittal Approval ( signage )10 days Wed 5/27/26 Tue 6/9/26 65 67 67 Fabrication & Delivery ( signage )60 days Wed 6/10/26 Tue 9/1/26 66 463 68 Foundation / Structure 61 days Mon 4/27/26 Tue 7/21/26 69 Concrete Foundations/Reinforcing 31 days Mon 4/27/26 Tue 6/9/26 03 - Concrete 70 Buyout ( concrete foundations ) 1 day Mon 4/27/26 Mon 4/27/26 30 71 71 Submittal Development ( concrete foundations )10 days Tue 4/28/26 Mon 5/11/26 70 72 72 Ryan Submittal Review ( concrete foundations )5 days Tue 5/12/26 Mon 5/18/26 71 73 73 Designer Submittal Approval ( concrete foundations )10 days Tue 5/19/26 Tue 6/2/26 72 74 74 Fabrication & Delivery ( concrete foundations )5 days Wed 6/3/26 Tue 6/9/26 73 459 75 Concrete Flatwork 26 days Mon 4/27/26 Tue 6/2/26 03 - Concrete 76 Buyout ( concrete flatwork ) 1 day Mon 4/27/26 Mon 4/27/26 30 77 77 Submittal Development ( concrete flatwork )10 days Tue 4/28/26 Mon 5/11/26 76 78 78 Ryan Submittal Review ( concrete flatwork )5 days Tue 5/12/26 Mon 5/18/26 77 79 79 Designer Submittal Approval ( concrete flatwork )5 days Tue 5/19/26 Tue 5/26/26 78 80 80 Fabrication & Delivery ( concrete flatwork )5 days Wed 5/27/26 Tue 6/2/26 79 408 81 Flatwork Concrete Reinforcing 26 days Mon 4/27/26 Tue 6/2/26 03 - Concrete 82 Buyout ( concrete Reinforcing ) 1 day Mon 4/27/26 Mon 4/27/26 30 83 83 Submittal Development ( concrete Reinforcing ) 10 days Tue 4/28/26 Mon 5/11/26 82 84 84 Ryan Submittal Review ( concrete Reinforcing ) 5 days Tue 5/12/26 Mon 5/18/26 83 85 85 Designer Submittal Approval ( concrete Reinforcing ) 5 days Tue 5/19/26 Tue 5/26/26 84 86 86 Fabrication & Delivery ( concrete Reinforcing ) 5 days Wed 5/27/26 Tue 6/2/26 85 408 87 Structural Steel 61 days Mon 4/27/26 Tue 7/21/26 88 Buyout ( structural steel ) 1 day Mon 4/27/26 Mon 4/27/26 30 90,95,100,105 89 Wide Flange (Building)34 days Tue 4/28/26 Mon 6/15/26 02 - General 90 Submittal Development ( structural steel )5 days Tue 4/28/26 Mon 5/4/26 88 91 91 Ryan Submittal Review ( structural steel )5 days Tue 5/5/26 Mon 5/11/26 90 92 92 Designer Submittal Approval ( structural steel )14 days Tue 5/12/26 Mon 6/1/26 91 93 93 Fabrication & Delivery ( structural steel )10 days Tue 6/2/26 Mon 6/15/26 92 546 94 Structural Steel (Canopy)54 days Tue 4/28/26 Mon 7/13/26 02 - General 95 Submittal Development ( structural steel )15 days Tue 4/28/26 Mon 5/18/26 88 96 96 Ryan Submittal Review ( structural steel )5 days Tue 5/19/26 Tue 5/26/26 95 97 97 Designer Submittal Approval ( structural steel )14 days Wed 5/27/26 Mon 6/15/26 96 98 98 Fabrication & Delivery 20 days Tue 6/16/26 Mon 7/13/26 97 451FS-10 days 99 Anchor Bolts/Embeds 30 days Tue 4/28/26 Tue 6/9/26 02 - General 100 Submittal Development ( anchor bolts )10 days Tue 4/28/26 Mon 5/11/26 88 101 101 Ryan Submittal Review ( anchor bolts )5 days Tue 5/12/26 Mon 5/18/26 100 102 102 Designer Submittal Approval ( anchor bolts )5 days Tue 5/19/26 Tue 5/26/26 101 103 103 Fabrication & Delivery ( anchor bolts )10 days Wed 5/27/26 Tue 6/9/26 102 459 104 Misc. Steel Fabrications 50 days Tue 4/28/26 Tue 7/7/26 02 - General 105 Submittal Development ( misc. steel fabrications )15 days Tue 4/28/26 Mon 5/18/26 88 106 106 Ryan Submittal Review ( misc. steel fabrications )5 days Tue 5/19/26 Tue 5/26/26 105 107 107 Designer Submittal Approval ( misc. steel fabrications )10 days Wed 5/27/26 Tue 6/9/26 106 108 108 Fabrication & Delivery ( misc. steel fabrications )20 days Wed 6/10/26 Tue 7/7/26 107 460 109 Bar joists / Decking 61 days Mon 4/27/26 Tue 7/21/26 02 - General 110 Buyout ( bar joists / decking ) 1 day Mon 4/27/26 Mon 4/27/26 30 111 111 Submittal Development ( bar joists / decking )15 days Tue 4/28/26 Mon 5/18/26 110 112 112 Ryan Submittal Review ( bar joists / decking )5 days Tue 5/19/26 Tue 5/26/26 111 113 113 Designer Submittal Approval ( bar joists / decking )10 days Wed 5/27/26 Tue 6/9/26 112 114 114 Fabrication & Delivery ( bar joists / decking )6 wks Wed 6/10/26 Tue 7/21/26 113 564 115 Envelope 107 days Fri 1/23/26 Tue 6/23/26 116 Glazing Exterior 91 days Fri 1/23/26 Mon 6/1/26 01 - Exterior Glazing 117 Buyout ( glazing exterior ) 1 day Fri 1/23/26 Fri 1/23/26 23 118 118 Submittal Development ( glazing exterior )15 days Mon 1/26/26 Fri 2/13/26 117 119 119 Ryan Submittal Review ( glazing exterior )5 days Mon 2/16/26 Fri 2/20/26 118 120 120 Designer Submittal Approval ( glazing exterior )10 days Mon 2/23/26 Fri 3/6/26 119 121 121 Fabrication & Delivery ( glazing exterior )12 wks Mon 3/9/26 Mon 6/1/26 120 444 122 Masonry Brick 41 days Mon 4/27/26 Tue 6/23/26 04 - Masonry 123 Buyout ( Masonry Brick )1 day Mon 4/27/26 Mon 4/27/26 30 124 124 Submittal Development ( Masonry Brick)10 days Tue 4/28/26 Mon 5/11/26 123 125 125 Ryan Submittal Review ( Masonry Brick )5 days Tue 5/12/26 Mon 5/18/26 124 126 126 Designer Submittal Approval ( Masonry Brick )10 days Tue 5/19/26 Tue 6/2/26 125 127 127 Fabrication & Delivery ( Masonry Brick )15 days Wed 6/3/26 Tue 6/23/26 126 448,462 128 Masonry Grout 36 days Mon 4/27/26 Tue 6/16/26 04 - Masonry 129 Buyout ( Masonry Grout )1 day Mon 4/27/26 Mon 4/27/26 30 130 ID Task Name Duration Start Finish Predecessors Successors Resource Names 130 Submittal Development ( Masonry Grout )10 days Tue 4/28/26 Mon 5/11/26 129 131 131 Ryan Submittal Review ( Masonry Grout )5 days Tue 5/12/26 Mon 5/18/26 130 132 132 Designer Submittal Approval ( Masonry Grout )10 days Tue 5/19/26 Tue 6/2/26 131 133 133 Fabrication & Delivery ( Masonry Grout )10 days Wed 6/3/26 Tue 6/16/26 132 448 134 Interior Buildout 187 days Fri 1/23/26 Wed 10/14/26 135 HS Bifold App Bay Doors 121 days Mon 4/27/26 Wed 10/14/26 06 - Overhead Doors 136 Buyout (HS Bifold App Bay Doors)1 day Mon 4/27/26 Mon 4/27/26 30 137 137 Submittal Development (HS Bifold App Bay Doors)15 days Tue 4/28/26 Mon 5/18/26 136 138 138 Ryan Submittal Review (HS Bifold App Bay Doors)5 days Tue 5/19/26 Tue 5/26/26 137 139 139 Designer Submittal Approval (HS Bifold App Bay Doors)10 days Wed 5/27/26 Tue 6/9/26 138 140 140 Fabrication & Delivery (HS Bifold App Bay Doors)18 wks Wed 6/10/26 Wed 10/14/26 139 457 141 Sectional App Bay Doors 61 days Mon 4/27/26 Tue 7/21/26 06 - Overhead Doors 142 Buyout (Sectional App Bay Doors)1 day Mon 4/27/26 Mon 4/27/26 30 143 143 Submittal Development (Sectional App Bay Doors)15 days Tue 4/28/26 Mon 5/18/26 142 144 144 Ryan Submittal Review (Sectional App Bay Doors)5 days Tue 5/19/26 Tue 5/26/26 143 145 145 Designer Submittal Approval (Sectional App Bay Doors)10 days Wed 5/27/26 Tue 6/9/26 144 146 146 Fabrication & Delivery (Sectional App Bay Doors)6 wks Wed 6/10/26 Tue 7/21/26 145 457 147 Light Gage Metal Studs 31 days Mon 4/27/26 Tue 6/9/26 05 - Framing 148 Buyout ( light gage metal studs ) 1 day Mon 4/27/26 Mon 4/27/26 30 149 149 Submittal Development ( light gage metal studs )5 days Tue 4/28/26 Mon 5/4/26 148 150 150 Ryan Submittal Review ( light gage metal studs )5 days Tue 5/5/26 Mon 5/11/26 149 151 151 Designer Submittal Approval ( light gage metal studs )10 days Tue 5/12/26 Tue 5/26/26 150 152 152 Fabrication & Delivery ( light gage metal studs )10 days Wed 5/27/26 Tue 6/9/26 151 476 153 Sheetrock / Specialties 31 days Mon 4/27/26 Tue 6/9/26 05 - Framing 154 Buyout ( sheetrock / specialties ) 1 day Mon 4/27/26 Mon 4/27/26 30 155 155 Submittal Development ( sheetrock / specialties )10 days Tue 4/28/26 Mon 5/11/26 154 156 156 Ryan Submittal Review ( sheetrock / specialties )5 days Tue 5/12/26 Mon 5/18/26 155 157 157 Designer Submittal Approval ( sheetrock / specialties )10 days Tue 5/19/26 Tue 6/2/26 156 158 158 Fabrication & Delivery ( sheetrock / specialties )1 wk Wed 6/3/26 Tue 6/9/26 157 483,522 159 CMU Walls 31 days Mon 4/27/26 Tue 6/9/26 04 - Masonry 160 Buyout ( CMU Walls )1 day Mon 4/27/26 Mon 4/27/26 30 161 161 Submittal Development ( CMU Walls )10 days Tue 4/28/26 Mon 5/11/26 160 162 162 Ryan Submittal Review ( CMU Walls )5 days Tue 5/12/26 Mon 5/18/26 161 163 163 Designer Submittal Approval ( CMU Walls )5 days Tue 5/19/26 Tue 5/26/26 162 164 164 Fabrication & Delivery ( CMU Walls )10 days Wed 5/27/26 Tue 6/9/26 163 550,559 165 Door Frames 107 days Fri 1/23/26 Tue 6/23/26 02 - General 166 Buyout ( door frames ) 1 day Fri 1/23/26 Fri 1/23/26 23 167 167 Submittal Development ( door frames )10 days Mon 1/26/26 Fri 2/6/26 166 168 168 Ryan Submittal Review ( door frames )5 days Mon 2/9/26 Fri 2/13/26 167 169 169 Designer Submittal Approval ( door frames )31 days Mon 2/16/26 Mon 3/30/26 168 170,171 170 Fabrication & Delivery ( exterior door frames )12 wks Tue 3/31/26 Tue 6/23/26 169 444 171 Fabrication and Delivery ( interior Frames)12 wks Tue 3/31/26 Tue 6/23/26 169 475,516 172 Door Hardware 71 days Mon 4/27/26 Tue 8/4/26 02 - General 173 Buyout ( door hardware ) 1 day Mon 4/27/26 Mon 4/27/26 30 174 174 Submittal Development ( door hardware )15 days Tue 4/28/26 Mon 5/18/26 173 175 175 Ryan Submittal Review ( door hardware )5 days Tue 5/19/26 Tue 5/26/26 174 176 176 Designer Submittal Approval ( door hardware )10 days Wed 5/27/26 Tue 6/9/26 175 177 177 Fabrication & Delivery ( door hardware )40 days Wed 6/10/26 Tue 8/4/26 176 504 178 Paint 41 days Mon 4/27/26 Tue 6/23/26 07 - Painting 179 Buyout ( paint ) 1 day Mon 4/27/26 Mon 4/27/26 30 180 180 Submittal Development ( paint )20 days Tue 4/28/26 Tue 5/26/26 179 181 181 Ryan Submittal Review ( paint )5 days Wed 5/27/26 Tue 6/2/26 180 182 182 Designer Submittal Approval ( paint )10 days Wed 6/3/26 Tue 6/16/26 181 183 183 Fabrication & Delivery ( paint )5 days Wed 6/17/26 Tue 6/23/26 182 485 184 Acoustical Ceilings 46 days Mon 4/27/26 Tue 6/30/26 05 - Framing 185 Buyout ( acoustical ceilings ) 1 day Mon 4/27/26 Mon 4/27/26 30 186 186 Submittal Development ( acoustical ceilings )15 days Tue 4/28/26 Mon 5/18/26 185 187 187 Ryan Submittal Review ( acoustical ceilings )5 days Tue 5/19/26 Tue 5/26/26 186 188 188 Designer Submittal Approval ( acoustical ceilings )10 days Wed 5/27/26 Tue 6/9/26 187 189 189 Fabrication & Delivery ( acoustical ceilings )15 days Wed 6/10/26 Tue 6/30/26 188 491 190 Ceramic Tile 66 days Mon 4/27/26 Tue 7/28/26 08 - Tile & Flooring 191 Buyout ( ceramic tile ) 1 day Mon 4/27/26 Mon 4/27/26 30 192 192 Submittal Development ( ceramic tile )20 days Tue 4/28/26 Tue 5/26/26 191 193 193 Ryan Submittal Review ( ceramic tile )5 days Wed 5/27/26 Tue 6/2/26 192 194 194 Designer Submittal Approval ( ceramic tile )10 days Wed 6/3/26 Tue 6/16/26 193 195 ID Task Name Duration Start Finish Predecessors Successors Resource Names 195 Fabrication & Delivery ( ceramic tile )6 wks Wed 6/17/26 Tue 7/28/26 194 489 196 Millwork 61 days Mon 4/27/26 Tue 7/21/26 02 - General 197 Buyout ( millwork ) 1 day Mon 4/27/26 Mon 4/27/26 30 198 198 Submittal Development ( millwork )15 days Tue 4/28/26 Mon 5/18/26 197 199 199 Ryan Submittal Review ( millwork )5 days Tue 5/19/26 Tue 5/26/26 198 200 200 Designer Submittal Approval ( millwork )10 days Wed 5/27/26 Tue 6/9/26 199 201 201 Fabrication & Delivery ( millwork )6 wks Wed 6/10/26 Tue 7/21/26 200 499 202 Wood Paneling 71 days Mon 4/27/26 Tue 8/4/26 05 - Framing 203 Buyout ( Wood Paneling ) 1 day Mon 4/27/26 Mon 4/27/26 30 204 204 Submittal Development ( Wood Paneling )15 days Tue 4/28/26 Mon 5/18/26 203 205 205 Ryan Submittal Review ( Wood Paneling )5 days Tue 5/19/26 Tue 5/26/26 204 206 206 Designer Submittal Approval ( Wood Paneling )10 days Wed 5/27/26 Tue 6/9/26 205 207 207 Fabrication & Delivery ( Wood Paneling )8 wks Wed 6/10/26 Tue 8/4/26 206 499 208 Flooring 61 days Mon 4/27/26 Tue 7/21/26 08 - Tile & Flooring 209 Buyout ( flooring ) 1 day Mon 4/27/26 Mon 4/27/26 30 210 210 Submittal Development ( flooring )20 days Tue 4/28/26 Tue 5/26/26 209 211 211 Ryan Submittal Review ( flooring )5 days Wed 5/27/26 Tue 6/2/26 210 212 212 Designer Submittal Approval ( flooring )10 days Wed 6/3/26 Tue 6/16/26 211 213 213 Fabrication & Delivery ( flooring )5 wks Wed 6/17/26 Tue 7/21/26 212 502 214 Specialties 66 days Mon 4/27/26 Tue 7/28/26 02 - General 215 Toilet Partitions / Specialties / FE / FE Cabinets 66 days Mon 4/27/26 Tue 7/28/26 216 Buyout ( toilet partitions / specialties ) 1 day Mon 4/27/26 Mon 4/27/26 30 217 217 Submittal Development ( toilet partitions / specialties )20 days Tue 4/28/26 Tue 5/26/26 216 218 218 Ryan Submittal Review ( toilet partitions / specialties )5 days Wed 5/27/26 Tue 6/2/26 217 219 219 Designer Submittal Approval ( toilet partitions / specialties )10 days Wed 6/3/26 Tue 6/16/26 218 220 220 Fabrication & Delivery ( toilet partitions / specialties )6 wks Wed 6/17/26 Tue 7/28/26 219 499 221 Interior Signage 66 days Mon 4/27/26 Tue 7/28/26 02 - General 222 Buyout ( interior signage ) 1 day Mon 4/27/26 Mon 4/27/26 30 223 223 Submittal Development ( interior signage )30 days Tue 4/28/26 Tue 6/9/26 222 224 224 Ryan Submittal Review ( interior signage )5 days Wed 6/10/26 Tue 6/16/26 223 225 225 Designer Submittal Approval ( interior signage )10 days Wed 6/17/26 Tue 6/30/26 224 226 226 Fabrication & Delivery ( interior signage )4 wks Wed 7/1/26 Tue 7/28/26 225 503 227 Fire Sprinkler 51 days Mon 4/27/26 Tue 7/7/26 09 - Fire Protection 228 Buyout ( fire sprinkler ) 1 day Mon 4/27/26 Mon 4/27/26 30 229 229 Submittal Development ( fire sprinkler )15 days Tue 4/28/26 Mon 5/18/26 228 230 230 Ryan Submittal Review ( fire sprinkler )5 days Tue 5/19/26 Tue 5/26/26 229 231 231 Designer Submittal Approval ( fire sprinkler )10 days Wed 5/27/26 Tue 6/9/26 230 232 232 Fire Marshall/City Approval 15 days Wed 6/10/26 Tue 6/30/26 231 233 233 Fabrication & Delivery ( fire sprinkler )5 days Wed 7/1/26 Tue 7/7/26 232 477 234 Plumbing / Mechanical 106 days Mon 4/27/26 Wed 9/23/26 235 Plumbing Piping / Accessories 31 days Mon 4/27/26 Tue 6/9/26 10 - Plumbing 236 Buyout ( plumbing piping / acc ) 1 day Mon 4/27/26 Mon 4/27/26 30 237 237 Submittal Development ( plumbing piping / acc )10 days Tue 4/28/26 Mon 5/11/26 236 238 238 Ryan Submittal Review ( plumbing piping / acc )5 days Tue 5/12/26 Mon 5/18/26 237 239 239 Designer Submittal Approval ( plumbing piping / acc )10 days Tue 5/19/26 Tue 6/2/26 238 240 240 Fabrication & Delivery ( plumbing piping / acc )1 wk Wed 6/3/26 Tue 6/9/26 239 478 241 Plumbing Fixtures 56 days Mon 4/27/26 Tue 7/14/26 10 - Plumbing 242 Buyout ( plumbing fixtures ) 1 day Mon 4/27/26 Mon 4/27/26 30 243 243 Submittal Development ( plumbing fixtures )20 days Tue 4/28/26 Tue 5/26/26 242 244 244 Ryan Submittal Review ( plumbing fixtures )5 days Wed 5/27/26 Tue 6/2/26 243 245 245 Designer Submittal Approval ( plumbing fixtures )10 days Wed 6/3/26 Tue 6/16/26 244 246 246 Fabrication & Delivery ( plumbing fixtures )4 wks Wed 6/17/26 Tue 7/14/26 245 493 247 Plumbing Insulation 31 days Mon 4/27/26 Tue 6/9/26 10 - Plumbing 248 Buyout ( plumbing insulation ) 1 day Mon 4/27/26 Mon 4/27/26 30 249 249 Submittal Development ( plumbing insulation )10 days Tue 4/28/26 Mon 5/11/26 248 250 250 Ryan Submittal Review ( plumbing insulation )5 days Tue 5/12/26 Mon 5/18/26 249 251 251 Designer Submittal Approval ( plumbing insulation )10 days Tue 5/19/26 Tue 6/2/26 250 252 252 Fabrication & Delivery ( plumbing insulation )1 wk Wed 6/3/26 Tue 6/9/26 251 478 253 ERVs 106 days Mon 4/27/26 Wed 9/23/26 11 - Mechanical 254 Buyout ( ERVs ) 1 day Mon 4/27/26 Mon 4/27/26 30 255 255 Submittal Development ( ERVs )10 days Tue 4/28/26 Mon 5/11/26 254 256 256 Ryan Submittal Review ( ERVs )5 days Tue 5/12/26 Mon 5/18/26 255 257 257 Designer Submittal Approval ( ERVs )10 days Tue 5/19/26 Tue 6/2/26 256 258 258 Fabrication & Delivery ( ERVs )16 wks Wed 6/3/26 Wed 9/23/26 257 498,536 259 Water Heaters 66 days Mon 4/27/26 Tue 7/28/26 10 - Plumbing ID Task Name Duration Start Finish Predecessors Successors Resource Names 260 Buyout ( Water Heaters ) 1 day Mon 4/27/26 Mon 4/27/26 30 261 261 Submittal Development ( Water Heaters ) 10 days Tue 4/28/26 Mon 5/11/26 260 262 262 Ryan Submittal Review ( Water Heaters ) 5 days Tue 5/12/26 Mon 5/18/26 261 263 263 Designer Submittal Approva ( Water Heaters ) 10 days Tue 5/19/26 Tue 6/2/26 262 264 264 Fabrication & Delivery ( Water Heaters ) 8 wks Wed 6/3/26 Tue 7/28/26 263 525,486 265 Furnace 56 days Mon 4/27/26 Tue 7/14/26 11 - Mechanical 266 Buyout ( Furnace ) 1 day Mon 4/27/26 Mon 4/27/26 30 267 267 Submittal Development ( Furnace )10 days Tue 4/28/26 Mon 5/11/26 266 268 268 Ryan Submittal Review ( Furnace )5 days Tue 5/12/26 Mon 5/18/26 267 269 269 Designer Submittal Approval ( Furnace )10 days Tue 5/19/26 Tue 6/2/26 268 270 270 Fabrication & Delivery ( Furnace )6 wks Wed 6/3/26 Tue 7/14/26 269 525,486 271 Heat Pumps 86 days Mon 4/27/26 Tue 8/25/26 11 - Mechanical 272 Buyout ( Heat Pumps ) 1 day Mon 4/27/26 Mon 4/27/26 30 273 273 Submittal Development ( Heat Pumps )10 days Tue 4/28/26 Mon 5/11/26 272 274 274 Ryan Submittal Review ( Heat Pumps )5 days Tue 5/12/26 Mon 5/18/26 273 275 275 Designer Submittal Approval ( Heat Pumps )10 days Tue 5/19/26 Tue 6/2/26 274 276 276 Fabrication & Delivery ( Heat Pumps )12 wks Wed 6/3/26 Tue 8/25/26 275 525,486 277 Exhaust Fans 66 days Mon 4/27/26 Tue 7/28/26 11 - Mechanical 278 Buyout ( Exhaust Fans ) 1 day Mon 4/27/26 Mon 4/27/26 30 279 279 Submittal Development ( Exhaust Fans )10 days Tue 4/28/26 Mon 5/11/26 278 280 280 Ryan Submittal Review ( Exhaust Fans )5 days Tue 5/12/26 Mon 5/18/26 279 281 281 Designer Submittal Approval ( Exhaust Fans )10 days Tue 5/19/26 Tue 6/2/26 280 282 282 Fabrication & Delivery ( Exhaust Fans )8 wks Wed 6/3/26 Tue 7/28/26 281 525,486 283 Kitchen Hood 86 days Mon 4/27/26 Tue 8/25/26 11 - Mechanical 284 Buyout ( Kitchen Hood ) 1 day Mon 4/27/26 Mon 4/27/26 30 285 285 Submittal Development ( Kitchen Hood )10 days Tue 4/28/26 Mon 5/11/26 284 286 286 Ryan Submittal Review ( Kitchen Hood )5 days Tue 5/12/26 Mon 5/18/26 285 287 287 Designer Submittal Approval ( Kitchen Hood )10 days Tue 5/19/26 Tue 6/2/26 286 288 288 Fabrication & Delivery ( Kitchen Hood )12 wks Wed 6/3/26 Tue 8/25/26 287 525,486 289 VRF 86 days Mon 4/27/26 Tue 8/25/26 11 - Mechanical 290 Buyout ( VRF ) 1 day Mon 4/27/26 Mon 4/27/26 30 291 291 Submittal Development ( VRF )10 days Tue 4/28/26 Mon 5/11/26 290 292 292 Ryan Submittal Review ( VRF )5 days Tue 5/12/26 Mon 5/18/26 291 293 293 Designer Submittal Approval ( VRF )10 days Tue 5/19/26 Tue 6/2/26 292 294 294 Fabrication & Delivery ( VRF )12 wks Wed 6/3/26 Tue 8/25/26 293 525,486 295 Split System AC 36 days Mon 4/27/26 Tue 6/16/26 11 - Mechanical 296 Buyout ( Split System AC ) 1 day Mon 4/27/26 Mon 4/27/26 30 297 297 Submittal Development ( Split System AC )10 days Tue 4/28/26 Mon 5/11/26 296 298 298 Ryan Submittal Review ( Split System AC )5 days Tue 5/12/26 Mon 5/18/26 297 299 299 Designer Submittal Approval ( Split System AC )10 days Tue 5/19/26 Tue 6/2/26 298 300 300 Fabrication & Delivery ( Split System AC )2 wks Wed 6/3/26 Tue 6/16/26 299 525,486 301 Gas-Fired Radiant Heaters 56 days Mon 4/27/26 Tue 7/14/26 11 - Mechanical 302 Buyout ( Gas-Fired Radiant Heaters ) 1 day Mon 4/27/26 Mon 4/27/26 30 303 303 Submittal Development ( Gas-Fired Radiant Heaters )10 days Tue 4/28/26 Mon 5/11/26 302 304 304 Ryan Submittal Review ( Gas-Fired Radiant Heaters )5 days Tue 5/12/26 Mon 5/18/26 303 305 305 Designer Submittal Approval ( Gas-Fired Radiant Heaters )10 days Tue 5/19/26 Tue 6/2/26 304 306 306 Fabrication & Delivery ( Gas-Fired Radiant Heaters )6 wks Wed 6/3/26 Tue 7/14/26 305 525,486 307 Gas-Fired Makeup Air Blower Coil (MAU)86 days Mon 4/27/26 Tue 8/25/26 11 - Mechanical 308 Buyout ( Gas-Fired MAU ) 1 day Mon 4/27/26 Mon 4/27/26 30 309 309 Submittal Development ( Gas-Fired MAU )10 days Tue 4/28/26 Mon 5/11/26 308 310 310 Ryan Submittal Review ( Gas-Fired MAU )5 days Tue 5/12/26 Mon 5/18/26 309 311 311 Designer Submittal Approval ( Gas-Fired MAU )10 days Tue 5/19/26 Tue 6/2/26 310 312 312 Fabrication & Delivery ( Gas-Fired MAU )12 wks Wed 6/3/26 Tue 8/25/26 311 525,486 313 Ductwork 36 days Mon 4/27/26 Tue 6/16/26 11 - Mechanical 314 Buyout ( ductwork ) 1 day Mon 4/27/26 Mon 4/27/26 30 315 315 Submittal Development ( ductwork )10 days Tue 4/28/26 Mon 5/11/26 314 316 316 Ryan Submittal Review ( ductwork )5 days Tue 5/12/26 Mon 5/18/26 315 317 317 Designer Submittal Approval ( ductwork )10 days Tue 5/19/26 Tue 6/2/26 316 318 318 Fabrication & Delivery ( ductwork )10 days Wed 6/3/26 Tue 6/16/26 317 486,525 319 Duct Insulation 36 days Mon 4/27/26 Tue 6/16/26 11 - Mechanical 320 Buyout ( duct insulation ) 1 day Mon 4/27/26 Mon 4/27/26 30 321 321 Submittal Development ( duct insulation )10 days Tue 4/28/26 Mon 5/11/26 320 322 322 Ryan Submittal Review ( duct insulation )5 days Tue 5/12/26 Mon 5/18/26 321 323 323 Designer Submittal Approval ( duct insulation )10 days Tue 5/19/26 Tue 6/2/26 322 324 324 Fabrication & Delivery ( duct insulation )10 days Wed 6/3/26 Tue 6/16/26 323 486,525 ID Task Name Duration Start Finish Predecessors Successors Resource Names 325 HVLS Fans (App Bay)86 days Mon 4/27/26 Tue 8/25/26 11 - Mechanical 326 Buyout ( HVLS Fans ) 1 day Mon 4/27/26 Mon 4/27/26 30 327 327 Submittal Development ( HVLS Fans )30 days Tue 4/28/26 Tue 6/9/26 326 328 328 Ryan Submittal Review ( HVLS Fans )5 days Wed 6/10/26 Tue 6/16/26 327 329 329 Designer Submittal Approval ( HVLS Fans )10 days Wed 6/17/26 Tue 6/30/26 328 330 330 Fabrication & Delivery ( HVLS Fans )8 wks Wed 7/1/26 Tue 8/25/26 329 525,486 331 Grilles / Diffusers 36 days Mon 4/27/26 Tue 6/16/26 11 - Mechanical 332 Buyout ( grilles / diffusers ) 1 day Mon 4/27/26 Mon 4/27/26 30 333 333 Submittal Development ( grilles / diffusers )10 days Tue 4/28/26 Mon 5/11/26 332 334 334 Ryan Submittal Review ( grilles / diffusers )5 days Tue 5/12/26 Mon 5/18/26 333 335 335 Designer Submittal Approval ( grilles / diffusers )10 days Tue 5/19/26 Tue 6/2/26 334 336 336 Fabrication & Delivery ( grilles / diffusers )10 days Wed 6/3/26 Tue 6/16/26 335 486,525 337 Controls Mechanical 70 days Mon 4/27/26 Mon 8/3/26 11 - Mechanical 338 Buyout ( controls mechanical ) 1 day Mon 4/27/26 Mon 4/27/26 30 339 339 Submittal Development ( controls mechanical )20 days Tue 4/28/26 Tue 5/26/26 338 340 340 Ryan Submittal Review ( controls mechanical )5 days Wed 5/27/26 Tue 6/2/26 339 341 341 Designer Submittal Approval ( controls mechanical )14 days Wed 6/3/26 Mon 6/22/26 340 342 342 Fabrication & Delivery ( controls mechanical )6 wks Tue 6/23/26 Mon 8/3/26 341 572FS-20 days 343 Electrical 113 days Mon 4/27/26 Fri 10/2/26 344 Inverters 113 days Mon 4/27/26 Fri 10/2/26 12 - Electrical 345 Buyout ( Inverters ) 1 day Mon 4/27/26 Mon 4/27/26 30 346 346 Submittal Development ( Inverters )10 days Tue 4/28/26 Thu 5/28/26 345 347 347 Ryan Submittal Review ( Inverters )5 days Fri 5/29/26 Thu 6/4/26 346 348 348 Designer Submittal Review ( Inverters )5 days Fri 6/5/26 Thu 6/11/26 347 349 349 Fabrication & Delivery ( Inverters )16 wks Fri 6/12/26 Fri 10/2/26 348 534,500 350 Pipe / Wiring 36 days Mon 4/27/26 Tue 6/16/26 12 - Electrical 351 Buyout ( elec pipe / wiring ) 1 day Mon 4/27/26 Mon 4/27/26 30 352 352 Submittal Development ( elec pipe / wiring )10 days Tue 4/28/26 Mon 5/11/26 351 353 353 Ryan Submittal Review ( elec pipe / wiring )5 days Tue 5/12/26 Mon 5/18/26 352 354 354 Designer Submittal Approval ( elec pipe / wiring )10 days Tue 5/19/26 Tue 6/2/26 353 355 355 Fabrication & Delivery ( elec pipe / wiring )10 days Wed 6/3/26 Tue 6/16/26 354 518 356 Floorboxes 81 days Mon 4/27/26 Tue 8/18/26 12 - Electrical 357 Buyout ( Floorboxes ) 1 day Mon 4/27/26 Mon 4/27/26 30 358 358 Submittal Development ( Floorboxes )15 days Tue 4/28/26 Mon 5/18/26 357 359 359 Ryan Submittal Review ( Floorboxes )5 days Tue 5/19/26 Tue 5/26/26 358 360 360 Designer Submittal Approval ( Floorboxes )10 days Wed 5/27/26 Tue 6/9/26 359 361 361 Fabrication & Delivery ( Floorboxes )10 wks Wed 6/10/26 Tue 8/18/26 360 532,495 362 Light Fixtures 91 days Mon 4/27/26 Tue 9/1/26 12 - Electrical 363 Buyout ( light fixtures ) 1 day Mon 4/27/26 Mon 4/27/26 30 364 364 Submittal Development ( light fixtures )15 days Tue 4/28/26 Mon 5/18/26 363 365 365 Ryan Submittal Review ( light fixtures )5 days Tue 5/19/26 Tue 5/26/26 364 366 366 Designer Submittal Approval ( light fixtures )10 days Wed 5/27/26 Tue 6/9/26 365 367 367 Fabrication & Delivery ( light fixtures )12 wks Wed 6/10/26 Tue 9/1/26 366 536,487,526,498 368 Lighting Controls 91 days Mon 4/27/26 Tue 9/1/26 12 - Electrical 369 Buyout ( light fixtures ) 1 day Mon 4/27/26 Mon 4/27/26 30 370 370 Submittal Development ( light fixtures )15 days Tue 4/28/26 Mon 5/18/26 369 371 371 Ryan Submittal Review ( light fixtures )5 days Tue 5/19/26 Tue 5/26/26 370 372 372 Designer Submittal Approval ( light fixtures )10 days Wed 5/27/26 Tue 6/9/26 371 373 373 Fabrication & Delivery ( light fixtures )12 wks Wed 6/10/26 Tue 9/1/26 372 498,536 374 Fire Alarm 46 days Mon 4/27/26 Tue 6/30/26 12 - Electrical 375 Buyout ( fire alarm ) 1 day Mon 4/27/26 Mon 4/27/26 30 376 376 Submittal Development ( fire alarm )10 days Tue 4/28/26 Mon 5/11/26 375 377 377 Ryan Submittal Review ( fire alarm )5 days Tue 5/12/26 Mon 5/18/26 376 378 378 Designer Submittal Approval ( fire alarm )10 days Tue 5/19/26 Tue 6/2/26 377 379 379 Fire Marshall/City Approval 10 days Wed 6/3/26 Tue 6/16/26 378 380 380 Fabrication & Delivery ( fire alarm )2 wks Wed 6/17/26 Tue 6/30/26 379 519 381 Building Automation Systems 51 days Mon 4/27/26 Tue 7/7/26 12 - Electrical 382 Buyout ( BAS ) 1 day Mon 4/27/26 Mon 4/27/26 30 383 383 Submittal Development ( BAS )10 days Tue 4/28/26 Mon 5/11/26 382 384 384 Ryan Submittal Review ( BAS )5 days Tue 5/12/26 Mon 5/18/26 383 385 385 Designer Submittal Approval ( BAS )10 days Tue 5/19/26 Tue 6/2/26 384 386 386 Fabrication & Delivery ( BAS )25 days Wed 6/3/26 Tue 7/7/26 385 519 387 Project Milestones 203 days Fri 2/27/26 Mon 12/14/26 388 Construction Documents Complete 0 days Fri 2/27/26 Fri 2/27/26 15 389 Full Buyout Under Contract 0 days Fri 4/24/26 Fri 4/24/26 30 IDID Task Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors RTask Name Duration Start Finish Predecessors Successors Resource Names 390 Construction Start 0 days Mon 4/27/26 Mon 4/27/26 397 391 Site Work Complete 0 days Wed 9/9/26 Wed 9/9/26 441 392 Water Live 0 days Wed 7/15/26 Wed 7/15/26 565FS+7 days 393 Substantial Completion 0 days Mon 12/14/26 Mon 12/14/26 579 394 Owner Move In 0 days Mon 12/14/26 Mon 12/14/26 579 395 Construction Process 180 days Mon 4/27/26 Fri 1/8/27 396 Mobilization 1 day Mon 4/27/26 Mon 4/27/26 397 Mobilize 1 day Mon 4/27/26 Mon 4/27/26 7,30 426,399,403FS+15 days,390,458,465 398 Sitework 88 days Thu 5/7/26 Wed 9/9/26 399 Install Tree Protection 1 day Thu 5/7/26 Thu 5/7/26 397,33FS+2 days 400,428,401 13 - Earthwork 400 Remove Trees 1 day Fri 5/8/26 Fri 5/8/26 399,33FS+2 days 403 13 - Earthwork 401 Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon (120 LF)7 days Fri 5/8/26 Mon 5/18/26 399,33FS+2 days 441,556 13 - Earthwork 402 West Parking Lot 22 days Tue 5/19/26 Thu 6/18/26 403 Demo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 4 days Tue 5/19/26 Fri 5/22/26 400,397FS+15 days404,412 13 - Earthwork 404 Cut / Export 6'' of Subgrade 3 days Tue 5/26/26 Thu 5/28/26 403 405,406 13 - Earthwork 405 Install Drain Tile Under PavementInstall Drain Tile Under Pavement 1 day Fri 5/29/26 Fri 5/29/26 404 406 13 - Earthwork 406 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 2 days Mon 6/1/26 Tue 6/2/26 405,404 407 13 - Earthwork 407 Fine Grade Pavement & Pour Prep - Sequence 1Fine Grade Pavement & Pour Prep - Sequence 1 2 days Thu 6/11/26 Fri 6/12/26 429,406 408 03 - Concrete 408 Pavement, Curb and Gutter Pour - Sequence 1Pavement, Curb and Gutter Pour - Sequence 1 1 day Mon 6/15/26 Mon 6/15/26 80,86,407 409 03 - Concrete 409 Fine Grade Pavement & Pour Prep - Sequence 2Fine Grade Pavement & Pour Prep - Sequence 2 2 days Tue 6/16/26 Wed 6/17/26 408 410 03 - Concrete 410 Pavement, Curb and Gutter Pour - Sequence 2Pavement, Curb and Gutter Pour - Sequence 2 1 day Thu 6/18/26 Thu 6/18/26 409 412,422,443,439,43803 - Concrete 411 East Parking Lot 20 days Tue 7/14/26 Mon 8/10/26 412 Demo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 6 days Tue 7/14/26 Tue 7/21/26 410,460,403 462,424,413 13 - Earthwork 413 Cut / Export 6'' of Subgrade 3 days Wed 7/22/26 Fri 7/24/26 412 414,415 13 - Earthwork 414 Install Drain Tile Under PavementInstall Drain Tile Under Pavement 2 days Mon 7/27/26 Tue 7/28/26 413 415 13 - Earthwork 415 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 3 days Wed 7/29/26 Fri 7/31/26 414,413 416 13 - Earthwork 416 Fine Grade Pavement & Pour Prep - Sequence 3Fine Grade Pavement & Pour Prep - Sequence 3 2 days Mon 8/3/26 Tue 8/4/26 415 417 03 - Concrete 417 Pavement, Curb and Gutter Pour - Sequence 3Pavement, Curb and Gutter Pour - Sequence 3 1 day Wed 8/5/26 Wed 8/5/26 416 418 03 - Concrete 418 Fine Grade Pavement & Pour Prep - Sequence 4Fine Grade Pavement & Pour Prep - Sequence 4 2 days Thu 8/6/26 Fri 8/7/26 417 419 03 - Concrete 419 Pavement, Curb and Gutter Pour - Sequence 4Pavement, Curb and Gutter Pour - Sequence 4 1 day Mon 8/10/26 Mon 8/10/26 418 432,439,438 03 - Concrete 420 Remove Sidewalks - Courtyard 6 days Tue 6/9/26 Tue 6/16/26 458 459,441,462 13 - Earthwork 421 Replace Sidewalks - Courtyard 4 days Tue 7/14/26 Fri 7/17/26 460 441,462 03 - Concrete 422 Remove and Replace Sidewalks - West EntranceRemove and Replace Sidewalks - West Entrance 10 days Fri 6/19/26 Thu 7/2/26 410 445,441,423,452,46313 - Earthwork,03 - Concrete 423 Remove and Replace Sidewalks - Along SE LA Grant PkRemove and Replace Sidewalks - Along SE LA Grant Pkwywy 8 days Fri 7/3/26 Tue 7/14/26 422 441 03 - Concrete,13 - Earthwork 424 Remove and Replace Sidewalks - EastRemove and Replace Sidewalks - East 6 days Wed 7/22/26 Wed 7/29/26 412 441 03 - Concrete,13 - Earthwork 425 North Site 10 days Wed 6/3/26 Tue 6/16/26 426 Regrade North Site due to Drainage IssuesRegrade North Site due to Drainage Issues 5 days Wed 6/3/26 Tue 6/9/26 43,49,397 427,429,430,571 13 - Earthwork 427 Install New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central Downspout 2 days Wed 6/10/26 Thu 6/11/26 426 428,441 13 - Earthwork 428 Demo Existing A/C Condensor PadDemo Existing A/C Condensor Pad 1 day Fri 6/12/26 Fri 6/12/26 427,399 430 03 - Concrete 429 Dig, Form and Pour New Stoop 1 day Wed 6/10/26 Wed 6/10/26 426 407,441 03 - Concrete 430 Form and Pour New A/C Condensor PadForm and Pour New A/C Condensor Pad 2 days Mon 6/15/26 Tue 6/16/26 428,426 441 03 - Concrete 431 Alternate #1 Scope of Work 12 days Tue 8/11/26 Wed 8/26/26 432 Demo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 2 days Tue 8/11/26 Wed 8/12/26 419 433 13 - Earthwork 433 Cut / Export 6'' of Subgrade 2 days Thu 8/13/26 Fri 8/14/26 432 434 13 - Earthwork 434 Install Drain Tile Under PavementInstall Drain Tile Under Pavement 2 days Mon 8/17/26 Tue 8/18/26 433 435 13 - Earthwork 435 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 3 days Wed 8/19/26 Fri 8/21/26 434 436 13 - Earthwork 436 Fine Grade Pavement & Pour Prep - Sequence 5Fine Grade Pavement & Pour Prep - Sequence 5 2 days Mon 8/24/26 Tue 8/25/26 435 437,440FS-2 days 03 - Concrete 437 Pavement, Curb and Gutter Pour - Sequence 5Pavement, Curb and Gutter Pour - Sequence 5 1 day Wed 8/26/26 Wed 8/26/26 436 439 03 - Concrete 438 Retrofit Existing Pole Mounted Site Light FixturesRetrofit Existing Pole Mounted Site Light Fixtures 3 days Tue 8/11/26 Thu 8/13/26 61,410,419 571 12 - Electrical 439 Install Pavement Markings 1 day Thu 8/27/26 Thu 8/27/26 437,410,419 571 13 - Earthwork 440 SUDAS Planting Window Hold 2 days Mon 8/24/26 Tue 8/25/26 436FS-2 days 441 441 Landscaping 10 days Wed 8/26/26 Wed 9/9/26 440,421,424,55,422,429,401,423,420,427,430391,571 02 - General 442 Exterior Building Finishes 106 days Tue 6/2/26 Wed 10/28/26 443 Sandblast and Scrape West Entrance Tube Steel StrucSandblast and Scrape West Entrance Tube Steel Structure 2 days Fri 6/19/26 Mon 6/22/26 410 451 07 - Painting 444 Remove and Storefront and Curtain WallRemove and Storefront and Curtain Wall 10 days Wed 6/24/26 Tue 7/7/26 121,170 445 01 - Exterior Glazing 445 Install Storefront Frames 5 days Wed 7/8/26 Tue 7/14/26 422,444 446 01 - Exterior Glazing 446 Install Storefront And Curtain Wall GlazingInstall Storefront And Curtain Wall Glazing 4 days Wed 7/15/26 Mon 7/20/26 445 447 01 - Exterior Glazing 447 Caulk Store Front 1 day Tue 7/21/26 Tue 7/21/26 446 448FS-5 days 01 - Exterior Glazing 448 Tuck Point Brick / Replace Limestone BaseTuck Point Brick / Replace Limestone Base 15 days Wed 7/15/26 Tue 8/4/26 127,133,447FS-5 days457,449,450,571 04 - Masonry 449 Replace Limestone Base 10 days Wed 8/5/26 Tue 8/18/26 448 450 04 - Masonry 450 Exterior Building Wash 5 days Wed 8/19/26 Tue 8/25/26 449,448 455 04 - Masonry 451 Repaint West Entrance Steel StructureRepaint West Entrance Steel Structure 1 day Tue 6/30/26 Tue 6/30/26 98FS-10 days,443 452 07 - Painting 452 Install ACM Metal Panels at West EntrnaceInstall ACM Metal Panels at West Entrnace 5 days Fri 7/3/26 Thu 7/9/26 422,451 453,454 02 - General 453 Install Metal Panel Soffit at West EntranceInstall Metal Panel Soffit at West Entrance 2 days Fri 7/10/26 Mon 7/13/26 452 454 02 - General 454 Replace Gyp Soffits adjacent to West EntranceReplace Gyp Soffits adjacent to West Entrance 5 days Tue 7/14/26 Mon 7/20/26 453,452 455,571 05 - Framing 4/27 Construction StartConstruction Start 9/9 Site Work CompleteSite Work Complete 7/15 Water Live 12/14 Substantial CompletionSubstantial Completion 12/14 Owner Move In Construction ProcessConstruction Process MobilizationMobilization SiteworkSitework 5/7 Install Tree ProtectionInstall Tree ProtectionInstall Tree Protection 5/8 Remove TreesRemove Trees 5/8 Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon (120 LF) West Parking LotWest Parking Lot 5/19 Demo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 5/26 Cut / Export 6'' of SubgradeCut / Export 6'' of SubgradeCut / Export 6'' of Subgrade 5/29 Install Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under Pavement 6/1 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 6/11 Fine Grade Pavement & Pour Prep - Sequence 1Fine Grade Pavement & Pour Prep - Sequence 1Fine Grade Pavement & Pour Prep - Sequence 1Fine Grade Pavement & Pour Prep - Sequence 1Fine Grade Pavement & Pour Prep - Sequence 1 6/15 Pavement, Curb and Gutter Pour - Sequence 1Pavement, Curb and Gutter Pour - Sequence 1Pavement, Curb and Gutter Pour - Sequence 1Pavement, Curb and Gutter Pour - Sequence 1Pavement, Curb and Gutter Pour - Sequence 1 6/16 Fine Grade Pavement & Pour Prep - Sequence 2Fine Grade Pavement & Pour Prep - Sequence 2Fine Grade Pavement & Pour Prep - Sequence 2Fine Grade Pavement & Pour Prep - Sequence 2 6/18 Pavement, Curb and Gutter Pour - Sequence 2Pavement, Curb and Gutter Pour - Sequence 2Pavement, Curb and Gutter Pour - Sequence 2Pavement, Curb and Gutter Pour - Sequence 2 East Parking LotEast Parking Lot 7/14 Demo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 7/227/22 Cut / Export 6'' of SubgradeCut / Export 6'' of Subgrade 7/277/27 Install Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under Pavement 7/297/29 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 8/38/3 Fine Grade Pavement & Pour Prep - Sequence 3Fine Grade Pavement & Pour Prep - Sequence 3Fine Grade Pavement & Pour Prep - Sequence 3Fine Grade Pavement & Pour Prep - Sequence 3Fine Grade Pavement & Pour Prep - Sequence 3 8/58/5 Pavement, Curb and Gutter Pour - Sequence 3Pavement, Curb and Gutter Pour - Sequence 3Pavement, Curb and Gutter Pour - Sequence 3Pavement, Curb and Gutter Pour - Sequence 3Pavement, Curb and Gutter Pour - Sequence 3 8/68/6 Fine Grade Pavement & Pour Prep - Sequence 4Fine Grade Pavement & Pour Prep - Sequence 4Fine Grade Pavement & Pour Prep - Sequence 4Fine Grade Pavement & Pour Prep - Sequence 4Fine Grade Pavement & Pour Prep - Sequence 4 8/108/10 Pavement, Curb and Gutter Pour - Sequence 4Pavement, Curb and Gutter Pour - Sequence 4Pavement, Curb and Gutter Pour - Sequence 4Pavement, Curb and Gutter Pour - Sequence 4Pavement, Curb and Gutter Pour - Sequence 4 6/9 Remove Sidewalks - CourtyardRemove Sidewalks - CourtyardRemove Sidewalks - Courtyard 7/14 Replace Sidewalks - CourtyardReplace Sidewalks - CourtyardReplace Sidewalks - CourtyardReplace Sidewalks - Courtyard 6/19 Remove and Replace Sidewalks - West EntranceRemove and Replace Sidewalks - West EntranceRemove and Replace Sidewalks - West EntranceRemove and Replace Sidewalks - West EntranceRemove and Replace Sidewalks - West Entrance 7/3 Remove and Replace Sidewalks - Along SE LA Grant PkRemove and Replace Sidewalks - Along SE LA Grant PkRemove and Replace Sidewalks - Along SE LA Grant PkRemove and Replace Sidewalks - Along SE LA Grant PkRemove and Replace Sidewalks - Along SE LA Grant Pkwywy 7/227/22 Remove and Replace Sidewalks - EastRemove and Replace Sidewalks - EastRemove and Replace Sidewalks - EastRemove and Replace Sidewalks - East North Site 6/3 Regrade North Site due to Drainage IssuesRegrade North Site due to Drainage IssuesRegrade North Site due to Drainage IssuesRegrade North Site due to Drainage IssuesRegrade North Site due to Drainage Issues 6/10 Install New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central DownspoutInstall New 8'' Storm Line from Central Downspout 6/12 Demo Existing A/C Condensor PadDemo Existing A/C Condensor PadDemo Existing A/C Condensor PadDemo Existing A/C Condensor PadDemo Existing A/C Condensor Pad 6/10 Dig, Form and Pour New StoopDig, Form and Pour New StoopDig, Form and Pour New StoopDig, Form and Pour New Stoop 6/15 Form and Pour New A/C Condensor PadForm and Pour New A/C Condensor PadForm and Pour New A/C Condensor PadForm and Pour New A/C Condensor Pad Alternate #1 Scope of WorkAlternate #1 Scope of WorkAlternate #1 Scope of Work 8/118/11 Demo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and GutterDemo Pavement, Curb and Gutter 8/138/13 Cut / Export 6'' of SubgradeCut / Export 6'' of SubgradeCut / Export 6'' of Subgrade 8/178/17 Install Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under PavementInstall Drain Tile Under Pavement 8/198/19 Import & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate SubbaseImport & Place 6'' Aggregate Subbase 8/248/24 Fine Grade Pavement & Pour Prep - Sequence 5Fine Grade Pavement & Pour Prep - Sequence 5Fine Grade Pavement & Pour Prep - Sequence 5Fine Grade Pavement & Pour Prep - Sequence 5Fine Grade Pavement & Pour Prep - Sequence 5 8/268/26 Pavement, Curb and Gutter Pour - Sequence 5Pavement, Curb and Gutter Pour - Sequence 5Pavement, Curb and Gutter Pour - Sequence 5Pavement, Curb and Gutter Pour - Sequence 5Pavement, Curb and Gutter Pour - Sequence 5 8/118/11 Retrofit Existing Pole Mounted Site Light FixturesRetrofit Existing Pole Mounted Site Light FixturesRetrofit Existing Pole Mounted Site Light FixturesRetrofit Existing Pole Mounted Site Light FixturesRetrofit Existing Pole Mounted Site Light Fixtures 8/278/27 Install Pavement MarkingsInstall Pavement MarkingsInstall Pavement Markings 8/248/24 SUDAS Planting Window HoldSUDAS Planting Window HoldSUDAS Planting Window Hold 8/268/26 LandscapingLandscaping Exterior Building FinishesExterior Building FinishesExterior Building Finishes 6/19 Sandblast and Scrape West Entrance Tube Steel StrucSandblast and Scrape West Entrance Tube Steel StrucSandblast and Scrape West Entrance Tube Steel StrucSandblast and Scrape West Entrance Tube Steel StrucSandblast and Scrape West Entrance Tube Steel Structure 6/24 Remove and Storefront and Curtain WallRemove and Storefront and Curtain WallRemove and Storefront and Curtain WallRemove and Storefront and Curtain Wall 7/8 Install Storefront FramesInstall Storefront Frames 7/157/15 Install Storefront And Curtain Wall GlazingInstall Storefront And Curtain Wall GlazingInstall Storefront And Curtain Wall Glazing 7/217/21 Caulk Store FrontCaulk Store Front 7/157/15 Tuck Point Brick / Replace Limestone BaseTuck Point Brick / Replace Limestone BaseTuck Point Brick / Replace Limestone BaseTuck Point Brick / Replace Limestone Base 8/58/5 Replace Limestone BaseReplace Limestone Base 8/198/19 Exterior Building WashExterior Building Wash 6/30 Repaint West Entrance Steel StructureRepaint West Entrance Steel StructureRepaint West Entrance Steel StructureRepaint West Entrance Steel Structure 7/3 Install ACM Metal Panels at West EntrnaceInstall ACM Metal Panels at West EntrnaceInstall ACM Metal Panels at West EntrnaceInstall ACM Metal Panels at West Entrnace 7/10 Install Metal Panel Soffit at West EntranceInstall Metal Panel Soffit at West EntranceInstall Metal Panel Soffit at West EntranceInstall Metal Panel Soffit at West Entrance 7/14 Replace Gyp Soffits adjacent to West EntranceReplace Gyp Soffits adjacent to West EntranceReplace Gyp Soffits adjacent to West EntranceReplace Gyp Soffits adjacent to West EntranceReplace Gyp Soffits adjacent to West Entrance J S N J M M J S N J M M J S N J M Half 2, 2025Half 2, 2025Half 2, 2025 Half 1, 2026Half 1, 2026Half 1, 2026 Half 2, 2026Half 2, 2026Half 2, 2026 Half 1, 2027Half 1, 2027Half 1, 2027 Half 2, 2027Half 2, 2027Half 2, 2027 Half 1, 2028Half 1, 2028Half 1, 2028 Ryan Companies US, Inc.Ryan Companies US, Inc.Waukee Existing Fire/Police Renovation Waukee Existing Fire/Police Renovation Waukee Existing Fire/Police Renovation Waukee Public Safety Renovation Ryan Companies US, Inc. Page 7 Thu 4/9/26 9:48 AMPage 7 Thu 4/9/26 9:48 AM 0101 ADD Install Tree Protection 1 day Thu 5/7/26 Thu 5/7/26 397,33FS+2 days 400,428,401 13 - Earthwork Remove Trees 1 day Fri 5/8/26 Fri 5/8/26 399,33FS+2 days 403 13 - Earthwork Install New Sanitary Line from App Bay/Gross Decon Install New Sanitary Line from App Bay/Gross Decon (120 LF)7 days Fri 5/8/26 Mon 5/18/26 399,33FS+2 days 441,556 13 - Earthwork 010101010101 ADDADDADD ID Task Name Duration Start Finish Predecessors Successors Resource Names 455 Remove and Replace Gutters and Downspouts 7 days Wed 8/26/26 Thu 9/3/26 450,454 456,457,571 02 - General 456 Tie In Downspouts Below Grade 3 days Fri 9/4/26 Wed 9/9/26 455 457 02 - General 457 Exterior OH & Bifold Doors & Man doors 10 days Thu 10/15/26 Wed 10/28/26 146,140,448,456,455571 06 - Overhead Doors 458 Demo Old Steel Deck and Stairs 5 days Tue 6/2/26 Mon 6/8/26 471,511,397 420,459 02 - General 459 Excavate and Pour New Deck Spread Footings 3 days Wed 6/17/26 Fri 6/19/26 420,74,103,458 460FS+2 days 03 - Concrete 460 Erect New Deck, Stairs and Railing 4 days Wed 7/8/26 Mon 7/13/26 108,459FS+2 days 412,421,461,571 02 - General 461 Remove Antenna From Building Roof 2 days Tue 7/14/26 Wed 7/15/26 460 463 12 - Electrical 462 Demo and Replace Trash Enclosure Masonry Walls 8 days Wed 7/22/26 Fri 7/31/26 127,412,421,420 463 04 - Masonry 463 Construct New Monument Sign on Existing Footing 3 days Wed 9/2/26 Fri 9/4/26 67,462,461,422 571 04 - Masonry 464 Interior Buildout 151 days Tue 4/28/26 Fri 11/27/26 465 Relocate FFE 5 days Tue 4/28/26 Mon 5/4/26 397 506,507,468,467 02 - General 466 Community Development Renovation 135 days Tue 5/5/26 Wed 11/11/26 467 Demo HVAC & Overhead MEP 5 days Tue 5/5/26 Mon 5/11/26 465 469 10 - Plumbing,09 - Fire Protection,11 - Mechanical,12 - Electrical 468 Demo RR Specialties 2 days Tue 5/5/26 Wed 5/6/26 465 469 02 - General 469 Demo Ceiling Finishes 4 days Tue 5/12/26 Fri 5/15/26 467,468 470 02 - General 470 Demo Floor Finishes 3 days Mon 5/18/26 Wed 5/20/26 469 471 02 - General 471 Demo Existing Gyp. Board Walls 5 days Thu 5/21/26 Thu 5/28/26 470 474,458,472,473,486,47602 - General 472 Above-Ceiling Plumbing Rough-In 10 days Fri 5/29/26 Thu 6/11/26 471 487,473,525,486 10 - Plumbing 473 Above-Ceiling HVAC Rougn-In 10 days Fri 6/12/26 Thu 6/25/26 472,471 487,474,486 11 - Mechanical 474 Above-Ceiling Electrical Rough-In 5 days Fri 6/26/26 Thu 7/2/26 471,473 487,486,525 12 - Electrical 475 Install Door Frames 5 days Wed 6/24/26 Tue 6/30/26 476FS-5 days,171 483 05 - Framing 476 Interior Framing 8 days Wed 6/10/26 Fri 6/19/26 152,471 478,475FS-5 days,47705 - Framing 477 Modify Existing Fire Sprinkler Piping for New Room Layout 10 days Wed 7/8/26 Tue 7/21/26 233,476 488,481,497 09 - Fire Protection 478 Plumbing In-Wall Rough-In 10 days Mon 6/22/26 Fri 7/3/26 240,252,476 481,479FS-2 days 10 - Plumbing 479 Electrical In-Wall Rough-In 10 days Thu 7/2/26 Wed 7/15/26 478FS-2 days 495,500,481,480FS-2 days12 - Electrical 480 Low Voltage / Fire Alarm In-Wall Rough-In 10 days Tue 7/14/26 Mon 7/27/26 479FS-2 days 481 12 - Electrical 481 In-Wall Inspections 1 day Tue 7/28/26 Tue 7/28/26 477,478,479,480 482 Ryan 482 Install In-Wall Backing & Blocking 4 days Wed 7/29/26 Mon 8/3/26 481 483 02 - General 483 Install Drywall 8 days Tue 8/4/26 Thu 8/13/26 158,475,482 484FS-5 days 05 - Framing 484 Tape and Finish Drywall 10 days Fri 8/7/26 Thu 8/20/26 483FS-5 days 485 05 - Framing 485 Painting Walls 5 days Fri 8/21/26 Thu 8/27/26 183,484 493,503,489,504 07 - Painting 486 Install New HVAC Equipment 15 days Wed 8/26/26 Wed 9/16/26 474,264,270,288,300,294,306,312,318,324,330,336,276574,572,488 11 - Mechanical 487 Install New Light Fixtures 5 days Wed 9/2/26 Wed 9/9/26 472,473,367,474 488 12 - Electrical 488 Above-Ceiling Inspections 1 day Thu 9/17/26 Thu 9/17/26 487,477,486 491FS-5 days Ryan 489 Tile Restrooms - floors 4 days Fri 8/28/26 Wed 9/2/26 195,485 490,494FS-5 days,49108 - Tile & Flooring 490 Install Tile Walls Restrooms 8 days Thu 9/3/26 Tue 9/15/26 489 496,493,491 08 - Tile & Flooring 491 Install Ceiling Grid 7 days Wed 9/16/26 Thu 9/24/26 189,490,488FS-5 days,489498,497,492 05 - Framing 492 Install Ceiling Tiles 4 days Fri 9/25/26 Wed 9/30/26 491 499,502,498FS-3 days05 - Framing 493 Restroom Accessories 1 day Wed 9/16/26 Wed 9/16/26 485,490,246 577 02 - General 494 Install Lobby Floor Tile 8 days Thu 8/27/26 Tue 9/8/26 489FS-5 days 577 08 - Tile & Flooring 495 Set Floorboxes 2 days Wed 8/19/26 Thu 8/20/26 361,479 502,496 12 - Electrical 496 MEP Wall Trim-Out 5 days Wed 9/16/26 Tue 9/22/26 490,495 498,500 10 - Plumbing,11 - Mechanical,12 - Electrical 497 Fire Sprinkler Trim-Out 5 days Fri 9/25/26 Thu 10/1/26 477,491 577 09 - Fire Protection 498 MEP Ceiling Trim-Out 7 days Mon 9/28/26 Tue 10/6/26 373,496,258,367,491,492FS-3 days501,577 10 - Plumbing,11 - Mechanical,12 - Electrical 499 Millwork & Specialities 15 days Thu 10/1/26 Wed 10/21/26 207,201,220,492 502 02 - General 500 Set and Terminate Inverter 2 days Mon 10/5/26 Tue 10/6/26 349,496,479 572 12 - Electrical 501 Install Added Millwork 4 days Wed 10/7/26 Mon 10/12/26 498 502 02 - General 502 Install Flooring & Base 10 days Thu 10/22/26 Wed 11/4/26 495,213,501,499,492504,503,577 08 - Tile & Flooring 503 Install Signage 3 days Thu 11/5/26 Mon 11/9/26 502,226,485 569 02 - General 504 Doors and Hardware 5 days Thu 11/5/26 Wed 11/11/26 502,177,485 577 02 - General 505 Fire Dept. Renovation 145 days Tue 5/5/26 Wed 11/25/26 506 Demo HVAC & Overhead MEP 10 days Tue 5/5/26 Mon 5/18/26 465 508,554 09 - Fire Protection,10 - Plumbing,11 - Mechanical,12 - Electrical 507 Demo RR Specialties 4 days Tue 5/5/26 Fri 5/8/26 465 508 02 - General 508 Demo Ceiling Finishes 3 days Tue 5/19/26 Thu 5/21/26 506,507 509 02 - General 509 Demo Floor Finishes 3 days Fri 5/22/26 Wed 5/27/26 508 510,511,543 02 - General 510 Demo Existing Gyp. Board Walls 5 days Thu 5/28/26 Wed 6/3/26 509 515 02 - General 511 Demo Non-Load Bearing CMU Walls 3 days Thu 5/28/26 Mon 6/1/26 509 514,458,513,512 04 - Masonry 512 Above-Ceiling Plumbing Rough-In 7 days Tue 6/2/26 Wed 6/10/26 511 525,527,513,515 10 - Plumbing 513 Above-Ceiling HVAC Rougn-In 7 days Thu 6/11/26 Fri 6/19/26 511,512 514,527,515 11 - Mechanical 514 Above-Ceiling Electrical Rough-In 5 days Mon 6/22/26 Fri 6/26/26 511,513 527,526,525,518 12 - Electrical 515 Interior Framing 5 days Mon 6/22/26 Fri 6/26/26 510,512,513 516,517 05 - Framing 516 Install Door Frames 5 days Mon 6/29/26 Fri 7/3/26 515,171 522,541 05 - Framing 517 Plumbing In-Wall Rough-In 5 days Fri 7/17/26 Thu 7/23/26 515,550,551,559 520,518FS-2 days 10 - Plumbing 518 Electrical In-Wall Rough-In 5 days Wed 7/22/26 Tue 7/28/26 514,355,517FS-2 days532,534,520,519FS-2 days12 - Electrical 519 Low Voltage/Fire Alarm In-Wall Rough-In 5 days Mon 7/27/26 Fri 7/31/26 380,386,518FS-2 days520 12 - Electrical ID Task Name Duration Start Finish Predecessors Successors Resource Names 520 In-Wall Inspections 1 day Mon 8/3/26 Mon 8/3/26 517,518,519 521 Ryan 521 Install In-Wall Backing & Blocking 3 days Tue 8/4/26 Thu 8/6/26 520 522 02 - General 522 Install Drywall 5 days Fri 8/7/26 Thu 8/13/26 516,560,158,549,521523 05 - Framing 523 Tape and Finish Drywall 5 days Fri 8/14/26 Thu 8/20/26 522 524 05 - Framing 524 Painting Walls 10 days Fri 8/21/26 Thu 9/3/26 523 562,530,528,540 07 - Painting 525 Install New HVAC Equipment 7 days Wed 8/26/26 Thu 9/3/26 264,270,288,300,294,306,312,330,276,282,472,474,512572,574,527 11 - Mechanical 526 Install New Light Fixtures 5 days Wed 9/2/26 Wed 9/9/26 514,367 527 12 - Electrical 527 Above-Ceiling Inspections 1 day Thu 9/10/26 Thu 9/10/26 514,526,525,512,513572,573,531FS-2 daysRyan 528 Tile Restroom Floors 6 days Fri 9/4/26 Mon 9/14/26 524 529,531 08 - Tile & Flooring 529 Tile Restroom Walls 10 days Tue 9/15/26 Mon 9/28/26 528 533,530,531 08 - Tile & Flooring 530 Install Restroom Accessories 2 days Tue 9/29/26 Wed 9/30/26 529,524 577 02 - General 531 Install Ceiling Grid 7 days Tue 9/29/26 Wed 10/7/26 529,527FS-2 days,528535,536 05 - Framing 532 Set Floorboxes 2 days Wed 8/19/26 Thu 8/20/26 518,361 539,533 12 - Electrical 533 MEP Wall Trim-Out 5 days Tue 9/29/26 Mon 10/5/26 529,532 536,534 10 - Plumbing,11 - Mechanical,12 - Electrical 534 Set and Terminate Inverter 2 days Tue 10/6/26 Wed 10/7/26 349,518,533 572 12 - Electrical 535 Fire Sprinkler Trim-Out 5 days Thu 10/8/26 Wed 10/14/26 531 537FS-3 days 09 - Fire Protection 536 MEP Ceiling Trim-Out 7 days Thu 10/8/26 Fri 10/16/26 367,373,533,258,531537FS-3 days 10 - Plumbing,11 - Mechanical,12 - Electrical 537 Install Ceiling Tiles 4 days Wed 10/14/26 Mon 10/19/26 535FS-3 days,536FS-3 days538 05 - Framing 538 Millwork & Specialities 15 days Tue 10/20/26 Mon 11/9/26 537 539 02 - General 539 Install Flooring & Base 10 days Tue 11/10/26 Mon 11/23/26 532,538 541FS-2 days,540FS-3 days,56908 - Tile & Flooring 540 Install Signage 3 days Thu 11/19/26 Mon 11/23/26 539FS-3 days,524 569 02 - General 541 Doors and Hardware 4 days Fri 11/20/26 Wed 11/25/26 539FS-2 days,516,560577 02 - General 542 FD Medium Decon / Locker Room Area 36 days Thu 5/28/26 Thu 7/16/26 543 Install Shoring for Lintel Work 3 days Thu 5/28/26 Mon 6/1/26 509 544 04 - Masonry 544 Demo Load-Bearing CMU Walls 3 days Tue 6/2/26 Thu 6/4/26 543 545 04 - Masonry 545 Demo SOG for Columns, UG Plumbing & CMU Thickened Slabs 3 days Fri 6/5/26 Tue 6/9/26 544 546 03 - Concrete 546 Install Lintels & Columns 4 days Tue 6/16/26 Fri 6/19/26 93,545 547,571 04 - Masonry 547 Install Underground Plumbing 5 days Mon 6/22/26 Fri 6/26/26 546 548 10 - Plumbing 548 Pour SOG & Thickened Slabs 3 days Mon 6/29/26 Wed 7/1/26 547 549,551FS+3 days,550FS+3 days03 - Concrete 549 Install Door Frames 3 days Thu 7/2/26 Mon 7/6/26 548 550,522 05 - Framing 550 CMU Wall Layout and Construction 8 days Tue 7/7/26 Thu 7/16/26 164,549,548FS+3 days517 04 - Masonry 551 Interior Framing 5 days Tue 7/7/26 Mon 7/13/26 548FS+3 days 517 05 - Framing 552 Apparatus Bay Work 101 days Tue 5/19/26 Thu 10/8/26 553 FD Fitness, Turnout & Gross Decon Area 32 days Tue 5/19/26 Thu 7/2/26 554 Demo Southern Most Bay Existing SOG 3 days Tue 5/19/26 Thu 5/21/26 506 555FS-1 day 03 - Concrete 555 Remove Trench Drain and Cap Sanitary Line 1 day Thu 5/21/26 Thu 5/21/26 554FS-1 day 556,557 10 - Plumbing 556 Install Underground Plumbing 4 days Fri 5/22/26 Thu 5/28/26 555,401 557 10 - Plumbing 557 SOG Prep 1 day Fri 5/29/26 Fri 5/29/26 556,555 558 03 - Concrete 558 Pour SOG 2 days Mon 6/1/26 Tue 6/2/26 557 559FS+5 days,561 03 - Concrete 559 Layout and Install CMU walls 15 days Wed 6/10/26 Tue 6/30/26 164,558FS+5 days 517,565,566,560 04 - Masonry 560 Install Door Frames 2 days Wed 7/1/26 Thu 7/2/26 559 522,541 04 - Masonry 561 Powerwash/Clean App Bay Structure 3 days Wed 6/3/26 Fri 6/5/26 558 562 07 - Painting 562 Tape & Prep App Bay Structure for Drywall Paint 5 days Fri 9/4/26 Fri 9/11/26 524,561 563 07 - Painting 563 Drywall Paint App Bay Structure 5 days Mon 9/14/26 Fri 9/18/26 562 564 07 - Painting 564 Install CFMF Joists & OSB Sheathing Lid 5 days Mon 9/21/26 Fri 9/25/26 114,563,565 567 05 - Framing 565 Modify Existing Fire Sprinkler System for New Rooms 4 days Wed 7/1/26 Mon 7/6/26 559 392FS+7 days,564 09 - Fire Protection 566 Install App Bay MEP Overhead 5 days Wed 7/1/26 Tue 7/7/26 559 567 10 - Plumbing,11 - Mechanical,12 - Electrical 567 Prep/Grind App Bay Floor for Resealing 5 days Mon 9/28/26 Fri 10/2/26 564,566 568 08 - Tile & Flooring 568 Caulk and Reseal App Bay Floor 4 days Mon 10/5/26 Thu 10/8/26 567 569 08 - Tile & Flooring 569 Final Clean 3 days Tue 11/24/26 Fri 11/27/26 539,540,503,568 578,577 Ryan 570 Project Close Out 64 days Thu 10/8/26 Fri 1/8/27 571 Exterior Punchlist/Completion 5 days Thu 10/29/26 Wed 11/4/26 457,439,448,460,546,441,426,455,454,463,438576Ryan 572 MEP Startup 5 days Thu 10/8/26 Wed 10/14/26 534,500,525,527,342FS-20 days,486574,573FS-5 days 09 - Fire Protection,10 - Plumbing,11 - Mechanical,12 - Electrical 573 City IT Network & Equipment 20 days Thu 10/8/26 Wed 11/4/26 572FS-5 days,527 574FS-5 days Waukee PD/FD 574 MEP Test and Balance 10 days Thu 10/29/26 Wed 11/11/26 525,486,572,573FS-5 days578,575 11 - Mechanical 575 MEP Commissioning 10 days Thu 11/12/26 Wed 11/25/26 574 579 10 - Plumbing,11 - Mechanical,12 - Electrical 576 Weather Days (Exterior Work)5 days Thu 11/5/26 Wed 11/11/26 571 579 Ryan 577 Interior Punchlist/Completion 10 days Mon 11/30/26 Fri 12/11/26 569,497,502,504,493,494,498,530,541579 Ryan 578 TCO Inspections 3 days Mon 11/30/26 Wed 12/2/26 569,574 579 Ryan 579 TCO/Substantial Completion 1 day Mon 12/14/26 Mon 12/14/26 577,576,575,578 580,582,394,393 580 Owner FFE/Fitness Equipment 11 days Tue 12/15/26 Wed 12/30/26 579 582,581 Waukee PD/FD 581 Final CO 1 day Thu 12/31/26 Thu 12/31/26 580 582 582 Owner Move In 5 days Mon 1/4/27 Fri 1/8/27 580,579,581 Waukee PD/FD Attachment 2 - Hourly Rates Updated: 3/1/2026 Des Moines - Field Labor Billing Rates Field Managers Effective Mar 1, 2026 - Feb 28, 2027 Union Craft Workers Effective May 1, 2025 - April 30, 2026 CLASSIFICATION STRAIGHT TIME TIME AND 1/2 DOUBLE TIME VP of Safety 234.00 0.00 0.00 Director of Scheduling 191.11 0.00 0.00 Field Ops Manager 191.11 0.00 0.00 Regional Field Coordinator 191.11 0.00 0.00 Assistant Field Coordinator 191.11 0.00 0.00 Field Coordinator 191.11 0.00 0.00 Senior Scheduling Engineer (out of town) 184.66 0.00 0.00 Quality Control Manager (out of town) 184.31 0.00 0.00 Corp Safety Director 182.00 0.00 0.00 Sr. Safety Director 182.00 0.00 0.00 Scheduling Manager 179.92 0.00 0.00 Scheduling Engineer (out of town) 175.49 0.00 0.00 Senior Superintendent (out of town) 170.96 0.00 0.00 Quality Control Manager 170.31 0.00 0.00 Senior Scheduling Engineer 169.66 0.00 0.00 Safety Director 166.91 0.00 0.00 Scheduling Engineer 160.49 0.00 0.00 Senior Superintendent 153.69 0.00 0.00 Superintendent (out of town) 150.57 0.00 0.00 Safety Coordinator 145.60 0.00 0.00 Safety Manager (out of town) 145.59 0.00 0.00 Superintendent 134.09 0.00 0.00 Concrete Superintendent 131.54 0.00 0.00 Quality Control Engineer (out of town) 122.24 0.00 0.00 Safety Engineer (out of town) 121.68 0.00 0.00 Senior Field Engineer (out of town) 99.65 0.00 0.00 Senior Field Engineer 93.65 0.00 0.00 Field Engineer (out of Town) 89.47 0.00 0.00 Field Engineer 83.25 0.00 0.00 Assistant Superintendent (out of town) 128.91 148.96 179.48 Assistant Superintendent 112.43 138.61 169.12 Yard Manager/Truck Operator (includes truck) 96.90 0.00 0.00 Cement Mason Assistant Superintendent 95.11 119.96 148.43 General Carpenter Foreman 89.33 112.36 138.83 Carpenter Foreman 86.98 109.37 135.11 Cement Mason Foreman 85.39 105.49 128.49 Lead Carpenter 83.45 104.90 129.56 Carpenter 82.28 103.39 127.68 Carpenter Apprentice 76.99 96.54 119.60 Cement Mason 76.32 95.36 116.98 Senior Labor Foreman 75.23 94.58 116.83 Labor Foreman 74.64 93.63 115.50 Lead Laborer 72.29 91.01 112.49 Laborer 71.70 90.05 111.16 Field Engineer - Intern 53.65 66.23 0.00 Rates will be updated annually. Updated: 3/1/2026 Des Moines - Office Staff Billing Rates Effective March 1, 2026 - February 28, 2027 CLASSIFICATION STRAIGHT TIME TIME AND 1/2 DOUBLE TIME Legal $319.00 NA NA VP Preconstruction $310.00 NA NA VP Construction $275.00 NA NA Director, Estimating $260.00 NA NA Director, Preconstruction $260.00 NA NA Sr Preconstruction Executive $260.00 NA NA Preconstruction Executive $248.00 NA NA Director, Construction $232.00 NA NA Sr Sustainability Design Mgr $223.00 NA NA Sr Project Executive $220.00 NA NA Site Specialist $218.40 NA NA Director of VDC $217.00 NA NA Environmental $217.00 NA NA Mechanical Solutions Manager $217.00 NA NA Computational Design $207.00 NA NA Sr Precon Manager $203.00 NA NA Account Project Executive $202.00 NA NA Sr. Sustainability Program Manager $202.00 NA NA Creative Director $201.00 NA NA Sr Estimator $200.00 NA NA Sr VDC Manager $199.00 NA NA Project Executive $198.00 NA NA Sr Project Manager I $178.00 NA NA Building Engineer $175.00 NA NA VDC Manager II $174.00 NA NA Precon Manager II $168.00 NA NA VDC Manager I $165.00 NA NA Sustainability Program Manager II $161.00 NA NA LEED Administrator $159.00 NA NA Estimator II $158.00 NA NA Project Manager II $157.00 NA NA Sr Production Manager $157.00 NA NA Production Manager $144.00 NA NA Precon Manager I $142.00 NA NA Sustainability Program Manager I $142.00 NA NA Estimator I $137.00 NA NA Project Manager I $135.00 NA NA Senior 3D Artist $132.00 NA NA Sr VDC Engineer $130.00 NA NA 3D Artist 2 $122.00 NA NA Inclusion Specialist $122.00 NA NA Sr Precon Engineer $121.00 NA NA Sr Project Engineer $120.00 NA NA Sustainability Project/Program Engineer $120.00 NA NA Marketing / Communications / PR / VDC Animations $117.00 NA NA Precon Engineer $116.00 NA NA VDC Engineer $113.00 NA NA Project Engineer $112.00 NA NA 3D Artist 1 $111.00 NA NA IT $105.00 NA NA Project Accountant $105.00 NA NA Sr Project Coordinator $103.00 NA NA Project Coordinator II $98.00 NA NA Project Coordinator I $91.00 NA NA Pursuit Specialist $76.00 NA NA Project Intern $52.00 NA NA Rates will be updated annually. CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'>' SECTION 00 60 00.04 EXHIBIT B – SAFETY REQUIREMENTS AND PROCEDURES Exhibit B )'Safety Requirements and Procedures ?#-'@845&219&$84'A+4+B-2'C$DD'+9&'+5'&#-'EC4-2F5'+B-4&'$4'$3GD-3-4&$4B'&#-'EC4-2F5'*+,-&.' /-01$2-3-4&5'+46'7289-612-5'5-&',82&#'%-D8CH'C#$9#'EC4-2'+B2--5'&8'$49D16-'$4'-+9#'72$3-'@84&2+9&<'' ' I<' *+,-&.'/-01$2-3-4&5'+46'7289-612-5 '' I<><' EC4-2F5'*+,-&.'78D$9$-5'+46'7289-612-5 '' I<><><' 728J-9&'*+,-&.'A+41+D<'EC4-2'C$DD'G2-G+2-'+'728J-9&'*+,-&.'A+41+D<'72$3-'@84&2+9&82' +46'+4.'+46'+DD'8,'&#-$2'51%)&$-2'984&2+9&825'K#-2-$4+,&-2'2-,-22-6'84D.'+5'72$3-' @84&2+9&82LH'+B2--5'&8'+6#-2-'&8'+DD'2-01$2-3-4&5'984&+$4-6'&#-2-$4<'?#-'G289-612-5' 81&D$4-6'$4'&#$5'3+41+D'+2-'3$4$313'2-01$2-3-4&5'+46'5#+DD'48&'2-D$-M-'72$3-' @84&2+9&82'+46'+4.'8,'&#-$2'51%)&$-2'984&2+9&825'8,'+4.'8,'$&5'5+,-&.'2-5G845$%$D$&$-5'5-&' ,82&#'$4'&#$5'72$3-'@84&2+9&<'N+$D12-'&8'+6#-2-'&8'&#-'2-01$2-3-4&5'8,'&#-'728J-9&'*+,-&.' A+41+D'5#+DD'%-'+'3+&-2$+D'%2-+9#'8,'&#$5'@84&2+9&< I<><O<' EC4-2P5'/$B#&'&8'/-3-6.'Q-,$9$-49$-5<'R,'72$3-'@84&2+9&82'82'+4.'51%)&$-2'984&2+9&82H' ,+$D5'&8'983GD.'C$&#'+4.'5+,-&.'G289-612-5'2-01$2-6'%.'D+C'82'%.'EC4-2H'EC4-2'5#+DD' #+M-'&#-'2$B#&H'%1&'48&'&#-'8%D$B+&$84H'&8'&+S-'+4.'4-9-55+2.'5&-G5'&8'2-3-6.'&#-' 6-,$9$-49.'+46'9#+2B-'&#-'-4&$2-'985&'&#-2-8,'&8'72$3-'@84&2+9&82<'?#-',+$D12-'8,'EC4-2' &8'&+S-'+4.'519#'+9&$84'5#+DD'$4'48'3+44-2'2-D$-M-'72$3-'@84&2+9&82'8,'+4.'8,'$&5'5+,-&.' 2-5G845$%$D$&$-5'5-&',82&#'$4'&#$5'72$3-'@84&2+9&<'EC4-2'2-5-2M-5'&#-'2$B#&'&8'$3GD-3-4&' T2&$9D-'I<O<U'2-B+26$4B'+66$&$84+D'5+,-&.'G-25844-D< I<><U<' EC4-2P5'*+,-&.'Q$59$GD$4+2.'728B2+3<'V4D-55'8&#-2C$5-'6-592$%-6'$4'&#-'728J-9&'*+,-&.' A+41+DH'72$3-'@84&2+9&82'+46'+4.'8,'&#-$2'51%)&$-2'984&2+9&825H'5#+DD'%-'51%J-9&'&8'&#-' ,8DD8C$4B'6$59$GD$4+2.'+9&$845',82'5+,-&.'M$8D+&$845'%.'$&5'-3GD8.--5< I<><U<><W84)5-2$815'X$8D+&$845 I<><U<><><' N$25&'M$8D+&$84'Y'EC4-2'C$DD'M-2%+DD.'C+24'&#-'M$8D+&82< I<><U<><O<' *-9846'+46'&#$26'M$8D+&$845'Y'EC4-2'C$DD'M-2%+DD.'C+24'&#-'M$8D+&82' +46'5-46'+'C2$&&-4'C+24$4B'&8'72$3-'@84&2+9&82<'72$3-'@84&2+9&82' C$DD'%-'2-01$2-6'&8'G283G&D.'2-5G846'$4'C2$&$4B'&8'EC4-2F5'C2$&&-4' C+24$4B<'*19#'2-5G845-'5#+DD'5&+&-'&#-'+9&$845'&8'%-'&+S-4'%.'72$3-' @84&2+9&82'&8'9822-9&'&#-'2-G-+&-6'5+,-&.'M$8D+&$84'+46'+5512-'&#+&'$&' C$DD'48&'89912'+B+$4<'T99-G&+%D-'+9&$845'3+.'$49D16-'2-38M+D'8,'&#-' M$8D+&82',283'&#-'728J-9&< I<><U<><U<' N812&#'M$8D+&$84'Y'EC4-2'C$DD'48&$,.'&#-'M$8D+&82'+46'72$3-' @84&2+9&82<'72$3-'@84&2+9&82'C$DD'$33-6$+&-D.'2-38M-'&#-'M$8D+&82' ,283'&#-'728J-9&< I<><U<O<'*-2$815'*+,-&.'X$8D+&$845 I<><U<O<><' N$25&'M$8D+&$84'Y'EC4-2'C$DD'M-2%+DD.'C+24'&#-'M$8D+&82'+46'5-46'+' C2$&&-4'C+24$4B'&8'72$3-'@84&2+9&82<'72$3-'@84&2+9&82'C$DD'%-' 2-01$2-6'&8'G283G&D.'2-5G846'$4'C2$&$4B'&8'EC4-2F5'C2$&&-4'C+24$4B<' *19#'2-5G845-'5#+DD'5&+&-'&#-'+9&$845'&8'%-'&+S-4'%.'72$3-' @84&2+9&82'&8'9822-9&'&#-'5+,-&.'M$8D+&$84'+46'+5512-'&#+&'$&'C$DD'48&' 89912'+B+$4<'T99-G&+%D-'+9&$845'3+.'$49D16-'-$&#-2'2-38M+D'8,'&#-' M$8D+&82',283'&#-'728J-9&'82'+'2-M$-C'8,'&#-'G28%D-3'C$&#'&#-'M$8D+&82' +46'+'6-9$5$84'&8'2-&+$4'&#-'M$8D+&82'84'&#-'728J-9&H'C$&#'2-3-6$+D' +9&$84'&+S-4< Attachment 3 - Exhibit B - Safety Requirements CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'O' I<><U<O<O<' *-9846'M$8D+&$84')'EC4-2'C$DD'48&$,.'&#-'M$8D+&82'+46'72$3-' @84&2+9&82<'72$3-'@84&2+9&82'C$DD'$33-6$+&-D.'2-38M-'&#-'M$8D+&82' ,283'&#-'728J-9&< I<><U<U<Z-4-2+D I<><U<U<><' R,'+4.'8,'72$3-'@84&2+9&82F5'-3GD8.--5'+2-'2-38M-6',283'&#$5' 728J-9&'+5'+'2-51D&'8,'5+,-&.'M$8D+&$845H'&#-.'9+448&'%-'&2+45,-22-6'&8' +48&#-2'G28J-9&'%-$4B'9845&219&-6'%.'EC4-2< I<><U<U<O<' ?#-'2-38M+D'8,'+4.'8,'72$3-'@84&2+9&82F5'-3GD8.--5',283'&#-' 728J-9&'5#+DD'$4'48'3+44-2'+,,-9&'72$3-'@84&2+9&82F5'8%D$B+&$84'&8' G-2,823'$&5'[82S'$4'+99826+49-'C$&#'&#-'728J-9&'*9#-61D-< I<><U<U<U<' W8&#$4B'984&+$4-6'$4'&#$5'6$59$GD$4+2.'G8D$9.'5#+DD'G28#$%$&'EC4-2' ,283'$33-6$+&-D.'2-38M$4B',283'&#-'728J-9&'+4.'-3GD8.--'8,'72$3-' @84&2+9&82'C#85-'984619&'9845&$&1&-5'+'5-2$815'M$8D+&$84'8,'+4.' 5+,-&.'G8D$9.H'2-B1D+&$84'82'2-01$2-3-4&'C#$9#'981D6'2-51D&'$4'5-2$815' $4J12.'&8'+4.'G-2584'82'5-2$815'6+3+B-'&8'+4.'G28G-2&.< I<><U<U<=<' EC4-2'5#+DDH'$4'$&5'2-+584+%D-'J16B3-4&H'6-&-23$4-'C#$9#'+9&$845' +2-'5-2$815'+46'C#$9#'+2-'484)5-2$815< '' I<O<' 72$3-'@84&2+9&82F5'Z-4-2+D'*+,-&.'/-5G845$%$D$&$-5 '' I<O<><' @83GD$+49-'C$&#'/1D-5H'/-B1D+&$845'+46'\+C5<'72$3-'@84&2+9&82'5#+DD'&+S-'+DD' 4-9-55+2.'5+,-&.'G2-9+1&$845'C$&#'2-5G-9&'&8'$&5'[82SH'5#+DD'983GD.'C$&#'+DD'5+,-&.' 3-+512-5'$4$&$+&-6'%.'EC4-2H'82'2-01$2-6'%.'&#-'EC4-2'82'&#-'72$3-'@84&2+9&H'&#-' 728J-9&'*G-9$,$9'*+,-&.'A+41+D'+46'&#-'-"G-9&+&$845'5-&',82&#'$4'2-B1D+2'J8%5$&-' 3--&$4B5H'$49D16$4BH'C$Q&'D$3$&+&$84H',82-3+4'3--&$4B5H'G28B2-55'3--&$4B5'+46'5$&-' 5+,-&.'3--&$4B5<'72$3-'@84&2+9&82'5#+DD'983GD.'C$&#'+DD'+GGD$9+%D-'D+C5H'826$4+49-5H' 21D-5H'2-B1D+&$845'+46'D+C,1D'826-25'8,'+4.'G1%D$9'+1R$&.',82'&#-'5+,-&.'8,'G-25845'82' G28G-2&.<'T4.'D-B+D'2-01$2-3-4&5'&#+&'+2-'382-'5&2$4B-4&'&#+4'EC4-2F5'2-01$2-3-4&5'C$DD' &+S-'G2-9-6-49-<'N+$D12-'&8'+&&-46'2-01$2-6'5+,-&.'3--&$4B5'82'%2$-,$4B5H'$49D16$4B'%1&' 48&'D$3$&-6'&8'*$&-'E2$-4&+&$845H'*+,-&.'9833$&&--5H'-&9<H'5-&'%.'EC4-2'C$Q&'G2$82'&8' +GG28M+D',283'&#-'EC4-2'C$DD'%-'9845$6-2-6'+'%2-+9#'8,'984&2+9&<'N+$D12-'&8'51%3$&' 2-01$2-6'5+,-&.'G+G-2C82S'%.'&#-'G28J-9&H'$49D16$4B'%1&'48&'D$3$&-6'&8'6+$D.'G-23$&5H'G2-) &+5S'GD+45H'-&9<'$5'+D58'+'%2-+9#'8,'984&2+9&< I<O<O<' /-5G845$%$D$&.',82'72$3-'@84&2+9&825<'72$3-'@84&2+9&82'5#+DD'%-'2-5G845$%D-',82'&#-' 5+,-&.'8,'$&5'-3GD8.--5'+46'&#-'-3GD8.--5'8,'+DD'8,'$&5'&$-2'51%984&2+9&825<'T4.' 2-,-2-49-'#-2-$4'&8']72$3-'@84&2+9&82F5'-3GD8.--5^'82']$&5'-3GD8.--5^'5#+DD'+GGD.' -01+DD.'&8'72$3-'@84&2+9&82F5'-3GD8.--5'+46'&8'+4.'-3GD8.--5'8,'51%)&$-25<'72$3-' @84&2+9&82'$5'2-5G845$%D-',82'-4512$4B'+4._+DD'&$-2)51%984&2+9&825'+&&-46'+' 72-9845&219&$84'72$3-'@84&2+9&82'*+,-&.'3--&$4B'$4'C#$9#'+'2-G2-5-4&+&$M-'8,'&#-'72$3-' @84&2+9&82'$5'$4'+&&-46+49-<'R,'&#-'51%)&$-2'$5'8G-2+&$4B'146-2'&#-'72$3-'@84&2+9&825' 5+,-&.'G28B2+3H'&#-'72$3-'@84&2+9&82'315&'51%3$&'K583-&#$4B'&8'5#8C'&#+&'&#-'51%)&$-2' #+5'%--4'&2+$4-6'84'&#-'51%5'G28B2+35LH'$,'&#-'51%)&$-2'$5'8G-2+&$4B'146-2'&#-$2'8C4' 5+,-&.'G28B2+3H'51%)&$-2'315&'51%3$&'&#-$2'8C4'G+G-2C82S'+46'#+M-'&#-$2'8C4' 72-9845&219&$84'72$3-'@84&2+9&82'*+,-&.',823< I<O<U<' T66$&$84+D'*+,-&.'7-25844-D<'EC4-2'2-5-2M-5'&#-'2$B#&'&8'2-01$2-'72$3-'@84&2+9&82H'+&' 72$3-'@84&2+9&82F5'8C4'985&H'&8'+66'84-'82'382-'G-8GD-'&8'$&5'92-C'C#8'+2-'6-6$9+&-6' &8'&#-'5+,-&.'8,'72$3-'@84&2+9&82F5'-3GD8.--5'+&'&#-'728J-9&H'$,'72$3-'@84&2+9&82F5' 5+,-&.'3-+512-5'+2-'6--3-6'51%5&+46+26'+5'68913-4&-6'$4'EC4-2F5'2-B1D+2'5+,-&.' +16$&5<'*+,-&.'/-G2-5-4&+&$M-'$5'6-,$4-6'+5'84-'C#8'3--&5'&#-'6-,$4$&$84'8,'E*`TF5' 983G-&-4&'G-2584'+46'#+5'+'M+D$6'E*`T'U:)`812'9845&219&$84'5+,-&.'98125-'9-2&$,$9+&-H' G855-55'+'9122-4&'NR/*?'TRQ_@7/_T!Q',283'+'4+&$84+DD.'2-98B4$a-6'G28B2+3'+46'#+5' +'3$4$313'8,'b'.-+25'8,'9845&219&$84'5+,-&.'3+4+B-3-4&'-"G-2$-49-< I<O<=<' \E?E'@8826$4+&82'_'A+4+B-2'TDD'72$3-'@84&2+9&825'C82S$4B'C$&#'-4-2B.'58129-5'+5' 6-,$4-6'%.'N-6-2+D'E*`T'84'&#-'G28J-9&'5#+DD'6-5$B4+&-'+'&2+$4-6'\E?E' @8826$4+&82_A+4+B-2'&8'8M-25--'&#-'72$3-'@84&2+9&825'\E?E'G28B2+3<'72$3-' @84&2+9&82K5L'+46'+4.'&$-2'984&2+9&825'5#+DD'-+9#'6-5$B4+&-'+'\E?E'@8826$4+&82'84'&#-' CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'U' G28J-9&'C#8'C$DD'%-'2-5G845$%D-',82'&#-'$3GD-3-4&+&$84H'&2+$4$4B'+46'2-B1D+&82.' 983GD$+49-'8,'&#-'72$3-'@84&2+9&82F5'\E?E'G8D$9.'+46'G289-612-5<'?#-'\E?E'G8D$9.' 5#+DD'3--&'&#-'3$4$313'2-01$2-3-4&5'+5'D$5&-6'$4'&#-'EC4-2'728J-9&'*+,-&.'A+41+D' \E?E'78D$9.'82'+4.'@D$-4&'G28J-9&'2-01$2-3-4&'2-D+&-6'&8'\E?E< I<O<b<' !4-2B.'A+25#+DDK5L'TDD'-D-9&2$9+D'72$3-'@84&2+9&825'C82S$4B'84'+'A$55$84'@2$&$9+D'G28J-9&' 5#+DD'G28M$6-'+'6-6$9+&-6'84)5$&-'!4-2B.'A+25#+DDK5L<'?#-'!4-2B.'A+25#+DD'C$DD'%-' 2-5G845$%D-',82'&#-'5+,-'-4-2B$a+&$84'_'6-)-4-2B$a+&$84'+9&$M$&$-5',82'&#-'G28J-9&<' T66$&$84+D'!4-2B.'A+25#+DD5'3+.'%-'2-01$2-6'%.'&#-'EC4-2'+&'&#-'72$3-'@84&2+9&82F5' 985&<'?#-'!4-2B.'A+25#+DD'C$DD'%-'2-5G845$%D-',82'&#-'&2+$4$4BH'98826$4+&$84H'983GD$+49-H' -3-2B-49.'2-5G845-H'$45G-9&$845H'\E?E'G8D$9._G289-612-5H'G-23$&&$4BH'+46'A-V'8,' 7289-612-5'KAE7L'8,'&#-'72$3-'@84&2+9&82<'?#-'!4-2B.'A+25#+DD'C$DD'G28M$6-'8M-25$B#&' +46',$4+D'51%3$55$84'&8'&#-'EC4-2',82'+DD'&#-'72$3-'@84&2+9&82K5L'$49$6-4&' $4M-5&$B+&$84K5LH'288&'9+15-H'+46'9822-9&$M-'+9&$845'2-D+&-6'&8'-4-2B$a+&$84'_'6-' -4-2B$a+&$84'+9&$M$&$-5< '' I<U<' 72$3-'@84&2+9&82F5'*+,-&.'/-5G845$%$D$&$-5'72$82'&8'@833-49$4B'@845&219&$84 '' I<U<><' ?2+$4$4B'84'728J-9&'*+,-&.'A+41+D<'72$3-'@84&2+9&82'5#+DD'6-5$B4+&-'+4'-3GD8.--'&8' 2-9-$M-'82$-4&+&$84'+46'&2+$4$4B',283'EC4-2'84'&#-'728J-9&'*+,-&.'A+41+D<'*19#' 6-5$B4+&-6'-3GD8.--'5#+DD'&#-4'&2+$4'+DD'-3GD8.--5'8,'72$3-'@84&2+9&82'C#8'C$DD'%-' C82S$4B'84'&#-'728J-9&'84'&#-'5+,-&.'G289-612-5'984&+$4-6'$4'&#-'728J-9&'*+,-&.'A+41+D<' 72$3-'@84&2+9&82'C+22+4&5'&#+&'-3GD8.--5'8,'72$3-'@84&2+9&82'C$DD'48&'%-'+DD8C-6'&8' 9833-49-'C82S'84'&#-'728J-9&'14&$D'&#-.'#+M-'2-9-$M-6'519#'&2+$4$4B<'T,&-2'72$3-' @84&2+9&82'983GD-&-5'&#-'&2+$4$4B'8,'$&5'-3GD8.--5H'$&'C$DD'#+M-'-+9#'-3GD8.--'5$B4'+' ,823'G28M$6-6'%.'EC4-2'$46$9+&$4B'&#+&'&#-'-3GD8.--'#+5'%--4'&2+$4-6'84'&#-' G289-612-5'$4'&#-'728J-9&'*+,-&.'A+41+D<'72$3-'@84&2+9&82'5#+DD'51%3$&'&#-'-"-91&-6' ,823'&8'EC4-2F5'51G-2$4&-46-4&'82'EC4-2F5'+B-4&'G2$82'&8'+DD8C$4B'$&5'-3GD8.--5'&8' 9833-49-'C82S< I<U<O<' @83G-&-4&'7-2584<'72$3-'@84&2+9&82'+46'+DD'51%)&$-25'5#+DD'G28M$6-'+'G28G-2D.'&2+$4-6' ]983G-&-4&'G-2584H^'+5'6-,$4-6'%.'E*`T'2-B1D+&$845<'*19#'983G-&-4&'G-2584'5#+DD'%-' +4'-3GD8.--'8,'3+4+B-2$+D'D-M-D'14D-55'72$3-'@84&2+9&82'48&$,$-5'EC4-2'&8'&#-'984&2+2.' +46'5#+DD'%-'84'&#-'728J-9&'5$&-'+&'+DD'&$3-5'C#$D-'&#-$2'598G-'8,'C82S'$5'%-$4B'G-2,823-6<' E*`T'*&+46+265'Y'OI'@N/'>IO;<UOK,L'6-,$4-'+'983G-&-4&'G-2584'+5'84-'C#8'$5' 9+G+%D-'8,'$6-4&$,.$4B'-"$5&$4B'+46'G2-6$9&+%D-'#+a+265'$4'&#-$2'598G-'8,'C82SH' 51228146$4B5'82'C82S$4B'9846$&$845'C#$9#'+2-'145+4$&+2.H'#+a+26815H'82'6+4B-2815'&8' -3GD8.--5'+46'C#8'#+5'+1R$a+&$84'&8'&+S-'G283G&'9822-9&$M-'3-+512-5'&8'-D$3$4+&-' &#-3<^ I<U<U<' c8%'`+a+26'T4+D.5$5<'72$3-'@84&2+9&82'5#+DD'G2-G+2-'+'G28G-2D.'983GD-&-6'J8%'#+a+26' +4+D.5$5'Kc`TL'+662-55$4B'&#-'983GD-&-'598G-'8,'C82S'+46'51%3$&'$&'&8'EC4-2F5' 51G-2$4&-46-4&'82'EC4-2F5'B-4&'G2$82'&8'9833-49$4B'+4.'C82S'84'&#-'728J-9&<'?#-' 72$3-'@84&2+9&82F5'983G-&-4&'G-2584'5#+DD'&2+$4'+DD'-3GD8.--5'+46'&#-$2'51%)&$-25'84'&#-' J8%'#+a+26'+4+D.5$5'G2$82'&8'%-B$44$4B'+4.'C82S'84'&#-'728J-9&<'?#-'c`T'5#+DD'$6-4&$,.' +46'-M+D1+&-'#+a+265H'5+,-'3-͡'8,'#+a+26'984&28D'+46'G-2584+D'G28&-9&$M-' -01$G3-4&'K77!L'2-01$2-6'&8'5+,-D.'G-2,823'&#-'C82S<'?#-'c`T'315&'%-'1G6+&-6'+46' G-25844-D'2-)&2+$4-6'C#-4-M-2'9#+4B-5'$4',+9$D$&$-5H'-01$G3-4&H'3+&-2$+D5H'82'G289-55-5' #+M-'899122-6<'T66$&$84+D'c`T5'3+.'%-'2-01$2-6'&8'%-'51%3$&&-6'6+$D.'<%.'&#-' 983G-&-4&'G-2584< I<U<=<' *+,-&.'Q+&+'*#--&5'K*Q*L<''72$3-'@84&2+9&82'5#+DD'51%3$&'#+a+26'983314$9+&$84' $4,823+&$84'+D84B'C$&#'+DD'+GGD$9+%D-'*Q*'68913-4&5'&8'EC4-2F5'51G-2$4&-46-4&''82' EC4-2F5'+B-4&'G2$82'&8'9833-49$4B'+4.'C82S'84'&#-'728J-9&<'*Q*'$4,823+&$84'315&'%-' 51%3$&&-6'%8&#'-D-9&284$9+DD.'+46'$4'#+26'98G.'+46'%-'5#+2-6'C$&#'+4.'484)9845&219&$84' 845$&-'$,'&#-.'3+.'%-'+,,-9&-6'%.'K82'-"G85-6'&8L'5+$6'3+&-2$+D'K$<-<'&-4+4&5H'M$5$&825H' 8C4-25F'2-G2-5-4&+&$M-5H'-&9<L<'>b)3$41&-5'G82&+%D-'-.-C+5#'5&+&$845'315&'%-'G28M$6-6' %.'72$3-'@84&2+9&825'$,'2-01$2-6'%.'*Q*',82'+4.'G28619&'15-6'84'5$&-'%.'72$3-' @84&2+9&82F5'G-25844-D< CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'=' I<U<b<' 72$3-'@84&2+9&82F5'*+,-&.'728B2+3<'72$3-'@84&2+9&82'5#+DD'51%3$&'+4'-D-9&284$9'+46' #+26'98G.'8,'$&5'5$&-)5G-9$,$9'5+,-&.'G28B2+3'&8'EC4-2F5'51G-2$4&-46-4&'82'EC4-2F5' +B-4&'G2$82'&8'9833-49$4B'+4.'C82S'84'&#-'728J-9&<'72$3-'@84&2+9&825'+2-'2-01$2-6'&8' 51%3$&'&#-'*$&-)*G-9$,$9'*+,-&.'728B2+3',82'+DD'8,'$&5'51%)&$-2'984&2+9&825<'R,'51%)&$-2' -3GD8.--5'+2-'C82S$4B'146-2'&#-'72$3-'@84&2+9&82F5'5+,-&.'G28B2+3H'&#-'72$3-' @84&2+9&82'5#+DD'%-'2-5G845$%D-'&8'&2+$4'&#-$2'51%)&$-2'984&2+9&825'84'&#-'72$3-' @84&2+9&82F5'5+,-&.'2-01$2-3-4&5_G8D$9$-5< I<U<;<' 72$3-'@84&2+9&82F5'Q21B'?-5&$4B'728B2+3<'72$3-'@84&2+9&82'5#+DD'51%3$&'+'98G.'8,'$&5' 621B'&-5&$4B'G28B2+3'&8'EC4-2F5'51G-2$4&-46-4&'82'EC4-2F5'+B-4&'$,'2-01-5&-6'%.' EC4-2< I<U<d<' E*`T'U:'?2+$4$4B<'T&'+DD'&$3-5'C#-4'72$3-'@84&2+9&82'$5'C82S$4B'84'&#-'728J-9&'5$&-H' 72$3-'@84&2+9&82'5#+DD'#+M-'+&'D-+5&'84-'3+4+B-2$+D'D-M-D'-3GD8.--'K983G-&-4&'G-2584H' D-+6'G-2584H',82-3+4H'51G-2$4&-46-4&'82'J8%5$&-'3+4+B-2L'C#8'#8D65'+'M+D$6'E*`T'U:' `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`T'2-B1D+&$845H'&#-'728J-9&'*+,-&.'A+41+DH'+46'&#-'728J-9&'5$&-' 9846$&$845'+46'&#-'G28B2-55'8,'$&5'[82SH'+DD'4-9-55+2.'5+,-B1+265',82'&#-'5+,-&.'+46' G28&-9&$84'8,'G-25845'C#8'3+.'%-'+,,-9&-6'%.'72$3-'@84&2+9&82F5'[82S<'*19#' 5+,-B1+265'5#+DD'$49D16-'G85&$4B'8,']6+4B-2^'5$B45'+46'8&#-2'C+24$4B5H'-2-9&$4B'C+24$4B' D$4-5H'48&$,.$4B'+4.'$46$M$61+D5'C#8'3$B#&'%-'+6M-25-D.'+,,-9&-6'%.'72$3-'@84&2+9&82F5' [82S'+46'G2838&$4B'+46'-4,829$4B'5+,-&.'2-B1D+&$845'+&'+DD'&$3-5<'T4.'B1+262+$D5' 2-38M-6'315&'%-'2-)$45&+DD-6'$33-6$+&-D.',8DD8C$4B'983GD-&$84'8,'&+5S'K>::e'&$-)8,,' +46'#+26)2+$D'%+22$9+6-'5.5&-3'315&'%-'$4'GD+9-L<'*--'+D58'I<=<>>< I<=<U<' *&219&12+D'EM-2D8+6$4B'72-M-4&$84<'72$3-'@84&2+9&82'5#+DD'48&'D8+6'82'G-23$&'+4.'G+2&'8,' $&5'[82S'82'&#-'728J-9&'&8'%-'D8+6-6'$4'+'3+44-2'&#+&'C81D6'92-+&-'+'5+,-&.'#+a+26<' 72$3-'@84&2+9&825'5#+DD'48&'D8+6'-01$G3-4&'+46_82'3+&-2$+D5'C#$9#'-"9--6'5&219&12+D' D$3$&+&$845'82'984619&'+4.'D8+6$4B'8G-2+&$845'&#+&'C81D6'92-+&-'+'5+,-&.'#+a+26<' !4B$4--2$4B'M-2$,$9+&$84'+GG28M+D'3+.'%-'2-01$2-6< I<=<=<' TD&-2$4B'*+,-&.'A-+512-5'R45&+DD-6'%.'E&#-25<'72$3-'@84&2+9&82'5#+DD'48&'2-38M-H'+D&-2' 82'8&#-2C$5-'$3G+$2'&#-'-,,-9&$M-4-55'8,'5+,-&.'3-+512-5'$45&+DD-6'%.'EC4-2'82'8&#-25' C$Q&'&#-'+GG28M+D'8,'EC4-2<'[#-2-'5+,-&.'3-+512-5'315&'%-'2-38M-6'82'+D&-2-6'&8' +DD8C'72$3-'@84&2+9&825'&8'G-2,823'C82S'519#'+5'%1&'48&'D$3$&-6'&8'9+%D-5H'%+22$-25H',D882' #8D-'98M-25H'B1+262+$D5H'&#-'72$3-'@84&2+9&82'5#+DD'G28M$6-'+66$&$84+D'984&28D5'82'5+,-&.' 3-+512-5'2-01$2-6'&8'3+$4&+$4'5+,-'C82S$4B'9846$&$845< I<=<b<' *+,-&.'A--&$4B5<'72$3-'@84&2+9&82'5#+DD'#8D6'C--SD.'5+,-&.']&88D%8"^'3--&$4B5'C$&#'$&5' -3GD8.--5'+46'51%3$&'+'98G.'8,'&#-'+B-46+'+46'3--&$4B'3$41&-5'K+5'+M+$D+%D-L'&8' EC4-2F5'51G-2$4&-46-4&'82'EC4-2F5'+B-4&<'72$3-'@84&2+9&82'5#+DD'2-01$2-'&#-' @83G-&-4&'7-2584'82'&#-'*+,-&.'/-G2-5-4&+&$M-'&8'+&&-46'&#-'A84&#D.'*+,-&.' @833$&&--'A--&$4B<'72$3-'@84&2+9&82'5#+DD'2-01$2-'+DD'8,'$&5'-3GD8.--5'&8'+&&-46' EC4-2F5'TDD'c8%'*+,-&.'3--&$4B'#-D6'+&'D-+5&'849-'+'384&#<'R&'$5'&#-'72$3-'@84&2+9&82F5' 2-5G845$%$D$&.'&8'983314$9+&-'+DD'5+,-&.'+46'8&#-2'$3G82&+4&'$4,823+&$84'&8'$&5' -3GD8.--5'$4'C#+&-M-2'D+4B1+B-'&#-.'G2$3+2$D.'5G-+S<'R,'72$3-'@84&2+9&82'$5'1&$D$a$4B' 484)!4BD$5#'5G-+S$4B'-3GD8.--5H'72$3-'@84&2+9&82'5#+DDH'+&'+DD'&$3-5H'#+M-'+&'D-+5&'84-' !4BD$5#'5G-+S$4B'-3GD8.--'84'&#-'728J-9&'*$&-'C#8'9+4'$4&-2G2-&',82'$&5'484)!4BD$5#' 5G-+S$4B'-3GD8.--5<'\+4B1+B-'%+22$-25'C$DD'WE?'%-'+4'-"915-',82'D+9S'8,'5+,-' G2+9&$9-5'+46'+66$&$84+D'&2+45D+&825'3+.'%-'2-01$2-6'%.'&#-'EC4-2'+&'&#-'72$3-' @84&2+9&82F5'985&< CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'b' I<=<;<' /-G82&$4B'T99$6-4&5<'72$3-'@84&2+9&82'5#+DD'G283G&D.'2-G82&'+DD'$49$6-4&5H'+99$6-4&5H' 3$482'$4J12$-5H'6+3+B-'&8'G28G-2&.H'82'4-+2'3$55-5'&8'EC4-2F5'51G-2$4&-46-4&'82' EC4-2F5'+B-4&<'72$3-'@84&2+9&82'5#+DD'984&$41-'&8'2-G82&'+DD'$4,823+&$84'&#+&'G-2&+$45'&8' &#-'+99$6-4&_$4J12._G28G-2&.'6+3+B-'14&$D'+'2-58D1&$84'$5'2-+9#-6'C$&#'&#-'$4J12-6' G-2584K5L'+46'&#-'G-2584K5L'$5'%+9S'&8'C82S'+46_82'&#-'6+3+B-6'G28G-2&.'$5'2-G+$2-6'82' 2-GD+9-6<'72$3-'@84&2+9&82'5#+DD'51%3$&'&#-$2'2-G82&'G283G&D.'K$49D16$4B'+'/88&)@+15-' T4+D.5$5'+46'@822-9&$M-'T9&$84K5L'GD+4'&8'G2-M-4&'2-899122-49-L'+5'2-01-5&-6'%.'&#-' EC4-2'82'EC4-2_@D$-4&'2-01$2-3-4&5< I<=<d<' N82SD$,&'EG-2+&825<'R,'72$3-'@84&2+9&82'+46_82'$&5'51%)&$-2'1&$D$a-5',82SD$,&5_G8C-2-6' $4615&2$+D'&219S5'&8'G-2,823'$&5'[82SH'&#-.'5#+DD'-3GD8.'84D.'9122-4&D.'9-2&$,$-6',82SD$,&' 8G-2+&825'&8'983GD.'C$&#'&#-'OI'@N/'>I>:<>df'N82SD$,&5_78C-2-6'R4615&2$+D'?219S5' 5&+46+26'+46'3+41,+9&12-2'5G-9$,$9+&$845_2-9833-46+&$845<'TDD'+&&+9#3-4&5'5#+DD'%-' +GG28M-6'%.'&#-'3+41,+9&12-2'+46'2+&-6'C$&#'+4'$6-4&$,$9+&$84',82'&#-'15-<'EG-2+&825' 3+.'%-'51%J-9&'&8'+66$&$84+D'&2+$4$4B'2-01$2-3-4&5'C#-4'5G-9$,$9'+&&+9#3-4&5'+2-'15-6' $4'+'3+44-2'&#+&'C81D6'2-9D+55$,.'&#-'-01$G3-4&'+5'+'92+4-<'/-,-2'&8'OI'@N/'*1%G+2&' @@'>IO;<>=::'K9LKfL< I<=<f<' @2+4-'EG-2+&825<'R,'72$3-'@84&2+9&82'1&$D$a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a+26'+4+D.5$5'315&'%-' 983GD-&-6'+46'&124-6'$4'5G-9$,$9+DD.'+662-55$4B'5+,-'&2+M-D$4B'8G-2+&$845< I<=<I<' `-D$98G&-25<' 72$3-' @84&2+9&82' 2-G2-5-4&5' &#+&' +DD' 15-' 8,' +' #-D$98G&-2' 5#+DD' %-' $4' +99826+49-'C$&#'+DD'D+C5H'21D-5H'2-B1D+&$845'+46'B1$6-D$4-5'2-D+&$4B'&#-2-&8H'$49D16$4B'%1&' 48&'D$3$&-6'&8'+4.'2-B1D+&$845'8,'&#-'N-6-2+D'TM$+&$84'T5589$+&$84<'72$3-'@84&2+9&82'5#+DD' G28M$6-'+'D$,&'5+,-&.'G289-612-5_GD+4'$49D16$4B'&#-'$&-35'D$5&-6'$4'&#-'`-D$98G&-2'@2+4-' 7289-612-5'N823'+&'D-+5&'U:'6+.5'G2$82'&8'8G-2+&$84'84'&#-'728J-9&< I<=<>:' !2-9&$84'!01$G3-4&<'R,'72$3-'@84&2+9&82'+46_82'$&5'51%)&$-2'1&$D$a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g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b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h'72$3-'@84&2+9&82'+46'51%)&$-25'5#+DD' 983GD.'C$&#'&#-',8DD8C$4B'2-01$2-3-4&5g I<=<>O<><' @N/'*1%G+2&'A'N+DD'728&-9&$84'*&+46+26'>IO;'2-01$2-5',+DD'G28&-9&$84'+&' 5$"'K;L',--&<'R&'$5'EC4-2F5'G8D$9.'&#+&'5&219&12+D'5&--D'-2-9&$84H'$45&+DD+&$84'8,' 3-&+D'6-9S$4BH'+46'6-&+$D'C82SH'C886',2+3-'9845&219&$84H'G2-9+5&' 98492-&-H'+46'59+,,8D6$4B'C$DD',8DD8C'&#-'2-01$2-3-4&5'8,'*1%G+2&'A'C#$9#' 5&+&-5'&#+&',+DD'G28&-9&$84'$5'2-01$2-6'+&'5$"'K;L',--&< I<=<>O<O<' !+9#'-3GD8.--'G-2,823$4B'+4.'8,'&#-'C82S'6-592$%-6'$4'OI'@N/' >IO;<b:>K%LK>L'ęB#'>IO;<b:>K%LK>bL'+46';',--&'82'382-'+%8M-'+'D8C-2' D-M-D'5#+DD'%-'G28&-9&-6',283',+DD$4B'C$&#'&#-'15-'8,'B1+262+$D'5.5&-35H' 5+,-&.'4-&'5.5&-35H'82'G-2584+D',+DD'+22-5&'5.5&-35< I<=<>O<U<' Z1+262+$D5'+46'5+,-&.'4-&5'5#+DD'%-'15-6'$4'983GD$+49-'C$&#'OI'@N/' >IO;<b:OK%L'+46'OI'@N/'>IO;<b:OK9L< I<=<>O<=<' 7-2584+D',+DD'+22-5&'5.5&-35'5#+DD'%-'15-6'$4'983GD$+49-'C$&#'OI'@N/' >IO;<b:OK9L< I<=<>O<b<' 72$3-'@84&2+9&82'5#+DD'15-',1DD'%86.'#+24-55-5'+5'G+2&'8,'+'G-2584+D',+DD' +22-5&'+&&+9#-6'&8'+'5#89S'+%582%$4B'D+4.+26'82'5-D,)2-&2+9&$4B'D+4.+26' K*/\L'-01$GG-6'C$&#'681%D-'D89S$4B'54+G#88S5'+46'&#-4'+&&+9#-6'&8'+4' +49#82+B-'G8$4&'9+G+%D-'8,'51GG82&$4B'bH:::'G81465'82'5#+DD'%-'6-5$B4-6H' $45&+DD-6H'+46'15-6'+5'G+2&'8,'+'983GD-&-'G-2584+D',+DD'+22-5&'5.5&-3'C#$9#' 3+$4&+$45'+'5+,-&.',+9&82'8,'+&'D-+5&'&C8i'+46'146-2'&#-'51G-2M$5$84'8,'+' 01+D$,$-6'G-2584 I<=<>O<;<' 72$3-'@84&2+9&825'15$4B'G-2584+D',+DD'+22-5&'5.5&-35'+46'5-D,'2-&2+9&$4B' D+4.+265'5#+DD'3+$4&+$4'983GD$+49-'C$&#'TW*R_T**7'jUbI<>=)O:O>< I<=<>O<d<' OI'@N/'>IO;<b:OK6LK>;L'7-2584+D',+DD'+22-5&'5.5&-35H'C#-4'5&8GG$4B'+' ,+DDH'5#+DD'%-'2$BB-6'519#'&#+&'+4'-3GD8.--'9+4'4-$&#-2',2--',+DD'382-'&#+4';' ,--&H'48&'984&+9&'+4.'D8C-2'D-M-D< I<=<>O<f<'' 7-2584+D',+DD'+22-5&'5.5&-35'+46'983G84-4&5'51%J-9&-6'&8'$3G+9&'D8+6$4B' ,283'+',+DD'5#+DD'%-'$33-6$+&-D.'2-38M-6',283'5-2M$9-'+46'5#+DD'48&'%-' 15-6'+B+$4',82'-3GD8.--'G28&-9&$84<'OI'@N/'>IO;<b:OK6LK>IL< I<=<>O<I<' [#-4'72$3-'@84&2+9&82'15-5'&-D-598G$4B_+-2$+D'D$,&5H'&#-'-3GD8.--'5#+DD'%-' &$-6'8,,'+&'+DD'KOI'@N/'>IO;<=bUK%LKOLKML'+46'&#-'72$3-'@84&2+9&82'5#+DD' -4512-'&#-'-3GD8.--'15$4B'&#-'G-2584+D',+DD'+22-5&'5.5&-35'C#$D-'C82S$4B' 84'&-D-598G$4B_+-2$+D'D$,&5'983GD.'C$&#'OI'@N/'>IO;<b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b:OK6LKO:L< I<=<>O<>O<'' ?#-'72$3-'@84&2+9&82'5#+DD'G28M$6-'+'&2+$4$4B'G28B2+3',82'-+9#'-3GD8.--' C#8'3$B#&'%-'-"G85-6'&8',+DD'#+a+265<'OI'@N/'>IO;<b:K+LK>L'?#-'72$3-' @84&2+9&82'5#+DD'M-2$,.'983GD$+49-'C$&#'+'C2$&&-4'9-2&$,$9+&$84'2-9826'+46' &#-'D+&-5&'&2+$4$4B'9-2&$,$9+&$84'5#+DD'%-'3+$4&+$4-6'84'&#-'J8%5$&-'+46' +M+$D+%D-',82'$45G-9&$84'+&'+DD'&$3-5< I<=<>U<'VT*<'R,'72$3-'@84&2+9&82'1&$D$a-5'6284-5'$4'9844-9&$84'C$&#'$&5'[82SH'72$3-'@84&2+9&82' 5#+DD'983GD.H'82'9+15-'$&5'51%984&2+9&82'&8'983GD.H'C$&#'&#-',8DD8C$4B'2-01$2-3-4&5g I<=<>U<><' 72$3-'@84&2+9&82'82'$&5'51%984&2+9&82'K&#-']EG-2+&82^L'#8D65'+'M+D$6' -"-3G&$84H'8G-2+&$4B'9-2&$,$9+&-'82'8&#-2'4-9-55+2.'+1R$a+&$845'$551-6' %.'&#-'N-6-2+D'TM$+&$84'T63$4$5&2+&$84'K]NTT^L'2-01$2-6',82'&#-'9833-29$+D' 8G-2+&$84'8,'&#-'VT*'$4'9844-9&$84'C$&#'&#-'[82S<'EG-2+&82'C$DD'8G-2+&-' CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'d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b<' EG-2+&82'C+22+4&5'&#+&'&#-'8G-2+&$84'8,'&#-'VT*'$5'G28M$6-6'G1251+4&'&8'+4' 8G-2+&$845'3+41+D'&#+&'$5'51,,$9$-4&'&8'8G-2+&-'&#-'VT*'5+,-D.'+46'$4' 983GD$+49-'C$&#'+DD'+GGD$9+%D-'D+C5'+46'2-B1D+&$845<'EG-2+&82'146-25&+465' EC4-2'$5'48&'$4'&#-'%15$4-55'8,'G28M$6$4B'+M$+&$84'5-2M$9-5'+46'&#+&' EG-2+&82'$5',1DD.'2-5G845$%D-',82'6-&-23$4$4B'$,'$&5'3$55$84'9+4'%-',D8C4' 5+,-D.'+46'$4'+99826+49-'C$&#'&#-'D+C<'R,'$&'9+448&H'&#-4'EG-2+&82'C$DD'48&',D.' 519#'3$55$84< I<=<>U<;<' EG-2+&82'C$DD'8G-2+&-'&#-'VT*'$4'+99826+49-'C$&#'+4.',-6-2+DH'5&+&-'82' D89+D'G2$M+9.'D+C5'+46'2-B1D+&$845<'?8'&#-'-"&-4&H'G2$M+9.'D+C5'+46' 2-B1D+&$845'#+M-'48&'%--4'+68G&-6'2-B+26$4B'VT*'8G-2+&$845H'EG-2+&82' 5#+DD'8G-2+&-'&#-'VT*'$4'+99826+49-'C$&#'NTTF5'B1$6+49-'84'G2$M+9.'%-5&' G2+9&$9-5< I<=<>U<d<' ?#-'VT*'5#+DD'48&'-"9--6'&#-'D-55-2'8,'bb'D%5'82'&#-'3+"$313'C-$B#&' G-23$&&-6'%.'EG-2+&82F5'VT*'+$292+,&'$4512-2< I<=<>=<'/-5G$2+%D-'@2.5&+DD$4-'*$D$9+<'72$3-'@84&2+9&82'+46'*1%)&$-25'5#+DD'983GD.'C$&#'&#-' 2-01$2-3-4&5'8,'E*`T'OI'@N/'>IO;<>>bU<'72$3-'@84&2+9&82'$5'2-5G845$%D-',82' -619+&$4B'+46'&2+$4$4B'$&5'-3GD8.--5'$4'2-98B4$a$4BH'+M8$6$4B'+46'984&28DD$4B'2-5G$2+%D-' 92.5&+DD$4-'5$D$9+'B-4-2+&-6'%.'9845&219&$84'&+5S5'+46'8G-2+&$845<'T'*$D$9+'@84&28D' 7D+4_728B2+3'5#+DD'%-'51%3$&&-6'$4'%8&#'-D-9&284$9'+46'#+2698G.',82'&8'&#-'EC4-2F5' 51G-2$4&-46-4&'82'EC4-2F5'+B-4&'G2$82'&8'9833-49$4B'+4.'C82S'84'&#-'728J-9&<'?#-' 72$3-'@84&2+9&82_*1%)&$-2'*$D$9+'@83G-&-4&'7-2584'315&'%-'G2-5-4&'+&'+DD'&$3-5'&8' -4512-'983GD$+49-'612$4B'G-2,823+49-'8,'5$D$9+'B-4-2+&$4B'&+5SK5L< END OF SECTION CITY OF WAUKEE EXISTING PD/FD BLDG RENOVATION OPN PROJECT NO. 25821000 AS BID SET - 04.03.2026 !"#$%$&'(')'*+,-&.'/-01$2-3-4&5'+46'7289-612-5' ::';:'::<:=')'f' THIS PAGE INTENTIONALLY LEFT BLANK Attachment 4 - Schedule of Fees Item Construction Services (Management Staff) General Conditions CMA & Cost of Work Fee (3.25%) Excluded Values (Owner Budget Items) Notes/Comment Other Exterior Enclosure $1,700.00 Building temporary enclosure. Interior Drywall Partitions $0.00 Other Electrical Services $0.00 Site Earthwork $0.00 Field Management $233,246.00 $5,700.00 Fuel is general conditions. Field Office & Supplies $61,998.77 Maintenance & Housekeeping $37,570.00 Temporary Utilities $1,600.00 Temp Controls & Safety $8,520.00 Security $0.00 Aids, Equip & Tools $6,704.00 Other Requirements $8,641.44 Soil Testing / Survey $0.00 Construction Testing $0.00 Quality Control $0.00 Envelope Review Consulant excluded. Direct to Owner. Project Manager Time $292,865.00 $1,710.00 Mileage is general conditions. Weather Conditions $5,000.00 General Liability, Umbrella, BR $8,024.61 Bonds $0.00 Excluded. Bonds will be carried by Primes. Other Design & Consultants $0.00 Design-Build Contigency $329,000.00 Construction Contingency will be Owner's budget. Permits / Plan Check Utility, Legal, Development Fees $4,800.00 Ryan Design -Builder Fee $203,446.67 Ryan Companies Total $530,911.00 $147,168.82 $203,446.67 $881,526.49 Owner/City Total $329,000.00 $329,000.00 Project Total $1,210,526.49