Loading...
HomeMy WebLinkAbout2026-05-18 I07 Trailridge Creek Plat 1_Final Plat AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 18, 2026 AGENDA ITEM: Consideration of approval of resolution approving a final plat for Trailridge Creek Plat 1 FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a final plat for Trailridge Creek Plat 1, located north of NW Douglas Parkway and west of NW 10th Street, containing 18.76-acres. The property is zoned R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay). The final plat includes 60 lots for single-family residential development. The lots range in size from 7,803 square feet to 17,550 square feet. All proposed lots meet or exceed the minimum requirements of the R-2/PD-1 zoning district. The public improvements associated with this plat include an extension of NW Sproul Drive, NW Hillside Blvd, and NW Trailridge Lane. Public utilities will service all proposed lots. Parkland dedication requirements were previously met with the dedication of the greenway areas to the north of the plat. All proposed easements have been indicated on the final plat. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the final plat at their meeting on October 28, 2025, and recommended approval: Approval of a Final Plat for Trailridge Creek Plat 1 Melissa DeBoer, Planning Coordinator, introduced the request for approval of a final plat for a single - family residential subdivision, as requested by JDS Real Estate Investments, LLC, represented by Emily Harding of Civil Design Advantage. The property is generally located north of NW Douglas Parkway and west of NW 10th Street, containing approximately 18.76-acres. This location was rezoned from A-1 to R-2/PD-1 in November 2024. A preliminary plat was approved in December 2024. The public improvements are currently being constructed and should be completed soon. The final plat indicates a total of 60 lots for single family residential development. All lots are zoned R-2/PD-1-, One- and Two-Family Residential District with a Planned Development Overlay. The lots range in size from 7,803 square feet to 17,550 square feet. All lots meet or exceed the minimum requirements of the R-2/PD-1 zoning. The proposed lots are subject to the following requirements of the Planned Development when they are developed: Minimum two car garage, adjacent lots cannot I7 share the same building elevation, minimum of 25% brick, stone, and/or stucco on the front street facing elevation, vinyl siding shall be permitted utilizing Royal Crest Double 4-inch (102 mm) Traditional Profile or reasonable equivalent, and Two (2) trees and two (2) shrubs planted on each lot at the time of individual lot development. A slight extension of NW Sproul Drive is included with this plat. Two new public streets are included with this plat, NW Hillcrest Boulevard and NW Trailridge Lane. A ten-foot-wide trail will be provided along the west side of NW Sproul Drive. Five-foot-wide sidewalks will be provided along all other sides of all streets with individual lot development. Utilities will be extended to provide service to each lot. Storm water detention will be provided within the floodplain/greenway area that runs from the northwest to the southeast corner of the site. The greenway area is owned by the City of Waukee. Parkland dedication requirements have been met with the dedication of 7.26-acres of land with the City of Waukee’s purchase agreement for the greenbelt parcel. Staff recommends approval of the final plat for Trailridge Creek Plat 1 subject to remaining staff comments, review of the legal documents, and completion of public improvements. Discussion as follows: • General discussion of street layout and city staff confirming there is currently no development to the west Motion by Commissioner Streit for Approval of a Final Plat for Trailridge Creek Plat 1, seconded by Commissioner Bannister. Ayes: Streit, Bankole, Beenken, Lohse, Tuel, and Bannister. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the final plat for Trailridge Creek Plat 4. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Final Plat PREPARED BY: Andy Kass, Community Development Director REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2026- APPROVING THE FINAL PLAT FOR TRAILRIDGE CREEK PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, JDS REAL ESTATES INVESTMENTS, LLC, has requested final plat approval of Trailridge Creek Plat 1 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on October 28, 2025, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Trailridge Creek Plat 1 and the documents relating thereto will comply with Section §176 – Subdivision Regulations of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 18th day of May, 2026, that the Final Plat for Trailridge Creek Plat 1 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1. Warranty Deed (Street Lot A & B); 2. Public Utility Easement; 3. Snow Storage Easement; 4. Public Sanitary Sewer Easement; 5. Public Overland Flowage Easement; 6. Public Storm Sewer Easement; 7. Temporary Turnaround Easement; and 8. Declaration of Private Easements ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Kala Anderson Chris Crone Rob Grove Lori Lyon Anna Bergman Pierce PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Trailridge Creek Plat 1 – Final Plat PREPARED BY: Melissa DeBoer AICP, Planning Coordinator REPORT DATE: October 24, 2025 MEETING DATE: October 28, 2025 GENERAL INFORMATION Owner/Applicant: JDS Real Estate Investments, LLC Owner’s Representative: Emily Harding, PE – Civil Design Advantage Request: The applicant is requesting approval of a final plat for a single-family residential subdivision. Location and Size: Property is generally located north of NW Douglas Parkway and west of NW 10th Street, containing approximately 18.76-acres. AREA MAP ABOVE: Aerial of property identifying the proposed plat (outlined in BLUE). October 23, 2025 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Single Family Residential R-2/PD-1 (One & Two Family Residential District with a Planned Development Overlay) North Vacant – Undeveloped Single Family Residential / Open Space A-1 (Agricultural District) and R-2/PD-1 (One & Two Family Residential District with a Planned Development Overlay) South Single-Family Residential (Fox Creek Meadows) / Institutional (Waukee Schools) Single Family Residential R-2/PD-1 (One & Two Family Residential District with a Planned Development Overlay) and A-1 (Agricultural District) East Open Space Open Space A-1 (Agricultural District) West Vacant – Undeveloped Single Family Residential / Open Space A-1 (Agricultural District) HISTORY The property was rezoned from A-1 to R-2/PD-1 in November 2024. A preliminary plat was approved in December 2024. The public improvements are currently being constructed and should be completed soon. PROJECT DESCRIPTION LOTS The final plat indicates a total of 60 lots for single family residential development. All lots are zoned R-2/PD-1, One and Two Family Residential District with a Planned Development Overlay. The lots range in size from 7,803 square feet to 17,550 square feet. All lots meet or exceed the minimum requirements of the R-2/PD-1 zoning. The table below summarizes the minimum requirements for the lots within the plat. Category R-2/PD-1 (minimum) Lot Area 6,000 square feet for lots less than 65-feet in width; 8,000 square feet for all other remaining lots Lot Width Maximum of 30% of lots – 55 feet; Maximum of 15% of lots – 60 feet; All other lots – 65 feet Front Yard Setback 25 feet Rear Yard Setback 25 feet Side Yard Setback 10 feet (total) October 23, 2025 3 of 3 The proposed lots are subject to the following requirements of the Planned Development when they are developed: • Minimum two car garage • Adjacent lots cannot share the same building elevation • Minimum of 25% brick, stone, and/or stucco on the front street facing elevation • Vinyl siding shall be permitted utilizing Royal Crest Double 4-inch (102 mm) Traditional Profile or reasonable equivalent • Two (2) trees and two (2) shrubs planted on each lot at the time of individual lot development STREETS AND TRAILS A slight extension of NW Sproul Drive is included with this plat. Two new public streets are included with this plat, NW Hillcrest Boulevard and NW Trailridge Lane. A ten-foot wide trail will be provided along the west side of NW Sproul Drive. Five-foot-wide sidewalks will be provided along all other sides of all streets with individual lot development. UTILITIES Utilities will be extended to provide service to each lot. Storm water detention will be provided within the floodplain/greenway area that runs from the northwest to the southeast corner of the site. The greenway area is owned by the City of Waukee. PARKLAND Parkland dedication requirements have been met with the dedication of 7.26-acres of land with the City of Waukee’s purchase agreement for the greenbelt parcel. STAFF RECOMMENDATION Staff recommends approval of the final plat for Trailridge Creek Plat 1 subject to remaining staff comments, review of the legal documents, and completion of public improvements. TRAILRIDGE CREEK PLAT 1 FINAL PLAT ENGINEER / SURVEYOR CI V I L D E S I G N A D V A N T A G E 2204.281 TR A I L R I D G E C R E E K P L A T 1 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 10 / 0 7 / 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : SE C O N D S U B M I T T A L 10 / 2 1 / 2 5 UP D A T E D 10 / 3 0 / 2 5 UP D A T E D 11 / 0 6 / 2 5 1 FI N A L P L A T LEGEND OWNER / DEVELOPER ZONING BULK REGULATIONS DATE OF SURVEY PLAT DESCRIPTION CURVE DATA NOTES INDEX LEGEND VICINITY MAP WAUKEE, IOWA MEREDITH DRIVE NW 1 0 T H S T R E E T / U A V E NW DOUGLAS PKWY NW S T R A T F O R D D R SITE SHEET 2 SHEET 3 SHEET INDEX LOT 35 LOT 50 LOT 52 LOT 53 LOT 27 LOT 26 LOT 25 LOT 24 LOT 22 LOT 21 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 59 LOT 57 LOT 55 LOT 54 N0 0 ° 0 7 ' 4 2 " W 1 1 0 5 . 1 0 ' ( M ) N0 0 ° 1 2 ' 4 7 " W 1 1 0 4 . 3 7 ' ( R ) NW T R A I L R I D G E L A N E LOT 23 LOT 51 LOT 56 LOT 58 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 38 LOT 50 LOT 52 LOT 53 LOT 27 LOT 26 LOT 25 LOT 54 N0 0 ° 0 7 ' 4 2 " W 1 1 0 5 . 1 0 ' ( M ) N0 0 ° 1 2 ' 4 7 " W 1 1 0 4 . 3 7 ' ( R ) S72°27'47"E 37.85'(M) S72°27'47"E 37.51'(R) S47 ° 4 3 ' 1 8 " E 110 . 4 7 ' ( M & R ) S57° 4 2 ' 3 0 " E 79.0 7 ' ( M & R ) S65°2 0 ' 5 5 " E 120.6 5 ' ( M & R ) S41 ° 1 6 ' 3 5 " E 117 . 6 9 ' ( M & R ) S49 ° 3 0 ' 1 3 " E 3 0 3 . 2 1 ' ( M & R ) 79.0 6 ' ( M & R ) NW H I L L C R E S T B L V D NW T R A I L R I D G E L A N E LOT 51 LOT 28 SEE LEFT CI V I L D E S I G N A D V A N T A G E 2204.281 TR A I L R I D G E C R E E K P L A T 1 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 10 / 0 7 / 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : SE C O N D S U B M I T T A L 10 / 2 1 / 2 5 UP D A T E D 10 / 3 0 / 2 5 UP D A T E D 11 / 0 6 / 2 5 2 FI N A L P L A T TRAILRIDGE CREEK PLAT 1 FINAL PLAT NW TRAILRIDGE LANE SEE RIGHT SEE S H E E T 3 SE E S H E E T 3 SE E S H E E T 3 NW H I L L C R E S T BLV D LOT 34 LOT 35 LOT 36 LOT 37 LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 43 LOT 44 LOT 45 LOT 3 LOT 4LOT 5LOT 6 LOT 7 LOT 9 LOT 46 LOT 47 LOT 48 LOT 49 LOT 50 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 59 S89°57'33"W 164.04'(M&R)S89°57'52"W 1320.68'(M) S89°59'32"W 1318.72'(R) S49 ° 3 0 ' 1 3 " E 3 0 3 . 2 1 ' ( M & R ) S50 ° 1 8 ' 4 0 " E 79.0 6 ' ( M & R ) S56°29'09"E 80.20'(M&R) S56° 0 9 ' 1 7 " E 2 2 5 . 0 0 ' ( M & R ) S54 ° 5 2 ' 2 3 " E 1 4 6 . 2 2 ' ( M & R ) S56° 0 2 ' 5 3 " E 73.9 8 ' ( M & R ) S1 8 ° 1 3 ' 3 5 " W 14 0 . 2 3 ' ( M & R ) Δ=11°22'33" L=67.50' R=340.00' CH=67.39' CHB=S84°15'52"E (M&R) S89°57'09"E 107.44'(M&R) Δ=20°19'03 " L = 1 7 0 . 2 1 ' R=480.00' C H = 1 6 9 . 3 2 ' CHB=S79°4 7 ' 3 7 " E (M&R) S69°38'06"E 2.30'(M&R) Δ=7°13'52" L=75.72' R=600.00' CH=75.67' CHB=S73°15'02"E (M&R) S76°51'58"E 27.09'(M&R) Δ=13°08'34" L=80.28' R=350.00' CH=80.11' CHB=S06°33'45"W (M&R) S00°00'32"E 16.62'(M&R) NW H I L L C R E S T B L V D NW HILLCRES T BLVD STREET LOT 'A'STREET LOT 'B' LOT 2 LOT 8 LOT 60 LOT 51 LOT 58 NW S P R O U L DR I V E LOT 1 CI V I L D E S I G N A D V A N T A G E 2204.281 TR A I L R I D G E C R E E K P L A T 1 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 10 / 0 7 / 2 5 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : SE C O N D S U B M I T T A L 10 / 2 1 / 2 5 UP D A T E D 10 / 3 0 / 2 5 UP D A T E D 11 / 0 6 / 2 5 3 FI N A L P L A T TRAILRIDGE CREEK PLAT 1 FINAL PLAT NW TRAILRIDGE LANE SE E S H E E T 2 LOT 1 DETAIL 'A' LOT 2 S89°57'33"W 164.04'(M&R)S89°57'52"W 1320.68'(M) S89°59'32"W 1318.72'(R)