Loading...
HomeMy WebLinkAbout2026-06-15 I01H_04 10th St Extension_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 15, 2026 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Elder Corporation for the 10th Street Extension Project, decreasing the contract in the amount of $23,976.50. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is for revision to the contract to adjust sanitary sewer alignment and avoid routing beneath the future forebay and lake. The layout was refined after bidding, resulting in an adjusted quantity of pipe and structures. It also modifies pipe classes for the 60-inch and 72-inch storm sewer, as proposed installation depths exceeded SUDAS limits for Class III pipe, requiring the substitution to Class IV pipe material. Additionally, this change order adds erosion stone for rock check dams to provide temporary erosion control based on field conditions. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order decreases the contract price in the amount of $23,976.50. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos I1H4 S-H Project No.: 4203290 June 10, 2026 Rudy Koester, Public Works Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #1 – Review and Recommendation to Approve 10th Street Extension Dear Mr. Koester: Please find attached Change Order #1 for the 10th Street Extension project. The change order includes the following items: • Reduction of 24” Sanitary Sewer Pipe. • Reduction of Class III 60-inch Storm Pipe • Reduction of Class III 72-inch Storm Pipe • Addition of 60” Sanitary Manhole. • Reduction of 72” Sanitary Manhole • Additional Clearing, Grubbing & Survey for Sanitary Sewer Alignment Change • Addition of Class IV 60-inch Storm Pipe • Addition of Class IV 72-inch Storm Pipe • Addition of Erosion Stone This change order revises the contract to adjust sewer alignment and avoid routing beneath the future forebay and lake. The layout was refined after bidding, resulting in an adjusted quantity of pipe and structures. It also modifies pipe classes for the 60-inch and 72-inch storm sewer, as proposed installation depths exceeded SUDAS limits for Class III pipe, requiring the substitution to Class IV pipe material. Additionally, this change order adds erosion stone for rock check dams to provide temporary erosion control based on field conditions. We have reviewed the change order items and unit prices, and both are in line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order deduct in the amount of $23,976.50 to the construction contract for the 10th Street Extension project with Elder Corporation of Des Moines, IA. Sincerely, SHIVE-HATTERY, INC. Patrick M. Watts, PE Civil Engineer Enc. Change Order #1 CITY OF WAUKEE 230 W HICKMAN ROAD WAUKEE, IOWA 50263 Contractor: 5088 E University Avenue Des Moines, IA $23,240,000.00 4/6/2026 18A LF $ 620.00 (118.00) $ (73,160.00) 32A LF $ 400.00 (599.00) $ (239,600.00) 33A LF $ 490.00 (586.00) $ (287,140.00) 70A EA $ 11,000.00 1.00 $ 11,000.00 71A EA $ 11,000.00 (1.00) $ (11,000.00) CO-1.1 LS $ 3,700.00 1.00 $ 3,700.00 CO-1.2 LF $ 431.00 599.00 $ 258,169.00 CO-1.3 LF $ 532.00 586.00 $ 311,752.00 CO-1.4 TON $ 76.75 30.00 $ 2,302.50 $ (23,976.50) $23,240,000.00 $0.00 $23,240,000.00 ($23,976.50) $23,216,023.50 -0.10% 0 Days 0 Days August 13, 2027 September 30, 2027 Title: Project Manager Date: The new Contract Sum including this Change Order will be Date: Approved By: City of Waukee Signature: Name: Brad Deets Title: City Administrator Date: Recommended By: Shive-Hattery Inc. Signature: Name: Patrick Watts Title: Civil Engineer Contractor: 2240021750 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of Description THE CONTRACT IS CHANGED AS FOLLOWS: Item 18A - "SANITARY SEWER G-MAIN, TRENCHED, 24 IN."; Decrease in the 24-inch sanitary sewer gravity main quantity. At the time of bidding, the future forebay and future lake layout was preliminary. However, prior to installation, the design was refined and the sanitary sewer alignment was adjusted to avoid routing beneath the future forebay and lake, resulting in a reduced quantity. Item 32A - "STORM SEWER, TRENCHED, RCP CLASS III, 60 IN."; Removal of the 60-inch Class III storm pipe. During submittal review, it was determined that the proposed installation depth exceeded the allowable limits for Class III pipe per SUDAS requirements, necessitating the removal 60 inch Class III pipe. Item 33A - "STORM SEWER, TRENCHED, RCP CLASS III, 72 IN."; Removal of the 72-inch Class III storm pipe. During submittal review, it was determined that the proposed installation depth exceeded the allowable limits for Class III pipe per SUDAS requirements, necessitating the removal 72 inch Class III pipe. Item 70A - "MANHOLE, SW-301,60 IN."; Increase in the number of 60-inch SW-301 manholes. Following refinement of the sanitary sewer alignment, improved pipe entry and exit angles were achieved at MH-2.12, allowing for the use of a smaller manhole and resulting in the increase of one manhole from the original design. Item 71A - "MANHOLE, SW-301, 72 IN."; Decrease in the number of 72-inch SW-301 manholes. Following refinement of the sanitary sewer alignment, improved pipe entry and exit angles were achieved at MH-2.12, allowing for the use of a smaller manhole and resulting in the reduction of one manhole from the original design. CO-1.1 - "ADDITIONAL SANITARY SEWER CLEARING, GRUBBING & SURVEY"; Addition of clearing, grubbing, and survey work resulting from the revised sanitary sewer alignment. The alignment adjustment required expansion of construction limits to accommodate the revised layout, necessitating additional clearing, grubbing, and survey beyond the original scope. CO-1.2 - "STORM SEWER, TRENCHED, RCP CLASS IV, 60 IN."; Addition of the 60-inch Class IV storm pipe. During submittal review, it was determined that the proposed installation depth exceeded the allowable limits for Class III pipe per SUDAS requirements, necessitating the addition of Class IV 60-inch pipe. CO-1.3 - "STORM SEWER, TRENCHED, RCP CLASS IV, 72 IN."; Addition of the 72-inch Class IV storm pipe. During submittal review, it was determined that the proposed installation depth exceeded the allowable limits for Class III pipe per SUDAS requirements, necessitating the addition of Class IV 72-inch pipe. CO-1.4 - "EROSION STONE"; Addition of erosion stone for construction of check dams. Erosion stone was added to the project to provide temporary erosion control measures in accordance with project needs and field conditions. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price ADDITIONAL SANITARY SEWER CLEARING, GRUBBING & SURVEY Vanderpool Construction Elder Corporation Signature: Name: Nick Tometich The Landscaping/Site Restoration/Final Completion Contract Time will be changed by STORM SEWER, TRENCHED, RCP CLASS III, 60 IN. STORM SEWER, TRENCHED, RCP CLASS III, 72 IN. The Grading/Structure/Utility/Paving Contract Time will be changed by The date of Grading/Structure/Utility/Paving Completion as of the date of this Change Order therefore is STORM SEWER, TRENCHED, RCP CLASS IV, 60 IN. STORM SEWER, TRENCHED, RCP CLASS IV, 72 IN. EROSION STONE SANITARY SEWER G-MAIN, TRENCHED, 24 IN. MANHOLE, SW-301, 72 IN. MANHOLE, SW-301, 60 IN. CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Landscaping/Site Restoration/Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 1 The Original Contract Sum was Unit June 10, 2026 10th Street Extension 1 of 1 06/11/2026 06/11/2026