Loading...
HomeMy WebLinkAbout2026-06-15 I11 Fireside Townhomes_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 15, 2026 AGENDA ITEM: Consideration of approval of resolution approving a site plan for Fireside Townhomes FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a site plan for townhome development. The owner is IA WAUKEE NW 2nd II, LLC and the applicant is IA WAUKEE NW 2nd, LLC. The property is located north of Hickman Road and west of NW 2nd Street, containing 6.47-acres. The property is zoned R-3, Multi-Family Residential District with a Planned Development Overlay. The first phase of the development was approved by City Council in September 2022. The first phase included a four-story apartment building. The building is just under 70,000 square feet and 50-feet in height. The building included a total of 282 units. A detached clubhouse, several garage buildings, and several outdoor amenities were also included with the first phase of the development. Construction of the first phase was completed in August 2024. The proposed site plan includes the second phase of development. The second phase includes a total of 12 townhome buildings with a total of 75 units, located just to the north of phase 1. All units are planned to be rentals and are located on one lot of record. The units range in size from 1,500 square feet to 1,900 square feet and includes 2 or 3 bedrooms. Each unit also includes an attached garage. Several access points are provided to the townhome units. All of the streets and drives interior to the site will be privately owned and maintained. A ten- foot-wide trail will be provided along the west side of the site, adjacent to NW 6th Street. A ten-foot-wide trail exists along the east side of the site, adjacent to NW 2nd Street. Two pedestrian connections will be provided into the site from the public trail along NW 6th Street. Several private sidewalks will be provided internal to the site. A total of 90 parking spaces are required, they are providing 90 spaces, including 15 visitor parking stalls. Public utilities are provided to the site. All utilities within the site will be privately owned and maintained. Storm water detention will be provided in existing ponds, one is located at the north side of the overall development and one at the east side. The ponds are privately owned and maintained. A minimum of 20% of the site is required to be open space, they are providing 41% They are providing the required amount of plantings, including a 40- foot-wide landscape buffer along the west side of the site, adjacent to NW 6th Street. I11 The building elevations are proposed to be constructed of fiber cement siding and panel in different color variations. All buildings are two-story. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the site plan request at their meeting on June 9, 2026, and recommended approval: Approval of a Site Plan for Fireside Townhomes Andy Kass, Community Development Director, introduced the request for approval of a site plan for a townhome residential development, as requested by IA Waukee NW 2nd II, LLC and IA Waukee NW 2nd LLC, represented by Cody Weaver of Civil Engineering Consultants. The property is located north of Hickman Road and west of NW 2nd Street, containing 6.47 acres. The first phase of the development was approved by City Council in September 2022. The first phase included a four-story apartment building. The building is just under 70,000 square feet in area and 50- ft tall at the highest point. The building included a total of 282 apartment units. A detached clubhouse, several garage buildings, and several outdoor amenities were also included with the first phase of the development. The first phase of construction was completed in August 2024. The proposed site plan includes the second phase of development for the overall development. The second phase includes a total of 12 townhome buildings with a total of 75 townhome units, located to the north of phase 1. All units are planned to be rentals and are located on one lot of record. The units range in size from 1,500 square feet to 1,900 square feet. The units have either two or three bedrooms. Each unit includes an attached garage. Several accesses are provided to the townhome units. The townhomes along the south side of the site will be accessed with the existing drive. The townhomes along the north side will be accessed with a new private street, that will include access from NW 6th Street along the west. All streets and drives interior to the site will be privately owned and maintained by the owner. A total of 90 parking spaces are required for this project and a total of 90 spaces are proposed, including 15 visitor stalls. A ten-foot-wide public trail will be provided along the west side of the site, adjacent to NW 6th Street. A ten-foot-wide trail exists along the east side of the site, adjacent to NW 2nd Street. Two pedestrian connections will be provided from the public trail along NW 6th Street into the site. Several private sidewalks will be provided throughout the development to provide internal pedestrian access throughout. Public utilities have been provided to the overall site. All utilities within the site will be privately owned and maintained. Storm water detention will be provided in existing ponds, one is located at the north side of the overall development, and one is located at the east side of the overall development, adjacent to NW 2nd Street. These ponds are privately owned and maintained. A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 41%. A 40-foot-wide landscape buffer will be provided along the west side of the site, adjacent to NW 6th Street. The landscape plan meets the requirements of the Landscape and Open Space Ordinance. The elevations of the buildings are proposed to be constructed of fiber cement siding and panel in different color variations. All buildings are two-story. Elevations of the proposed buildings have been provided for review along with the proposed color schemes. No street lighting for the internal private street has been proposed at this time. General exterior residential house lighting will be provided on the exterior of each unit. The lighting plan meets the requirements of the Site Plan Ordinance. Parkland dedication requirements have been satisfied with previous phases of development with a combination of a public trail and a fee in lieu of land dedication. The Comprehensive Plan classifies the subject property as Medium Density Residential. The Medium Density Residential classification provides for a variety of attached side-by-side townhome and row home products. The Plan states that neighborhoods should include a variety of housing options that accommodate a range of needs, price points and life stages of residents. The proposed site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Planned Development, and Comprehensive Plan. Staff recommends approval of the site plan for Fireside Townhomes subject to any remaining staff comments. Discussion as follows: • General discussion of private roads within the development • Staff confirmation of 12 buildings and 75 two-story units Motion by Commissioner Lohse for Approval of a Site Plan for Fireside Townhomes, seconded by Commissioner Broderick. Ayes: Broderick. Nays: None. Motion carried. RECOMMENDATION: Approve the resolution ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan IV. Building Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2026- APPROVING THE SITE PLAN FOR FIRESIDE TOWNHOMES IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Fireside Townhomes, subject to remaining staff comments on June 9, 2026; AND, WHEREAS, the Site Plan for Fireside Townhomes is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Fireside Townhomes is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 15th day of June, 2026, that the Site Plan for Fireside Townhomes is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Kala Anderson Chris Crone Rob Grove Lori Lyon Anna Berman Pierce PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Fireside Townhomes – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: June 5, 2026 MEETING DATE: June 9, 2026 GENERAL INFORMATION Owner: IA WAUKEE NW 2ND II, LLC Applicant: IA WAUKEE NW 2ND, LLC Owner’s Representative: Cody Weaver, PE with Civil Engineering Consultants, Inc Request: The applicant is requesting approval of a site plan for a townhome residential development. Location and Size: Property is located north of Hickman Road and west of NW 2nd Street, containing 6.47-acres. AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. June 4, 2026 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Single Family Residential, Medium Density Residential & Open Space R-3 (Multi-Family Residential District) / PD-1 (Planned Development Overlay) North Vacant - Undeveloped Single Family Residential R-3 (Multi-Family Residential District) South Commercial / Industrial / Agricultural Mixed Use Corridor C-1 (Community & Highway Service Commercial District), M-1A (Limited Industrial District), & A-1 (Agricultural District) East Vacant - Undeveloped Single Family Residential & Medium Density Residential R-2 (One & Two Family Residential District) West Industrial Medium Density Residential M-1A (Limited Industrial District) HISTORY The first phase of the development was approved by City Council in September 2022. The first phase included a four-story apartment building. The building is just under 70,000 square feet in area and 50-ft tall at the highest point. The building included a total of 282 apartment units. A detached clubhouse, several garage buildings, and several outdoor amenities were also included with the first phase of the development. The first phase of construction was completed in August 2024. PROJECT DESCRIPTION The proposed site plan includes the second phase of development for the overall development. The second phase includes a total of 12 townhome buildings with a total of 75 townhome units, located to the north of phase 1. All units are planned to be rentals and are located on one lot of record. The units range in size from 1,500 square feet to 1,900 square feet. The units have either two or three bedrooms. Each unit includes an attached garage. ACCESS AND PARKING Several accesses are provided to the townhome units. The townhomes along the south side of the site will be accessed with the existing drive. The townhomes along the north side will be accessed with a new private street, that will include access from NW 6th Street along the west. All streets and drives interior to the site will be privately owned and maintained by the owner. A total of 90 parking spaces are required for this project and a total of 90 spaces are proposed, including 15 visitor stalls. SIDEWALKS/TRAILS A ten-foot-wide public trail will be provided along the west side of the site, adjacent to NW 6th Street. A ten- foot-wide trail exists along the east side of the site, adjacent to NW 2nd Street. Two pedestrian connections will be provided from the public trail along NW 6th Street into the site. Several private sidewalks will be provided throughout the development in order to provide internal pedestrian access throughout. June 4, 2026 3 of 3 UTILITIES Public utilities have been provided to the overall site. All utilities within the site will be privately owned and maintained. Storm water detention will be provided in existing ponds, one is located at the north side of the overall development and one is located at the east side of the overall development, adjacent to NW 2nd Street. These ponds are privately owned and maintained. LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 41%. A 40-foot-wide landscape buffer will be provided along the west side of the site, adjacent to NW 6th Street. The landscape plan meets the requirements of the Landscape and Open Space Ordinance. ELEVATIONS The elevations of the buildings are proposed to be constructed of fiber cement siding and panel in different color variations. All buildings are two-story. Elevations of the proposed buildings have been provided for review along with the proposed color schemes. LIGHTING PLAN No street lighting for the internal private street has been proposed at this time. General exterior residential house lighting will be provided on the exterior of each unit. The lighting plan meets the requirements of the Site Plan Ordinance. PARKLAND DEDICATION Parkland dedication requirements have been satisfied with previous phases of development with a combination of a public trail and a fee in lieu of land dedication. COMPREHENSIVE PLAN The Comprehensive Plan classifies the subject property as Medium Density Residential. The Medium Density Residential classification provides for a variety of attached side-by-side townhome and row home products. The Plan states that neighborhoods should include a variety of housing options that accommodate a range of needs, price points and life stages of residents. STAFF RECOMMENDATION The proposed site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, Planned Development, and Comprehensive Plan. Staff recommends approval of the site plan for Fireside Townhomes subject to any remaining staff comments. CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N PRELIMINARY PRELIMINARY Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 COVER.dwg, 5/22/2026 12:25:01 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N 5'x5' Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DETAILS.dwg, 5/22/2026 12:25:17 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DETAILS.dwg, 5/22/2026 12:25:27 PM, ltwiford, 1:1 YADR W SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING PA R K I N G LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DEMOLITION PLAN.dwg, 5/22/2026 12:26:10 PM, ltwiford, 1:1 YADR W SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PA R K I N G NO PARKIN G ∆ ∆ ∆ ∆ ∆ LOT 2 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DIMENSION OVERALL.dwg, 5/22/2026 12:26:56 PM, ltwiford, 1:1 SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G NO PARKING CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DIMENSION 20.dwg, 5/22/2026 12:27:50 PM, ltwiford, 1:1 NO PARKING NO PARKING NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 DIMENSION 20.dwg, 5/22/2026 12:28:14 PM, ltwiford, 1:1 YADR W SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PA R K I N G NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Varies 71 2'' FORM GRADE ELEV. Slope as per plans DRIVEWAY DROP CURB NO SCALE 3" Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 CURB PLAN.dwg, 5/22/2026 12:29:01 PM, ltwiford, 1:1 YADR W 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PA R K I N G NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING OVERALL.dwg, 5/22/2026 12:30:07 PM, ltwiford, 1:1 SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP NO PARKING CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING 20.dwg, 5/22/2026 1:00:02 PM, ltwiford, 1:1 NO PARKING NO PARKING NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING 20.dwg, 5/22/2026 12:30:53 PM, ltwiford, 1:1 YADR W 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PA R K I N G NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING LEGEND.dwg, 5/22/2026 12:31:48 PM, ltwiford, 1:1 NO PARKIN G SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING DETAILS.dwg, 5/22/2026 12:33:10 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:38:12 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:39:37 PM, ltwiford, 1:1 NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:40:22 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:41:06 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:41:52 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:43:17 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 GRADING BUILDINGS.dwg, 5/22/2026 12:44:47 PM, ltwiford, 1:1 YADR W 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 UTILITY OVERALL.dwg, 5/22/2026 12:47:41 PM, ltwiford, 1:1 SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP NO PARKING 6- I N C H S E R V @ 2 % 6- I N C H S E R V @ 2 % 6-INCH SERV @ 2% 6- I N C H S E R V @ 2 % 6- I N C H S E R V @ 2 % 6- I N C H S E R V @ 2 % 6- I N C H S E R V @ 2 % 6-INCH SERV @ 2% CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 SANITARY 20.dwg, 5/22/2026 12:48:48 PM, ltwiford, 1:1 NO NO PARKING NO PARKIN G 6-IN C H S E R V @ 2 % 6-INCH SERV @ 2% 6- I N C H S E R V @ 2 % 6- I N C H S E R V @ 2 % CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 SANITARY 20.dwg, 5/22/2026 12:49:14 PM, ltwiford, 1:1 SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G NO PARKING SE R V SE R V SE R V SE R V SE R V SE R V SE R V CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 WATER 20.dwg, 5/22/2026 12:50:31 PM, ltwiford, 1:1 NO PARKING NO PARKING NO PARKIN G SE R V SE R V SER V SE R V CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 WATER 20.dwg, 5/22/2026 12:50:57 PM, ltwiford, 1:1 SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G EP EM SE R V SE R V SE R V SE R V SE R V SE R V SE R V CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 STORM 20.dwg, 5/22/2026 12:52:15 PM, ltwiford, 1:1 NO PARKING NO PARKIN G SER V SE R V SE R V SE R V CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 STORM 20.dwg, 5/22/2026 12:52:42 PM, ltwiford, 1:1 SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" S CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 UTILITY OVERALL.dwg, 5/22/2026 12:53:54 PM, ltwiford, 1:1 NO PARKING NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 UTILITY OVERALL.dwg, 5/22/2026 12:54:19 PM, ltwiford, 1:1 SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" S G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 LANDSCAPING 20.dwg, 5/22/2026 12:55:35 PM, ltwiford, 1:1 NO PARKING NO PARKING NO PA R K I N G NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N MARK Botanical name QUAN.SIZE ROOT REMARKS COMMON NAME TYPE AA Acer griseum 'JFS KW22AGRI'3 1" CAL.CONT.MATCHED, SPECIMEN COPPER ROCKET PAPERBARK MAPLE AC Astilbe chinensis 'Purple Candles'118 1 GAL.CONT.MATCHED. SPECIMEN PURPLE CANDLES ASTILBE 2' o.c., MULCH BED AE Acer truncatum x platanoides 'JFS-KW187'9 1.5" CAL.CONT.MATCHED, SPECIMEN RUBY SUNSET SHANTUNG MAPLE 20' o.c. AF Ajuga reptans 'Mahogany'16 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED MAHOGANY BUGLEWEED 12" o.c., 9" FROM WALK AG Allium 'Millenium'38 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED ORNAMENTAL ONION 18" o.c., 9" FROM WALK AH Amelanchier arborea 17 8' HT.CONT.MATCHED, SPECIMEN SERVICEBERRY MULTI-STEM CA Calamagrostis x acutifolia 'Karl Foerster'286 1 GAL.CONT.MATCHED. SPECIMEN, MULCH BED KARL FOERSTER GRASS 2' o.c., 1' FROM MOAT CC Cercis canadensis f. alba 'Royal White'5 1.5" CAL.CONT.MATCHED, SPECIMEN ROYAL WHITE REDBUD CO Coreopsis verticillata 'Zagreb'64 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED ZAGREB THREADLEAF COREOPSIS 15" o.c., 9" FROM WALK CD Cornus sanguinea 'Cato'50 5 GAL.CONT.MATCHED, SPECIMEN, MULCH BED ACTIC SUN DOGWOOD 3' o.c., 2' FROM WALK GB Ginkgo biloba 'Princeton Sentry'6 1.5" CAL.CONT.MATCHED, SPECIMEN PRINCETON SENTRY GINKGO GT Gleditsia triacanthos f. inermis 'Skycole'19 1.5" CAL.B&B MATCHED, SPECIMEN SKYLINE HONEYLOCUST HA Heptacodium miconiodies 'JFS GM1HM'4 1" CAL.CONT.MATCHED, SPECIMEN STARS & SPARKS SEVEN-SON FLOWER 12' o.c. HB Heuchera 'Berry Smoothie'114 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED BERRY SMOOTHIE CORAL BELL 12" o.c., 9" FROM WALK HC Hemerocallis 'Happy Returns'55 1 GAL.CONT.MATCHED, SPECIMEN, MULCH BED HAPPY RETURNS DAYLILY 24" o.c., 15" FROM WALK HD Hydrangea arborescens 'NCHA1'40 18" HT.CONT.MATCHED, SPECIMEN INVINCIBELLE SPIRIT HYDRANGEA 3' o.c., MULCH BED LT Liriodendron tulipfera 'JFS-Oz'9 1.5" CAL.CONT.MATCHED, SPECIMEN EMERALD CITY TULIP TREE MH Malus 'Hozam'4 1" CAL.CONT.MATCHED, SPECIMEN HOLIDAY GOLD CRABAPPLE MR Malus 'JFS-KW5'15 1" CAL.CONT.MATCHED, SPECIMEN ROYAL RAINDROPS CRABAPPLE MULCH BED MS Malus 'Sutyzam'7 1" CAL.CONT.MATCHED, SPECIMEN SUGAR TYME CRABAPPLE OV Ostrya virginica 'JFS-KW5'7 1.5" CAL.CONT.MATCHED, SPECIMEN, MULCH BED AUTUMN TREASURE HOPHORNBEAM PO Physocarpus opulifolius 'Donna May'40 15" HT.CONT.MATCHED, SPECIMEN DONNA MAY NINEBARK 3' o.c., MULCH BED PA Picea glauca 'Densata'7 7' HT.B&B MATCHED, SPECIMEN BLACK HILLS SPRUCE 9' o.c. PB Picea omorika 12 7' HT.B&B MATCHED, SPECIMEN SERBIAN SPRUCE PC Picea pungens 6 7' HT.B&B MATCHED, SPECIMEN COLORADO SPRUCE PD Pinus cembra 'Herman'9 7' HT.B&B MATCHED, SPECIMEN PRAIRIE STATESMAN SWISS STONE PINE 9' o.c. PF Pinus flexilis 'Cesarini Blue'14 7' HT.CONT.MATCHED, SPECIMEN CESARINI BLUE LIMBER PINE 9' o.c. PS Pseudotsuga menziesii var. glauca 16 7' HT.B&B MATCHED, SPECIMEN DOUGLASFIR QM Quercus macrocarpa 'JFS-KW3'8 1.5" CAL.B&B MATCHED, SPECIMEN URBAN PINNACLE OAK TM Taxus x media 'Flushing'65 6' HT.CONT.MATCHED, SPECIMEN FLUSHING YEW 2.5' o.c., MULCH BED UF Ulmus x 'Frontier'6 1.5' CAL.B&B MATCHED, SPECIMEN FRONTIER ELM WP Weigela florida 'Polka'22 30" HT.CONT.MATCHED, SPECIMEN, MULCH BED POLKA WEIGELA 3.17' OC, 18" FROM MOAT WR Weigela 'Rumba'142 18" HT.CONT.MATCHED, SPECIMEN, MULCH BED RUMBA WEIGELA 3' o.c., 2' FROM WALK Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 LANDSCAPING 20.dwg, 5/22/2026 12:56:11 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N · ·· · · · · · · · · · · · · · · · · Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 SWPPP SUPPORT.dwg, 5/22/2026 12:56:55 PM, ltwiford, 1:1 W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" YADR W SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" S S G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G EP EM NO PARKING NO PARKING NO PARKING NO PA R K I N G NO PARKIN G CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . U r b a n d a l e , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 SWPP PLAN.dwg, 5/22/2026 12:57:50 PM, ltwiford, 1:1 CE C Ci v i l E n g i n e e r i n g C o n s u l t a n t s , I n c . 24 0 0 8 6 t h S t r e e t . U n i t 1 2 . D e s M o i n e s , I o w a 5 0 3 2 2 51 5 . 2 7 6 . 4 8 8 4 . m a i l @ c e c l a c . c o m PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N Q:\A-FILES\A-2200\A2280\_C3D Drawings\Construction Documents\Site Plan\A2280 SWPPP SUPPORT.dwg, 5/22/2026 12:58:18 PM, ltwiford, 1:1 DW WHREF DW WHREF DW WH REF DW WH REF DW WH REF DW WHREF DW WHREF DW WH REF DW WHREF DW WHREF REF DW WH DW WH REF DW WH REF DW WHREF DW WHREF REF DW WH DW WH REF REF DW WH DW WHREF DW WH REF REF DW WH DW WH REF DW WHREF DW WHREF DW WHREF DW WH REF DW WH REF DW WH REF DW WHREF DW WHREF DW WH REF DW WHREF DW WHREF REF DW WH DW WH REF SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN 8" SAN8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN 8" SAN8" SAN8" SAN8" SAN8" SAN8" SAN8" S S NO PARKING NO PARKING NO PARKING NO PARKING NO PARKING NO PA R K I N G 4 grills here SIGN DESIGN t1-t2 goes to pond pinch the site NO PARKIN G BUILDING TYPE 4 MIRRORED DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF REF DW WH DW WH REF BUILDING TY P E 3 (MIRRORED ) BUILDING TYPE 4 DW WH REF DW WH REF DW WH REF REF DW WH DW WH REF BU I L D I N G T Y P E 4 (M I R R O R E D ) BUILDING TYPE 1 BUILDING TYPE 2 - COLOR SCHEME A DW WH REF DW WH REF DW WHREF DW WHREF DW WHREF DW WH REF DW WH REF BUILDING TYPE 2 - COLOR SCHEME B (MIRRORED) BUILDING TYPE 2 - COLOR SCHEME B (MIRRORED) DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF DW WH REF BUILDING TY P E 2 - COLOR SCHE M E A BUILDI N G T Y P E 2 - COLOR S C H E M E A DW WH REF DW WH REF DW WHREF DW WHREF DW WHREF DW WH REF DW WH REFBUILDING TYPE 4 BUILDING TYPE 2 - COLOR SCHEME B (MIRRORED) 25'0'50'75'100'25' A100 ARCHITECTURAL SITE PLAN SITE PLAN - WAUKEE PHASE II SCALE: SEE GRAPHIC SCALE1 JOB NUMBER PA2416 REVISIONS Plageman Architecture SHEET NAME IS S U E D F O R C O N S T R U C T I O N www.plagemanarchitecture.com CO P Y R I G H T 2 0 2 6 - P L A G E M A N A R C H I T E C T U R E - T H E S E D R A W I N G S A R E I N S T R U M E N T S O F S E R V I C E I N T E N D E D F O R T H E U S E O F T H I S P R O J E C T O N L Y - A N Y R E U S E O R R E P R O D U C T I O N F O R A N O T H E R P R O J E C T I S S T R I C T L Y P R O H I B I T E D . 02/27/2026 INITIAL PERMIT SUBMITTAL 5/7/2026 RESUBMITTED PERMIT SUBMITTAL SHEET NUMBER DRAWN BY: (PARCH) Elon, NC 27244 P.O. Box 1623 919-619-5012 CO N S T R U C T I O N D R A W I N G S F O R : FI R E S I D E @ W A U K E E - P H A S E I I A T O W N H O M E C O M M U N I T Y L O C A T E D I N W A U K E E , I O W A 5/26/2026 1 CODE AND OWNER COMMENTS 5/7/2026 2 COLOR VARIATION 5/26/2026 FIRESIDE AT WAUKEE - PHASE II PROJECT DATA BUILDING TYPE AMOUNTS: BUILDING TYPE ONE:1 BUILDING TYPE TWO:6 BUILDING TYPE THREE:1 BUILDING TYPE FOUR:4 BUILDING TOTAL:12 UNIT TYPE AMOUNTS: T1 UNIT:7 T2 UNIT:22 T3 UNIT:29 T4 UNIT:17 UNIT TOTAL:75 2 2 2 2 2 2 SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" JAMES HARDIE "DEEP OCEAN" COLOR LEGEND JAMES HARDIE "ARCTIC WHITE" JAMES HARDIE "PEARL GRAY" JAMES HARDIE - WOODTONE "ASPEN RIDGE" NOTE: ALL EXTERIOR SIDING TO BE 100% CEMENTITIOUS SIDING A212A EXTERIOR ELEVATIONS - COLORED JOB NUMBER PA2416 REVISIONS Plageman Architecture SHEET NAME IS S U E D F O R C O N S T R U C T I O N www.plagemanarchitecture.com CO P Y R I G H T 2 0 2 6 - P L A G E M A N A R C H I T E C T U R E - T H E S E D R A W I N G S A R E I N S T R U M E N T S O F S E R V I C E I N T E N D E D F O R T H E U S E O F T H I S P R O J E C T O N L Y - A N Y R E U S E O R R E P R O D U C T I O N F O R A N O T H E R P R O J E C T I S S T R I C T L Y P R O H I B I T E D . 02/27/2026 INITIAL PERMIT SUBMITTAL 5/7/2026 RESUBMITTED PERMIT SUBMITTAL SHEET NUMBER DRAWN BY: (PARCH) Elon, NC 27244 P.O. Box 1623 919-619-5012 CO N S T R U C T I O N D R A W I N G S F O R : FI R E S I D E @ W A U K E E - P H A S E I I A T O W N H O M E C O M M U N I T Y L O C A T E D I N W A U K E E , I O W A 5/26/2026 1 CODE AND OWNER COMMENTS 5/7/2026 2 COLOR VARIATION 5/26/2026 TAG DESCRIPTION EXTERIOR ELEVATION MATERIALS LEGEND ·COLOR 1: HARDIE COLOR "DEEP OCEAN" ·COLOR 2: HARDIE COLOR "ARCTIC WHITE" ·COLOR 3: HARDIE COLOR "PEARL GRAY" SEE WALL SECTIONS FOR ADDITIONAL MATERIAL SPECIFICATIONS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 24" O.C. - COLOR 1 HARDIE PLANK LAP SIDING: 6" EXPOSURE SELECT SMOOTH - PRIMED, COLOR 1 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 24" O.C. - COLOR 3 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 48" O.C. - COLOR 3 HARDIE SHAKE SIDING - STRAIT EDGE - CEDARMILL - COLOR 3 HARDIE TRIM PROFILE SURROUND - HARDIE PANEL SIDING - SMOOTH - COLOR 2 - TAMLYN XTREME TRIM AT SEAMS - SEE DETAILS 3 4" X 5 1 2" HARDIE TRIM BOARD - SMOOTH - COLOR 2 HARDIE TRIM BOARD - SMOOTH - COLOR 2 - SEE SECTION DETAILS FOR MORE INFORMATION 30 YEAR ASPHALT ARCHITECTURAL SHINGLES - COLOR: CHARCOAL DURABRAC - 0508 POST & BEAM BRACKET (PVC) - 0508V43 - 60" X 18" X 6" ALUM. RAILING SYSTEM - MATCH LOOK AND COLOR OF PHASE ONE SCHEDULED WINDOW SCHEDULED GARAGE DOOR NOTE: ·ALL EXTERIOR TRIM(INCLUDING WINDOW TRIM), COLUMNS, BRACKETS AND RAILINGS TO BE COLOR 2 - GLOSS ·ALL COLORS IN BODY OF BUILDING TO BE EGGSHELL ·NOT ALL COLORS OR MATERIALS ARE TAGGED IN THESE DRAWINGS. MATERIAL CALL OUTS ARE TYPICAL. COLORS ARE ORGANIZED BY UNIT. INQUIRE IF THERE ARE ANY QUESTIONS ON COLOR PLACEMENT. ·ALL WINDOW INSTALLATIONS SHALL BE PER MANUFACTURER INSTALLATION AND WATERPROOFING. DO NOT VOID WINDOW WARRANTY BY DEVIATING FROM MANUFACTURERS INSTALLATION REQUIREMENTS. ·INSTALL ALL SIDING AND FINISHES WITH MANUFACTURER RECOMMENDED GAPS, FLASHING AND CAULKING. ·KEEP ALL FINISH MATERIALS AWAY FROM FINISHED GRADE PER MANUFACTURERS SPECIFICATIONS ·GC TO CREATE MOCK UP PANEL REPRESENTING ALL COLORS PRIOR OR CONSTRUCTION FOR OWNER APPROVAL WOODTONE - RUSTIC SERIES - HARDIE SHAKE SIDING - STAGGERED EDGE - CEDARMILL - COLOR: ASPEN RIDGE HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 12" O.C. - COLOR 1 EXTERIOR ELEVATION - BUILDING TYPE TWO - FRONT ELEVATION - COLOR SCHEME A SCALE: 1/8" = 1'-0"1 SCALE: 1/8" = 1'-0"2 SCALE: 1/8" = 1'-0"4 SCALE: 1/8" = 1'-0"3 EXTERIOR ELEVATION - BUILDING TYPE TWO - BACK ELEVATION - COLOR SCHEME A EXTERIOR ELEVATION - BUILDING TYPE TWO - SIDE ELEVATION - COLOR SCHEME AEXTERIOR ELEVATION - BUILDING TYPE TWO - SIDE ELEVATION - COLOR SCHEME A 2 SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" SLAB ON GRADE 0'-0" SINGLE STORY ROOF TRUSS BRG. 10'-1 1/4" TOP OF SUBFLOOR 10'-8" LOWER RIDGE HEIGHT 22'-3" SECONDARY RIDGE HEIGHT 28'-4" UPPER RIDGE HEIGHT 35'-0" WINDOW HEAD HEIGHT 8'-0" WINDOW HEAD HEIGHT 18'-8" SECOND FLOOR ROOF TRUSS BRG. 19'-9 1/4" JAMES HARDIE "DEEP OCEAN" COLOR LEGEND JAMES HARDIE "ARCTIC WHITE" JAMES HARDIE "PEARL GRAY" JAMES HARDIE - WOODTONE "ASPEN RIDGE" NOTE: ALL EXTERIOR SIDING TO BE 100% CEMENTITIOUS SIDING A212B EXTERIOR ELEVATIONS - COLORED JOB NUMBER PA2416 REVISIONS Plageman Architecture SHEET NAME IS S U E D F O R C O N S T R U C T I O N www.plagemanarchitecture.com CO P Y R I G H T 2 0 2 6 - P L A G E M A N A R C H I T E C T U R E - T H E S E D R A W I N G S A R E I N S T R U M E N T S O F S E R V I C E I N T E N D E D F O R T H E U S E O F T H I S P R O J E C T O N L Y - A N Y R E U S E O R R E P R O D U C T I O N F O R A N O T H E R P R O J E C T I S S T R I C T L Y P R O H I B I T E D . 02/27/2026 INITIAL PERMIT SUBMITTAL 5/7/2026 RESUBMITTED PERMIT SUBMITTAL SHEET NUMBER DRAWN BY: (PARCH) Elon, NC 27244 P.O. Box 1623 919-619-5012 CO N S T R U C T I O N D R A W I N G S F O R : FI R E S I D E @ W A U K E E - P H A S E I I A T O W N H O M E C O M M U N I T Y L O C A T E D I N W A U K E E , I O W A 5/26/2026 1 CODE AND OWNER COMMENTS 5/7/2026 2 COLOR VARIATION 5/26/2026 TAG DESCRIPTION EXTERIOR ELEVATION MATERIALS LEGEND ·COLOR 1: HARDIE COLOR "DEEP OCEAN" ·COLOR 2: HARDIE COLOR "ARCTIC WHITE" ·COLOR 3: HARDIE COLOR "PEARL GRAY" SEE WALL SECTIONS FOR ADDITIONAL MATERIAL SPECIFICATIONS. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 24" O.C. - COLOR 1 HARDIE PLANK LAP SIDING: 6" EXPOSURE SELECT SMOOTH - PRIMED, COLOR 1 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 24" O.C. - COLOR 3 HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 48" O.C. - COLOR 3 HARDIE SHAKE SIDING - STRAIT EDGE - CEDARMILL - COLOR 3 HARDIE TRIM PROFILE SURROUND - HARDIE PANEL SIDING - SMOOTH - COLOR 2 - TAMLYN XTREME TRIM AT SEAMS - SEE DETAILS 3 4" X 5 1 2" HARDIE TRIM BOARD - SMOOTH - COLOR 2 HARDIE TRIM BOARD - SMOOTH - COLOR 2 - SEE SECTION DETAILS FOR MORE INFORMATION 30 YEAR ASPHALT ARCHITECTURAL SHINGLES - COLOR: CHARCOAL DURABRAC - 0508 POST & BEAM BRACKET (PVC) - 0508V43 - 60" X 18" X 6" ALUM. RAILING SYSTEM - MATCH LOOK AND COLOR OF PHASE ONE SCHEDULED WINDOW SCHEDULED GARAGE DOOR NOTE: ·ALL EXTERIOR TRIM(INCLUDING WINDOW TRIM), COLUMNS, BRACKETS AND RAILINGS TO BE COLOR 2 - GLOSS ·ALL COLORS IN BODY OF BUILDING TO BE EGGSHELL ·NOT ALL COLORS OR MATERIALS ARE TAGGED IN THESE DRAWINGS. MATERIAL CALL OUTS ARE TYPICAL. COLORS ARE ORGANIZED BY UNIT. INQUIRE IF THERE ARE ANY QUESTIONS ON COLOR PLACEMENT. ·ALL WINDOW INSTALLATIONS SHALL BE PER MANUFACTURER INSTALLATION AND WATERPROOFING. DO NOT VOID WINDOW WARRANTY BY DEVIATING FROM MANUFACTURERS INSTALLATION REQUIREMENTS. ·INSTALL ALL SIDING AND FINISHES WITH MANUFACTURER RECOMMENDED GAPS, FLASHING AND CAULKING. ·KEEP ALL FINISH MATERIALS AWAY FROM FINISHED GRADE PER MANUFACTURERS SPECIFICATIONS ·GC TO CREATE MOCK UP PANEL REPRESENTING ALL COLORS PRIOR OR CONSTRUCTION FOR OWNER APPROVAL WOODTONE - RUSTIC SERIES - HARDIE SHAKE SIDING - STAGGERED EDGE - CEDARMILL - COLOR: ASPEN RIDGE HARDIE PANEL SIDING - CEDARMILL W/ 2.5"W X .75" THICK BATTEN @ 12" O.C. - COLOR 1 EXTERIOR ELEVATION - BUILDING TYPE TWO - FRONT ELEVATION - COLOR SCHEME B SCALE: 1/8" = 1'-0"1 SCALE: 1/8" = 1'-0"2 SCALE: 1/8" = 1'-0"4 SCALE: 1/8" = 1'-0"3 EXTERIOR ELEVATION - BUILDING TYPE TWO - BACK ELEVATION - COLOR SCHEME B EXTERIOR ELEVATION - BUILDING TYPE TWO - SIDE ELEVATION - COLOR SCHEME BEXTERIOR ELEVATION - BUILDING TYPE TWO - SIDE ELEVATION - COLOR SCHEME B 2