Loading...
HomeMy WebLinkAbout2026-07-20 I01H_07 SE LA Grant Pkwy-SE Esker Ridge Dr Traffic Signal_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 20, 2026 AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 1 to Iowa Signal, Inc., for the SE L.A Grant Parkway & SE Esker Ridge Drive Traffic Signal Project, increasing the contract in the amount of $1,400.00 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 adds a Re-route Fiber Conduit item to the original contract. This change is necessary as the proposed location for the mast arm pole in the NW corner of the intersection was in conflict with the Waukee Community School District fiber optic conduit that runs north-south on the west side of SE LA Grant Pkwy. It was not possible to adjust the location of the mast arm pole to avoid the conflict due to insufficient space between the fiber conduit and the storm sewer encased in concrete in that corner. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $1,400.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Lisa Bauman REVIEWED BY:Sara Kappos I1H7 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2025\125.0322.01\construction\ltr_2026-07-08_co-01_lagrant-esker_fibermove.docx July 8, 2026 Rudy Koester, P.E. Public Works Director City of Waukee 805 University Ave Waukee, IA 50263 RE: CHANGE ORDER NO. 1 SE LA GRANT PKWY & SE ESKER RIDGE DR TRAFFIC SIGNAL S&A PROJECT NO.: 125.0322.01 Dear Mr. Koester: Change order #1 adds a “Reroute Fiber Conduit” item to the original contract. This change is necessary because the proposed location for the mast arm pole in the NW corner of the intersection was in conflict with the Waukee Community School District fiber optic conduit that runs north- south on the west side of SE LA Grant Pkwy. It was not possible to adjust the location of the mast arm pole to avoid the conflict due to insufficient space between the fiber conduit and the storm sewer encased in concrete in that corner. Attached is change order #1 for the project. This change order increases the original contract amount of $235,174.21 by $1,400.00. The resulting new contract amount is $236,574.21. We recommend approving this change order to amend the original contract as shown in the attached change order form. Please contact me should you have any questions regarding this partial payment application. Sincerely, SNYDER & ASSOCIATES, INC. Andrew Houchin, P.E. Project Engineer Enclosure OWNER: City of Waukee PROJECT: SE LA Grant Pkwy & SE Esker Ridge Dr PROJECT #: 125.0322.01 To: You are directed to make the following changes in this contract: 1. Description of change to be made: 2. Reason for Change: 3. Settlement for the cost of making the change shall be as follows: Item No. Item Description Quantity Unit Unit Price Total Price 4. Reroute Fiber Conduit 1 LS $1,400.00 $1,400.00 TOTAL $1,400.00 4.This change order will result in a net change in the contract completion time of days and a net change in the cost of the project of $1400.00 divided as follows: Contract Contract Amount Completion Date Approved funds and contract completion date as per (Engineer's Estimate, Contract or last approved C.O.)$235,174.21 August 3, 2026 Change due to this C.O. (+ or -)$1,400.00 Totals including this C.O.:$236,574.21 August 3, 2026 The change described herein is understood, and the terms of settlement are hereby agreed to: Iowa Signal, Inc. CONTRACTOR By DATE: Snyder & Associates, Inc. ENGINEER By DATE: City of Waukee OWNER By DATE: CHANGE ORDER NO. 1 City, State, Zip Iowa Signal, Inc. Contractor 3711 SE Capitol Cir Grimes, IA 50111 Address This change is necessary because the existing storm sewer west of the mast arm pole in the NW corner of the intersection is encased in a large amount of concrete which is in conflict with the proposed location of the mast arm pole. There is not sufficent space for a signal pole footing between the edge of the encased storm sewer and the existing City/Waukee Schools fiber conduit. The fiber conduit will be exposed and shifted east to provide space for the signal footing. Add item "Reroute Fiber Conduit". Item includes excavating existing City/Waukee Schools fiber conduit in NW corner of intersection and shifting it east to provide space for mast arm pole footing. V:\Projects\2025\125.0322.01\Construction\CO-01_2026-06-02_RerouteSchoolFiber.xlsx 6/2/2026