CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: July 20, 2026
AGENDA ITEM:Consideration of approval of a motion approving Change Order No. 1
to Iowa Signal, Inc., for the SE L.A Grant Parkway & SE Esker Ridge
Drive Traffic Signal Project, increasing the contract in the amount of
$1,400.00
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 adds a Re-route Fiber Conduit
item to the original contract. This change is necessary as the proposed location for the mast arm
pole in the NW corner of the intersection was in conflict with the Waukee Community School
District fiber optic conduit that runs north-south on the west side of SE LA Grant Pkwy. It was
not possible to adjust the location of the mast arm pole to avoid the conflict due to insufficient
space between the fiber conduit and the storm sewer encased in concrete in that corner.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order increases the contract price in the amount of $1,400.00.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Change Order No. 1
II. Letter of Recommendation
PREPARED BY:Lisa Bauman
REVIEWED BY:Sara Kappos
I1H7
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM
v:\projects\2025\125.0322.01\construction\ltr_2026-07-08_co-01_lagrant-esker_fibermove.docx
July 8, 2026
Rudy Koester, P.E.
Public Works Director
City of Waukee
805 University Ave
Waukee, IA 50263
RE: CHANGE ORDER NO. 1
SE LA GRANT PKWY & SE ESKER RIDGE DR TRAFFIC SIGNAL
S&A PROJECT NO.: 125.0322.01
Dear Mr. Koester:
Change order #1 adds a “Reroute Fiber Conduit” item to the original contract. This change is
necessary because the proposed location for the mast arm pole in the NW corner of the intersection
was in conflict with the Waukee Community School District fiber optic conduit that runs north-
south on the west side of SE LA Grant Pkwy. It was not possible to adjust the location of the mast
arm pole to avoid the conflict due to insufficient space between the fiber conduit and the storm
sewer encased in concrete in that corner.
Attached is change order #1 for the project. This change order increases the original contract
amount of $235,174.21 by $1,400.00. The resulting new contract amount is $236,574.21. We
recommend approving this change order to amend the original contract as shown in the attached
change order form.
Please contact me should you have any questions regarding this partial payment application.
Sincerely,
SNYDER & ASSOCIATES, INC.
Andrew Houchin, P.E.
Project Engineer
Enclosure
OWNER: City of Waukee PROJECT: SE LA Grant Pkwy & SE Esker Ridge Dr
PROJECT #: 125.0322.01
To:
You are directed to make the following changes in this contract:
1. Description of change to be made:
2. Reason for Change:
3. Settlement for the cost of making the change shall be as follows:
Item No. Item Description Quantity Unit Unit Price Total Price
4. Reroute Fiber Conduit 1 LS $1,400.00 $1,400.00
TOTAL $1,400.00
4.This change order will result in a net change in the contract completion time of days and a net change
in the cost of the project of $1400.00 divided as follows:
Contract Contract
Amount Completion Date
Approved funds and contract completion date as per (Engineer's
Estimate, Contract or last approved C.O.)$235,174.21 August 3, 2026
Change due to this C.O. (+ or -)$1,400.00
Totals including this C.O.:$236,574.21 August 3, 2026
The change described herein is understood, and the terms of settlement are hereby agreed to:
Iowa Signal, Inc.
CONTRACTOR
By DATE:
Snyder & Associates, Inc.
ENGINEER
By DATE:
City of Waukee
OWNER
By DATE:
CHANGE ORDER NO. 1
City, State, Zip
Iowa Signal, Inc.
Contractor
3711 SE Capitol Cir
Grimes, IA 50111
Address
This change is necessary because the existing storm sewer west of the mast arm pole in the NW corner of the intersection is encased in a
large amount of concrete which is in conflict with the proposed location of the mast arm pole. There is not sufficent space for a signal pole
footing between the edge of the encased storm sewer and the existing City/Waukee Schools fiber conduit. The fiber conduit will be
exposed and shifted east to provide space for the signal footing.
Add item "Reroute Fiber Conduit". Item includes excavating existing City/Waukee Schools fiber conduit in NW corner of intersection and
shifting it east to provide space for mast arm pole footing.
V:\Projects\2025\125.0322.01\Construction\CO-01_2026-06-02_RerouteSchoolFiber.xlsx
6/2/2026