Loading...
HomeMy WebLinkAbout2020-08-17-Resolution 2020-305_Accept Public Improvements, Lift Station No 3 Rehabilitation Phase 2-Backup Pump ReplacementRESOLUTION 2020-305 RESOLUTION ACCEPTING THE LIFT STATION NO. 3 REHABILITATION PHASE 2 - BACKUP PUMP REPLACEMENT WHEREAS, on the 161h day of September, 2019, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Synergy Contracting, LLC, of Bondurant, IA, for the construction of certain public improvements generally described as the Lift Station No. 3 Rehabilitation Phase 2 - Backup Pump Replacement; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on August 7, 2020: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $245,868.16, as shown in the report of the Engineer. PASSED AND APPROVED this 17`h day of August, 2020. V � Mayor ATTEST: City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman X R. Charles Bottenberg X Chris Crone X Larry R. Lyon X Ben Sinclair X