Loading...
HomeMy WebLinkAbout2020-11-16-Resolution 2020-446_Accept Public Improvements, Wastewater Treatment Facility DemolitionRESOLUTION 2020-446 RESOLUTION ACCEPTING THE WASTEWATER TREATMENT FACILITY DEMOLITION WHEREAS, on the 16th day of September, 2019, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Wenthold Excavating of Cambridge, IA, for the construction of certain public improvements generally described as the Wastewater Treatment Facility Demolition; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on November 11, 2020: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $956,686.80, as shown in the report of the Engineer. PASSED AND APPROVED this 16th day of November, 2020. ATTEST: �)� �- City Clerk RESULTS OF VOTE: AYE Anna Bergman X R. Charles Bottenberg X Chris Crone X Larry R. Lyon X Ben Sinclair X Mayor NAY ABSENT ABSTAIN