Loading...
HomeMy WebLinkAbout2003-06-16-Resolutions 03-141_Wastewater Treatment Facility - Engineer AgrTHE CITY OF WAUKEE,IOWA RESOLUTION 03-141 APPROVING AN AGREEMENT WITH VEENSTRA &KIMM,INC.FOR ENGINEERING SERVICES FOR WASTEWATER TREATMENT FACILITY IMPROVEMENTS IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE,IOWA WHEREAS,funds in the amount of$84,350.00 still remain in the Clean Water State Revolving Fund Proj ect No.CS 19211501,Waukee Wastewater Treatment Facility;AND, WHEREAS,Iowa Department of Natural Resources has approved the utilization of these funds for the improvements as listed: Increase capacity of reed bed filtrate pump by replacing pump with larger capacity pump; Modify outlet of reed bed filtrate pump outlet to eliminate short-circuiting; Increase the capacity of diffused aeration system by the addition of ninety new diffusers; Addition of two new 40 HP blowers to increase aeration capacity; Modifications to electrical and control systems to accommodate new blowers; Preparation of an operation and maintenance manual for the existing facilities (not to exceed $5,000);AND, $4,000 $5,000 $20,000 $25,000 $9,000 $5,000 WHEREAS,the City entered into an agreement with Veenstra &Kimm,Inc.to prepare plans and specifications and the necessary construction services for the improvements to the waste water treatment facility;AND, WHEREAS,city staff desires to retain Veenstra &Kimm,Inc.to provide the necessary engineering services for the design and construction of the additional improvements and the preparation of an operation and maintenance manual for a total cost not to exceed $10,000 without written agreement with the City of Waukee. NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council in session this 16th day of June 2003 that it hereby approves an agreement with Veenstra &Kimm,Inc.for engineering services for Wastewater Treatment Facility Improvements. Attest: ROLL CALL VOTE Nicholas C.Gruber Donald L.Bailey,II. Mike Watts Bill Peard Darlene Stanton AYE X X X X X NAY ABSENT I )